| More |
Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
CIVIL ENGINEERS
|
Professional coastal engineering services which may include initial design schematics, preparation o...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Professional coastal engineering services which may include initial design schematics, preparation of budgets, infrastructure design, surveys, elevations, soil reports, inspections, take-offs, estimating, design development, construction documents, bidding assistance, construction supervision and payment certification. Deliverables established on a Task Assignment basis. |
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverables reviewed to ensure work satisfactorily completed in accordance with specifications in contract and task assignment. |
| Financial Consequences: No payment for unsatisfactory services. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task Assignment No. 1 - Attendance at Mediation Meeting relating to the construction of the Munyon I...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task Assignment No. 1 - Attendance at Mediation Meeting relating to the construction of the Munyon Island Small Boat Docking Facility. |
| Deliverable Price: $1,728.00 |
| Non Price Justification: |
| Performance Metrics: Services reviewed to ensure satisfactorily completed in accordance with specifications in the Task Assignment. |
| Financial Consequences: No payment for unsatisfactory services. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment No. 1 |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 2: Complete Corp Application package to include Eng Form 4345 as well as permit sketches, previ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 2: Complete Corp Application package to include Eng Form 4345 as well as permit sketches, previous environmental resource surveys, and previous NWP-3 verification letter, provided by DEP $1,885; Response to one (1) comprehensive RAI from the Corps and receipt of Corps NWP-3 Verification $4,827; Meeting Minutes from up to two (2) meetings in support of securing the NWP-3 Verification $2,250. |
| Deliverable Price: $8,905.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
TA3: Data Collection Summary $2,316.38; Provide a summary of the site visit with photographs and sur...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA3: Data Collection Summary $2,316.38; Provide a summary of the site visit with photographs and survey drawings showing the shoreline elevations $2,578.27; Preliminary and Final Coastal Engineering Report as indicated in Task 3, with electronic copies for BNCR $7,352.15. |
| Deliverable Price: $12,246.80 |
| Non Price Justification: |
| Performance Metrics: The deliverables shall be reviewed by Department staff to ensure the Data Collection Summary and Coastal Engineering Reports are complete and contain field observation summaries, site assessments and sketches, suitable aerial photographs, GIS data, Opinion of Probable Coast and other Data required for Tasks 1, 2, & 3. Site visit shall be verified with Park staff and shall ensure Site Visit Summary contains the necessary Survey Data with shoreline elevations and survey drawings. Documents shall be provided electronically in MS Word, AutoCAD, and image .pdf, .jpg, .tif, etc. formats where applicable |
| Financial Consequences: No payment shall be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory; the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, at its sole discretion, terminate the Contract for failure to perform. |
| Source Documentation Page Reference: TA3 |
| Deliverable Number: |
|
|
|
|
Civil engineering
|
Task 4: (1a) Complete Corps Application package to include Eng Form 4345, as well as permit sketches...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 4: (1a) Complete Corps Application package to include Eng Form 4345, as well as permit sketches, previous environmental resource surveys, and previous NWP-3 verification letter, provided by Department $1,844.98. (1b) Response to one (1) comprehensive RAI from the Corps and receipt of Corps Individual Permit $7,822.28. (2) Meeting Minutes from two (2) meetings in support of securing an Individual Permit $3,445.52. |
| Deliverable Price: $13,112.78 |
| Non Price Justification: |
| Performance Metrics: (a) The deliverables shall be reviewed by Department staff to ensure they are complete and meet the requirements described in Task 1a. Documents shall be provided electronically in MS Word, AutoCAD, and image .pdf, .jpg, .tif, etc. formats where applicable. The Department shall sign the application form and return the signed application form to Coastal System for submittal. (b) The deliverables shall be reviewed by Department staff to ensure they are complete and meet the requirements described in Task 1b. Documents shall be provided electronically in MS Word, AutoCAD, and image .pdf, .jpg, .tif, etc. formats where applicable. (2) The deliverables shall be reviewed by Department staff to ensure they are complete and meet the requirements described in Task 2. Documents shall be provided electronically in MS Word, AutoCAD, and image .pdf, .jpg, .tif, etc. formats where applicable. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, at its sole discretion, terminate the Contract for failure to perform. |
| Source Documentation Page Reference: Scope of work |
| Deliverable Number: |
|