Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
CIVIL ENGINEERS
|
Professional coastal engineering services which may include initial design schematics, preparation o...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Professional coastal engineering services which may include initial design schematics, preparation of budgets, infrastructure design, surveys, elevations, soil reports, inspections, take-offs, estimating, design development, construction documents, bidding assistance, construction supervision and payment certification. Deliverables established on a Task Assignment basis. |
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverables reviewed to ensure work satisfactorily completed in accordance with specifications in contract and task assignment. |
| Financial Consequences: No payment for unsatisfactory services. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 1: Task 1-Perform Topographic Survey-2 signed and sealed hardcopies of the ACAD files, and elec...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Task 1-Perform Topographic Survey-2 signed and sealed hardcopies of the ACAD files, and electronic copies in either MS Word or Adobe Acrobat.pdf file format $6,308; Task 2-Assessment of Site Conditions- Report Memorandum including photos, maps, and diagrams. Recommendations for design alternates based on the conclusion of data research, site visit, and meetings with SJRWMD, USACE, and DEP Staff. Report show results of SAV survey revealing species inventories and historical/biological resources, indicate possible sites for environmentally appropriate construction access points, and recommendation for permitting strategy $5,700. |
| Deliverable Price: $12,008.00 |
| Non Price Justification: |
| Performance Metrics: Deliverable reviewed to ensure reports complete, all information requests have been addressed, all shop drawings and product submittals have been approved and site observations were timely completed. |
| Financial Consequences: Consultant will not be paid for services not performed satisfactorily. Task Assignment will be terminated if the consultant fails to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Civil engineering
|
Task 2: 3a. Conceptual Design letter report to include: probable construction cost estimates, an ana...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 2: 3a. Conceptual Design letter report to include: probable construction cost estimates, an analysis of at least two different design alternatives, discusion of permit feasibility and permitting requirements, and a synopsis of conference conclusions on the most likely design alternatives $8,151; 3b. Provide sketches and Preliminary Design Drawings suitable for permitting $13, 158; 3c. Final Design Drawings and Technical Specifications $6,172; 4a. Prepare and submit a Permit Application Package in Department, Volusia County and City of Ormond Beach formats where applicable with two additional electronic pdf and/or MS Work copies $3,113; 4b. Complete RAI responses ready for submission in Department format and 3 hard copies with an electronic copy in MS Work, AutoCAD and image pdf, jpg, tic, etc formats $14,589 (two payment of $7,294.50 each shall be authorized upon issuance of the SJRWMD permit and completion of Task 4B). CO1 - increased funding added application fee $1,190. CO2 - corrected payment language of Task 4B. |
| Deliverable Price: $46,373.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables shall be reviewed by Department staff to ensure they are complete and meet the requirements. Documents shall be provided electronically. Consultant will not be paid for services not performed satisfactorily. Task Assignment will be terminated if the consultant fails to perform.
|
| Financial Consequences: No payment will be made for deliverables deemed unsatisfactory by the Department. In the event that a deliverable is deemed unsatisfactory by the Department, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe the Department may, in it sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: TA2CO2 |
| Deliverable Number: |
|
|
|
T3 - 1a
|
Professional engineering services
|
Task 3, del 1a: Bidding - Summary of the questions answered by CT-GEC during the bidding phase; a di...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3, del 1a: Bidding - Summary of the questions answered by CT-GEC during the bidding phase; a digital copy of the answers will be emailed to the DEPARTMENT..
|
| Deliverable Price: $3,065.54 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the DEPARTMENT to confirm they are complete, accurate, and timely.
|
| Financial Consequences: "No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of
a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a
satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform."
|
| Source Documentation Page Reference: page 5 |
| Deliverable Number: T3 - 1a |
|
|
|
T3 - 1b
|
Professional engineering services
|
Task 3, del 1b: Construction Phase Services - Part 1 - One Construction Progress Report; a digital c...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3, del 1b: Construction Phase Services - Part 1 - One Construction Progress Report; a digital copy of the Progress Report will be emailed to the DEPARTMENT.
|
| Deliverable Price: $9,085.35 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the DEPARTMENT to confirm they are complete, accurate, and timely.
|
| Financial Consequences: "No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of
a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a
satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform."
|
| Source Documentation Page Reference: page 4-5 |
| Deliverable Number: T3 - 1b |
|
|
|
T3 - 1c
|
Professional engineering services
|
Task 3, del 1c: Construction Phase Services - Part 2 - One Construction Progress Report; a digital c...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3, del 1c: Construction Phase Services - Part 2 - One Construction Progress Report; a digital copy of the Progress Report will be emailed to the DEPARTMENT.
|
| Deliverable Price: $6,762.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the DEPARTMENT to confirm they are complete, accurate, and timely.
|
| Financial Consequences: "No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of
a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a
satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform."
|
| Source Documentation Page Reference: page 4-5 |
| Deliverable Number: T3 - 1c |
|