Contract Information

 

Summary

Agency Name: DEPARTMENT OF ENVIRONMENTAL PROTECTION

Agency Contract ID: CN202

Long Title: Statewide - Michael Baker Jr., Inc.

Vendor Name: MICHAEL BAKER INTERNATIONAL INC

Total Contract Amount: $2,429,656.64

Total Budgetary Amount: $2,429,656.64

Total Payment To Date: $2,143,373.20

Date of Execution: 02/25/2015

General Description: Statewide Continuing Services Contract

Main Information

Agency Contract ID: CN202

FLAIR Contract ID: CN202

Short Title: CN202

Long Title: Statewide - Michael Baker Jr., Inc.

Contract Type: Master Agreement

Contract Status: Active

Date of Execution: 02/25/2015

Date of Beginning: 02/25/2015

Original End Date: 02/24/2020

New Ending Date: 02/25/2025

Agency Service Area: DRP

Statutory Authority: 255, F.S.

Contract Involves State or Federal Financial Assistance: No

Recipient Type:

Provide for Administrative Cost: No

Provide for Periodic Increase: No

Procurement Information

Authorized Advanced Payment: No

Method of Procurement: Consultant's Competitive Negotiation Act [s. 287.055, F.S.]

State Term Contract ID:

Contract’s Exemption Justification:

Agency Reference Number: RFSOQBDC01-13/14

Business Case Study Done: No

Legal Challenges to Procurement: No

Outsourcing / Capital Improvements

Was the Contracted Function Previously Performed by the State: No

Was the Contracted Function Considered for Insourcing back to the State: No

Did the Vendor Make Capital Improvements on State Property: No

Budget Information

Original Contract Amount: $0.00

Total Contract Amount: $2,429,656.64

Total Recurring Budgetary Amount: $0.00

Total Non-Recurring Budgetary Amount: $2,429,656.64

Total Budgetary Amount: $2,429,656.64

Total Unfunded Amount: $0.00

As of Date: 1/7/2025

Recurring Budgetary Amount Account Code Fiscal Year Effective Date FY Cost Accumulator Agency Amendment Reference
$0.00 37-20-2-675005-37500300-00-100718-00 07/01/2024 2024-2025
$0.00 37-10-1-000286-37150700-00-100777-00 07/01/2017 2017-2018
$0.00 37-10-1-000286-37100500-00-100777-00 07/01/2017 2017-2018


Non-Recurring Budgetary Amount Account Code Fiscal Year Effective Date FY Cost Accumulator Agency Amendment Reference
$16,887.92 37-20-2-675005-37500300-00-100718-00 01/07/2025 2024-2025 T45CO5
$8,323.51 37-20-2-675005-37500300-00-100718-00 07/01/2024 2024-2025 T45CO4
$34,769.84 37-20-2-423001-37500300-00-080039-23 07/01/2022 2022-2023 U3200 T44CO2
$10,911.53 37-20-2-423001-37500300-00-080039-23 07/01/2022 2022-2023 U3200 T33CO3
$20,912.84 37-20-2-423001-37500300-00-080039-23 07/01/2022 2022-2023 U3200 T43CO1
$39,705.27 37-20-2-423001-37500300-00-080039-23 07/01/2022 2022-2023 U3200 T44CO1
$99,632.40 37-20-2-423001-37500300-00-080039-23 07/01/2022 2022-2023 U3200 T44
$76,547.04 37-20-2-423001-37500300-00-080039-23 07/01/2022 2022-2023 T43
$99,747.21 37-20-2-423001-37500300-00-080039-22 07/01/2022 2022-2023 T40
$23,406.98 37-20-2-423001-37500400-00-080039-22 07/01/2021 2021-2022 U3200 T45CO3
$5,823.71 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 U3200 T33CO3
$17,714.60 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 U3200 T45CO2
$37,642.05 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 U3200 T47
$3,880.61 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 U3200 T46
$19,131.95 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 U3200 T45CO1
$17,244.09 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 U3200 T45
$5,860.16 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 U3200 T36CO2
$11,722.60 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 U3200 T42
$12,929.28 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 U3100 T41
($5,798.52) 37-20-2-423001-37500300-00-080039-21 07/01/2021 2021-2022 U3200 T38CO1
$49,573.69 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 U3200 T36CO1
$4,415.14 37-20-2-408001-37500300-00-080039-20 07/01/2021 2021-2022 U3200 T39
$1,755.44 37-20-2-423001-37500300-00-080039-21 07/01/2021 2021-2022 U3200 T32CO3
$53,508.45 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 U3200 T37
$94,176.29 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 T33CO1
$46,673.59 37-20-2-423001-37500300-00-080039-21 07/01/2021 2021-2022 U3200 T32CO1
$10,148.02 37-20-2-423001-37500300-00-080039-21 07/01/2020 2020-2021 U3200 T33CO3
$3.59 37-20-2-423001-37500300-00-080039-21 07/01/2020 2020-2021 U3200 T46
$39,280.90 37-20-2-423001-37500300-00-080039-21 07/01/2020 2020-2021 U3200 T38
$79,703.96 37-20-2-423001-37500300-00-080039-21 07/01/2020 2020-2021 T33CO1
$15,058.20 37-20-2-423001-37500300-00-080039-22 07/01/2020 2020-2021 U3200 T36
$8,911.89 37-20-2-675002-37500300-00-080039-21 07/01/2020 2020-2021 U3200 T31CO1
$11,807.92 37-20-2-675002-37500300-00-080039-21 07/01/2020 2020-2021 U3200 T35
$10,148.02 37-20-2-423001-37500300-00-080039-21 07/01/2020 2020-2021 T33
$7,156.16 37-20-2-675002-37500300-00-080039-19 07/01/2020 2020-2021 T34
$18,308.40 37-20-2-423001-37500300-00-080039-21 07/01/2020 2020-2021 U3200 T32
$3,040.01 37-20-2-675002-37500300-00-088130-19 07/01/2020 2020-2021 U3200 T30CO1
$61,440.31 37-20-2-675002-37500300-00-080039-21 07/01/2020 2020-2021 U3200 T31
$11,261.18 37-20-2-675002-37500300-00-080039-19 07/01/2019 2019-2020 U3200 T32CO2
$5,599.24 37-20-2-675002-37500300-00-080039-19 07/01/2019 2019-2020 TA34 CO2
$48,028.12 37-20-2-675002-37500300-00-080039-19 07/01/2019 2019-2020 U3200 T34CO1
$0.00 37-20-2-526001-37500300-00-088040-20 07/01/2019 2019-2020
$45,490.78 37-20-2-408001-37500300-00-080039-20 07/01/2019 2019-2020 T30
$12,788.49 37-10-1-000286-37500300-00-080039-20 07/01/2019 2019-2020 U3200 T28CO1
$14,944.65 37-10-1-000286-37500300-00-080039-20 07/01/2019 2019-2020 T28
$23,164.53 37-20-2-423001-37100400-00-030000-00 07/01/2019 2019-2020 T27
$34,998.73 37-20-2-675002-37500300-00-080039-19 07/01/2018 2018-2019 U3200 T29
$14,118.40 37-20-2-675002-37500300-00-088130-18 07/01/2018 2018-2019 T23
$5,291.36 37-20-2-675002-37500300-00-088130-19 07/01/2018 2018-2019 U3200 T26
$14,850.08 37-20-2-675002-37500300-00-088130-19 07/01/2018 2018-2019 T25
$26,678.10 37-20-2-675002-37500300-00-080039-19 07/01/2018 2018-2019 U3200 T13CO2
$90.00 37-20-2-423001-37500300-00-080039-17 07/01/2018 2018-2019 U3200 T13CO2
$60,478.95 37-20-2-675002-37500300-00-080039-19 07/01/2018 2018-2019 T24
$7,625.16 37-20-2-675002-37500300-00-080039-18 07/01/2017 2017-2018 T17CO1
$0.00 37-20-2-408001-37500300-00-088040-18 07/01/2017 2017-2018
$13,353.36 37-20-2-675002-37500300-00-080039-18 07/01/2017 2017-2018 TA21
$0.00 37-10-1-000286-37500300-00-088130-17 07/01/2016 2016-2017
$5,698.21 37-10-1-000286-37500300-00-131500-17 07/01/2016 2016-2017 T19
$8,692.87 37-20-2-423001-37500300-00-080039-17 07/01/2016 2016-2017 TA22
$1,944.54 37-20-2-423001-37500300-00-080039-17 07/01/2016 2016-2017 U3200 T18
$8,937.54 37-20-2-423001-37500300-00-080039-17 07/01/2016 2016-2017 u3200 T12
$52,920.67 37-20-2-423001-37500300-00-080039-17 07/01/2016 2016-2017 T14
$21,368.07 37-20-2-423001-37500300-00-080039-17 07/01/2016 2016-2017 T15
$29,240.42 37-20-2-423001-37500300-00-080039-17 07/01/2016 2016-2017 T13
$3,921.72 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 TA17CO2
$85,276.96 37-20-2-423001-37500300-00-088130-16 07/01/2015 2015-2016 131500 T20
$7,625.16 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 131500 T17
($969.32) 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 T6CO4
$25,856.82 37-20-2-423001-37500300-00-088130-16 07/01/2015 2015-2016 T14CO1
$0.00 37-20-2-261019-37500300-00-088137-16 07/01/2015 2015-2016
$48,599.00 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 T13
$4,479.36 37-20-2-423001-37500300-00-088130-16 07/01/2015 2015-2016 T5CO1
$17,320.90 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 T8CO1
$9,529.22 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 T6CO2
$52,234.91 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 T11
$72,432.89 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 T1CO1
$16,419.98 37-20-2-342300-37500300-00-080039-16 07/01/2015 2015-2016 TA6
$8,090.28 37-20-2-261019-37300100-00-100628-00 07/01/2015 2015-2016 T9
$14,990.92 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 T2CO2
$17,463.37 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 TA7
$26,607.28 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016
$6,000.00 37-20-2-261019-37500300-00-088137-15 07/01/2014 2014-2015 T10CO1
$6,063.56 37-20-2-423001-37500300-00-088130-15 07/01/2014 2014-2015 T14CO1
$21,438.79 37-20-2-131001-37500300-00-080039-15 07/01/2014 2014-2015 T8CO2
$0.00 37-20-2-261019-37500300-00-088137-15 07/01/2014 2014-2015
$3,282.18 37-20-2-423001-37500300-00-080039-15 07/01/2014 2014-2015 U3200 T6CO1
$238.45 37-20-2-131001-37500300-00-080039-15 07/01/2014 2014-2015 T1CO1
$9,290.35 37-20-2-423001-37500300-00-080039-16 07/01/2014 2014-2015 T8
$195,501.08 37-20-2-423001-37500300-00-088130-16 07/01/2014 2014-2015 T5
$49,761.55 37-20-2-131001-37500300-00-080039-15 07/01/2014 2014-2015 TA1
$0.00 05/13/2015 2014-2015
$0.00 37-20-2-423001-37500300-00-088130-14 07/01/2013 2013-2014
$48,900.80 37-20-2-131001-37500300-00-080039-15 07/01/2013 2013-2014 T8
$9,681.00 37-20-2-423001-37500300-00-088130-15 07/01/2013 2013-2014 T3
$55,000.00 37-20-2-131001-37500300-00-080039-14 07/01/2013 2013-2014 TA1
$0.00 37-20-2-423001-37500300-00-088130-13 07/01/2012 2012-2013
$11,652.60 37-20-2-261019-37500300-00-088137-13 07/01/2012 2012-2013 T10
$40,018.33 37-20-2-423001-37500300-00-081158-12 07/01/2011 2011-2012 U3200 T16
$23,280.00 37-20-2-423001-37500300-00-080158-12 07/01/2011 2011-2012 T4

Contract Change

Change Type Amendment Amount Agency Amendment Reference Change Description Amendment Effective Date Amendment Execution Date New Ending Date
Amendment $0.00 CMC5 Contract Manager Change 01/12/2026 01/12/2026
Amendment $0.00 CMC4 Contract Manager Change 07/22/2025 07/22/2025
Amendment $16,887.92 T45CO5 Additional Services 12/17/2024 12/17/2024
Amendment $8,323.51 T45CO4 Additional Services 09/04/2024 09/04/2024
Amendment $0.00 T43CO2 Time Extension 05/06/2024 05/06/2024
Amendment $34,769.84 T44CO2 Additional services 04/23/2024 04/23/2024 02/25/2025
Amendment $23,406.98 T45CO3 Additional Services 04/09/2024 04/09/2024
Amendment $26,883.26 T33CO3 Additional Services 02/14/2024 02/14/2024 02/24/2025
Amendment $17,714.60 T45CO2 Additional Services and Time Extension 02/09/2024 02/09/2024 02/25/2025
Amendment $20,912.84 T43CO1 Additional Services 01/31/2024 01/31/2024
Amendment $37,642.05 T47 Additional Services 11/02/2023 11/02/2023
Amendment $39,705.27 T44CO1 Additional Services 10/17/2023 10/17/2023
Amendment $3,884.20 T46 Extension of time 09/27/2023 09/27/2023
Amendment $19,131.95 T45CO1 Additional Services 09/08/2023 09/08/2023
Amendment $0.00 T33CO2 Task time Extension 06/22/2023 06/22/2023
Amendment $17,244.09 T45 Additional Services 05/22/2023 05/22/2023
Amendment $0.00 T38CO2 Time Extension 03/28/2023 03/28/2023
Amendment $99,632.40 T44 Additional Services 03/08/2023 03/08/2023
Amendment $5,860.16 T36CO2 Additional Services 02/21/2023 02/21/2023
Amendment $76,547.04 T43 Additional services 12/21/2022 12/21/2022
Amendment $0.00 T32CO5 Time extension 12/05/2022 12/05/2022
Amendment $0.00 T34CO4 Time Extension 12/05/2022 12/05/2022 06/30/2023
Amendment $11,722.60 T42 Additional Services 11/21/2022 11/21/2022
Amendment $12,929.28 T41 Additional services 10/18/2022 10/18/2022
Amendment $0.00 T34CO3 Task time Extension 06/23/2022 06/23/2022
Amendment $0.00 T32CO4 Extension of time only 06/13/2022 06/13/2022 12/31/2022
Amendment $99,747.21 T40 Additional Services 05/18/2022 05/18/2022
Amendment ($5,798.52) T38CO1 Removed scope of work 04/15/2022 04/15/2022
Amendment $49,573.69 T36CO1 add development of storm water runoff control Doc. 03/04/2022 03/04/2022
Amendment $4,415.14 T39 New Task Assignment 02/22/2022 02/22/2022
Amendment $1,755.44 T32CO3 asbestos and lead based paint testing for roofing materials 01/21/2022 01/21/2022
Amendment $53,508.45 T37 Adding Task 11/15/2021 11/15/2021
Amendment $39,280.90 T38 Design and permit 11/15/2021 11/15/2021
Amendment $15,058.20 T36 Adding Task 10/14/2021 10/14/2021
Amendment $173,880.25 T33CO1 Design and Permitting Services 10/05/2021 10/05/2021 06/30/2023
Amendment $11,261.18 T32CO2 Inspections for country standards on new plumbing/electrical 07/29/2021 07/29/2021
Amendment $0.00 TA28 CO3 Time extension of 6 months 06/15/2021 06/15/2021 12/31/2021
Amendment $5,599.24 TA34 CO2 Additional generator capacity and enclosed platform 05/19/2021 05/19/2021
Amendment $0.00 CMC3 Contract Manager Change 05/06/2021 05/06/2021
Amendment $46,673.59 T32CO1 more buildings being worked on, more permitting and plans 04/05/2021 04/05/2021
Amendment $48,028.12 T34CO1 design and permit upgraded electrical system 03/29/2021 03/29/2021
Amendment $0.00 T30CO2 Task time extension only 02/22/2021 02/22/2021
Amendment $8,911.89 T31CO1 Documetns are to be revised by consultant to meet new codes 02/05/2021 02/05/2021
Amendment $11,807.92 T35 Consultant to inspect system and recommend improvements 12/22/2020 12/22/2020
Amendment $7,156.16 T34 Provide field inspection, electrical analysis & report 12/08/2020 12/08/2020
Amendment $10,148.02 T33 Provide designs for 3 conceptual site plans and utilities 12/08/2020 12/08/2020
Amendment $18,308.40 T32 electrical and Plumbing Inspection for 8 buildings 11/12/2020 11/12/2020
Amendment $3,040.01 T30CO1 Permitting Services 09/23/2020 09/23/2020
Amendment $61,440.31 T31 Construction administration tasks. 09/14/2020 09/14/2020
Amendment $0.00 CMC2 Contract Manager Change 07/15/2020 07/15/2020
Amendment $0.00 T20CO5 No-cost time extension 06/17/2020 06/17/2020
Amendment $45,490.78 T30 Professional Engineering Services 04/02/2020 04/02/2020
Renewal $0.00 A1 Renewal Amednment 02/26/2020 02/26/2020 02/25/2025
Amendment $12,788.49 T28CO1 Adds design and permitting services 02/13/2020 02/13/2020
Amendment $34,998.73 T29 Design & Permitting Services 01/21/2020 01/21/2020
Amendment $0.00 T20CO4 No-cost time extension 11/25/2019 11/25/2019
Amendment $14,944.65 T28 Inspection services 10/15/2019 10/15/2019
Amendment $23,164.53 T27 Design and permitting services 08/28/2019 08/28/2019
Amendment $0.00 CMC1 Department Contract Manager Change 04/30/2019 04/30/2019
Amendment $14,850.08 T25 Bridge Inspection Services 04/04/2019 04/04/2019
Amendment $5,291.36 T26 Visual Assessment 04/03/2019 04/03/2019
Amendment $26,768.78 T13CO2 Construction Administration Services 03/05/2019 03/05/2019
Amendment $0.00 T20CO2 No Cost Time Extension 12/28/2018 12/28/2018
Amendment $60,478.95 T24 Construction Administration services 08/06/2018 08/06/2018
Amendment $0.00 TA20CO1 Change in Task Time 07/01/2018 06/29/2018
Amendment $14,118.40 T23 This new task is to provide construction administration serv 06/21/2018 06/21/2018 12/26/2019
Amendment $0.00 ASA Agency Service Area change 07/01/2018 05/21/2018
Amendment $0.00 T8CO6 Time Extension 04/25/2018 04/25/2018 05/30/2018
Amendment $0.00 T13CO1 Time Extension 04/11/2018 04/11/2018
Amendment $3,921.04 TA17CO2 Funding Increase 03/13/2018 03/13/2018
Amendment $7,625.16 T17CO1 Silver Springs State Park 02/19/2018 02/19/2018
Amendment $0.00 CO5 ENTERED IN ERROR 12/19/2017 12/19/2017 04/30/2018
Amendment $0.00 TA8CO5 TIME EXTENSION 12/19/2017 12/19/2017 04/30/2018
Amendment $0.00 TA14CO3 Time Extension 12/12/2017 12/12/2017 03/21/2018
Amendment $8,692.87 TA22 Professional Services aAsbestos and Lead-Based Paint Testing 11/28/2017 11/28/2017
Amendment $5,698.21 T19 Design services above water under water inspection 11/07/2017 11/07/2017
Amendment $85,276.96 T20 Proj. NO: 60976C- "Provide permitting and 11/07/2017 11/07/2017 06/30/2018
Amendment $13,353.36 TA21 Ft Clinch State Park 11/01/2017 11/01/2017
Amendment $1,944.54 T18 Structures Inspections 10/11/2017 10/11/2017
Amendment $0.00 T8CO4 Change order to add time to allow permitting activities 09/13/2017 09/13/2017 12/29/2017
Amendment $6,000.00 T10CO1 Additional construction administration including submittal r 09/07/2017 09/07/2017 12/31/2018
Amendment $0.00 T14CO2 An additional 90-days of project time is requested to comple 09/07/2017 09/07/2017 12/21/2017
Amendment $7,625.16 T17 Proj. NO: 61178-"This TA is for the inspection, materials 08/31/2017 08/31/2017 12/31/2018
Amendment $0.00 T6CO5 Sebastian Inlet State Park 05/25/2017 05/25/2017
Amendment $0.00 T8CO3 ADDITIONAL TIME 05/24/2017 05/24/2017 09/30/2017
Amendment $31,920.38 T14CO1 add 2 ADA elevated timber observation decks Add Task Time 04/28/2017 04/28/2017 09/22/2017
Amendment $40,018.33 T16 FKOHT 04/24/2017 04/24/2017
Amendment ($145.00) TA12CO1 DECREASE FUNDING 04/11/2017 04/11/2017
Amendment ($969.32) T6CO4 Sebastian Inlet State Park 03/24/2017 03/24/2017
Amendment $9,082.54 T12 LIMITED SURVEY, ADA DESIGN FOR CAMPSITE #27 03/08/2017 03/08/2017
Amendment $0.00 T5CO2 INCREASE TASK TIME 02/27/2017 02/27/2017 09/01/2017
Amendment $21,368.07 T15 Fort Clinch State Park 02/22/2017 02/22/2017
Amendment $0.00 TA6CO3 Sebastian Inlet State Park 12/19/2016 12/19/2016
Amendment $21,438.79 T8CO2 Increases funding amount. 12/16/2016 12/16/2016
Amendment $52,920.67 T14 Falling Waters 11/01/2016 11/01/2016
Amendment $77,839.42 T13 Oscar Scherer State Park 10/07/2016 10/07/2016
Amendment $4,479.36 T5CO1 Increase task amount; additional task time 10/04/2016 10/04/2016
Amendment $17,320.90 T8CO1 Increase task amount 06/30/2016 06/30/2016
Amendment $9,529.22 T6CO2 Increase task amount 06/30/2016 06/30/2016
Amendment $11,652.60 T10 FKOHT - Old Spanish Harbor Bridge 06/30/2016 06/30/2016
Amendment $52,234.91 T11 Fort Clinch State Park 06/17/2016 06/17/2016
Amendment $72,671.34 T1CO1 Increase Task Amount; Additional Task Time 06/14/2016 06/14/2016
Amendment $0.00 HW06BCO2 Entered in error 06/14/2016 06/14/2016
Amendment $3,282.18 T6CO1 Increase task amount 05/23/2016 05/23/2016
Amendment $8,090.28 T9 Florida Geological Survey 02/03/2016 02/03/2016
Amendment $58,191.15 T8 Hillsborough River State Park 01/05/2016 01/05/2016
Amendment $14,990.92 T2CO2 Increase Task Amount 12/22/2015 12/22/2015
Amendment $16,419.98 TA6 Sebastian Inlet State Park 12/14/2015 12/14/2015
Amendment $17,463.37 TA7 Sebastian Inlet State Park 12/14/2015 12/14/2015
Amendment $195,501.08 T5 River Rise Preserve State Park 12/07/2015 12/07/2015
Amendment $9,681.00 T3 Silver Springs State PArk 11/18/2015 11/18/2015
Amendment $23,280.00 T4 7 Mile & Bahia Honda Bridge 11/04/2015 11/04/2015
Amendment $0.00 T2CO1 Task 2 time extension 09/17/2015 09/17/2015
Amendment $26,607.28 TA2 Inspect and assess bridge condition 07/16/2015 07/16/2015
Amendment $104,761.55 TA1 Construction documents for the replacement boathouse. 06/16/2015 06/16/2015

Vendor

Name Line 1Name Line 2City State ZipMinority Vendor Designation
MICHAEL BAKER INTERNATIONAL INCMICHAEL BAKER INTERNATIONAL, IN TALLAHASSEE FL 323090000 Non-Minority

CFDA

No CFDA Codes found for the contract.

CSFA

No CSFA Codes found for the contract.
More Deliverable Number      Commodity/Service Type Major Deliverable Method of Payment
     
Professional engineering services Task 18- Inspection and Findings Memo: A brief memo summarizing the condition of each structure at t... Fixed Price - Lump Sum
     
Professional engineering services Task 40: Subtask 1: Partial Bridge and Abutment Survey. Perform survey for the abutment and bridge r... Fixed Price - Lump Sum
     
Professional engineering services Task 40: Subtask 5: Hydraulics and Scour Analysis. 1)preparing a simplified river model to estimat... Fixed Price - Lump Sum
     
Professional engineering services Task 8 Subtask 1B: Final Plans - Printed Hard Copies: Final Plans, signed and sealed (3 Copies), Spe... Fixed Price - Lump Sum
     
Professional engineering services Task 8 Subtask 2B: Application Approval - A copy of the approved permit application and documentatio... Fixed Price - Lump Sum
     
Professional engineering services Task 8 Subtask 4: Copies of Field notes (PDF Format) Fixed Price Cost: Michael Baker Int., Senior E... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 8-5A: Copies of field notes and electronic data raw files from field survey. Fixed Price - Lump Sum
     
Professional engineering services Task 8-5B: Data processing - three (3) signed/sealed sets of the updated and revised survey and one ... Fixed Price - Lump Sum
     
Professional engineering services T5-4: Upon completion of the geotechnical study three (3) copies of the report, signed and sealed by... Fixed Price - Lump Sum
     
Professional engineering services TASK 12-1: Three (3) signed/sealed sets of the updated and revised survey; One (1) compact disc with... Fixed Price - Lump Sum
     
Professional engineering services TASK 12-2: Engineer's Estimate of Cost (PDF); (3) Hard Copy Sets of plans (11x17); Final PDF Plans a... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services TASK 12-3: Engineer's Estimate of Cost; (3) Hard Copy Sets of plans (11x17); Final PDF Plans and Cad... Fixed Price - Lump Sum
     
Professional engineering services TASK 21 - Subtask 1: An Electronic .pdf of handwritten field notes will be provided to the BDC Proje... Fixed Price - Lump Sum
     
Professional engineering services TASK 1-5: BAKER will provide a total of four (4) printed copies and an emailed PDF, as well as elect... Fixed Price - Lump Sum
     
Professional engineering services TASK 1-7.4: VoltAir will provide a total of four (4) copies and an emailed PDF, of the deliverable p... Fixed Price - Lump Sum
     
Professional engineering services Task 8; CO2; D6A: 60% Re-Submittal Layout and Design Review: Electronic PDF set of Review plans. Fi... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 8; CO2; D6B: FEMA Floodway Report: Electronic PDF and (3) signed and Sealed Reports. Fixed pric... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 17: Subtask 1-The inspection and material testing results shall be presented in a Technical Fin... Fixed Price - Lump Sum
     
Professional engineering services Task 24, Subtask 12: Mandatory Pre-Bid meeting and Pre-construction Meeting. 12A: MBI will record, p... Fixed Price - Lump Sum
     
Professional engineering services Task 5, Subtask 2.2: Suwannee River Water Management District Environmental Permitting - Michael Bak... Fixed Price - Lump Sum
     
Professional engineering services Task 5, Subtask 2.3: Columbia County Special Exception - Michael Baker will provide a PDF copy of th... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 5, Subtask 2.1: Data Collection and Field Surveys - Natural Resource Digital Maps. Fixed price ... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 5, Subtask 2.4: Permit Issuance - Michael Baker will provide a PDF copy of the SR WMD permit. Fixed Price - Lump Sum
     
Professional engineering services Task 5, CO 1, Del. 9: Task 7 deliverables will be incorporated into plan submittals outlined in the... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 13, Del. 1A: Copies of field notes and electronic data raw files. will be provided to the BDC P... Fixed Price - Lump Sum
 Displaying 1 to 25 of 350     1 2 3 4 5 6 7 8 ...  14 Next  Last


Payments are also referred to as expenditures (creating or incurring a legal obligation to disburse money) or disbursements (the payment of expenditures). Payments include disbursements and accounting adjustments made on a contract. Payments are always positive amounts while accounting adjustments may be positive or negative depending on the type of adjustment.

Payment Details

"Date" in the listing below indicates the date the payment voucher was recorded in the system, not the date the payment was issued.
More Fiscal Year Total Amount
     
2024-2025 $187,597.23
     
2023-2024 $131,538.78
     
2022-2023 $354,105.85
     
2021-2022 $186,283.45
     
2020-2021 $190,444.77
     
2019-2020 $125,235.29
     
2018-2019 $42,284.01
     
2017-2018 $272,363.19
     
2016-2017 $447,263.77
     
2015-2016 $206,256.86

If a payment or adjustment to a contract was made before July 1, 2012, the information may not be posted in this system.

Contract Documents


Click on the pdf icon or Agency Document Link to view the document
Document Type Document Reference # Executed Date Document Add Date Agency Document Link View
Original Contract Original Contract - CN202 02/25/2015 5/13/2015 2:08:33 PM
Procurement Original Contract - CN202 5/13/2015 2:08:53 PM
Renewal A1 02/26/2020 2/28/2020 4:49:06 PM
Amendment CMC1 04/30/2019 5/6/2019 9:41:55 AM
Amendment CMC2 07/15/2020 7/15/2020 2:14:51 PM
Amendment CMC3 05/06/2021 5/12/2021 12:23:25 PM
Amendment CMC4 07/22/2025 7/23/2025 12:15:02 PM
Amendment CMC5 01/12/2026 1/12/2026 3:18:24 PM
Amendment T10 06/30/2016 7/14/2016 3:22:54 PM
Amendment T10CO1 09/07/2017 9/13/2017 12:53:14 PM
Amendment T11 06/17/2016 6/20/2016 10:24:29 AM
Amendment T12 03/08/2017 3/9/2017 3:21:01 PM
Amendment T13 10/07/2016 10/18/2016 4:35:41 PM
Amendment T13CO1 04/11/2018 4/16/2018 2:11:16 PM
Amendment T13CO2 03/05/2019 3/6/2019 6:14:01 PM
Amendment T14 11/01/2016 11/7/2016 1:45:33 PM
Amendment T14CO1 04/28/2017 5/16/2017 1:44:55 PM
Amendment T14CO2 09/07/2017 9/13/2017 1:45:30 PM
Amendment T15 02/22/2017 2/24/2017 2:05:45 PM
Amendment T16 04/24/2017 4/25/2017 7:53:19 AM
Amendment T17 08/31/2017 9/5/2017 11:36:30 AM
Amendment T17CO1 02/19/2018 2/21/2018 8:41:19 AM
Amendment T18 10/11/2017 12/11/2017 12:45:38 PM
Amendment T19 11/07/2017 12/20/2017 2:06:56 PM
Amendment T1CO1 06/14/2016 6/20/2016 9:31:13 AM
Amendment T20 11/07/2017 11/8/2017 3:26:43 PM
Amendment T20CO2 12/28/2018 4/4/2019 3:25:06 PM
Amendment T20CO4 11/25/2019 11/26/2019 10:44:52 AM
Amendment T20CO5 06/17/2020 6/19/2020 9:36:41 AM
Amendment T23 06/21/2018 6/25/2018 10:53:05 AM
Amendment T24 08/06/2018 11/15/2018 8:01:48 AM
Amendment T25 04/04/2019 4/4/2019 4:42:50 PM
Amendment T26 04/03/2019 4/8/2019 4:52:15 PM
Amendment T27 08/28/2019 8/29/2019 9:39:27 AM
Amendment T28 10/15/2019 10/16/2019 1:06:57 PM
Amendment T28CO1 02/13/2020 2/14/2020 3:28:12 PM
Amendment T29 01/21/2020 1/23/2020 9:01:56 AM
Amendment T2CO1 09/17/2015 9/28/2015 11:21:43 AM
Amendment T2CO2 12/22/2015 1/8/2016 11:57:17 AM
Amendment T3 11/18/2015 11/25/2015 2:32:56 PM
Amendment T30 04/02/2020 4/9/2020 11:10:19 AM
Amendment T30CO1 09/23/2020 10/12/2020 4:18:52 PM
Amendment T30CO2 02/22/2021 2/24/2021 12:50:25 PM
Amendment T31 09/14/2020 9/22/2020 2:08:41 PM
Amendment T31CO1 02/05/2021 2/9/2021 12:27:05 PM
Amendment T32 11/12/2020 11/13/2020 3:24:59 PM
Amendment T32CO1 04/05/2021 4/16/2021 10:36:02 AM
Amendment T32CO2 07/29/2021 8/2/2021 10:29:05 AM
Amendment T32CO3 01/21/2022 2/11/2022 8:28:17 AM
Amendment T32CO4 06/13/2022 6/13/2022 3:37:00 PM
Amendment T32CO5 12/05/2022 12/6/2022 10:39:13 AM
Amendment T33 12/08/2020 12/14/2020 1:26:35 PM
Amendment T33CO1 10/05/2021 11/9/2021 2:23:01 PM
Amendment T33CO2 06/22/2023 6/23/2023 4:24:48 PM
Amendment T33CO3 02/14/2024 2/15/2024 4:42:47 PM
Amendment T34 12/08/2020 12/14/2020 9:10:22 AM
Amendment T34CO1 03/29/2021 4/5/2021 9:59:40 AM
Amendment T34CO3 06/23/2022 6/28/2022 12:58:11 PM
Amendment T34CO4 12/05/2022 12/6/2022 4:21:44 PM
Amendment T35 12/22/2020 1/6/2021 2:27:53 PM
Amendment T36 10/14/2021 11/4/2021 5:02:23 PM
Amendment T36CO1 03/04/2022 3/9/2022 5:13:18 PM
Amendment T36CO2 02/21/2023 2/23/2023 4:21:59 PM
Amendment T37 11/15/2021 11/16/2021 5:26:09 PM
Amendment T38 11/15/2021 11/18/2021 12:31:41 PM
Amendment T38CO1 04/15/2022 4/18/2022 11:49:18 AM
Amendment T38CO2 03/28/2023 3/28/2023 3:22:06 PM
Amendment T39 02/22/2022 2/22/2022 5:00:20 PM
Amendment T4 11/04/2015 11/6/2015 11:14:56 AM
Amendment T40 05/18/2022 5/19/2022 6:18:12 PM
Amendment T41 10/18/2022 10/19/2022 9:46:06 AM
Amendment T42 11/21/2022 11/22/2022 11:12:53 AM
Amendment T43 12/21/2022 12/22/2022 10:43:20 AM
Amendment T43CO1 01/31/2024 2/5/2024 1:32:09 PM
Amendment T43CO2 05/06/2024 5/7/2024 1:41:42 PM
Amendment T44 03/08/2023 3/10/2023 9:57:25 AM
Amendment T44CO1 10/17/2023 10/19/2023 11:09:02 AM
Amendment T44CO2 04/23/2024 4/26/2024 1:29:54 PM
Amendment T45 05/22/2023 5/23/2023 10:55:57 AM
Amendment T45CO1 09/08/2023 9/11/2023 2:09:30 PM
Amendment T45CO2 02/09/2024 2/13/2024 1:20:37 PM
Amendment T45CO3 04/09/2024 7/9/2024 3:34:02 PM
Amendment T45CO4 09/04/2024 9/16/2024 2:00:31 PM
Amendment T45CO5 12/17/2024 12/19/2024 2:12:03 PM
Amendment T46 09/27/2023 9/29/2023 10:32:48 AM
Amendment T47 11/02/2023 11/3/2023 10:26:05 AM
Amendment T5 12/07/2015 12/17/2015 11:33:55 AM
Amendment T5CO1 10/04/2016 10/12/2016 2:02:43 PM
Amendment T5CO2 02/27/2017 3/8/2017 12:39:10 PM
Amendment T6CO1 05/23/2016 6/8/2016 11:06:30 AM
Amendment T6CO2 06/30/2016 7/14/2016 3:09:19 PM
Amendment T6CO4 03/24/2017 6/5/2017 5:16:27 PM
Amendment T6CO5 05/25/2017 6/6/2017 6:46:47 PM
Amendment T8 01/05/2016 1/26/2016 9:22:17 AM
Amendment T8CO1 06/30/2016 7/18/2016 3:17:20 PM
Amendment T8CO2 12/16/2016 12/19/2016 12:55:32 PM
Amendment T8CO3 05/24/2017 5/25/2017 3:06:58 PM
Amendment T8CO4 09/13/2017 9/13/2017 2:30:51 PM
Amendment T8CO6 04/25/2018 5/9/2018 7:43:31 AM
Amendment T9 02/03/2016 2/4/2016 2:44:57 PM
Amendment TA1 06/16/2015 6/25/2015 9:41:39 AM
Amendment TA12CO1 04/11/2017 4/18/2017 3:55:23 PM
Amendment TA14CO3 12/12/2017 12/14/2017 9:34:19 AM
Amendment TA17CO2 03/13/2018 3/14/2018 12:48:19 PM
Amendment TA2 07/16/2015 7/17/2015 2:12:22 PM
Amendment TA20CO1 06/29/2018 7/25/2018 4:10:35 PM
Amendment TA21 11/01/2017 12/13/2017 4:18:44 PM
Amendment TA22 11/28/2017 12/6/2017 5:46:47 PM
Amendment TA28 CO3 06/15/2021 6/17/2021 5:55:28 PM
Amendment TA34 CO2 05/19/2021 5/26/2021 12:03:51 PM
Amendment TA6 12/14/2015 12/17/2015 12:14:06 PM
Amendment TA6CO3 12/19/2016 12/23/2016 1:41:28 PM
Amendment TA7 12/14/2015 12/17/2015 12:14:22 PM
Amendment TA8CO5 12/19/2017 4/18/2018 11:23:50 AM


Audit results posted prior to June 30, 2012, appear in a summarized form. As of July 1, 2012, the audit reporting process was expanded to include additional questions and comments from the Bureau of Auditing. As audits are captured in electronic format, they will be posted to this system. If you are interested in seeing audit reports by Fiscal Year and Agency Action Plans, please click here to navigate to the Transparency Florida Contract Audit page.

  • No audits have been conducted on this contract at this time.