Contract Information

 

Summary

Agency Name: DEPARTMENT OF ENVIRONMENTAL PROTECTION

Agency Contract ID: CN204

Long Title: Statewide - WOOD

Vendor Name: WSP USA ENVIRONMENT & INFRASTRU

Total Contract Amount: $2,517,875.13

Total Budgetary Amount: $2,486,389.57

Total Payment To Date: $1,933,708.41

Date of Execution: 03/03/2015

General Description: Statewide Continuing Services Contract.

Main Information

Agency Contract ID: CN204

FLAIR Contract ID: CN204

Short Title: CN204

Long Title: Statewide - WOOD

Contract Type: Master Agreement

Contract Status: Active

Date of Execution: 03/03/2015

Date of Beginning: 03/03/2015

Original End Date: 03/02/2020

New Ending Date: 06/29/2025

Agency Service Area: DRP

Statutory Authority: 258, F.S.

Contract Involves State or Federal Financial Assistance: No

Recipient Type:

Provide for Administrative Cost: No

Provide for Periodic Increase: No

Procurement Information

Authorized Advanced Payment: No

Method of Procurement: Consultant's Competitive Negotiation Act [s. 287.055, F.S.]

State Term Contract ID:

Contract’s Exemption Justification:

Agency Reference Number: RFSOQ BDC01-13/14

Business Case Study Done: No

Legal Challenges to Procurement: No

Outsourcing / Capital Improvements

Was the Contracted Function Previously Performed by the State: No

Was the Contracted Function Considered for Insourcing back to the State: No

Did the Vendor Make Capital Improvements on State Property: No

Budget Information

Original Contract Amount: $0.00

Total Contract Amount: $2,517,875.13

Total Recurring Budgetary Amount: $59,132.26

Total Non-Recurring Budgetary Amount: $2,427,257.31

Total Budgetary Amount: $2,486,389.57

Total Unfunded Amount: $31,485.56

As of Date: 9/11/2024

Recurring Budgetary Amount Account Code Fiscal Year Effective Date FY Cost Accumulator Agency Amendment Reference
$0.00 37-20-2-675005-37500300-00-100718-00 07/01/2024 2024-2025
$4,269.41 37-20-2-506002-37350400-00-104070-00 07/01/2017 2017-2018 T26
$19,589.80 37-20-2-506002-37350400-00-104070-00 12/04/2017 2017-2018 T24
$12,423.69 37-20-2-423001-37500300-00-103886-00 07/01/2017 2017-2018 T25
$0.00 37-20-2-506002-37350400-00-104070-00 07/01/2015 2015-2016
$6,611.92 37-20-2-408001-37350400-00-104070-00 05/18/2015 2014-2015 TA1
$16,237.44 37-20-2-408001-37350400-00-104070-00 05/18/2015 2014-2015 TA2


Non-Recurring Budgetary Amount Account Code Fiscal Year Effective Date FY Cost Accumulator Agency Amendment Reference
$0.00 37-20-2-408001-37100400-00-101496-00 07/01/2024 2024-2025
$26,249.82 37-20-2-408001-37500300-00-080039-25 07/01/2024 2024-2025 T51
$85,309.27 37-20-2-675002-37500300-00-080039-24 07/01/2023 2023-2024 U3100 T43CO4
$80,510.01 37-20-2-408001-37500300-00-080039-24 07/01/2023 2023-2024 U1500 T50
$37,088.94 37-20-2-675002-37500300-00-080039-24 07/01/2023 2023-2024 U3100 T43CO1
$75,965.81 37-20-2-423001-37500300-00-080039-23 07/01/2022 2022-2023 U4130 T45
$64,686.72 37-20-2-423001-37100400-00-100718-00 07/01/2022 2022-2023 T47
$85,805.24 37-20-2-423001-37500300-00-080039-23 07/01/2022 2022-2023 U1500 T46
$18,641.15 37-20-2-423001-37500300-00-080039-23 07/01/2022 2022-2023 U1500 T42
$74,980.15 37-20-2-423001-37500300-00-080039-22 07/01/2022 2022-2023 U1660 T41
$35,126.30 37-20-2-408001-37500300-00-080039-22 07/01/2021 2021-2022 T49
$18,358.89 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 U3200 T37CO1
($10.33) 37-20-2-506002-37350400-00-104070-00 07/01/2021 2021-2022 T40CO1
$86,872.59 37-20-2-408001-37500300-00-080039-21 07/01/2021 2021-2022 U3200 T37
$15,577.17 37-20-2-408001-37500300-00-080039-21 07/01/2021 2021-2022 U4120 T36
$21,837.00 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 U3200 T38
$4,048.84 37-20-2-408001-37500300-00-080039-21 07/01/2020 2020-2021 U3200 T37CO3
$12,860.95 37-20-2-423001-37500300-00-080039-22 07/01/2020 2020-2021 U3200 T39CO1
$17,166.69 37-20-2-339074-37500300-00-088137-20 07/01/2020 2020-2021 U3200 T37
$48,996.85 37-20-2-408001-37500300-00-080039-21 07/01/2020 2020-2021 U1500 T34CO1
$23,223.36 37-20-2-408001-37500300-00-080039-21 07/01/2020 2020-2021 T39
$74,396.00 37-20-2-408001-37500300-00-080039-19 07/01/2020 2020-2021 T39
$0.00 37-20-2-675002-37500300-00-080039-21 07/01/2020 2020-2021
$98,534.37 37-20-2-650002-37500300-00-080039-21 07/01/2020 2020-2021 T35
$3,048.34 37-20-2-408001-37500300-00-080039-21 07/01/2020 2020-2021 U4120 T33CO1
$16,042.93 37-20-2-408001-37500300-00-080039-21 07/01/2020 2020-2021 U3200 T34
$74,804.72 37-20-2-408001-37500300-00-080039-20 07/01/2020 2020-2021 U3200 T28CO1
$1,148.39 37-20-2-506002-37350400-00-104070-00 07/01/2020 2020-2021 T32CO1
$60,510.88 37-20-2-423001-37500300-00-100718-00 07/01/2019 2019-2020 U3200 T48
($60,510.88) 37-20-2-423001-37100400-00-100718-00 07/01/2019 2019-2020 T47CO1
$10,384.88 37-20-2-506002-37350400-00-010000-00 07/01/2019 2019-2020 U3200 T44
$6,779.00 37-20-2-423001-37500300-00-080039-19 07/01/2019 2019-2020 U3200 T28CO2
$6,778.75 37-20-2-339074-37500300-00-088137-19 07/01/2019 2019-2020 U3200 T28CO2
$25,149.47 37-20-2-408001-37500300-00-080039-20 07/01/2019 2019-2020 U4120 T33
$62,833.30 37-20-2-408001-37500300-00-080039-20 07/01/2019 2019-2020 U3200 T31
$62,833.31 37-20-2-339074-37500300-00-088137-20 07/01/2019 2019-2020 U3200 T31
$0.00 37-20-2-675002-37500300-00-080039-19 07/01/2018 2018-2019
$0.00 37-20-2-408001-37500300-00-080039-19 07/01/2018 2018-2019
$99,988.50 37-20-2-339074-37500300-00-088137-19 07/01/2018 2018-2019 T28
$99,988.51 37-20-2-423001-37500300-00-080039-19 07/01/2018 2018-2019 T28
$0.00 37-20-2-339074-37500300-00-088137-18 07/01/2017 2017-2018
($0.65) 37-20-2-506002-37350400-00-104070-00 07/01/2017 2017-2018 T26CO1
$12,423.69 37-20-2-261019-37350400-00-140076-18 07/01/2017 2017-2018 T25
$14,647.80 37-20-2-423001-37400300-00-080039-17 07/01/2016 2016-2017 T30
$12,513.32 37-20-2-261019-37350400-00-140076-17 07/01/2016 2016-2017 T20
$3,275.60 37-20-2-131001-37500300-00-088130-14 07/01/2016 2016-2017 T12CO2
$6,326.80 37-10-1-000286-37500300-00-088130-17 07/01/2016 2016-2017 U3100 T21
$21,469.69 37-20-2-423001-37500300-00-080039-17 07/01/2016 2016-2017 U3200 T22
$0.00 37-20-2-423001-37500300-00-080039-17 07/01/2016 2016-2017
$330.84 37-10-1-000286-37500300-00-088130-17 07/01/2016 2016-2017 T15CO1
$21,367.90 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 T18
$5,500.00 37-20-2-423001-37500300-00-088130-16 07/01/2015 2015-2016 T15CO6
$3,113.20 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 131500 T18CO1
$7,954.00 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 T23
$0.00 37-20-2-339074-37500300-00-088137-16 07/01/2015 2015-2016
$0.00 37-20-2-423001-37500300-00-088130-16 07/01/2015 2015-2016
$1,598.00 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 T11CO1
$34,536.28 37-20-2-193001-37350400-00-084205-97 07/01/2015 2015-2016 T13
$5,801.32 37-20-2-131001-37500300-00-080039-14 07/01/2015 2015-2016 TA4CO1
$5,801.32 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 TA7CO1
$5,801.32 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 TA6CO1
$53,561.38 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 T11
$21,748.26 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 TA7
$22,412.46 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 TA6
$5,754.61 37-20-2-131001-37500300-00-088130-15 07/01/2014 2014-2015 T15CO1
$0.00 37-20-2-131001-37500300-00-080039-15 07/01/2014 2014-2015
$50,000.00 37-20-2-423001-37500300-00-088130-15 07/01/2014 2014-2015 T15
$30,180.06 37-20-2-339074-37500300-00-088137-15 07/01/2014 2014-2015 T10
$15,262.03 37-20-2-339074-37500300-00-088137-15 07/01/2014 2014-2015 T9
$13,976.99 37-20-2-131001-37500300-00-080039-14 07/01/2014 2014-2015 TA4
$50,000.00 37-20-2-423001-37500300-00-088130-15 07/01/2014 2014-2015 TA3
$0.00 05/13/2015 2014-2015
$6,081.35 37-20-2-131001-37500300-00-088130-14 07/01/2013 2013-2014 T12
$98,810.42 37-20-2-131001-37500300-00-080039-14 07/01/2013 2013-2014 T14CO1
$64,962.35 37-20-2-423001-37500300-00-088130-14 07/01/2013 2013-2014 T15
$10,553.58 37-20-2-131001-37500300-00-080039-14 07/01/2013 2013-2014 T14
$8,435.47 37-20-2-423001-37500300-00-080039-13 07/01/2013 2013-2014 TA4
$70,605.62 37-20-2-131001-37500300-00-080039-14 07/01/2013 2013-2014 TA5
$5,373.00 37-20-2-131001-37500300-00-088130-14 07/01/2013 2013-2014 TA3
$76,351.12 37-20-2-423001-37500300-00-088130-14 07/01/2013 2013-2014 TA3
$15,378.14 37-20-2-423001-37500300-00-080039-13 07/01/2012 2012-2013 T15
$8,512.64 37-20-2-423001-37500300-00-088130-13 07/01/2012 2012-2013 TA3
$8,381.88 37-20-2-506002-37500300-00-104070-00 07/01/2000 2000-2001 T40
$3,668.08 37-20-2-193001-37350400-00-084205-97 07/01/1998 1998-1999 131500 T16CO3
($1,190.19) 37-20-2-193001-37500300-00-084205-97 07/01/1997 1997-1998 TA27 CO5
$5,297.88 37-20-2-193001-37500300-00-084205-97 07/01/1996 1996-1997 T32
($15.11) 37-20-2-193001-37500300-00-084205-97 07/01/1996 1996-1997 T27CO3
($18.71) 37-20-2-193001-37350400-00-084205-97 07/01/1996 1996-1997 T19CO1
$322.58 37-20-2-193001-37500300-00-084205-97 07/01/1996 1996-1997 T27CO2
$1,814.00 37-20-2-193001-37500300-00-084205-97 07/01/1996 1996-1997 T16CO7
$7.68 37-20-2-193001-37500300-00-084205-97 07/01/1996 1996-1997 T19CO2
$65.31 37-20-2-193001-37500300-00-084205-97 07/01/1996 1996-1997 T27CO1
$27,017.08 37-20-2-193001-37500300-00-084205-97 07/01/1996 1996-1997 T27
$4,622.95 37-20-2-193001-37500300-00-084205-97 07/01/1996 1996-1997 T16CO5
$17,162.68 37-20-2-193001-37350400-00-084205-97 07/01/1996 1996-1997 T16CO4
$20,101.00 37-20-2-193001-37350400-00-084205-97 07/01/1996 1996-1997 T19
$9,425.30 37-20-2-193001-37500300-00-084205-97 07/01/1996 1996-1997 T16CO1
$29,632.82 37-20-2-193001-37350400-00-084205-97 07/01/1996 1996-1997 T16
$34,536.28 37-20-2-193001-37350400-00-084205-97 07/01/1996 1996-1997 T8

Contract Change

Change Type Amendment Amount Agency Amendment Reference Change Description Amendment Effective Date Amendment Execution Date New Ending Date
Amendment $0.00 T15CO3 Time Extension 08/01/2017 08/01/2017
Amendment $0.00 CMC5 Contract Manager Change 01/12/2026 01/12/2026
Amendment $0.00 CMC4 Contract Manager Change 07/23/2025 07/23/2025
Amendment $31,485.56 T52 Additional services 08/26/2024 08/26/2024 06/29/2025
Amendment $26,249.82 T51 Additional Services 08/19/2024 08/19/2024
Amendment $85,309.27 T43CO4 Additional Services 08/06/2024 08/06/2024 03/03/2025
Amendment $0.00 T43CO3 Additional Services 06/12/2024 06/12/2024
Amendment $0.00 T43CO2 Additional services. 05/24/2024 05/24/2024
Amendment $4,048.84 T37CO3 Additional Services 03/26/2024 03/26/2024 03/03/2025
Amendment $80,510.01 T50 Additional Services 12/14/2023 12/14/2023
Amendment $37,088.94 T43CO1 Additional Services 11/21/2023 11/21/2023
Amendment $35,126.30 T49 Hydrological plan 10/30/2023 10/30/2023
Amendment $0.00 T37CO2 Time Extension 09/25/2023 09/25/2023 12/31/2024
Amendment $60,510.88 T48 Additional Services 07/07/2023 07/07/2023
Amendment ($60,510.88) T47CO1 Reduce TA and transfer to new TA for next fiscal year 06/22/2023 06/22/2023
Amendment $0.00 T39CO2 Task time Extension 06/22/2023 06/22/2023
Amendment $64,686.72 T47 Additional Services 05/22/2023 05/22/2023
Amendment $85,805.24 T46 Additional services 04/20/2023 04/20/2023
Amendment $75,965.81 T45 Additional Services 03/06/2023 03/06/2023
Amendment $0.00 A2 Name and wage rate update 03/01/2023 03/01/2023
Amendment $12,860.95 T39CO1 Additional Services 01/31/2023 01/31/2023
Amendment $0.00 T43 Additional services 10/18/2022 10/18/2022
Amendment $10,384.88 T44 Additional Services 09/30/2022 09/30/2022
Amendment $18,641.15 T42 Attend county meeting for future storm water mgmt. 09/09/2022 09/09/2022
Amendment $18,358.89 T37CO1 Additional Services 08/22/2022 08/22/2022
Amendment $0.00 T28CO3 Time Extension 05/20/2022 05/20/2022 11/24/2022
Amendment $0.00 T2CO4 Placed in error 05/20/2022 05/20/2022
Amendment ($10.33) T40CO1 Decrease in fixed fee due to change in position staff and hr 02/10/2022 02/10/2022
Amendment $74,980.15 T41 Develop point bar monitoring tools 09/23/2021 09/23/2021
Amendment $104,039.28 T37 Remove Downs Damn (water cntrl stucture) from Mayakka River 09/07/2021 09/07/2021
Amendment $48,996.85 T34CO1 site visit to review existing conditions 08/25/2021 08/25/2021
Amendment $8,381.88 T40 Wetland monitoring for year 3 of Alafia-Chicora project 08/20/2021 08/20/2021
Amendment $21,837.00 T38 provide limited bidding services and construction admin serv 08/09/2021 08/09/2021
Amendment $0.00 TA35 Made in error 06/29/2021 06/29/2021
Amendment $97,619.36 T39 Hydrologic model, geotech, project mgmt., design, & permits 06/29/2021 06/29/2021
Amendment $98,534.37 T35 Septic to Sewer Connections for Ranger 06/17/2021 06/17/2021
Amendment ($1,190.19) TA27 CO5 Decrease in fixed fee due to change in position staff and ho 05/24/2021 05/24/2021
Amendment $0.00 CMC3 Contract Manager Change 05/06/2021 05/06/2021
Amendment $15,577.17 T36 Point bar #1 restoration project design/mangement 04/05/2021 04/05/2021
Amendment $3,048.34 T33CO1 4 water wells and vegetation transects need surveys 03/22/2021 03/22/2021
Amendment $13,557.75 T28CO2 Includes historic mitigation as request by DOS 03/09/2021 03/09/2021
Amendment $16,042.93 T34 Preliminary engineering services 12/11/2020 12/11/2020
Amendment $74,804.72 T28CO1 Professional Services 09/29/2020 09/29/2020
Amendment $1,148.39 T32CO1 Increase funding for Subtask 2 09/23/2020 09/23/2020
Amendment $0.00 CMC2 Entered in error 07/15/2020 07/15/2020
Amendment $0.00 CMC1 Contract Manager Change 07/15/2020 07/15/2020
Amendment $25,149.47 T33 Well monitoring services 06/09/2020 06/09/2020
Amendment $0.00 T31CO1 No-cost time extension 05/12/2020 05/12/2020
Amendment $0.00 T27CO4 Task time extension of 1 year 05/07/2021 05/07/2020
Amendment $5,297.88 T32 Professional Engineering Services 04/24/2020 04/24/2020
Amendment $0.00 A1 Renewal & Contractor Name Change 03/04/2020 03/10/2020 03/03/2025
Amendment $125,666.61 T31 Feasibility Study Services 02/13/2020 02/13/2020
Amendment ($15.11) T27CO3 Recuces task assignment total cost 01/31/2020 01/31/2020
Amendment $322.58 T27CO2 Removes subtask 2, adds Subtask 2A + 2B 09/23/2019 09/23/2019
Amendment $1,814.00 T16CO7 Increase in task amount for fixed price costs 09/23/2019 09/23/2019
Amendment $0.00 T2 Entered in error 07/28/2019 07/28/2019
Amendment $7.68 T19CO2 Changes in staff positions and hours. 07/28/2019 07/28/2019
Amendment $14,647.80 T30 Permitting Services 07/26/2019 07/26/2019
Amendment $0.00 T16CO6 Task Time Extension 06/27/2019 06/27/2019
Amendment $65.31 T27CO1 Cost/Fee Adjustment 06/24/2019 06/24/2019
Amendment ($0.65) T26CO1 Reduced Cost 06/24/2019 06/24/2019
Amendment $27,017.08 T27 Engineering and Permitting Services 02/18/2019 02/18/2019
Amendment $199,977.01 T28 Feasibility Study Services 02/12/2019 02/12/2019
Amendment ($18.71) T19CO1 Staff Changes & Funding Decrease 09/10/2018 09/10/2018
Amendment $4,269.41 T26 Engineering & Permitting 09/10/2018 09/10/2018
Amendment $4,622.95 T16CO5 Increase in Task Assignment Amount 08/23/2018 08/23/2018
Amendment $0.00 ASA Agency Service Area change 07/01/2018 05/21/2018
Amendment $0.00 CO1 Vendor name change 04/16/2018 04/16/2018
Amendment $0.00 T18CO3 Change order is for time extension only. No additional funds 03/29/2018 03/29/2018 05/28/2018
Amendment $24,847.38 T25 Putnam County- Dam break analysis Emergency Action Plan 03/22/2018 03/22/2018 06/30/2018
Amendment $17,162.68 T16CO4 Increase in Task Assignment Amount due to additional reveget 02/14/2018 02/14/2018
Amendment $5,500.00 T15CO6 Jonathan Dickinson State Park 02/02/2018 02/02/2018 05/01/2018
Amendment $0.00 TA18CO2 Time Extension 12/21/2017 12/21/2017 03/30/2018
Amendment $0.00 T14CO6 Time Extension to complete permitting 12/08/2017 12/08/2017 03/16/2018
Amendment $0.00 T15CO5 Task Time Extension 12/04/2017 12/04/2017 02/28/2018
Amendment $19,589.80 T24 Provide engineering and permitting services for a pipe repla 11/27/2017 11/27/2017 06/29/2018
Amendment $3,113.20 T18CO1 Proj. NO: 60986C- "Consultant to provide design 10/06/2017 10/06/2017 12/31/2017
Amendment $0.00 T14CO5 Time Extension 09/25/2017 09/25/2017
Amendment $3,668.08 T16CO3 Proj. NO: 600408.5- Increase in Task Assignment Amount due 08/10/2017 08/10/2017 06/30/2018
Amendment $21,469.69 T22 Proj NO. 61176C- Consultant to provide design and permitting 08/04/2017 08/04/2017 06/30/2018
Amendment $7,954.00 T23 Proj. NO: 60857C- Professional topographic survey 07/10/2017 07/10/2017 09/30/2017
Amendment $6,326.80 T21 Engineering Services 07/07/2017 07/07/2017
Amendment $0.00 T14CO4 Time extension change order to complete permitting. 06/30/2017 06/30/2017
Amendment $0.00 T16CO2 Time Extension 06/30/2017 06/30/2017
Amendment $12,513.32 T20 Geotechnical assessment and inspection of the Kirkpatrick Da 06/06/2017 06/06/2017
Amendment $0.00 T15CO2 Time Extension to complete permitting phase 04/28/2017 04/28/2017 08/01/2017
Amendment $0.00 T14CO3 ADDITIONAL TASK TIME 03/29/2017 03/29/2017
Amendment $0.00 T4CO1 Time extension for 18 months. 03/27/2017 03/27/2017 09/30/2018
Amendment $20,101.00 T19 Chicora Tract - Polk County 03/20/2017 03/20/2017
Amendment $3,275.60 T12CO2 ADA Family Restroom Additions 03/09/2017 03/09/2017
Amendment $21,367.90 T18 Road widening at Hugh Taylor Birch SP 02/27/2017 02/27/2017
Amendment $9,425.30 T16CO1 Increase task funding $9,425.30. 01/31/2017 01/31/2017
Amendment $0.00 T14CO2 Additional task time. 01/27/2017 01/27/2017
Amendment $6,085.45 T15CO1 Increase task amount; additional task time 11/28/2016 11/28/2016
Amendment $98,810.42 T14CO1 Increase task amount; additional task time 06/30/2016 06/30/2016
Amendment $29,632.82 T16 Chicora Tract - Polk County 06/16/2016 06/16/2016
Amendment $0.00 T11CO2 Task time extension 04/19/2016 04/19/2016
Amendment $0.00 T4CO2 Task time extension 03/25/2016 03/25/2016
Amendment $0.00 T6CO2 Additioanl task time 03/25/2016 03/25/2016
Amendment $130,340.49 T15 Jonathan Dickinson 03/25/2016 03/25/2016
Amendment $0.00 T7CO2 Increase Task Time 03/25/2016 03/25/2016
Amendment $10,553.58 T14 Delnor-Wiggins 03/02/2016 03/02/2016
Amendment $1,598.00 T11CO1 Increase task amount 03/01/2016 03/01/2016
Amendment $6,081.35 T12 Hugh Taylor Birch State Park 02/03/2016 02/03/2016
Amendment $0.00 T9CO1 Additional Task Time 01/28/2016 01/28/2016
Amendment $0.00 T10CO1 Additional Task Time 01/28/2016 01/28/2016
Amendment $34,536.28 T13 Chicora Tract - Polk County 01/25/2016 01/25/2016
Amendment $5,801.32 TA6CO1 Task Funding Increase & Time Extension 12/14/2015 12/14/2015
Amendment $5,801.32 TA7CO1 Task Funding Increase & Time Extension 12/14/2015 12/14/2015
Amendment $5,801.32 TA4CO1 Task Funding Increase & Time Extension 12/14/2015 12/14/2015
Amendment $53,561.38 T11 Hugh Taylor Birch State Park 09/08/2015 09/08/2015
Amendment $30,180.06 T10 Long Key State Park 09/02/2015 09/02/2015
Amendment $15,262.03 T9 Professional Services for Bahia State Park 09/02/2015 09/02/2015
Amendment $34,536.28 T8 Chicora Tract - Polk County 08/04/2015 08/04/2015
Amendment $22,412.46 TA4 Professional Engineering Services 07/29/2015 07/29/2015
Amendment $22,412.46 TA6 Design, permit and construct connections to sewer systems 07/29/2015 07/29/2015
Amendment $21,748.26 TA7 John Pennekamp SP 07/29/2015 07/29/2015
Amendment $70,605.62 TA5 Provide A/E design services for new administration building. 07/25/2015 07/25/2015
Amendment $140,236.76 TA3 Provide A/E design services. 06/18/2015 06/18/2015
Amendment $6,611.92 TA1 Chicora Track - Polk County 04/10/2015 04/10/2015
Amendment $16,237.44 TA2 Chicora Track - Polk County 04/10/2015 04/10/2015

Vendor

Name Line 1Name Line 2City State ZipMinority Vendor Designation
WSP USA ENVIRONMENT & INFRASTRU NEWBERRY FL 326690000 Non-Minority

CFDA

No CFDA Codes found for the contract.

CSFA

No CSFA Codes found for the contract.
More Deliverable Number      Commodity/Service Type Major Deliverable Method of Payment
     
Professional engineering services Task 36: Subtask 2 - PERMIT PREPARATION AND SUBMITTAL, Deliverable: The deliverable will include a p... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 36: Subtask 1 - DESIGN, Deliverable: The deliverable will include a design plan set in electron... Fixed Price - Lump Sum
     
Professional engineering services Task 36: Subtask 3 - CONSTRUCTION SERVICES, Deliverable: Wood will provide a field inspection log al... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 36: Subtask 4 - PROJECT MANAGEMENT, Deliverable: The deliverable will include biweekly status u... Fixed Price - Lump Sum
     
Professional engineering services Task 14: Subtask 1: At a minimum the documents shall include• CS - Cover Sheet, utilizing the standa... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 14, subtask 2: • CS - Cover Sheet, utilizing the standard format provided by BOC. • 60% Design ... Fixed Price - Lump Sum
     
Professional engineering services Task 35 SUBTASK 2: SURVEY - Deliverable: The deliverable will include one signed and sealed copy of ... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 40: Subtask 3: YEAR THREE MONITORING & ANNUAL REPORT - Year Three Annual Report will be submitt... Fixed Price - Lump Sum
     
Professional engineering services Task 25, Deliverable 1: A site visit memo with pictures, field notes, and dam related information co... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 25, Deliverable 2: -Draft computer modeling analysis report which includes project information;... Fixed Price - Lump Sum
     
Professional engineering services Task 25, Deliverable 3: Draft EAP for review by the FDSP staff (electronic submittal); Second draft... Fixed Price - Lump Sum
     
Professional engineering services Task 16: Construction Admin and As-Built Cert. - Monthly Invoices with related time sheets, and a Me... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 15: • CS - Cover Sheet, utilizing the standard format provided by BOC. • Schematic, Architectur... Fixed Price - Lump Sum
     
Professional engineering services Task 1: Digital copy of written response to USACE RAI received via email (2/24/2015) and subsequent ... Fixed Price - Lump Sum
     
Professional engineering services Task 2: Monthly Invoices with related time sheets, and a Memo Summary of work completed in the invoi... Fixed Price - Lump Sum
     
Professional engineering services Subtask I: Verify Existing Conditions • A geotechnical report in electronic format (8-1/2""x11 "" re... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Subtask II- Provide 30% Schematic Design:• CS - Cover Sheet, utilizing the standard format provided ... Fixed Price - Lump Sum
     
Professional engineering services Subtask III-Provide 60% Design Development: • CS - Cover Sheet, utilizing the standard format provid... Fixed Price - Lump Sum
     
Professional engineering services Subtask IV-Provide 100% Bid Documents: • Final CS - Cover Sheet (standard BOC format and border). • ... Fixed Price - Lump Sum
     
Professional engineering services Subtask V-Provide Permitting Services: Amec Foster Wheeler shall provide original copies of the perm... Fixed Price - Lump Sum
     
Professional engineering services TA5: • A geotechnical report in electronic format (8-1 /2""x11"" report format). • A final written r... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services TA5: • CS - Cover Sheet, utilizing the standard format provided by BOC • Schematic, Architectural, S... Fixed Price - Lump Sum
     
Professional engineering services TA5: • CS - Cover Sheet, utilizing the standard format provided by BDC • 60% Design Development Arch... Fixed Price - Lump Sum
     
Professional engineering services TA5: • Final CS - Cover Sheet (standard BOC format and border). • Final Architectural restoration pl... Fixed Fee / Unit Rate
     
Professional engineering services TA5: Amec Foster Wheeler shall provide original copies of the permits and approval notifications to ... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
 Displaying 1 to 25 of 325     1 2 3 4 5 6 7 8 ...  13 Next  Last


Payments are also referred to as expenditures (creating or incurring a legal obligation to disburse money) or disbursements (the payment of expenditures). Payments include disbursements and accounting adjustments made on a contract. Payments are always positive amounts while accounting adjustments may be positive or negative depending on the type of adjustment.

Payment Details

"Date" in the listing below indicates the date the payment voucher was recorded in the system, not the date the payment was issued.
More Fiscal Year Total Amount
     
2024-2025 $151,349.87
     
2023-2024 $242,770.23
     
2022-2023 $173,995.26
     
2021-2022 $268,700.09
     
2020-2021 $227,559.79
     
2019-2020 $230,455.45
     
2018-2019 $86,310.97
     
2017-2018 $144,769.68
     
2016-2017 $210,783.59
     
2015-2016 $189,378.96
     
2014-2015 $7,634.52

If a payment or adjustment to a contract was made before July 1, 2012, the information may not be posted in this system.

Contract Documents


Click on the pdf icon or Agency Document Link to view the document
Document Type Document Reference # Executed Date Document Add Date Agency Document Link View
Original Contract Original Contract - CN204 03/03/2015 5/13/2015 2:38:35 PM
Procurement Original Contract - CN204 5/13/2015 2:38:57 PM
Amendment A1 03/10/2020 3/11/2020 3:59:09 PM
Amendment A2 03/01/2023 3/7/2023 3:23:21 PM
Amendment CMC1 07/15/2020 7/16/2020 9:12:11 AM
Amendment CMC3 05/06/2021 5/12/2021 12:25:48 PM
Amendment CMC4 07/23/2025 7/23/2025 12:18:22 PM
Amendment CMC5 01/12/2026 1/12/2026 3:20:56 PM
Amendment CO1 04/16/2018 6/4/2018 10:00:13 AM
Amendment T10 09/02/2015 9/17/2015 2:11:58 PM
Amendment T10CO1 01/28/2016 1/29/2016 11:45:51 AM
Amendment T11 09/08/2015 9/9/2015 2:53:20 PM
Amendment T11CO1 03/01/2016 3/14/2016 11:27:47 AM
Amendment T11CO2 04/19/2016 4/21/2016 1:42:33 PM
Amendment T12 02/03/2016 3/7/2016 1:43:53 PM
Amendment T12CO2 03/09/2017 3/16/2017 12:14:56 PM
Amendment T13 01/25/2016 5/2/2016 11:37:52 AM
Amendment T14 03/02/2016 3/14/2016 9:16:26 AM
Amendment T14CO1 06/30/2016 7/5/2016 4:33:12 PM
Amendment T14CO2 01/27/2017 1/30/2017 9:08:33 AM
Amendment T14CO3 03/29/2017 4/3/2017 10:58:12 AM
Amendment T14CO4 06/30/2017 7/7/2017 4:41:46 PM
Amendment T14CO5 09/25/2017 9/25/2017 4:59:51 PM
Amendment T14CO6 12/08/2017 12/11/2017 8:09:06 AM
Amendment T15 03/25/2016 5/13/2016 8:49:56 AM
Amendment T15CO1 11/28/2016 11/29/2016 11:37:40 AM
Amendment T15CO2 04/28/2017 5/16/2017 2:29:33 PM
Amendment T15CO3 08/01/2017 8/2/2017 1:20:07 PM
Amendment T15CO5 12/04/2017 12/7/2017 1:14:48 PM
Amendment T15CO6 02/02/2018 2/5/2018 2:18:22 PM
Amendment T16 06/16/2016 7/18/2016 4:39:11 PM
Amendment T16CO1 01/31/2017 2/3/2017 10:32:56 AM
Amendment T16CO2 06/30/2017 5/1/2019 2:34:44 PM
Amendment T16CO3 08/10/2017 8/14/2017 12:28:51 PM
Amendment T16CO4 02/14/2018 2/16/2018 10:14:27 AM
Amendment T16CO5 08/23/2018 8/27/2018 11:24:05 AM
Amendment T16CO6 06/27/2019 7/3/2019 2:25:51 PM
Amendment T16CO7 09/23/2019 9/24/2019 12:47:02 PM
Amendment T18 02/27/2017 3/9/2017 3:53:03 PM
Amendment T18CO1 10/06/2017 10/9/2017 12:29:38 PM
Amendment T18CO3 03/29/2018 4/6/2018 2:50:43 PM
Amendment T19 03/20/2017 8/16/2017 9:47:02 AM
Amendment T19CO1 09/10/2018 9/11/2018 2:34:35 PM
Amendment T19CO2 07/28/2019 8/8/2019 1:57:15 PM
Amendment T20 06/06/2017 10/4/2017 2:32:25 PM
Amendment T21 07/07/2017 10/3/2017 9:10:26 AM
Amendment T22 08/04/2017 8/7/2017 11:21:01 AM
Amendment T23 07/10/2017 7/11/2017 8:30:05 AM
Amendment T24 11/27/2017 12/4/2017 2:49:38 PM
Amendment T25 03/22/2018 8/23/2018 11:05:22 AM
Amendment T26 09/10/2018 1/16/2019 1:53:57 PM
Amendment T26CO1 06/24/2019 7/8/2019 10:30:46 AM
Amendment T27 02/18/2019 2/21/2019 10:08:12 AM
Amendment T27CO1 06/24/2019 7/3/2019 3:27:49 PM
Amendment T27CO2 09/23/2019 9/24/2019 9:36:53 AM
Amendment T27CO3 01/31/2020 2/14/2020 9:05:56 AM
Amendment T27CO4 05/07/2020 7/29/2021 4:07:09 PM
Amendment T28 02/12/2019 2/15/2019 9:55:26 AM
Amendment T28CO1 09/29/2020 10/6/2020 10:42:10 AM
Amendment T28CO2 03/09/2021 3/22/2021 11:42:55 AM
Amendment T28CO3 05/20/2022 5/26/2022 1:39:54 PM
Amendment T30 07/26/2019 7/26/2019 3:36:32 PM
Amendment T31 02/13/2020 2/24/2020 10:41:15 AM
Amendment T31CO1 05/12/2020 5/13/2020 9:50:52 AM
Amendment T32 04/24/2020 5/1/2020 3:45:41 PM
Amendment T32CO1 09/23/2020 9/23/2020 12:13:36 PM
Amendment T33 06/09/2020 6/11/2020 9:08:16 AM
Amendment T33CO1 03/22/2021 6/4/2021 12:50:00 PM
Amendment T34 12/11/2020 12/17/2020 12:44:26 PM
Amendment T34CO1 08/25/2021 8/30/2021 12:06:59 PM
Amendment T35 06/17/2021 6/22/2021 3:10:34 PM
Amendment T36 04/05/2021 4/15/2021 2:23:38 PM
Amendment T37 09/07/2021 9/10/2021 4:09:30 PM
Amendment T37CO1 08/22/2022 8/30/2022 11:11:15 AM
Amendment T37CO2 09/25/2023 9/27/2023 4:44:03 PM
Amendment T37CO3 03/26/2024 4/15/2024 1:22:28 PM
Amendment T38 08/09/2021 8/13/2021 8:41:03 AM
Amendment T39 06/29/2021 7/21/2021 9:47:27 AM
Amendment T39CO1 01/31/2023 2/2/2023 2:37:19 PM
Amendment T39CO2 06/22/2023 6/23/2023 4:17:08 PM
Amendment T40 08/20/2021 8/25/2021 12:55:16 PM
Amendment T40CO1 02/10/2022 3/7/2022 1:52:37 PM
Amendment T41 09/23/2021 10/27/2021 9:14:52 AM
Amendment T42 09/09/2022 9/23/2022 4:42:00 PM
Amendment T43 10/18/2022 1/13/2023 10:32:49 AM
Amendment T43CO1 11/21/2023 11/27/2023 10:48:45 AM
Amendment T43CO2 05/24/2024 5/24/2024 2:14:20 PM
Amendment T43CO3 06/12/2024 6/13/2024 9:23:18 AM
Amendment T43CO4 08/06/2024 8/7/2024 2:52:49 PM
Amendment T44 09/30/2022 10/3/2022 2:27:02 PM
Amendment T45 03/06/2023 6/5/2023 9:04:24 AM
Amendment T46 04/20/2023 4/25/2023 12:25:54 PM
Amendment T47 05/22/2023 5/26/2023 10:17:13 AM
Amendment T47CO1 06/22/2023 6/23/2023 4:09:00 PM
Amendment T48 07/07/2023 7/11/2023 11:05:29 AM
Amendment T49 10/30/2023 10/31/2023 11:05:37 AM
Amendment T4CO2 03/25/2016 6/7/2016 2:25:07 PM
Amendment T50 12/14/2023 12/18/2023 9:33:27 AM
Amendment T51 08/19/2024 8/26/2024 10:35:08 AM
Amendment T52 08/26/2024 8/27/2024 3:43:21 PM
Amendment T6CO2 03/25/2016 6/7/2016 3:38:28 PM
Amendment T7CO2 03/25/2016 6/7/2016 4:18:59 PM
Amendment T8 08/04/2015 8/14/2015 2:04:54 PM
Amendment T9 09/02/2015 9/3/2015 8:28:50 AM
Amendment T9CO1 01/28/2016 1/29/2016 11:32:47 AM
Amendment TA1 04/10/2015 7/21/2015 2:16:02 PM
Amendment TA18CO2 12/21/2017 12/21/2017 3:09:38 PM
Amendment TA2 04/10/2015 5/18/2015 9:38:29 AM
Amendment TA27 CO5 05/24/2021 5/25/2021 3:50:30 PM
Amendment TA3 06/18/2015 6/22/2015 10:56:01 AM
Amendment TA4 07/29/2015 7/30/2015 5:07:29 PM
Amendment TA4CO1 12/14/2015 12/16/2015 2:23:18 PM
Amendment TA5 07/25/2015 7/27/2015 4:47:09 PM
Amendment TA6 07/29/2015 7/30/2015 5:29:05 PM
Amendment TA6CO1 12/14/2015 12/16/2015 11:27:54 AM
Amendment TA7 07/29/2015 7/31/2015 8:45:08 AM
Amendment TA7CO1 12/14/2015 12/16/2015 2:00:38 PM


Audit results posted prior to June 30, 2012, appear in a summarized form. As of July 1, 2012, the audit reporting process was expanded to include additional questions and comments from the Bureau of Auditing. As audits are captured in electronic format, they will be posted to this system. If you are interested in seeing audit reports by Fiscal Year and Agency Action Plans, please click here to navigate to the Transparency Florida Contract Audit page.
Audit Type Review Date Fiscal Year View
Contract Review 10/14/2016 2016-2017 View