Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
Professional engineering services
|
Task 1: Topographic Survey in both Signed and Sealed Hardcopy and digital format (CAD) shall be subm...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Topographic Survey in both Signed and Sealed Hardcopy and digital format (CAD) shall be submitted to both FDEP and Consultant for peer review. The topographic survey part of Task 1 is scheduled to take 15 business days from Notice to Proceed.
|
| Deliverable Price: $9,961.92 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by FDEP and Consultant and determined if task is considered complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: TA1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: CONSULTANT shall submit one (1) digital copy in .pdf format to FDEP for design review. A Pre...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: CONSULTANT shall submit one (1) digital copy in .pdf format to FDEP for design review. A Preliminary Cost Estimate will be submitted to determine if design is within FDEP’s budget for overall project. This task
is scheduled to take 35 business days from completion of Task 1.
|
| Deliverable Price: $11,371.36 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by FDEP and determined if task is considered complete, accurate and timely before being authorized to proceed. Any questions provided by FDEP shall be addressed and revised deliverables submitted to FDEP.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: TA1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Construction Plans and Technical Specifications shall be submitted to FDEP for review. A Fin...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Construction Plans and Technical Specifications shall be submitted to FDEP for review. A Final Cost Estimate will be submitted to determine if design is within FDEP’s budget for overall project. This task is scheduled to take 30 business days from completion of Task 3.
|
| Deliverable Price: $17,151.36 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by FDEP and Consultant and determined if task is considered complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: TA1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: CCCL Permit (Field Permit) from FDEP and Dominium's Exemption letter from SFWMD will be subm...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1: CCCL Permit (Field Permit) from FDEP and Dominium's Exemption letter from SFWMD will be submitted to FDEP. This task is scheduled to take
110 business days following completion of Task 2.
$7,435.00
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by FDEP and Consultant and determined if task is considered complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: TA1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 2, Del 1: CONSULT ANT shall submit one (1) digital copy of Site Visit Notes & Findings to FDEP....
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 2, Del 1: CONSULT ANT shall submit one (1) digital copy of Site Visit Notes & Findings to FDEP. The Project Start-up Coordination and Site Visit is scheduled to take 10 business days from Notice to Proceed. Not to exceed $4,192.50
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by FDEP and determined if task is considered complete, accurate and timely before being authorized to proceed. Any questions provided by FDEP shall be addressed and revised deliverables submitted to FDEP.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: TA2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 2, Del 2: CONSULT ANT shall submit one (I) digital copy in .pdf format and four (4) hard copies...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 2, Del 2: CONSULT ANT shall submit one (I) digital copy in .pdf format and four (4) hard copies of the Structural Inspection Report to FDEP. This task is scheduled to take 15 business days from completion of Task 1. |
| Deliverable Price: $7,514.96 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by FDEP and determined if task is considered complete, accurate and timely before being authorized to proceed. Any questions provided by FDEP shall be addressed and revised deliverables submitted to FDEP.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: TA2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 4 - City of Miami 40-year Building Recertification acceptance letter shall be provided to FDEP ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 4 - City of Miami 40-year Building Recertification acceptance letter shall be provided to FDEP upon acceptance. If additional improvements are necessary to obtain acceptance letter from the City of Miami, a subsequent Task Assignment for additional inspection services will be required. This task is scheduled to take 30 business days following Notice to Proceed. Fixed Price Cost $725.00; Reimbursables- $106 Anticipated Postage, $276 Application Fee to the City of Miami Building Dept. Cost not to exceed $1,107. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 6, Subtask 5: Permitting. A digital copy of the Miami Dade Health Department Permit shall be su...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 6, Subtask 5: Permitting. A digital copy of the Miami Dade Health Department Permit shall be submitted to the BDC Project Manager. Fixed price $5,925.00; reimbursable postage not to exceed $260.00, FDEP Application not to exceed $250.00, DERM Force Main Application Fee not to exceed $419.25, DERM Lift Station Application Fee not to exceed $268.75. Total cost not to exceed $7,123.00. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform
|
| Source Documentation Page Reference: 5 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 6, Subtask 6: Final Bid Documents. Construction Plans shall be submitted in both AutoCAD and si...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 6, Subtask 6: Final Bid Documents. Construction Plans shall be submitted in both AutoCAD and signed/sealed PDF formats; Technical Specifications and final Cost Estimate shall be submitted in PDF format to the BDC Project Manager.
|
| Deliverable Price: $10,365.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform
|
| Source Documentation Page Reference: 6 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 6, subtask 3: Geotechnical engineering services. Consultant shall submit 1 digital copy of Geot...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 6, subtask 3: Geotechnical engineering services. Consultant shall submit 1 digital copy of Geotechnical Report in .pdf format shall be submitted to the BDC Project Manager.
|
| Deliverable Price: $3,059.71 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform
|
| Source Documentation Page Reference: 4 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 6, Subtask 4: 60% Construction Documents. CONSULTANT shall submit one (1) digital copy in .pdf ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 6, Subtask 4: 60% Construction Documents. CONSULTANT shall submit one (1) digital copy in .pdf format of the plans and the Preliminary Cost Estimate to the BDC Project Manager.
|
| Deliverable Price: $13,675.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform
|
| Source Documentation Page Reference: 5 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 9: Subtask 1 Project Coordination; meeting minutes will be delivered digitally to the project m...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 9: Subtask 1 Project Coordination; meeting minutes will be delivered digitally to the project manager.
|
| Deliverable Price: $1,940.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 9: Subtask 2 Conceptual Siote Plan Documents; one (1) digital copy of a rendered conceptual pla...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 9: Subtask 2 Conceptual Siote Plan Documents; one (1) digital copy of a rendered conceptual plan in.pdf format for each option (3 in total). One (1) digital copy of an annotated conceptual plan in .pdf format for each option (3 in total).
The annotated plan will identify the various strategies of Low Impact Develop components that are being utilized in each concept and how they are interconnected. One (1) digital copy of the ROM Cost Estimate for each conceptual option (3 total) to the
Project Manager.
|
| Deliverable Price: $12,975.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 6, Subtask 2: Survey services
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 6, Subtask 2: Survey services
|
| Deliverable Price: $6,946.28 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform
|
| Source Documentation Page Reference: 3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3, Del. 1: CONSULTANT shall submit one (1) digital copy of Project Kick-Off Meeting Minutes to ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3, Del. 1: CONSULTANT shall submit one (1) digital copy of Project Kick-Off Meeting Minutes to FDEP. The Project Start-up Coordination is scheduled to take 3 business days from Notice to Proceed. |
| Deliverable Price: $870.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by FDEP and determined if task is considered complete, accurate and timely before being authorized to proceed. Any questions provided by FDEP shall be addressed and revised deliverables submitted to FDEP.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3, Del. 2: CONSULTANT shall submit one (1) digital copy in .pdf format and four (4) hard copies...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3, Del. 2: CONSULTANT shall submit one (1) digital copy in .pdf format and four (4) hard copies of the Electrical/Structural Inspection Report to FDEP. This task is scheduled to take 20 business days from completion of Task 1.
|
| Deliverable Price: $3,330.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by FDEP and determined if task is considered complete, accurate and timely before being authorized to proceed. Any questions provided by FDEP shall be addressed and revised deliverables submitted to FDEP.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 2-3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3, Del. 3: City of Miami 40-year Building Recertification acceptance letter shall be provided t...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 3, Del. 3: City of Miami 40-year Building Recertification acceptance letter shall be provided to FDEP upon acceptance. If additional improvements are necessary to obtain acceptance letter from the City of Miami, a subsequent Task Assignment for additional inspection services will be required. This task is scheduled to take 10 business days following completion of Task 2. Cost not to exceed $1,107.00.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables shall be accepted by FDEP and determined if task is considered complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 5, Del. 1: Construction Plans and Technical Specifications shall be submitted to FDEP for revie...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 5, Del. 1: Construction Plans and Technical Specifications shall be submitted to FDEP for review. A final Cost Estimate will be submitted to determine if design is within FDEP’s budget for overall project. Construction Plans shall include electric site plan, riser, panel schedule, notes, specifications, details, and photometrics. This task is scheduled to take 30 business days following Notice to Proceed.
|
| Deliverable Price: $8,530.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 5, Del. 2: Written responses to RFIs, shop drawings will be provided to FDEP and contractor (vi...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 5, Del. 2: Written responses to RFIs, shop drawings will be provided to FDEP and contractor (via PDF format) during construction, and site electric letter of substantial compliance will be provided following construction. This task is scheduled to take 60 business days following Bid Award to selected contractor. Cost not to exceed $6,652
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 7, Subtask 2: Topographic Survey in both signed and sealed hardcopy, signed & sealed PDF, and d...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 7, Subtask 2: Topographic Survey in both signed and sealed hardcopy, signed & sealed PDF, and digital format per the BDC CAD Standards as attached to the agreement CN208 (CAD) and shall be submitted to the BDC Project Manager. CGA (Survey) Senior Registered Surveyor $145.00 x 2 hrs; 3 man survey crew $176.33 x 24 hrs, Survey CADD Technician $95.00 x 19 hrs, Engineering Director V $165.00 x 1hr; Project Manager IV $145.00 x 4 hrs; Senior CADD Tech Manager $115.00 x 3hrs; Environmental Specialist $105.00 x 20 hrs.
Subtask Total = $9,516.92 |
| Deliverable Price: $9,516.92 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: Task 7, page 3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 7, Subtask 3: Submission of one digital copy of Geotechnical Report in .pdf format to BDC Proje...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 7, Subtask 3: Submission of one digital copy of Geotechnical Report in .pdf format to BDC Project Manager - Engineering Director V $165.00 x 1hr; Project Manager IV $145.00 x 4 hrs; Clerical $53.84 x 1hr; Engineering Technician $69.84 x 2.5 hrs; Senior Engineer $150.36 x 7hrs; Principal Engineer $184.29 x 1hr; Mobilization of equipment & crew $250.00 EA x 1 hr; SPT Borings (lump sum) $950 x 1 hr; Casing (lump sum) $250 x 1hr; Asphalt Pavement Core (lump sum) $150 x 1hr; Limerock Beach Ratio Tests (lump sum) $600 x 1hr; Grain size Analysis (lump sum) $140 x hr; Lab Analysis (lump sum) $200 x1hr. Total Task = $4,750.25 |
| Deliverable Price: $4,750.25 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 7, Subtask 4: Preparation and submission of schematic design plans to the BDC Project Manager f...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 7, Subtask 4: Preparation and submission of schematic design plans to the BDC Project Manager for review - Engineering Director V $165.00 x 2 hrs; Project Manager IV $145.00 x 12 hrs; Engineer II $105.00 x 14 hrs; Senior CADD Tech Manager $115.00 x 14 hrs. Subtask Total = $5,150.00. |
| Deliverable Price: $5,150.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: Task 7, page 5 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 7 CO1: Subtask 5: 60% Construction Documents; CONSULT ANT shall submit one ( 1) digital copy in...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 7 CO1: Subtask 5: 60% Construction Documents; CONSULT ANT shall submit one ( 1) digital copy in .pdf format of the plans and the Preliminary Cost Estimate to the BDC Project Manager.
|
| Deliverable Price: $14,320.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 7 CO1: Subtask 6: Permitting; A digital copy of the applicable permits and approvals shall be s...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 7 CO1: Subtask 6: Permitting; A digital copy of the applicable permits and approvals shall be submitted to the BOC Project Manager.
|
| Deliverable Price: $50,550.41 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 7 CO1: Subtask 7: Final Bid Documents; Construction Plans shall be submitted in both AutoCAD an...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 7 CO1: Subtask 7: Final Bid Documents; Construction Plans shall be submitted in both AutoCAD and signed/sealed PDF formats; Technical Specifications and final Cost Estimate shall be submitted in PDF format to the BDC Project Manager.
|
| Deliverable Price: $8,875.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|