Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
Professional engineering services
|
Task 8, Subtask 1A: Site Evaluation - Site Visit (one) to observe the existing entry improvements an...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 8, Subtask 1A: Site Evaluation - Site Visit (one) to observe the existing entry improvements and to determine the possibility of environmental concerns with wetlands or Threatened and Endangered Species - Email of onsite photos, environmental report and field notes in .pdf format |
| Deliverable Price: $1,320.28 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 8, Subtask 2: Subtask 1B Digital copies of conceptual site plans in .pdf format
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 8, Subtask 2: Subtask 1B Digital copies of conceptual site plans in .pdf format
|
| Deliverable Price: $4,254.24 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 8, Subtask 3: Geotechnical Engineering Services - Report of Geotechnical Engineering including ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 8, Subtask 3: Geotechnical Engineering Services - Report of Geotechnical Engineering including the results of the field exploration and engineering analyses in PDF format. The results of the subsurface exploration will be presented in a written report signed and sealed by a professional engineer specializing in geotechnical engineering.
|
| Deliverable Price: $5,914.54 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 5 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 8, Subtask 4: 30% Park improvement plans - Digital copies in PDF/CAD format of the 30% Park Imp...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 8, Subtask 4: 30% Park improvement plans - Digital copies in PDF/CAD format of the 30% Park Improvement Plans.
|
| Deliverable Price: $4,029.80 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 5 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 8: Subtask 5A 60% Park improvement plans and draft of OPC costs in .pdf format
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 8: Subtask 5A 60% Park improvement plans and draft of OPC costs in .pdf format
|
| Deliverable Price: $8,052.54 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 6 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 8: Subtask 5B Architectural/Structural/Electrical MEP services
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 8: Subtask 5B Architectural/Structural/Electrical MEP services
|
| Deliverable Price: $8,953.02 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 6 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 8: Subtask 6A-SWFWMD application: Prepare for and submit permit modification for the existing p...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 8: Subtask 6A-SWFWMD application: Prepare for and submit permit modification for the existing permit at the park $9,953.62 and application fees up to $184; Subtask 6B-SWFWMD Issuance: Issuance of approved SWFWMD permit $265.22; Subtask 6C-Utility Coordination: Coordinate with appropriate utility companies to make sure there aren't any conflicts with the proposed design $1,512.20 |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 8, Subtask 7A: Final Construction Documents
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 8, Subtask 7A: Final Construction Documents
|
| Deliverable Price: $6,585.74 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 8 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 8, Subtask 8: Subtask 6 pdf copies of all applications and RAIs submitted to WMD, PDF copy of a...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 8, Subtask 8: Subtask 6 pdf copies of all applications and RAIs submitted to WMD, PDF copy of approved SWFWMD permit Copies of emails regarding relocation and utility coordination
|
| Deliverable Price: $11,915.04 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 8 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 8, Subtask 9A: Site Evaluation - Email of onsite photos, Environmental Report and field notes i...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 8, Subtask 9A: Site Evaluation - Email of onsite photos, Environmental Report and field notes in .pdf format.
CO1: Subtask 9A added to original task. |
| Deliverable Price: $3,238.78 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T8CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 8, Subtask 9B: Digital copy of the seven conceptual site plans in .pdf format.
CO1: Subtask 9B...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 8, Subtask 9B: Digital copy of the seven conceptual site plans in .pdf format.
CO1: Subtask 9B added to original task. |
| Deliverable Price: $3,566.68 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T8CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 8, Subtask 10: Subtask 10 Survey; PDF/CAD file of survey area for use in design.
CO1: Subtask ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 8, Subtask 10: Subtask 10 Survey; PDF/CAD file of survey area for use in design.
CO1: Subtask 10 added to original task. |
| Deliverable Price: $8,339.64 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T8CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 8, Subtask 11: Geotechnical Services; Report of Geotechnical Engineering including the results ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 8, Subtask 11: Geotechnical Services; Report of Geotechnical Engineering including the results of the field exploration and engineering analyses. The results of the subsurface exploration will be presented in a written report signed and sealed by a professional engineer specializing in geotechnical engineering.
to be delivered to BOC project manager.
CO1: Subtask 11 added to original task.
|
| Deliverable Price: $5,215.91 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T8CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 8, Subtask 12: 30% Park Improvement Plans - Digital copies in PDF/CAD format of the additional ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 8, Subtask 12: 30% Park Improvement Plans - Digital copies in PDF/CAD format of the additional work to be included in the 30% Park Improvement Plans to be delivered to BOC project manager. |
| Deliverable Price: $1,599.53 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T8CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 8, Subtask 13: 60% Park Improvement Plans Digital copies in PDF/CAD format of the additional wo...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 8, Subtask 13: 60% Park Improvement Plans Digital copies in PDF/CAD format of the additional work to be included in the 60% Park
Improvement Plans.to be delivered to BOC project manager.
CO1: Subtask 13 added to original task.
|
| Deliverable Price: $1,599.53 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T8CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 8, Subtask 14: SWFWMD Permit Application, Digital copies in PDF/CAD format of the additional wo...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 8, Subtask 14: SWFWMD Permit Application, Digital copies in PDF/CAD format of the additional work to be included in the Final Construction Documents for the Park Improvement Plans. To be delivered to BDC project manager.
CO1: Subtask 14 added to the original task.
|
| Deliverable Price: $2,787.44 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T8CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 8, Subtask 15: Final Construction Documents; Digital copies in PDF/CAD format of the additional...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 8, Subtask 15: Final Construction Documents; Digital copies in PDF/CAD format of the additional work to be included in the Final Construction Documents for the Park Improvement Plans. To be delivered to BDC project manager.
CO1: Subtask 15 added to the original task.
|
| Deliverable Price: $1,599.53 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 18, Subtask 11A: SWFWMD Permit Exemption Application - PDF copies of all applications and RAl's...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 18, Subtask 11A: SWFWMD Permit Exemption Application - PDF copies of all applications and RAl's submitted to WMD. |
| Deliverable Price: $902.78 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 18, Subtask 6A: SWFWMD Permit Exemption Application-prepare for and submit permit exemption ack...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 18, Subtask 6A: SWFWMD Permit Exemption Application-prepare for and submit permit exemption acknowledgment request; PDF copies of all applications and RAl's submitted to WMD. Fixed price $4,254.36; Application fees not to exceed $100.00. Total cost not to exceed $4,354.36
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 20, Subtask 5B: Permit Application; PDF copies of all applications and RAI responses submitted ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 20, Subtask 5B: Permit Application; PDF copies of all applications and RAI responses submitted to SFWMD and ACOE. Fixed price $5,033.64; reimbursable Application Fees SWFWMD not to exceed $250.00. Total cost for Subtask 5B is $5,283.64. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 23, Subtask 15: Permitting and Utility Coordination - Orange County Right of Way Use Permit - S...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 23, Subtask 15: Permitting and Utility Coordination - Orange County Right of Way Use Permit - Submit Proposed Turn Lane Plans to Orange County for review and approval of the proposed Turn Lane. This scope includes initial submittal and revision and resubmittal to one round of comments from the County. Estimate application fees of $350; Seminole County Right of Way Use Permit - Submit Proposed Turn Lane Plans to Seminole County for review and approval of the proposed Turn Lane. This scope includes initial submittal and revision and resubmittal to one round of comments from the County. Estimate application fees of $350; Water Management District (WMD) Permit Exemption - Prepare for and submit for a formal exemption to stormwater requirements for the Proposed Turn Lane. Estimated application fees of $150; Utility Coordination - Coordinate with appropriate utility companies in order to have the existing utility relocated for the Proposed Turn Lane. This scope does not cover any fees that will be charged by the utility company for the actual work of relocating. Deliverables: PDF copy of Orange County Permit Approval, PDF copy of Seminole, County Permit Approval, PDF copy of WMD Permit Exemption, Email coordination regarding relocation (if requested). Fixed price $16,532.66; reimbursable application fees not to exceed $850.00. Task Total Not to Exceed: $17,382.66. CO1: Adds Subtask 15. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
TA28: 6A - Permit Application, Deliverable: PDF copies of applications. Reimbursable = $100 permit f...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: TA28: 6A - Permit Application, Deliverable: PDF copies of applications. Reimbursable = $100 permit fee. Subtask 6a fee = 132.61; total cost not to exceed 232.61 |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the department to confirm they are complete, accurate, and timely. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform. |
| Source Documentation Page Reference: 6 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 14, Subtask 7A: Permitting PDF copies of all applications and RAl's submitted to Volusia County...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 14, Subtask 7A: Permitting PDF copies of all applications and RAl's submitted to Volusia County. $2,897.59; Reimbursable for application fees not to exceed $575.00.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 14, Subtask 7B: PDF copy of Permit Approval; PDF copies of all applications and RAl's submitted...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 14, Subtask 7B: PDF copy of Permit Approval; PDF copies of all applications and RAl's submitted to WMD. PDF copy of Permit Exemption. $2,801.57; Reimbursables for application fees not to exceed $100.00
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 15, Sutask 6 Permitting: 6A SWFWMD Pre-application Meeting- PDF copies of meeting minutes. To b...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 15, Sutask 6 Permitting: 6A SWFWMD Pre-application Meeting- PDF copies of meeting minutes. To be delivered to BDC $700.04; 6B Permit Application- PDF copies of all applications and RAI responses submitted to SWFWMD to be delivered to BDC $6,116.56; reimbursable cost not to exceed $250.00. 6C SWFWMD Issuance- PDF copy of approved SWFWMD permit to be delivered to BDC $265.22. 6D ACOE Permit Issuance- PDF copy of approved ACOE permit to be delivered to BDC $265.22. |
| Deliverable Price: $7,597.04 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 7 |
| Deliverable Number: |
|