Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
Professional engineering services
|
Task 1, Del. 4: • Copy of all approved submittals and other closeout documents • Copy of contractors...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1, Del. 4: • Copy of all approved submittals and other closeout documents • Copy of contractors record drawings • Copy of field reports and punch list. Fixed Price $4,772.89; reimbursable mileage $279.46. Cost not to exceed $5,052.35
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 7 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1, Del. 1: • (1) hard copy sets of 24 x 36 prints of 30% documents for review and PDF version •...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1, Del. 1: • (1) hard copy sets of 24 x 36 prints of 30% documents for review and PDF version • (1) hard copies of draft/outline technical specifications • Finish samples • Cut sheets of light fixtures • Meeting minutes
• Preliminary cost estimate. Cost not to exceed $5,134.68"
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 4 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1, Del. 2: • (1) 24 x 36 sets of 90% Plans for review & PDF • (1) 8 1/2 x 11 sets of specificat...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1, Del. 2: • (1) 24 x 36 sets of 90% Plans for review & PDF • (1) 8 1/2 x 11 sets of specifications for review & PDF • Material samples. Cost not to exceed $4,724.48
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 5 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1, Del. 3: • ( 5) 24 x 36 sets of plans - ( 4 of 5 to be signed and sealed) & PDF • ( 5) 8 1/2 ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1, Del. 3: • ( 5) 24 x 36 sets of plans - ( 4 of 5 to be signed and sealed) & PDF • ( 5) 8 1/2 x 11 specifications - ( 4 of 5 to be signed and sealed) & PDF • CADD files • Cost estimate. Cost not to exceed $1,827.19
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 6 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1, Del. 5: 8 1/2 x 11 Copy of material survey report/results of findings. Cost not to exceed $2...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1, Del. 5: 8 1/2 x 11 Copy of material survey report/results of findings. Cost not to exceed $2,295.05
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 8 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
As indicated in individual task assignments.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: As indicated in individual task assignments.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Agreement without a financial exchange or impact |
| Performance Metrics: Prior to submission to the Department, the Consultant shall review all deliverables to ensure the same are accurate and complete at time of submittal and meet or exceed the specified deliverable.
|
| Financial Consequences: The Department will not pay for any unsatisfactory deliverables. In the event the Department deems a deliverable unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable at no additional cost to the Department within 15 consecutive days. If the Consultant fails to resubmit a satisfactory deliverable within the specified timeframe, the Department, in its sole discretion, may terminate the Task Assignment and/or Agreement for failure to perform.
|
| Source Documentation Page Reference: As indicated in individual task assignments. |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 2: Subtask 7 Additional Services to complete whole building survey; asbestos report. CO1: Adds ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 2: Subtask 7 Additional Services to complete whole building survey; asbestos report. CO1: Adds Subtask 7, increases task total.
|
| Deliverable Price: $2,852.43 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 2: Subtask 1 Preliminary: (2) hard copy sets of 24 x 36 prints of scoping documents for review ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 2: Subtask 1 Preliminary: (2) hard copy sets of 24 x 36 prints of scoping documents for review and PDF version, Meeting minutes, Asbestos report. Fixed Price Costs: $23218.28 Reimbursable cost for Postage: $10.00 Reimbursable cost for printing: $20.00 Reimbursable cost for mileage at .445/mi rate: $665.72 Task total not to exceed: $23914.00
|
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 2: Subtask 2 30% Plans: (2) hard copy sets of 24 x 36 prints of 30% documents for review and PD...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 2: Subtask 2 30% Plans: (2) hard copy sets of 24 x 36 prints of 30% documents for review and PDF version, (1) hard copy specifications, Cut sheets of equipment, Meeting minutes, Preliminary cost estimate. Fixed Price Cost: $21,213.42 Reimbursable cost for postage: $40.00 Reimbursable cost for printing: $137.50 Reimbursable cost for mileage at .445/mi rate: $332.86 Task total not to exceed: $21723.78
|
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 2: Subtask 3 100% Plans: ( 5) 24 x 36 sets of plans - ( 4 of 5 to be signed and sealed) & PDF, ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 2: Subtask 3 100% Plans: ( 5) 24 x 36 sets of plans - ( 4 of 5 to be signed and sealed) & PDF, ( 5) 8 ½ x 11 specifications - ( 4 of 5 to be signed and sealed) & PDF, CADD files, Cost estimate. Fixed Price Costs: $23,125.89 Reimbursable cost for postage: $220.00 Reimbursable cost for printing: $575.00 Task total not to exceed: $23,920.89
|
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 4 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 2: Subtask 4 Bidding Assistance: Copies of RFl's, Substitutions, addendum, GMP review letter
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 2: Subtask 4 Bidding Assistance: Copies of RFl's, Substitutions, addendum, GMP review letter
|
| Deliverable Price: $3,797.99 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 5 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 2: Subtask 5 50% Construction Administration: Copy of all approved submittals, Copy of field re...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 2: Subtask 5 50% Construction Administration: Copy of all approved submittals, Copy of field reports. Fixed Price Costs: $6571.12 Reimbursable cost for mileage at .445/mi rate: $332.86 Task total not to exceed: $6903.98
|
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 6 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 2: Subtask 6 100% Construction Administration: Copy of all approved submittals and other closeo...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 2: Subtask 6 100% Construction Administration: Copy of all approved submittals and other closeout documents, Copy of contractors red-lined record drawings, Copy of field reports and punch list. Fixed Price Costs: $6128.27. Reimbursable costs for mileage at .445/mi rate: $332.86 Task total not to exceed: $6461.13
|
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 7 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 2: Subtask 8 - 100% construction documents ASA 002; (2) hard copy sets of 24 x 36 prints of con...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 2: Subtask 8 - 100% construction documents ASA 002; (2) hard copy sets of 24 x 36 prints of construction documents for review and PDF version. Fixed Price Cost: $72369.48 reimbursable costs for postage: $100.00 reimbursable cost for printing: $825.00 Reimbursable costs for travel at .445 mileage rate: $832,15 Task total not to exceed: $74126.63 CO2: Adds Subtask 8, increases task total.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T2CO2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 2: Subtask 9 - Bidding ASA 002; Copies of RFIs substitutions addendum GMP review letter. CO2: A...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 2: Subtask 9 - Bidding ASA 002; Copies of RFIs substitutions addendum GMP review letter. CO2: Adds Subtask 9, increases task total.
|
| Deliverable Price: $6,154.30 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T2CO2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 2: Subtask 10 - 50% contract administration ASA 002; copy of all approved submittals, copy of f...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 2: Subtask 10 - 50% contract administration ASA 002; copy of all approved submittals, copy of field reports. Fixed Price Cost: $12630.42 Reimbursable costs for travel at .445 mileage rate: $832.15 Task total not to exceed: $13462.57 CO2: Adds Subtask 9, increases task total.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T2CO2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 2: Subtask 11 - 100% construction administration ASA 002; • Copy of all approved submittals and...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 2: Subtask 11 - 100% construction administration ASA 002; • Copy of all approved submittals and other closeout documents
• Copy of contractors red-lined record drawings
• Copy of field reports, final completion, and punch list Fixed Price Cost: $14111.49 Reimbursable cost for travel at .445 mileage rate: $832.15 Task total not to exceed: $14943.64 Co2: Adds Subtask 11, increases task total.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T2CO2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 2: Subtask 12 - Construction administration monitoring 50% as a 002; submit TEM air sampling PL...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 2: Subtask 12 - Construction administration monitoring 50% as a 002; submit TEM air sampling PLM, submit air monitoring reports Fixed Price Cost: $0.00 Reimbursable cost for TEM Air samples: $1560.00 Reimbursable cost for air monitoring: $37500.00 Task total not to exceed: $39060.00 CO2: Adds Subtask 12, increases task total.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T2CO2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 2: Subtask 13 - construction administration monitoring 100% ASA 002; • Submit TEM Air sampling ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 2: Subtask 13 - construction administration monitoring 100% ASA 002; • Submit TEM Air sampling PLM
• Submit Air Monitoring reports
• Submit Final Report Fixed Price Cost: $750.00 Reimbursable cost for TEM air sampling: $1440.00 Reimbursable cost for air monitoring: $37500.00 Task total not to exceed: $38940.00 Co2: Adds subtask 13, increases task total.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T2CO2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 2: Subtask 14 - 100% Construction Documents ASA 003, Deliverable - (2) hard copy sets of 24 x 3...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 2: Subtask 14 - 100% Construction Documents ASA 003, Deliverable - (2) hard copy sets of 24 x 36 prints of construction documents for review and PDF version. Reimbursable = Mileage, (1) trips x 374 miles x $.445/mile = 166.43. Subtask fee = $3,625.65, total cost = $3,794.08.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the department to confirm they are complete, accurate, and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 2: Subtask 15 - Construction Administration ASA 003, Deliverable - Copies of RFI’s, Change Orde...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 2: Subtask 15 - Construction Administration ASA 003, Deliverable - Copies of RFI’s, Change Order, ASI, as applicable.
|
| Deliverable Price: $731.82 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the department to confirm they are complete, accurate, and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 2: Subtask 16: Revised Documents for 7th edition of the FBC – ASA 004, Deliverable: (2) hard co...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 2: Subtask 16: Revised Documents for 7th edition of the FBC – ASA 004, Deliverable: (2) hard copy sets of 24 x 36 prints of construction documents for review and PDF version. Reimbursable = $100 postage, $230 to print. Subtask fee = $4,318.17. Cost no to exceed $4,648.17.
CO4: Increase in Cost |
| Deliverable Price: $4,648.17 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the department to confirm they are complete, accurate, and timely. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform. |
| Source Documentation Page Reference: CO4 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 2: Subtask 17: Revise Documents for Owner requested change to stucco and Hardie board
– ASA 005...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 2: Subtask 17: Revise Documents for Owner requested change to stucco and Hardie board
– ASA 005 - (2) hard copy sets of 24 x 36 prints of construction documents for review and PDF version. Reimbursable = $50 for postage, 2x sets of 5x sheets @ $2.00/sheet = $20, printing specification cost for 30 sheets @ .15/sheet = $9. $79 reimbursable total. Subtask fee = 1,273.49. Total cost not to exceed $1,352.49.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the department to confirm they are complete, accurate, and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO5 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3: Subtask 1: Prepare 30% Documents: Order of magnitude cost estimate, Hard copy and PDF copy o...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 3: Subtask 1: Prepare 30% Documents: Order of magnitude cost estimate, Hard copy and PDF copy of 30% documents Fixed Price cost: $8,606.70 Reimbursable Postage Cost: $25.00 Reimbursable Printing - Plans cost: $16.00 Reimbursable Printing - Specification cost: $60.00 Reimbursable Milage (@ $0.445 per mile) cost: $169.10 Subtask 1 will not exceed $8,876.80
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: Page 2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3: Subtask 2: 100% documents: Five Hard copies and pdf copy of 100% contract documents. Update ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 3: Subtask 2: 100% documents: Five Hard copies and pdf copy of 100% contract documents. Update probable cost estimate. Transmit AutoCAD files via eTransmit to the BDC project manger Fixed Price cost: $7,480.20 Reimbursable Postage Cost: $100.00 Reimbursable Printing - Plans cost: $50.00 Reimbursable Printing - Specification cost: $225.00 Subtask 2 will not exceed $7,855.20
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: Page 3 |