Contract Information

 

Summary

Agency Name: DEPARTMENT OF ENVIRONMENTAL PROTECTION

Agency Contract ID: CN214

Long Title: Statewide - George and Associates.

Vendor Name: GEORGE & ASSOCIATES, CONSULTING

Total Contract Amount: $2,966,114.81

Total Budgetary Amount: $2,966,114.81

Total Payment To Date: $2,402,670.83

Date of Execution: 03/03/2015

General Description: Statewide Continuing Services Contract.

Main Information

Agency Contract ID: CN214

FLAIR Contract ID: CN214

Short Title: CN214

Long Title: Statewide - George and Associates.

Contract Type: Master Agreement

Contract Status: Closed or Expired

Date of Execution: 03/03/2015

Date of Beginning: 03/03/2015

Original End Date: 03/02/2020

New Ending Date: 03/03/2025

Agency Service Area: DRP

Statutory Authority: 258, F.S.

Contract Involves State or Federal Financial Assistance: No

Recipient Type:

Provide for Administrative Cost: No

Provide for Periodic Increase: No

Procurement Information

Authorized Advanced Payment: No

Method of Procurement: Consultant's Competitive Negotiation Act [s. 287.055, F.S.]

State Term Contract ID:

Contract’s Exemption Justification:

Agency Reference Number: RFSOQ BDC01-13/14

Business Case Study Done: No

Legal Challenges to Procurement: No

Outsourcing / Capital Improvements

Was the Contracted Function Previously Performed by the State: No

Was the Contracted Function Considered for Insourcing back to the State: No

Did the Vendor Make Capital Improvements on State Property: No

Budget Information

Original Contract Amount: $0.00

Total Contract Amount: $2,966,114.81

Total Recurring Budgetary Amount: $0.00

Total Non-Recurring Budgetary Amount: $2,966,114.81

Total Budgetary Amount: $2,966,114.81

Total Unfunded Amount: $0.00

As of Date: 12/18/2024

No Recurring Budgetary records found for this contract.

Non-Recurring Budgetary Amount Account Code Fiscal Year Effective Date FY Cost Accumulator Agency Amendment Reference
$10,759.44 37-20-2-408001-37500300-00-080039-25 07/01/2024 2024-2025 U3100 T53
$0.00 37-20-2-408001-37500300-00-080039-24 07/01/2023 2023-2024
$68,516.18 37-20-2-675002-37500300-00-080039-24 07/01/2023 2023-2024 U3200 T52
$14,582.70 37-20-2-423001-37500300-00-080039-23 07/01/2022 2022-2023 U3200 T45CO1
$15,860.00 37-10-1-000286-37500300-00-080039-23 07/01/2022 2022-2023 U3100 T43CO3
$238,442.18 37-10-1-000286-37500300-00-080039-23 07/01/2022 2022-2023 U3100 T43CO2
$92,191.41 37-20-2-423001-37500300-00-080039-23 07/01/2022 2022-2023 U3200 T45
$24,832.80 37-10-1-000286-37500300-00-080039-23 07/01/2022 2022-2023 U3200 T46
$159,917.46 37-20-2-423001-37500300-00-080039-23 07/01/2022 2022-2023 U3200 T44
$6,368.53 37-10-1-000286-37500300-00-080039-23 07/01/2022 2022-2023 U3100 T43CO1
$13,942.36 37-10-1-000286-37500300-00-085154-22 07/01/2022 2022-2023 U3100 T40CO1
$30,655.64 37-10-1-000286-37500300-00-080039-23 07/01/2022 2022-2023 U3100 T43
($2,974.67) 37-20-2-423001-37500300-00-080039-22 07/01/2022 2022-2023 U3200 T39CO1
$9,630.00 37-20-2-423001-37500300-00-080039-22 07/01/2022 2022-2023 U3200 T39
$33,591.62 37-10-1-000286-37500300-00-085154-22 07/01/2021 2021-2022 U3200 T41CO3
$11,073.00 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 U3200 T37CO4
$387,867.19 37-20-2-423001-37500300-00-080029-22 07/01/2021 2021-2022 U3200 T37CO3
$90,471.24 37-10-1-000286-37500300-00-085154-22 07/01/2021 2021-2022 U3200 T49
$2,789.69 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 U3200 T38CO1
$18,279.27 37-10-1-000286-37500300-00-085154-22 07/01/2021 2021-2022 U3100 T40CO2
$39,704.06 37-10-1-000286-37500300-00-085154-22 07/01/2021 2021-2022 U3200 T41CO2
($2,325.00) 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 U3200 T37CO2
$9,509.00 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 U3200 T37CO1
$9,162.12 37-10-1-000286-37500300-00-085154-22 07/01/2021 2021-2022 U3200 T41CO1
$2,630.40 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 U3100 T35CO2
$72,852.97 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 U3200 T37
$27,856.44 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 U3200 T42
$83,366.44 37-10-1-000286-37500300-00-085154-22 07/01/2021 2021-2022 U3200 T41
$114,418.00 37-10-1-000286-37500300-00-085154-22 07/01/2021 2021-2022 U3100 T40
$4,446.00 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 U3100 T35CO1
$54,308.93 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 U3100 T34
$38,305.37 37-20-2-675002-37500300-00-080039-21 07/01/2020 2020-2021 U3100 T47
$24,944.16 37-20-2-675002-37500300-00-080039-21 07/01/2020 2020-2021 U3200 T36
$60,632.00 37-20-2-423001-37500300-00-080039-22 07/01/2020 2020-2021 U3200 T38
$35,797.98 37-20-2-423001-37500300-00-080039-22 07/01/2020 2020-2021 U3200 T33
$89,952.13 37-20-2-423001-37500300-00-080039-22 07/01/2020 2020-2021 T32
$1,603.18 37-20-2-675002-37500300-00-088130-19 07/01/2020 2020-2021 T30CO5
$55,227.50 37-20-2-675002-37500300-00-088130-21 07/01/2020 2020-2021 U3200 T31
$17,295.78 37-20-2-408001-37500300-00-080039-20 07/01/2019 2019-2020 U3100 T47
$0.00 37-10-1-000286-37500300-00-080039-20 07/01/2019 2019-2020
$21,144.83 37-20-2-423001-37500300-00-080039-20 07/01/2019 2019-2020 U3200 T35
$0.00 37-20-2-131001-37500300-00-080039-14 07/01/2019 2019-2020 TA26
$6,412.72 37-20-2-000286-37500300-00-088040-19 07/01/2018 2018-2019 U3200 T30CO4
$3,651.72 37-20-2-000286-37500300-00-088040-19 07/01/2018 2018-2019 U3200 T30CO3
$6,393.91 37-10-1-000286-37500300-00-088040-19 07/01/2018 2018-2019 U3200 T30CO1
$32,201.24 37-10-1-000286-37500300-00-088040-19 07/01/2018 2018-2019 U3200 T30
$7,468.90 37-20-2-675002-37500300-00-080039-19 07/01/2018 2018-2019 U3200 T28
$14,230.09 37-20-2-675002-37500300-00-080039-18 07/01/2017 2017-2018 T26
$0.00 37-20-2-675002-37500300-00-080039-18 07/01/2017 2017-2018
$18,287.44 37-20-2-675002-37500300-00-080039-18 07/01/2017 2017-2018 T15CO2
$5,698.22 37-20-2-423001-37500300-00-080039-17 07/01/2016 2016-2017 TA22
$20,854.53 37-20-2-423001-37220100-00-087870-17 07/01/2016 2016-2017 T29
$29,936.00 37-20-2-423001-37220100-00-087870-17 07/01/2016 2016-2017 TA25CO1
$0.00 37-20-2-423001-37220100-00-087870-17 07/01/2016 2016-2017
$29,799.72 37-20-2-423001-37500300-00-080039-17 07/01/2016 2016-2017 U3200 T25
$9,687.34 37-20-2-423001-37500300-00-080039-17 07/01/2016 2016-2017 U3200 TA23
$4,896.00 37-20-2-423001-37500300-00-080039-17 07/01/2016 2016-2017 T15CO1
$19,882.42 37-20-2-423001-37500300-00-080039-17 07/01/2016 2016-2017 U3200 T21
$57,550.33 37-20-2-423001-37500300-00-080039-17 07/01/2016 2016-2017 U3200 T20
$26,225.94 37-20-2-423001-37500300-00-080039-16 07/01/2016 2016-2017 T19
$1,864.84 37-20-2-423001-37500300-00-080039-17 07/01/2016 2016-2017 T18
$12,648.00 37-20-2-423001-37500300-00-080039-17 07/01/2016 2016-2017 T17
$10,320.00 37-20-2-423001-37500300-00-080039-17 07/01/2016 2016-2017 T16
$45,039.34 37-20-2-423001-37500300-00-080039-17 07/01/2016 2016-2017 T15
$14,598.86 37-20-2-423001-37500300-00-080039-17 07/01/2016 2016-2017 T12
$17,670.91 37-20-2-423001-37500300-00-080039-17 07/01/2016 2016-2017 T13
$3,124.94 37-10-1-000286-37500300-00-088130-17 07/01/2016 2016-2017 T14
$1,610.76 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 T19CO1
$9,945.68 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 T27
$27,784.32 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 T24
$27,655.32 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 T11
$9,667.88 37-20-2-423001-37500300-00-088130-16 07/01/2015 2015-2016 T9
$0.00 37-20-2-675002-37100500-00-100777-00 07/01/2015 2015-2016
$6,004.00 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 T4CO2
$80,616.00 37-20-2-675002-37500300-00-030000-00 07/01/2015 2015-2016 TA3CO2
$6,989.04 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 T1CO1
$15,579.00 37-20-2-675002-37500300-00-030000-00 07/01/2015 2015-2016 T2
$7,177.39 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 TA4
$62,520.00 37-20-2-675002-37100500-00-030000-00 08/07/2015 2015-2016 TA3
$201.62 37-20-2-131001-37500300-00-080039-15 07/01/2014 2014-2015 U3200 T20
$24,417.00 37-20-2-131001-37500300-00-080039-15 07/01/2014 2014-2015 T10
$22,324.93 37-20-2-131001-37500300-00-080039-15 07/01/2014 2014-2015 T5
$42,729.95 37-20-2-131001-37500300-00-080039-15 07/01/2014 2014-2015 T6
$13,370.98 37-20-2-423001-37500300-00-080039-16 07/01/2014 2014-2015 T4CO1
$56,893.25 37-20-2-131001-37500300-00-080039-14 05/18/2015 2014-2015 TA1
$0.00 04/29/2015 2014-2015
$20,405.02 37-20-2-131001-37500300-00-080039-14 07/01/2013 2013-2014 T5
$9,510.93 37-20-2-423001-37500300-00-088130-13 07/01/2012 2012-2013 T7
$134,640.00 37-20-2-675002-37500300-00-100777-00 07/01/2000 2000-2001 T8

Contract Change

Change Type Amendment Amount Agency Amendment Reference Change Description Amendment Effective Date Amendment Execution Date New Ending Date
Amendment $0.00 T47CO1 This is a time only extension to the end of the contract. Pl 10/28/2024 10/28/2024 03/03/2025
Amendment $10,759.44 T53 Additional services 08/14/2024 08/14/2024
Amendment $0.00 T44CO1 Time Only Extension 07/19/2024 07/19/2024 03/03/2025
Amendment $33,591.62 T41CO3 Additional Services 07/19/2024 07/19/2024
Amendment $68,516.18 T52 Additional services 07/08/2024 07/08/2024 03/03/2025
Amendment $14,582.70 T45CO1 Additional services 06/06/2024 06/06/2024
Amendment $11,073.00 T37CO4 Additional Services 03/07/2024 03/07/2024
Amendment $0.00 T36CO2 time extension 12/18/2023 12/18/2023 12/31/2024
Amendment $90,471.24 T49 proposal for weeki wacheestate park 11/08/2023 11/08/2023
Amendment $387,867.19 T37CO3 Additional Services 11/07/2023 11/07/2023
Amendment $15,860.00 T43CO3 Additional Services 09/11/2023 09/11/2023
Amendment $238,442.18 T43CO2 Additional Services 08/18/2023 08/18/2023 05/01/2025
Amendment $92,191.41 T45 Additional Services 08/02/2023 08/02/2023
Amendment $24,832.80 T46 Additional Services 07/31/2023 07/31/2023
Amendment $55,601.15 T47 Additional Services 07/21/2023 07/21/2023
Amendment $39,704.06 T41CO2 Environmental Services and Cultural Resource Assessment 06/30/2023 06/30/2023 09/15/2024
Amendment $18,279.27 T40CO2 Additional Services 06/30/2023 06/30/2023
Amendment $0.00 T32CO1 Task time Extension 06/06/2023 06/06/2023
Amendment ($2,325.00) T37CO2 Additional services 05/26/2023 05/26/2023
Amendment $0.00 T34CO1 Task time Extension 05/17/2023 05/17/2023
Amendment $159,917.46 T44 Additional Services 04/11/2023 04/11/2023
Amendment $9,509.00 T37CO1 Additional services 03/31/2023 03/31/2023
Amendment $9,162.12 T41CO1 Gopher Tortoise Services 02/08/2023 02/08/2023
Amendment $6,368.53 T43CO1 Gopher Tortoise Services 02/08/2023 02/08/2023
Amendment $13,942.36 T40CO1 Add Gopher Tortoise Services 02/07/2023 02/07/2023
Amendment $2,630.40 T35CO2 Additional Services 02/02/2023 02/02/2023
Amendment $2,789.69 T38CO1 Additional Services 02/02/2023 02/02/2023
Amendment $0.00 T36CO1 Task time extension 12/06/2022 12/06/2022
Amendment $30,655.64 T43 additional service 10/26/2022 10/26/2022
Amendment $27,856.44 T42 Additional services 08/03/2022 08/03/2022
Amendment $114,418.00 T40 Additional Services 07/29/2022 07/29/2022
Amendment $83,366.44 T41 Provide infrastructure and sewer improvements 07/27/2022 07/27/2022
Amendment $4,446.00 T35CO1 Additional Services 07/20/2022 07/20/2022
Amendment $54,308.93 T34 Additional Services 06/13/2022 06/13/2022
Amendment ($2,974.67) T39CO1 Cost Decrease 04/28/2022 04/28/2022
Amendment $9,630.00 T39 Additional Services 04/18/2022 04/18/2022
Amendment $24,944.16 T36 Design and permitting services for water plant 03/04/2022 03/04/2022
Amendment $21,144.83 T35 Provide Documents and Administrative Svs. 02/01/2022 02/01/2022
Amendment $60,632.00 T38 Design and permit 02/01/2022 02/01/2022
Amendment $35,797.98 T33 Design and Permitting Services 01/07/2022 01/07/2022
Amendment $72,852.97 T37 conceptual planning and design services 12/02/2021 12/02/2021
Amendment $55,227.50 T31 Adding Task 11/15/2021 11/15/2021
Amendment $1,603.18 T30CO5 Construction Administration Services 11/15/2021 11/15/2021
Amendment $89,952.13 T32 Construction Administration Services 11/15/2021 11/15/2021
Amendment $0.00 CMC3 Contract Manager Change 05/06/2021 05/06/2021
Amendment $6,412.72 T30CO4 Additional construction administration services 01/25/2021 01/25/2021
Amendment $3,651.72 T30CO3 Additional Services and CA 11/02/2020 11/02/2020
Amendment $0.00 CMC2 Contract Manager Change 07/15/2020 07/15/2020
Amendment $0.00 T30CO2 No-cost time extension 06/08/2020 06/08/2020
Amendment $0.00 A1 Renewal 03/04/2020 03/10/2020 03/03/2025
Amendment $6,393.91 T30CO1 Additional Services 12/11/2019 12/11/2019
Amendment $32,201.24 T30 Design, Permitting & CA Services 10/22/2019 10/22/2019
Amendment $0.00 TA26 Entered in Error 05/31/2018 07/01/2019
Amendment $0.00 CMC1 Department Contract Manager Change 04/30/2019 04/30/2019
Amendment $20,854.53 T29 Moves Subtasks from exp. TA 10/03/2018 10/03/2018
Amendment $7,468.90 T28 Construction Admin. Services 09/10/2018 09/10/2018
Amendment $14,230.09 T26 Provide plans update, bidding services and construction admi 05/31/2018 05/31/2018 06/30/2019
Amendment $9,945.68 T27 Provide construction administration services for campground 05/23/2018 05/23/2018 11/30/2018
Amendment $0.00 ASA Agency Service Area change 07/01/2018 05/21/2018
Amendment $29,936.00 TA25CO1 Increase funding and adds additional task 02/23/2018 02/23/2018 06/30/2018
Amendment $27,784.32 T24 "Provide inspection and permitting services for Port B Resto 01/03/2018 01/03/2018
Amendment $0.00 TA20CO1 Time Extension 12/21/2017 12/21/2017 03/31/2018
Amendment $0.00 T15CO3 Increase in task time 12/19/2017 12/19/2017 12/31/2018
Amendment $29,799.72 T25 Potable Water Service Preparations 11/08/2017 11/08/2017
Amendment $0.00 T19CO2 Time Extension 08/30/2017 08/30/2017
Amendment $9,687.34 TA23 Construction Administration Services 08/24/2017 08/24/2017
Amendment $18,287.44 T15CO2 Proj. NO: 61124C-Additional post design services to assist 07/18/2017 07/18/2017 12/31/2017
Amendment $5,698.22 TA22 Construction Administrative Services 07/14/2017 07/14/2017
Amendment $1,610.76 T19CO1 New Contractor - Time Extension 05/31/2017 05/31/2017
Amendment $4,896.00 T15CO1 Paynes Prairie Preserve State Park 05/30/2017 05/30/2017
Amendment $57,751.95 T20 Cross Florida Greenway 05/18/2017 05/18/2017
Amendment $19,882.42 T21 DeLeon Springs State Park. 05/18/2017 05/18/2017
Amendment $26,225.94 T19 Dagny Johnson Key Largo Hammock Botanical State Park 02/14/2017 02/14/2017
Amendment $0.00 T4CO3 Big Shoal State Park 12/20/2016 12/20/2016
Amendment $1,864.84 T18 Topsail Hill Preserve State Park 12/16/2016 12/16/2016
Amendment $10,320.00 T16 Florida Caverns State Park 09/20/2016 09/20/2016
Amendment $12,648.00 T17 Ochlockonee River State Park 09/20/2016 09/20/2016
Amendment $45,039.34 T15 Paynes Prairie Preserve State Park 09/09/2016 09/09/2016
Amendment $17,670.91 T13 Surveying, Design & Permitting at St. Andrews SP Campground 08/23/2016 08/23/2016
Amendment $14,598.86 T12 Big Lagoon State Park 08/23/2016 08/23/2016
Amendment $3,124.94 T14 Provide geotechnical investigation for Gainesville-Hawthorne 08/16/2016 08/16/2016 09/30/2016
Amendment $27,655.32 T11 Dagny Johnson Key Largo State Park 08/08/2016 08/08/2016
Amendment $24,417.00 T10 DeLeon Springs State park 08/03/2016 08/03/2016
Amendment $9,667.88 T9 Geotechnical testing and report for Paynes Prairie Preserve 07/14/2016 07/14/2016
Amendment $134,640.00 T8 Augmented Staff Support 06/30/2016 06/30/2016
Amendment $6,004.00 T4CO2 Big Shoals State Park 06/08/2016 06/08/2016
Amendment $0.00 T3CO3 ADDITION OF ADDITIONAL POSITION/REALLOCATION OF HOURS 05/25/2016 05/25/2016
Amendment $9,510.93 T7 Falling Waters State Park 05/23/2016 05/23/2016
Amendment $42,729.95 T5 Cross Florida Greenways 02/10/2016 02/10/2016
Amendment $42,729.95 T6 Cross Florida Greenways 02/10/2016 02/10/2016
Amendment $0.00 T1CO2 additional task time 01/05/2016 01/05/2016
Amendment $0.00 T3CO1 ADDITIONAL TIME 12/31/2015 12/31/2015 01/31/2016
Amendment $80,616.00 TA3CO2 Task Funding Increase & Additional Time 12/31/2015 12/31/2015
Amendment $13,370.98 T4CO1 Increase Task Amount; Additional task time 12/14/2015 12/14/2015
Amendment $6,989.04 T1CO1 Adding services 08/18/2015 08/18/2015
Amendment $7,177.39 TA4 Big Shoals State Park 08/07/2015 08/07/2015
Amendment $62,520.00 TA3 FDEP Parks and Recreation - Area of Operations 08/06/2015 08/06/2015
Amendment $15,579.00 T2 FDEP Parks and Recreation - Area of Operations 07/14/2015 07/14/2015
Amendment $56,893.25 TA1 Edward Ball Wakulla Springs State Park 03/27/2015 03/27/2015
Amendment $0.00 CN214 ERROR ENTRY 12/01/2099 12/01/2009 12/31/2099

Vendor

Name Line 1Name Line 2City State ZipMinority Vendor Designation
GEORGE & ASSOCIATES, CONSULTING TALLAHASSEE FL 323030000 Non-Minority

CFDA

No CFDA Codes found for the contract.

CSFA

No CSFA Codes found for the contract.
More Deliverable Number      Commodity/Service Type Major Deliverable Method of Payment
     
Professional engineering services Task 13, Del. 1A: Upon completion of the field work, Nobles Consulting Group, Inc. will provide a s... Fixed Price - Lump Sum
     
Professional engineering services Task 13, Del. 1B: Florida Environmental & Land Services, Inc. will provide a 81/2"x 11" report tha... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 4: • 60% Construction Plan set with including demolition plan, sedimentation plan, connection a... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 4: Large format and/or 8 Y2''x I I design documents. Documents may include but not necessarily ... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 5, Del. 1: George & Associates, Consulting Engineers, Inc. and it design team members will prep... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 5, Del. 2: • Develop 30-percent plans (5-sets) • Develop Preliminary construction cost estimate... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 5, Del. 3: • 1OO-percent Plans (5-sets) • Final Construction Cost Estimate • Design Documentati... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 6, Del 1: George & Associates, Consulting Engineers, Inc. and it design team members will prepa... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 6, Del 2: • Develop 30-percent plans (5-sets), • Develop Preliminary construction cost estimate... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 6, Del 3: • 1OO-percent Plans (5-sets) • Final Construction Cost Estimate • Design Documentati... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 6, Del 4: Final plans package signed and sealed by a Florida Registered Professional Engineer (... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 1.1- Design of water loop system and second level HVAC systems: Large format documents design d... Fixed Price - Lump Sum
     
Professional engineering services Task 1.2- Design Florida Room Mechanical System: "• Large format documents design documents and 8 Y2... Fixed Price - Lump Sum
     
Professional engineering services Task 1.3- New mechanical system(s) for the Lobby, Dining, and GiftShop: "• Large format documents de... Fixed Price - Lump Sum
     
Professional engineering services Task 1.4- New mechanical system(s) for Kitchen and Storage space: "• Large format documents design d... Fixed Price - Lump Sum
     
Civil engineering Task 1.5- New mechanical system(s) for first floor Office and Administration area: "• Large format d... Fixed Price - Lump Sum
     
Professional engineering services Task 1.6- Contract Administration: "• Field reports in 8 I /2""x 11"" format • Shop drawing reviews ... Fixed Price - Lump Sum
     
Professional engineering services Task 1.7C-Project Coordination Services for Task 1.3: "• Large format documents design documents and... Fixed Price - Lump Sum
     
Professional engineering services Task 1.7B- Project Coordination for Task 1.2: "• Large format documents design documents and 8 1/2""... Fixed Price - Lump Sum
     
Professional engineering services Task 1.7A- Project Coordination Services for Task 1.1: "• Large format documents design documents an... Fixed Price - Lump Sum
     
Professional engineering services Task 1.7D- New mechanical system(s) for Kitchen and Storage space: "• Large format documents design ... Fixed Price - Lump Sum
     
Professional engineering services Task 1.7E- New mechanical system(s) for first floor Office and Administration area: "• Large format ... Fixed Price - Lump Sum
     
Professional engineering services Task 1.7F- Task 1.6 Contract Administration: "• Field reports in 8 I /2""x 11"" format • Shop drawi... Fixed Price - Lump Sum
     
Professional engineering services Task 1.8A- Water Piping Systems Design: Large format and or 8 1/2"" x 11"" design documents. Docume... Fixed Price - Lump Sum
     
Professional engineering services Task 1.8B- Flow Test: 8 1/2"" x 11"" documents / report indicating the existing pressure / flow fro... Fixed Price - Lump Sum
 Displaying 1 to 25 of 396     1 2 3 4 5 6 7 8 ...  16 Next  Last


Payments are also referred to as expenditures (creating or incurring a legal obligation to disburse money) or disbursements (the payment of expenditures). Payments include disbursements and accounting adjustments made on a contract. Payments are always positive amounts while accounting adjustments may be positive or negative depending on the type of adjustment.

Payment Details

"Date" in the listing below indicates the date the payment voucher was recorded in the system, not the date the payment was issued.
More Fiscal Year Total Amount
     
2024-2025 $351,692.36
     
2023-2024 $582,629.19
     
2022-2023 $413,487.25
     
2021-2022 $164,815.94
     
2020-2021 $4,071.72
     
2019-2020 $32,748.58
     
2018-2019 $58,580.91
     
2017-2018 $168,731.53
     
2016-2017 $379,596.55
     
2015-2016 $246,316.80

If a payment or adjustment to a contract was made before July 1, 2012, the information may not be posted in this system.

Contract Documents


Click on the pdf icon or Agency Document Link to view the document
Document Type Document Reference # Executed Date Document Add Date Agency Document Link View
Original Contract Original Contract - CN214 03/03/2015 4/30/2015 9:50:10 AM
Procurement Original Contract - CN214 7/7/2023 3:01:35 PM
Amendment A1 03/10/2020 3/12/2020 8:56:34 AM
Amendment CMC1 04/30/2019 5/6/2019 9:57:31 AM
Amendment CMC2 07/15/2020 7/16/2020 8:21:43 AM
Amendment CMC3 05/06/2021 5/12/2021 12:47:12 PM
Amendment T10 08/03/2016 8/8/2016 2:48:55 PM
Amendment T11 08/08/2016 8/15/2016 4:21:59 PM
Amendment T12 08/23/2016 8/26/2016 3:04:26 PM
Amendment T13 08/23/2016 8/26/2016 11:27:33 AM
Amendment T14 08/16/2016 8/16/2016 3:52:57 PM
Amendment T15 09/09/2016 9/13/2016 8:57:25 AM
Amendment T15CO1 05/30/2017 5/31/2017 6:47:51 PM
Amendment T15CO2 07/18/2017 7/21/2017 8:38:32 AM
Amendment T15CO3 12/19/2017 12/20/2017 11:38:05 AM
Amendment T16 09/20/2016 10/10/2016 10:43:11 AM
Amendment T17 09/20/2016 10/10/2016 11:27:40 AM
Amendment T18 12/16/2016 12/19/2016 11:48:23 AM
Amendment T19 02/14/2017 2/17/2017 2:16:29 PM
Amendment T19CO1 05/31/2017 9/5/2017 10:00:51 AM
Amendment T19CO2 08/30/2017 10/5/2017 10:46:54 AM
Amendment T1CO1 08/18/2015 6/27/2016 10:05:12 AM
Amendment T1CO2 01/05/2016 6/20/2016 11:34:06 AM
Amendment T2 07/14/2015 8/18/2015 11:36:52 AM
Amendment T20 05/18/2017 5/23/2017 1:20:46 PM
Amendment T21 05/18/2017 5/23/2017 1:27:12 PM
Amendment T24 01/03/2018 1/4/2018 1:16:13 PM
Amendment T25 11/08/2017 11/9/2017 1:58:46 PM
Amendment T26 05/31/2018 6/20/2018 8:05:22 AM
Amendment T27 05/23/2018 5/31/2018 3:47:48 PM
Amendment T28 09/10/2018 9/11/2018 3:07:11 PM
Amendment T29 10/03/2018 11/19/2018 3:22:55 PM
Amendment T30 10/22/2019 10/23/2019 11:43:27 AM
Amendment T30CO1 12/11/2019 12/12/2019 3:50:20 PM
Amendment T30CO2 06/08/2020 6/10/2020 8:20:14 AM
Amendment T30CO3 11/02/2020 11/3/2020 3:01:40 PM
Amendment T30CO4 01/25/2021 1/28/2021 2:20:39 PM
Amendment T30CO5 11/15/2021 11/22/2021 8:26:50 AM
Amendment T31 11/15/2021 11/18/2021 10:41:28 AM
Amendment T32 11/15/2021 12/22/2021 2:53:27 PM
Amendment T32CO1 06/06/2023 6/13/2023 10:54:49 AM
Amendment T33 01/07/2022 2/11/2022 8:47:21 AM
Amendment T34 06/13/2022 6/13/2022 4:19:04 PM
Amendment T34CO1 05/17/2023 5/18/2023 4:01:44 PM
Amendment T35 02/01/2022 7/22/2022 2:44:36 PM
Amendment T35CO1 07/20/2022 7/22/2022 2:56:03 PM
Amendment T35CO2 02/02/2023 2/8/2023 1:42:34 PM
Amendment T36 03/04/2022 3/21/2022 10:50:00 AM
Amendment T36CO1 12/06/2022 12/14/2022 3:36:31 PM
Amendment T36CO2 12/18/2023 12/20/2023 9:10:34 AM
Amendment T37 12/02/2021 8/11/2022 3:24:42 PM
Amendment T37CO1 03/31/2023 4/4/2023 4:18:17 PM
Amendment T37CO2 05/26/2023 6/2/2023 10:15:24 AM
Amendment T37CO3 11/07/2023 11/13/2023 2:19:00 PM
Amendment T37CO4 03/07/2024 3/8/2024 3:25:34 PM
Amendment T38 02/01/2022 3/3/2022 1:10:34 PM
Amendment T38CO1 02/02/2023 7/24/2023 11:13:33 AM
Amendment T39 04/18/2022 4/18/2022 3:43:49 PM
Amendment T39CO1 04/28/2022 5/3/2022 2:08:42 PM
Amendment T3CO1 12/31/2015 1/6/2016 8:02:38 AM
Amendment T3CO3 05/25/2016 6/28/2016 9:30:44 AM
Amendment T40 07/29/2022 8/3/2022 11:23:54 AM
Amendment T40CO1 02/07/2023 2/8/2023 2:38:57 PM
Amendment T40CO2 06/30/2023 7/10/2023 2:15:13 PM
Amendment T41 07/27/2022 7/29/2022 3:46:58 PM
Amendment T41CO1 02/08/2023 2/8/2023 2:49:50 PM
Amendment T41CO2 06/30/2023 7/10/2023 9:47:20 AM
Amendment T41CO3 07/19/2024 7/23/2024 8:23:22 AM
Amendment T42 08/03/2022 8/4/2022 9:26:51 AM
Amendment T43 10/26/2022 12/27/2022 4:34:46 PM
Amendment T43CO1 02/08/2023 2/13/2023 3:18:36 PM
Amendment T43CO2 08/18/2023 8/22/2023 11:32:04 AM
Amendment T43CO3 09/11/2023 9/12/2023 9:41:20 AM
Amendment T44 04/11/2023 4/17/2023 11:38:37 AM
Amendment T44CO1 07/19/2024 7/22/2024 1:46:33 PM
Amendment T45 08/02/2023 8/7/2023 4:43:24 PM
Amendment T45CO1 06/06/2024 6/6/2024 4:47:02 PM
Amendment T46 07/31/2023 8/4/2023 10:20:33 AM
Amendment T47 07/21/2023 7/24/2023 2:43:36 PM
Amendment T47CO1 10/28/2024 10/28/2024 4:19:04 PM
Amendment T49 11/08/2023 11/8/2023 4:31:02 PM
Amendment T4CO1 12/14/2015 12/23/2015 11:29:20 AM
Amendment T4CO2 06/08/2016 6/20/2016 2:47:29 PM
Amendment T4CO3 12/20/2016 12/28/2016 1:29:53 PM
Amendment T5 02/10/2016 3/2/2016 2:56:25 PM
Amendment T52 07/08/2024 7/10/2024 9:00:05 AM
Amendment T53 08/14/2024 8/16/2024 10:38:08 AM
Amendment T6 02/10/2016 2/16/2016 2:05:27 PM
Amendment T7 05/23/2016 6/7/2016 4:49:12 PM
Amendment T8 06/30/2016 7/1/2016 10:16:21 AM
Amendment T9 07/14/2016 7/18/2016 8:25:13 AM
Amendment TA1 03/27/2015 5/18/2015 2:30:21 PM
Amendment TA20CO1 12/21/2017 12/21/2017 3:04:57 PM
Amendment TA22 07/14/2017 7/17/2017 4:42:33 PM
Amendment TA23 08/24/2017 8/25/2017 4:22:56 PM
Amendment TA25CO1 02/23/2018 2/26/2018 12:58:25 PM
Amendment TA3 08/06/2015 8/7/2015 1:15:22 PM
Amendment TA3CO2 12/31/2015 2/12/2016 9:58:25 AM
Amendment TA4 08/07/2015 8/11/2015 8:32:45 AM


Audit results posted prior to June 30, 2012, appear in a summarized form. As of July 1, 2012, the audit reporting process was expanded to include additional questions and comments from the Bureau of Auditing. As audits are captured in electronic format, they will be posted to this system. If you are interested in seeing audit reports by Fiscal Year and Agency Action Plans, please click here to navigate to the Transparency Florida Contract Audit page.
Audit Type Review Date Fiscal Year View
Expanded Audit of Payment 03/01/2024 2023-2024 View
Contract Review 07/26/2023 2023-2024 View