Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
Professional engineering services
|
As indicated in individual task assignments.
A1: Renewal.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: As indicated in individual task assignments.
A1: Renewal. |
| Deliverable Price: $0.00 |
| Non Price Justification: Agreement without a financial exchange or impact |
| Performance Metrics: Prior to submission to the Department, the Consultant shall review all deliverables to ensure the same are accurate and complete at time of submittal and meet or exceed the specified deliverable.
|
| Financial Consequences: The Department will not pay for any unsatisfactory deliverables. In the event the Department deems a deliverable unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable at no additional cost to the Department within 15 consecutive days. If the Consultant fails to resubmit a satisfactory deliverable within the specified timeframe, the Department, in its sole discretion, may terminate the Task Assignment and/or Agreement for failure to perform.
|
| Source Documentation Page Reference: A1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Subtask 1A – Kickoff Meeting and Staff Coordination, Deliverable - – Meeting notes for kicko...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Subtask 1A – Kickoff Meeting and Staff Coordination, Deliverable - – Meeting notes for kickoff and coordination meeting.
|
| Deliverable Price: $5,907.10 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the department to confirm they are complete, accurate, and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Subtask 1B – Mobilization Preparation, Deliverable – Submit safety plan and work plan to FDE...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1: Subtask 1B – Mobilization Preparation, Deliverable – Submit safety plan and work plan to FDEP. Reimbursable - Airfare, out-of-state = Nashville to Key West $850.00, 1 Trip; Atlanta to Key West $850.00 1 Trip; Nashville to Key West $850.00 1 Trip; Tools, Supplies & Drone $60.00 2 - Trips; reimbursable total = $2,670. Subtask fee = $17,862.92. Total fixed price cost not to exceed $20,532.92.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the department to confirm they are complete, accurate, and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Subtask 1C – Project Management, Deliverable – Progress report/letter will be submitted to s...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Subtask 1C – Project Management, Deliverable – Progress report/letter will be submitted to summarize completed Task 1 activities.
|
| Deliverable Price: $2,735.66 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the department to confirm they are complete, accurate, and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Subtask 2A – Bridge Field Evaluation, deliverable – Evaluation notes and photo logs will be ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1: Subtask 2A – Bridge Field Evaluation, deliverable – Evaluation notes and photo logs will be included in the bridge evaluation report. A progress report will be submitted at the conclusion of the field activities to document the durations and critical findings. The progress report will verify the completion of Task 2 activities. Reimbursables (auots, lodging, subistence, misc) - Rental Truck (Weres) Travel to and On-Site / Week $700.00 3 Weeks = $2,100.00; Rental Car (Engineers) Airport to Site (Days) $32.00 4 Days = $128.00; Fuel (Vehicles & Boat) Travel, On-Site, On-Water $2.50 300 Gal. = $750.00; Excess Baggage Fees Tools, Supplies & Drone $60.00 2 Trips = $120.00; Meals – Inspection and Travel Days, Based on full day – prorate for travel days 36.00, 31 Travel days = $1,116.00; Per Diem (Class A) Field Engineers/Last Travel, Day $80.00, 3 Days = $240.00; Lodging (Marathon FL) Field Engineers/Night $230.00 for 28 Nights = $6,440.00; Boat Rental 22’ Deck Boat / Week, $1,600.00 for 2 Weeks = 3,200.00; Local Boat Operator Boat Operator/Day $463.00 for 14 Days = 6,482.00; Incidentals (Ice, water, Gatoraid, etc) Based on actual costs with receipts 200.00 for 1 At Cost = 200.00. Reimbursable total cost = $20,776.00. Subtask fee = $41,432.00. Total cost not to exceed $62,208.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the department to confirm they are complete, accurate, and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Subtask 2B – Drone with Video/Photos, deliverable – All drone video and digital photographs ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1: Subtask 2B – Drone with Video/Photos, deliverable – All drone video and digital photographs will be submitted along with the Task 3 evaluation reports. Reimbursables for drone operator expenses = Rental Car (Drone Opp.) Airport to Marathon $32.00 for 5 Days =$160.00; Meals - Travel Based on full day – prorate for travel days, $36.00 for 5 Days= $180.00; Per Diem (Class A) Drone Operator/Day $80.00 for 1 Days = $80.00; Lodging (Marathon FL) Drone Operator/Night $230.00 for 5 Nights = $1,150.00; Drone Rental Daily Fee (Privately Owned) $125.00 for 4 Days = $500.00. reimbursable total = $2,070.00. Subtask fee = $7,908.60. Total cost not to exceed $9978.6.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the department to confirm they are complete, accurate, and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Subtask 2C – Quality Control, deliverable – A letter report will be submitted to document th...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1: Subtask 2C – Quality Control, deliverable – A letter report will be submitted to document the QC inspection. Reimbursable for on-site quality control = Airfare (Chief Engineer) Tallahassee to Key West $640.00 for 1 Trip = $640.00; Meals – Inspection and Travel Days Based on full day – prorate for actual travel times 36.00 for 3 Days = $108.00; Lodging (Marathon FL) QC/Night $230.00 for 2 Nights = $460.00; Rental Car (QC) Airport to Marathon $32.00 for 2 Days = $64.00. Total reimbursable cost = $1,272. Subtask fee = $3,620.32. Total cost not to exceed $4,892.32.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the department to confirm they are complete, accurate, and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Subtask 3A – Bridge Evaluation Report Preparation, deliverable – Draft evaluation report for...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Subtask 3A – Bridge Evaluation Report Preparation, deliverable – Draft evaluation report for each bridge will be submitted in digital (pdf) format, including copies of representative photographs. Photographs and videos will be submitted in appropriate format (jpg, mov, etc.)
|
| Deliverable Price: $38,634.26 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the department to confirm they are complete, accurate, and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Subtask 3B – Report QC, deliverable – Final sealed report and QC verification form will be p...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Subtask 3B – Report QC, deliverable – Final sealed report and QC verification form will be provided, signed by the responsible PE.
|
| Deliverable Price: $4,977.94 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the department to confirm they are complete, accurate, and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 2 Subtask 1: Initial Evaluation, Coordination, and Site Review - A letter memorandum of the fie...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 2 Subtask 1: Initial Evaluation, Coordination, and Site Review - A letter memorandum of the field evaluation findings will be submitted following the completion of the field activities. Fixed Price Total - $19,982.08. Reimbursable Travel Cost - $3,475.00. Total reimbursable not to exceed total cost of $23,457.00.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 2 Subtask 2: LiDAR Survey (DRMP) - Submit final LiDAR survey files for incorporation into the b...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 2 Subtask 2: LiDAR Survey (DRMP) - Submit final LiDAR survey files for incorporation into the bridge design documents. Fixed Price Total - $19,961.59. Reimbursable Travel Cost - $4,515.00. Total reimbursable not to exceed total cost of $24,476.59.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 2 Subtask 3: Plan Setup and Coordination with DRMP - Preliminary bridge layout will be submitte...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 2 Subtask 3: Plan Setup and Coordination with DRMP - Preliminary bridge layout will be submitted for FDEP review for proposed scale and coverage.
|
| Deliverable Price: $9,738.48 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 2 Subtask 4: 60% Plan Submission - 60% complete plan sheets, details, quantity calculations, an...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 2 Subtask 4: 60% Plan Submission - 60% complete plan sheets, details, quantity calculations, anticipated demolition requirements.
|
| Deliverable Price: $119,881.98 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 2 Subtask 5: 90% Plan Submission - 90% complete plan sheets, details, quantity calculations, an...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 2 Subtask 5: 90% Plan Submission - 90% complete plan sheets, details, quantity calculations, anticipated demolition requirements.
|
| Deliverable Price: $66,791.26 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 2 Subtask 6: Final Plan Submission - Final, sealed plan sheets, details, quantity calculations,...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 2 Subtask 6: Final Plan Submission - Final, sealed plan sheets, details, quantity calculations, and Cadd files.
|
| Deliverable Price: $25,280.44 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 2 Subtask 7: Bid and Advertisement Coordination - Written responses to contractor inquiries and...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 2 Subtask 7: Bid and Advertisement Coordination - Written responses to contractor inquiries and final revised plan submission.
|
| Deliverable Price: $8,193.10 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 2 Subtask 8: Environmental Permit Coordination - Summary minutes/memo(s) detailing the results ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 2 Subtask 8: Environmental Permit Coordination - Summary minutes/memo(s) detailing the results of the coordination with each agency, and Final memo detailing permit requirements, data collection needs, and tentative permitting timeline. Fixed Price Total - $12,671.12. Reimbursable ESA Support Cost - $2,848.00. Total reimbursable not to exceed total cost of $15.519.12.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3: Subtask 1A: Existing Information Review: A letter memorandum of the evaluation findings in...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: Subtask 1A: Existing Information Review: A letter memorandum of the evaluation findings in PDF Format.
|
| Deliverable Price: $4,473.60 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3: Subtask 1B: Preliminary Utility Coordination: A letter memorandum of all correspondences sen...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: Subtask 1B: Preliminary Utility Coordination: A letter memorandum of all correspondences sent to the affected utilities, as well as the concept, in PDF Format.
|
| Deliverable Price: $2,352.04 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3: Subtask 1C: Preliminary Permitting: A letter memorandum of all correspondences sent to the i...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: Subtask 1C: Preliminary Permitting: A letter memorandum of all correspondences sent to the identified permitting agencies as well as the concept, in PDF Format.
|
| Deliverable Price: $3,359.78 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3: Change Order 1: Subtask 2A: Bridge Repair Sketches/Plan Sheets - Sketches/plan sheets of pro...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: Change Order 1: Subtask 2A: Bridge Repair Sketches/Plan Sheets - Sketches/plan sheets of proposed repairs to provide to the Construction Manager with associated cost estimate.
|
| Deliverable Price: $6,505.86 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3: Change Order 1: Subtask 2B: RFI Technical Responses - Technical response memos for a maximum...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: Change Order 1: Subtask 2B: RFI Technical Responses - Technical response memos for a maximum of two RFIs, or a final repair memorandum will be submitted to confirm completion of these repairs.
|
| Deliverable Price: $2,395.95 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3: Change Order 2: Subtask 3: Final progress report in PDF format.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: Change Order 2: Subtask 3: Final progress report in PDF format.
|
| Deliverable Price: $19,835.32 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3: Change Order 2: Subtask 4A: Bridge rating memorandum of the evaluation findings for the supe...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: Change Order 2: Subtask 4A: Bridge rating memorandum of the evaluation findings for the superstructure in PDF Format.
|
| Deliverable Price: $11,321.72 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3: Change Order 2: Subtask 4B: A bridge rating memorandum of the evaluation findings for the su...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: Change Order 2: Subtask 4B: A bridge rating memorandum of the evaluation findings for the substructure in PDF format.
|
| Deliverable Price: $9,202.50 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO2 |
| Deliverable Number: |
|