| More |
Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
Professional engineering services
|
Task 1-4: HDG will be providing a substantial review report (punch list) and a final completion repo...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1-4: HDG will be providing a substantial review report (punch list) and a final completion report in an 8.5" x 11· format. Fixed price $8,452.00; Reimbursable mileage $555.35. Costs not to exceed $9,007.35. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for the satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified time frame, the Department may, in its sole discretion, terminate the Contract for failure
to perform. |
| Source Documentation Page Reference: T1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1-3: Task III Prepare 100% Construction Documents: HOG will be providing POF's and one set of 2...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1-3: Task III Prepare 100% Construction Documents: HOG will be providing POF's and one set of 24" x 36" drawings for this phase of the project. We would anticipate a 10 day review by BOC and return of said comments to HOG prior to proceeding to Task IV. We propose to prepare the following construction documents for the affected areas:
a Cover Sheet, utilizing the standard format provided by BOC (24" x 36" Drawing);
b. New campground site plan for the Sand Dollar Campsite Loop illustrating proposed electrical modifications (24" x 36" drawing);
c. New electrical outlet plan for the proposed campsite layout (24" x 36" drawing);
d. New electrical riser, calculations. schedules and specifications 24" x 36" drawing);
e. Any technical specifications we will specifically attempt to place on the drawings. making part of the construction drawing set (24" x 36" drawing). Fixed Price costs @ $4,548.00; Reimbursable costs not to exceed $192.00. Total Costs not to exceed $4,740.00. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for the satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified time frame, the Department may, in its sole discretion, terminate the Contract for failure
to perform. |
| Source Documentation Page Reference: T1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1-2: HOG will submit 60% Construction Documents inclusive of any specifications required at thi...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1-2: HOG will submit 60% Construction Documents inclusive of any specifications required at this time to the BOC proJect manager for review and comment We propose to prepare the following construction documents in for the affected areas:
b. Cover Sheet. utilizing the standard format provided by BOC;
c. New campground site plan for the Sand Dollar Campsite Loop illustrating proposed electrical modifications;
d. New electrical outlet plan for the proposed campsite layout;
e New electrical riser, calculations, schedules and specifications;
f. Any technical specifications or product literature is an 8.5" x 11". Fixed Price $4,848.00; Reimbursable costs $42.00. Costs not to exceed $4,890.00. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for the satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified time frame, the Department may, in its sole discretion, terminate the Contract for failure
to perform. |
| Source Documentation Page Reference: T1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1-1: HDG will be providing 1 set of completed drawings for this phase we will be meeting with t...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1-1: HDG will be providing 1 set of completed drawings for this phase we will be meeting with the Park Manager, verifying the provided existing drawings from BOC and documenting current field data.
a. A 24" x 35· Campground site plan for the Sand Dollar Campsite Loop illustrating existing electrical layout and water lines. These elements will be field verified using a measurement wheel and tape measure. A professional survey is not included in this proposal. An 8.5 x 11" field report will also be submitted outlining our work. Fixed Price $2,814; Reimbursable costs $12; Reimbursable travel $185.13. Costs not to exceed $3,011.13. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for the satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified time frame, the Department may, in its sole discretion, terminate the Contract for failure
to perform. |
| Source Documentation Page Reference: T1 |
| Deliverable Number: |
|