Contract Information

 

Summary

Agency Name: DEPARTMENT OF ENVIRONMENTAL PROTECTION

Agency Contract ID: CN217

Long Title: Statewide - JGP

Vendor Name: JGP STRUCTURAL GROUP, INC.

Total Contract Amount: $1,745,413.38

Total Budgetary Amount: $1,745,413.38

Total Payment To Date: $1,096,914.59

Date of Execution: 03/03/2015

General Description: Statewide Continuing Services Contract.

Main Information

Agency Contract ID: CN217

FLAIR Contract ID: CN217

Short Title: CN217

Long Title: Statewide - JGP

Contract Type: Master Agreement

Contract Status: Closed or Expired

Date of Execution: 03/03/2015

Date of Beginning: 03/03/2015

Original End Date: 03/02/2020

New Ending Date: 03/03/2025

Agency Service Area: DRP

Statutory Authority: 258.004, F.S.

Contract Involves State or Federal Financial Assistance: No

Recipient Type:

Provide for Administrative Cost: No

Provide for Periodic Increase: No

Procurement Information

Authorized Advanced Payment: No

Method of Procurement: Consultant's Competitive Negotiation Act [s. 287.055, F.S.]

State Term Contract ID:

Contract’s Exemption Justification:

Agency Reference Number: RFSOQ BDC01-13/14

Business Case Study Done: No

Legal Challenges to Procurement: No

Outsourcing / Capital Improvements

Was the Contracted Function Previously Performed by the State: No

Was the Contracted Function Considered for Insourcing back to the State: No

Did the Vendor Make Capital Improvements on State Property: No

Budget Information

Original Contract Amount: $0.00

Total Contract Amount: $1,745,413.38

Total Recurring Budgetary Amount: $0.00

Total Non-Recurring Budgetary Amount: $1,745,413.38

Total Budgetary Amount: $1,745,413.38

Total Unfunded Amount: $0.00

As of Date: 10/21/2025

Recurring Budgetary Amount Account Code Fiscal Year Effective Date FY Cost Accumulator Agency Amendment Reference
$0.00 37-20-2-675005-37500300-00-100718-00 07/01/2024 2024-2025
$0.00 37-20-2-675005-37500300-00-100718-00 07/01/2024 2024-2025


Non-Recurring Budgetary Amount Account Code Fiscal Year Effective Date FY Cost Accumulator Agency Amendment Reference
$0.00 37-10-1-000286-37500400-00-083643-25 07/01/2024 2024-2025
$21,850.00 37-20-2-408001-37500300-00-080039-25 07/01/2024 2024-2025 U3200 T79
$34,281.76 37-20-2-675005-37500300-00-100718-00 07/01/2024 2024-2025 U3200 T75
$30,630.00 37-20-2-675002-37500300-00-080039-24 07/01/2023 2023-2024 U3200 T64CO1
$1,780.00 37-20-2-675002-37500300-00-080039-24 07/01/2023 2023-2024 U3200 T78
$53,679.50 37-20-2-675002-37500300-00-080039-24 07/01/2023 2023-2024 U3200 T69
$0.00 37-20-2-675002-37500300-00-088040-24 07/01/2023 2023-2024
$21,815.00 37-20-2-408001-37500300-00-080039-24 07/01/2023 2023-2024 U3200 T65
$6,888.30 37-20-2-408001-37500300-00-088040-23 07/01/2022 2022-2023 U3200 T72
$8,695.44 37-20-2-423001-37500300-00-080039-23 07/01/2022 2022-2023 U3200 T51CO1
$16,505.00 37-20-2-423001-37500400-00-083643-23 07/01/2022 2022-2023 U3210 T66
$30,610.00 37-20-2-423001-37500300-00-080039-23 07/01/2022 2022-2023 U3200 T54
$0.00 37-20-2-675002-37500300-00-088040-23 07/01/2022 2022-2023 T61
$5,986.65 37-20-2-408001-37500300-00-088040-23 07/01/2022 2022-2023 U3200 T57
$54,645.25 37-20-2-423001-37500300-00-080039-23 07/01/2022 2022-2023 U3200 T53
$14,880.00 37-20-2-408001-37500300-00-088040-23 07/01/2022 2022-2023 U3200 T29CO2
$25,566.00 37-20-2-423001-37500300-00-080039-23 07/01/2022 2022-2023 U3200 T51
$14,235.00 37-20-2-035001-37500300-00-088040-23 07/01/2022 2022-2023 U3200 T47
$11,894.60 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 U3200 T76
$9,982.72 37-20-2-408001-37500300-00-080039-22 07/01/2021 2021-2022 U3100 T77
$7,977.50 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 U3200 T71
$15,852.16 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 U3200 T70
$18,589.50 37-20-2-408001-37500300-00-080039-22 07/01/2021 2021-2022 U3200 T67
$9,945.00 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 U3200 T62
$40,889.40 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 U3200 T60
$34,797.00 37-10-1-000286-37500300-00-085154-22 07/01/2021 2021-2022 U3200 T61
$5,580.00 37-20-2-408001-37500300-00-080039-22 07/01/2021 2021-2022 U3200 T59
$12,919.22 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 U1300 T58
$20,790.00 37-20-2-408001-37500300-00-080039-22 07/01/2021 2021-2022 U3200 T46
$8,901.55 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 U3200 T34CO1
$6,975.00 37-20-2-408001-37500300-00-080039-22 07/01/2021 2021-2022 U3200 T44
$42,834.50 37-20-2-423001-37500300-00-080039-21 07/01/2021 2021-2022 U3200 T40
$18,974.36 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 U3200 T37
$9,392.70 37-20-2-675002-37500300-00-080039-19 07/01/2021 2021-2022 U3200 T20CO2
$5,548.30 37-20-2-675002-37500300-00-088130-21 07/01/2021 2021-2022 U3200 T33
$27,802.40 37-20-2-423001-37500300-00-080039-22 07/01/2021 2021-2022 U3200 T32
$12,897.17 37-20-2-675002-37500300-00-088130-21 07/01/2021 2021-2022 U3200 T28
$48,943.89 37-20-2-675002-37500300-00-088130-21 07/01/2021 2021-2022 TA27
$19,648.28 37-20-2-675002-37500300-00-088130-21 07/01/2021 2021-2022 TA26
$35,584.28 37-20-2-408001-37500300-00-080039-21 07/01/2021 2021-2022 U3200 T25
$3,230.00 37-20-2-675002-37500300-00-080039-21 07/01/2020 2020-2021 U3200 T73
$13,902.28 37-20-2-675002-37500300-00-088130-21 07/01/2020 2020-2021 U3100 T77
$6,845.00 37-20-2-423001-37500300-00-080039-21 07/01/2020 2020-2021 U3200 T74
$16,750.00 37-20-2-423001-37500300-00-080039-21 07/01/2020 2020-2021 U3200 T68
$6,340.60 37-20-2-675002-37500300-00-080039-21 07/01/2020 2020-2021 U3200 T63
$650.00 37-20-2-423001-37500300-00-080039-21 07/01/2020 2020-2021 U3200 T63
$30,000.00 37-20-2-339074-37500300-00-088137-21 07/01/2020 2020-2021 U1300 T58
$14,887.28 37-20-2-675002-37500300-00-088130-21 07/01/2020 2020-2021 U3100 T48
$29,436.85 37-20-2-675002-37500300-00-088130-21 07/01/2020 2020-2021 T49
$12,114.72 37-10-1-675002-37500300-00-008813-02 07/02/2020 2020-2021 U3201 T45
$2,037.03 37-10-1-423001-37500300-00-008003-92 07/01/2020 2020-2021 U3200 T45
$10,990.00 37-20-2-675002-37500300-00-080039-21 07/01/2020 2020-2021 U3200 T43
$6,662.70 37-20-2-675002-37500300-00-080039-21 07/01/2020 2020-2021 U3200 T20CO3
$18,825.06 37-20-2-423001-37500300-00-080039-21 07/01/2020 2020-2021 T42
$2,953.30 37-20-2-675002-37500300-00-088130-21 07/01/2020 2020-2021 U3200 T41
$10,750.00 37-20-2-408001-37500300-00-080039-20 07/01/2020 2020-2021 U3100 T38
$18,825.06 37-20-2-423001-37500300-00-080039-21 07/01/2020 2020-2021 U3200 T16CO4
$6,750.00 37-20-2-408001-37500300-00-088130-20 07/01/2020 2020-2021 U3200 T18CO2
$4,729.95 37-20-2-675002-37500300-00-080039-21 07/01/2020 2020-2021 U3200 T39
$19,910.00 37-20-2-408001-37500300-00-080039-20 07/01/2020 2020-2021 T36
$9,610.61 37-20-2-408001-37500300-00-080039-21 07/01/2020 2020-2021 U3200 T34
$13,940.00 37-20-2-675002-37500300-00-080039-19 07/01/2020 2020-2021 U4120 T35
$6,825.00 37-20-2-675002-37500300-00-088130-21 07/01/2020 2020-2021 TA28
$500.00 37-20-2-675002-37500300-00-088130-21 05/14/2021 2020-2021 TA26CO1
$1,729.00 37-20-2-675002-37500300-00-088130-21 07/01/2020 2020-2021 TA27CO1
$62.00 37-20-2-408001-37500300-00-080039-21 07/01/2020 2020-2021 TA25CO1
$48,866.15 37-20-2-675002-37500300-00-088130-21 07/01/2020 2020-2021 U3200 T22CO1
$3,968.45 37-20-2-675002-37500300-00-080039-21 07/01/2020 2020-2021 U3200 T21CO1
$3,703.08 37-20-2-675002-37500300-00-080039-21 07/01/2020 2020-2021 U3200 T24
$13,840.80 37-20-2-675002-37500300-00-088130-21 07/01/2020 2020-2021 U3200 T23
$16,191.80 37-20-2-675002-37500300-00-080039-21 07/01/2020 2020-2021 T21
$12,829.73 37-20-2-423001-37500300-00-080039-21 07/01/2020 2020-2021 T22
$5,243.38 37-20-2-423001-37500300-00-080039-21 07/01/2020 2020-2021 U3200 T20
$2,685.00 37-20-2-423001-37500300-00-080039-20 07/01/2020 2020-2021 T16CO1
$8,380.00 37-20-2-423001-37500300-00-080039-21 07/01/2020 2020-2021 T19
$4,738.58 37-20-2-423001-37500300-00-080039-21 07/01/2020 2020-2021 T12CO1
$29,954.50 37-10-1-000286-37500300-00-088040-19 07/01/2020 2020-2021 U3200 T17
$3,330.00 37-20-2-408001-37500300-00-088130-20 07/01/2019 2019-2020 U3200 T18CO5
$10,695.00 37-20-2-408001-37500300-00-088130-20 11/01/2019 2019-2020 U3200 T18CO4
$3,610.00 37-20-2-408001-37500300-00-080039-20 07/01/2019 2019-2020 U3200 T50
$5,939.40 37-20-2-423001-37500300-00-080039-20 07/01/2019 2019-2020 T42
$6,825.00 37-20-2-675002-37500300-00-080039-19 07/01/2019 2019-2020 U4120 TA30
$1,629.87 37-20-2-423001-37500400-00-083643-20 07/01/2019 2019-2020 U3210 T14CO1
$84,620.37 37-20-2-408001-37500300-00-088130-20 07/01/2019 2019-2020 T18
$8,328.04 37-20-2-408001-37500300-00-080039-20 07/01/2019 2019-2020 T15
$3,000.00 37-10-1-000286-37500300-00-080039-20 07/01/2019 2019-2020 T13CO1
$27,970.40 37-20-2-423001-37500300-00-080039-20 07/01/2019 2019-2020 U3200 T16
$1,840.00 37-20-2-423001-37500400-00-083643-20 07/01/2019 2019-2020 U3220 T14
$10,643.55 37-10-1-000286-37500300-00-080039-20 07/01/2019 2019-2020 T13
$13,879.74 37-10-1-000286-37500300-00-080039-20 07/01/2019 2019-2020 U3200 T12
$46,152.00 37-20-2-675002-37500300-00-080039-19 07/01/2018 2018-2019 T31
$39,309.80 37-20-2-675002-37500300-00-080039-19 07/01/2018 2018-2019 U3200 T20CO1
$0.00 37-20-2-675002-37500300-00-080039-19 07/01/2018 2018-2019
$0.00 37-20-2-675002-37500300-00-080039-18 07/01/2017 2017-2018
$2,976.65 37-20-2-423001-37500300-00-080039-17 01/03/2018 2017-2018 T10CO1
$0.00 37-10-1-000286-37500300-00-088130-17 07/01/2016 2016-2017
$8,375.55 37-20-2-423001-37500300-00-080039-17 07/01/2016 2016-2017 T10
$7,713.70 37-20-2-423001-37500300-00-088130-16 07/01/2015 2015-2016 TA1CO1
$2,844.90 37-20-2-423001-37500300-00-088130-16 07/01/2015 2015-2016 U3200 T1CO2
$18,861.80 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 T11
$3,851.25 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 131300 T7CO2
$12,645.60 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 T3CO1
$31,685.72 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 T6
$15,974.32 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 T5
$1,453.20 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 T4
$30,486.60 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 T3
$34,760.64 37-20-2-423001-37500300-00-080039-16 07/01/2015 2015-2016 T2
$7,859.66 37-20-2-423001-37500300-00-080039-16 07/01/2014 2014-2015 T9
$4,923.60 37-20-2-131001-37500300-00-080039-15 07/01/2014 2014-2015 T4
$27,927.10 37-20-2-131001-37500300-00-088130-15 07/01/2014 2014-2015 TA1
$0.00 05/15/2015 2014-2015
$37,723.48 37-20-2-131001-37500300-00-080039-15 07/01/2013 2013-2014 T7
$5,280.00 37-20-2-423001-37500300-00-080158-12 07/01/2011 2011-2012 T8
$33,871.10 37-20-2-675002-37500300-00-100592-00 07/01/1999 1999-2000 U3200 TA29

Contract Change

Change Type Amendment Amount Agency Amendment Reference Change Description Amendment Effective Date Amendment Execution Date New Ending Date
Amendment $0.00 CMC5 Contract Manager Change 01/12/2026 01/12/2026
Amendment $0.00 CMC4 Contract Manager Change 07/22/2025 07/22/2025
Amendment $11,894.60 T76 Additional Services 01/08/2025 01/08/2025
Amendment $1,780.00 T78 Additional Services 11/26/2024 11/26/2024
Amendment $21,850.00 T79 Additional Services 11/20/2024 11/20/2024
Amendment $23,885.00 T77 Additional services 10/28/2024 10/28/2024 06/30/2025
Amendment $34,281.76 T75 Additional Services 10/15/2024 10/15/2024
Amendment $6,845.00 T74 Additional services 09/20/2024 09/20/2024
Amendment $6,888.30 T72 Additional Services 09/20/2024 09/20/2024
Amendment $3,230.00 T73 Additional Services 09/20/2024 09/20/2024
Amendment $7,977.50 T71 Additional Services 08/02/2024 08/02/2024
Amendment $8,695.44 T51CO1 Additional Services 07/16/2024 07/16/2024
Amendment $15,852.16 T70 Additional Services 07/08/2024 07/08/2024
Amendment $16,750.00 T68 Additional Services 06/25/2024 06/25/2024
Amendment $53,679.50 T69 Additional Services 06/25/2024 06/25/2024
Amendment $0.00 T18CO6 Time Extension 06/06/2024 06/06/2024 01/15/2025
Amendment $18,589.50 T67 Additional services 05/07/2024 05/07/2024
Amendment $0.00 T32CO3 Time Extension 04/05/2024 04/05/2024 02/24/2025
Amendment $3,330.00 T18CO5 Additional Services 03/07/2024 03/07/2024
Amendment $0.00 T34CO4 Time Extension 12/20/2023 12/20/2023
Amendment $0.00 T49CO1 Time Extension 12/18/2023 12/18/2023 12/31/2024
Amendment $6,990.60 T63 professional services to provide an updated hydraulic study 12/05/2023 12/05/2023
Amendment $21,815.00 T65 Additional Services 11/21/2023 11/21/2023
Amendment $10,695.00 T18CO4 Additional Services 11/21/2023 11/21/2023
Amendment $1,900.00 T64CO1 Additional Services 11/08/2023 11/08/2023
Amendment $16,505.00 T66 Engineering services to investigate 10/17/2023 10/17/2023
Amendment $30,610.00 T54 Professional services to provide structural repair design 08/29/2023 08/29/2023
Amendment $0.00 T32CO2 Time Extension 08/01/2023 08/01/2023
Amendment $28,730.00 T64 Additional Services 07/31/2023 07/31/2023
Amendment $9,945.00 T62 Additional services 06/22/2023 06/22/2023
Amendment $0.00 T34CO3 Task time Extension 06/20/2023 06/20/2023
Amendment $34,797.00 T61 Additional Services 06/02/2023 06/02/2023
Amendment $40,889.40 T60 Additional services 06/02/2023 06/02/2023
Amendment $5,580.00 T59 Additional Services 04/20/2023 04/20/2023
Amendment $42,919.22 T58 Additional Services 04/07/2023 04/07/2023
Amendment $0.00 T18CO3 Time extension 04/07/2023 04/07/2023
Amendment $54,645.25 T53 Additional Services 03/31/2023 03/31/2023
Amendment $5,986.65 T57 Additional services 03/31/2023 03/31/2023
Amendment $3,610.00 T50 Additional Services 03/15/2023 03/15/2023
Amendment $14,880.00 T29CO2 Additional Services/Time extension 03/15/2023 03/15/2023 06/28/2024
Amendment $25,566.00 T51 Additional services 03/08/2023 03/08/2023
Amendment $14,235.00 T47 Additional Services 03/06/2023 03/06/2023
Amendment $14,887.28 T48 Additional Services 02/27/2023 02/27/2023
Amendment $29,436.85 T49 Additional services 02/20/2023 02/20/2023
Amendment $0.00 T39CO1 Time only extension 12/13/2022 12/13/2022
Amendment $0.00 T41CO1 Time only extension 12/13/2022 12/13/2022
Amendment $0.00 T34CO2 Time Extension 12/13/2022 12/13/2022 06/30/2023
Amendment $0.00 T32CO1 Task Time Extension 12/12/2022 12/12/2022
Amendment $20,790.00 T46 Additional services 12/01/2022 12/01/2022
Amendment $8,901.55 T34CO1 additional Services 09/29/2022 09/29/2022
Amendment $14,151.75 T45 Additional Services 08/03/2022 08/03/2022
Amendment $6,975.00 T44 Design services 07/13/2022 07/13/2022
Amendment $6,662.70 T20CO3 Additional Services 07/07/2022 07/07/2022
Amendment $10,990.00 T43 Additional Services 07/07/2022 07/07/2022
Amendment $0.00 T29CO1 Time Extension 06/29/2022 06/29/2022
Amendment $0.00 T31CO1 Time Extension 05/26/2022 05/26/2022 12/31/2022
Amendment $24,764.46 T42 Additional Services 05/20/2022 05/20/2022
Amendment $2,953.30 T41 Additional Services 05/06/2022 05/06/2022
Amendment $42,834.50 T40 Additional Services 04/26/2022 04/26/2022
Amendment $10,750.00 T38 Additional Services 04/26/2022 04/26/2022
Amendment $4,729.95 T39 construction administration services 03/04/2022 03/04/2022
Amendment $6,750.00 T18CO2 provide structural analysis and engineering for the piles 03/04/2022 03/04/2022
Amendment $18,825.06 T16CO4 Hillsborough County requires a No-Rise certification study 03/04/2022 03/04/2022
Amendment $9,392.70 T20CO2 Additional Services 02/08/2022 02/08/2022
Amendment $18,974.36 T37 Adding Task 02/08/2022 02/08/2022
Amendment $0.00 T18CO1 No cost time extension 12/29/2021 12/29/2021 12/29/2022
Amendment $19,910.00 T36 Design Drawing Services 12/22/2021 12/22/2021
Amendment $9,610.61 T34 New Task Assignment 12/15/2021 12/15/2021
Amendment $13,940.00 T35 Provide site verification 12/01/2021 12/01/2021
Amendment $0.00 T16CO3 6 Month time extension 09/23/2021 09/23/2021
Amendment $5,548.30 T33 Provide structural review of multiple restrooms 08/31/2021 08/31/2021
Amendment $27,802.40 T32 Design, support, and permit 2 pedestrian bridge repairs 08/30/2021 08/30/2021
Amendment $46,152.00 T31 Vehicular Bridges 860160-860161 06/17/2021 06/17/2021
Amendment $0.00 TA15 CO1 Time extension 06/09/2021 06/09/2021 12/27/2021
Amendment $33,871.10 TA29 On site verification of existing conditions, design and perm 06/01/2021 06/01/2021
Amendment $6,825.00 TA30 Site visit to review existing conditions 05/21/2021 05/21/2021
Amendment $6,825.00 TA28 Site visit to review existing conditions 05/21/2021 05/21/2021
Amendment $500.00 TA26CO1 This CO corrects calculation errors in the Proposa 05/13/2021 05/13/2021
Amendment $1,729.00 TA27CO1 This change order corrects calculation errors in the Proposa 05/13/2021 05/13/2021
Amendment $62.00 TA25CO1 This change order corrects calculation errors in the Proposa 05/07/2021 05/07/2021
Amendment $0.00 CMC3 Contract Manager Change 05/06/2021 05/06/2021
Amendment $35,584.28 T25 Provide construction documents, DHR coordination, and constr 04/14/2021 04/14/2021
Amendment $0.00 T26 Made in error 04/05/2021 04/05/2021
Amendment $12,897.17 T28 verification of structure/s and provide design/permitting 04/05/2021 04/05/2021
Amendment $48,943.89 TA27 Provide construction documents 04/05/2021 04/05/2021
Amendment $19,648.28 TA26 Construction, permitting, and plans for ADA access 04/05/2021 04/05/2021
Amendment $0.00 T16CO2 Task time extension only 03/08/2021 03/08/2021
Amendment $0.00 TA25 Made in error 02/22/2021 02/22/2021
Amendment $3,703.08 T24 Provide analysis of existing structural conditions 02/22/2021 02/22/2021
Amendment $3,968.45 T21CO1 Provide additional design services 02/22/2021 02/22/2021
Amendment $39,309.80 T20CO1 More site visits and CA services 02/15/2021 02/15/2021
Amendment $48,866.15 T22CO1 More site visits and CA services 02/15/2021 02/15/2021
Amendment $13,840.80 T23 Consultant is to provide design and permitting services 01/29/2021 01/29/2021
Amendment $16,191.80 T21 Consultant providing design and permitting services 12/08/2020 12/08/2020
Amendment $5,243.38 T20 Consultant to perform site visits 12/04/2020 12/04/2020
Amendment $12,829.73 T22 Consultant site visit audit existing structures for repairs 12/04/2020 12/04/2020
Amendment $2,685.00 T16CO1 Permitting Services 10/23/2020 10/23/2020
Amendment $8,380.00 T19 Professional engineering services 09/28/2020 09/28/2020
Amendment $29,954.50 T17 Construction administration services. 09/14/2020 09/14/2020
Amendment $4,738.58 T12CO1 Professional services. 08/28/2020 08/28/2020
Amendment $84,620.37 T18 Professional engineering services 07/21/2020 07/21/2020
Amendment $0.00 CMC2 Contract Manager Change 07/15/2020 07/15/2020
Amendment $1,629.87 T14CO1 Task consultant with CA services 05/01/2020 05/01/2020
Amendment $3,000.00 T13CO1 Professional Engineering services 04/17/2020 04/17/2020
Amendment $27,970.40 T16 Professional engineering services 04/15/2020 04/15/2020
Amendment $8,328.04 T15 Professional engineering services 03/18/2020 03/18/2020
Renewal $0.00 A1 Renewal 03/04/2020 03/11/2020 03/03/2025
Amendment $1,840.00 T14 Structural Drawing Services 01/07/2020 01/07/2020
Amendment $10,643.55 T13 Repair and renovation services 09/27/2019 09/27/2019
Amendment $13,879.74 T12 Design and Permitting Services 08/22/2019 08/22/2019
Amendment $0.00 CMC1 Department Contract Manager Change 04/30/2019 04/30/2019
Amendment $18,861.80 T11 Providing bidding and construction assistance 11/06/2018 11/06/2018
Amendment $0.00 ASA Agency Service Area change 07/01/2018 05/21/2018
Amendment $0.00 T7CO3 Judah P. Benjamin Confederate Memorial Gamble Plan 02/12/2018 02/12/2018
Amendment $2,976.65 T10CO1 Gasparilla Island SP 01/02/2018 01/02/2018 03/14/2018
Amendment $3,851.25 T7CO2 Proj. NO: 60950C-"Unforeseen issues arising from demolition 11/07/2017 11/07/2017 02/12/2018
Amendment $0.00 T7CO1 Time Extension 09/20/2017 09/20/2017
Amendment $2,844.90 T1CO2 PROJECT NO. 60974C 03/23/2017 03/23/2017 12/31/2017
Amendment $0.00 T1CO1 Made in error 12/19/2016 12/19/2016
Amendment $7,713.70 TA1CO1 Curry Hammock State Park 12/19/2016 12/19/2016
Amendment $8,375.55 T10 Gasparilla Island State Park 11/14/2016 11/14/2016
Amendment $12,645.60 T3CO1 increase task amount 06/09/2016 06/09/2016
Amendment $37,723.48 T7 Gamble Plantation 12/22/2015 12/22/2015
Amendment $7,859.66 T9 Savannas Preserve State Park 12/01/2015 12/01/2015
Amendment $5,280.00 T8 Niles Channel Bridge 11/04/2015 11/04/2015
Amendment $15,974.32 T5 John U Lloyd State Park Dock Repair 10/06/2015 10/06/2015
Amendment $31,685.72 T6 Dagny Johnson Key Largo Hammock Botanical 10/06/2015 10/06/2015
Amendment $6,376.80 T4 Florida Caverns, HIstoric Building Reroof 09/23/2015 09/23/2015
Amendment $30,486.60 T3 Bald Point State Park 09/16/2015 09/16/2015
Amendment $34,760.64 T2 Little Manatee River State Park 09/10/2015 09/10/2015 11/24/2016
Amendment $27,927.10 TA1 Engineering services and construction documents. 06/18/2015 06/18/2015

Vendor

Name Line 1Name Line 2City State ZipMinority Vendor Designation
JGP STRUCTURAL GROUP, INC. TALLAHASSEE FL 323030000 Non-Minority

CFDA

No CFDA Codes found for the contract.

CSFA

No CSFA Codes found for the contract.
More Deliverable Number      Commodity/Service Type Major Deliverable Method of Payment
     
Professional engineering services Task 3: SESI will provide JGP with a geotechnical investigation report based on the on-site work. Th... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 3: JGP will submit the GPR letter indicating that the ground penetrating radar (GPR) investigat... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 4: Final Design Documents and specifications will be revised to include: • Final CS - Cover She... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 4: Construction Administration services to include: • Review and respond to contractor RFl's (r... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 9: JGP will submit the 60% Documents and draft technical specifications to the BDC project mana... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 9: Final Design Documents and specifications will be revised to include: • Final CS - Cover She... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 3; CO1: JGP will submit the 90% Documents and technical specifications to the BDC project manag... Cost Reimbursement Plus Percentage of Cost
     
Professional engineering services Task 5: JGP will submit the 60% Documents and draft technical specifications to the BDC project mana... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 5: Final Design Documents and specifications will be revised to include: • Final CS - Cover She... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 5: Written clarifications and responses to the various bidders questions for items related to t... Fixed Price - Lump Sum
     
Professional engineering services Task 5: Construction Administration services to include: Review and respond to contractor RFl's (req... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 10, Del. 1: JGP will submit the Updated Final Documents and technical specifications to the BDC... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 20 Subtask 1a - Review Existing Conditions: A summary list of repair items and information rega... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 20 Subtask 1b - Review Existing Conditions: A summary list of repair items and information rega... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 22 Subtask 1a - Review Existing Conditions: A Summary list of repair items and information rega... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 22 Subtask 1b - Review Existing Conditions: A Summary list of repair items and information rega... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 17: Subtask 4 - final documents; provide pdf of final documents. Fixed Price Cost: $6650.00. Re... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 27: Subtask 3: 60% Documents, Deliverable: 60% Documents (Drawings and OPC) in pdf format will ... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 27: Subtask 1: 30% Documents, Deliverable: 30% Documents in pdf format will be provided to BOC ... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 10, Del. 2: Written clarifications and responses to the various bidder's questions for items re... Fixed Price - Lump Sum
     
Professional engineering services Task 10, Del. 3: Construction Administration services include the following deliverable items. • Rev... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task 3; CO1: JGP will submit the Final Documents and technical specifications to the BDC project man... Fixed Price - Lump Sum
     
Professional engineering services Task 3; CO1: Written clarifications and responses to the various bidders questions for items related... Fixed Price - Lump Sum
     
Professional engineering services Task 9: The letter addressed to the building official regarding the project and the written clarific... Fixed Price - Lump Sum
     
Professional engineering services Task 7: "Final Design Documents and specifications will be revised to include: • Final CS - Cover Sh... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
 Displaying 1 to 25 of 566     1 2 3 4 5 6 7 8 ...  23 Next  Last


Payments are also referred to as expenditures (creating or incurring a legal obligation to disburse money) or disbursements (the payment of expenditures). Payments include disbursements and accounting adjustments made on a contract. Payments are always positive amounts while accounting adjustments may be positive or negative depending on the type of adjustment.

Payment Details

"Date" in the listing below indicates the date the payment voucher was recorded in the system, not the date the payment was issued.
More Fiscal Year Total Amount
     
2024-2025 $138,344.14
     
2023-2024 $120,211.83
     
2022-2023 $211,286.26
     
2021-2022 $247,303.35
     
2020-2021 $141,147.30
     
2019-2020 $26,686.05
     
2018-2019 $10,533.76
     
2017-2018 $30,581.50
     
2016-2017 $81,782.66
     
2015-2016 $89,037.74

If a payment or adjustment to a contract was made before July 1, 2012, the information may not be posted in this system.

Contract Documents


Click on the pdf icon or Agency Document Link to view the document
Document Type Document Reference # Executed Date Document Add Date Agency Document Link View
Original Contract Original Contract - CN217 03/03/2015 5/15/2015 10:14:41 AM
Procurement Original Contract - CN217 5/15/2015 10:15:01 AM
Renewal A1 03/11/2020 3/12/2020 9:21:08 AM
Amendment CMC1 04/30/2019 5/6/2019 10:01:10 AM
Amendment CMC2 07/15/2020 7/16/2020 8:31:52 AM
Amendment CMC3 05/06/2021 5/12/2021 1:02:08 PM
Amendment CMC4 07/22/2025 7/23/2025 3:53:50 PM
Amendment CMC5 01/12/2026 1/12/2026 3:25:28 PM
Amendment T10 11/14/2016 11/15/2016 5:10:26 PM
Amendment T10CO1 01/02/2018 1/3/2018 10:55:36 AM
Amendment T11 11/06/2018 11/13/2018 1:29:36 PM
Amendment T12 08/22/2019 8/22/2019 3:51:52 PM
Amendment T12CO1 08/28/2020 10/1/2020 8:40:52 AM
Amendment T13 09/27/2019 9/30/2019 11:18:11 AM
Amendment T13CO1 04/17/2020 4/21/2020 9:43:41 AM
Amendment T14 01/07/2020 1/8/2020 9:53:54 AM
Amendment T14CO1 05/01/2020 1/5/2021 4:02:15 PM
Amendment T15 03/18/2020 9/24/2020 2:45:46 PM
Amendment T16 04/15/2020 4/17/2020 9:41:15 AM
Amendment T16CO1 10/23/2020 10/26/2020 3:03:40 PM
Amendment T16CO2 03/08/2021 3/15/2021 3:40:52 PM
Amendment T16CO3 09/23/2021 9/27/2021 12:24:08 PM
Amendment T16CO4 03/04/2022 3/10/2022 10:57:27 AM
Amendment T17 09/14/2020 9/22/2020 12:30:04 PM
Amendment T18 07/21/2020 10/9/2020 1:15:47 PM
Amendment T18CO1 12/29/2021 1/5/2022 10:16:57 AM
Amendment T18CO2 03/04/2022 3/10/2022 9:56:14 AM
Amendment T18CO3 04/07/2023 4/17/2023 12:59:06 PM
Amendment T18CO4 11/21/2023 11/27/2023 10:50:18 AM
Amendment T18CO5 03/07/2024 3/11/2024 1:55:24 PM
Amendment T18CO6 06/06/2024 6/6/2024 2:19:21 PM
Amendment T19 09/28/2020 10/26/2020 2:31:57 PM
Amendment T1CO2 03/23/2017 3/27/2017 3:21:55 PM
Amendment T2 09/10/2015 9/11/2015 4:37:25 PM
Amendment T20 12/04/2020 12/9/2020 8:19:39 AM
Amendment T20CO1 02/15/2021 2/26/2021 4:36:05 PM
Amendment T20CO2 02/08/2022 2/10/2022 10:40:43 AM
Amendment T20CO3 07/07/2022 7/11/2022 9:27:34 AM
Amendment T21 12/08/2020 12/11/2020 3:54:32 PM
Amendment T21CO1 02/22/2021 2/24/2021 12:33:42 PM
Amendment T22 12/04/2020 12/9/2020 9:06:37 AM
Amendment T22CO1 02/15/2021 2/26/2021 4:55:57 PM
Amendment T23 01/29/2021 2/3/2021 3:43:35 PM
Amendment T24 02/22/2021 2/23/2021 2:14:12 PM
Amendment T25 04/14/2021 5/11/2021 4:56:44 PM
Amendment T28 04/05/2021 4/15/2021 5:24:53 PM
Amendment T29CO1 06/29/2022 6/30/2022 11:15:18 AM
Amendment T29CO2 03/15/2023 3/16/2023 3:23:50 PM
Amendment T3 09/16/2015 9/21/2015 9:31:22 AM
Amendment T31 06/17/2021 6/24/2021 1:58:19 PM
Amendment T31CO1 05/26/2022 6/1/2022 2:48:05 PM
Amendment T32 08/30/2021 9/2/2021 4:44:42 PM
Amendment T32CO1 12/12/2022 12/13/2022 3:15:02 PM
Amendment T32CO2 08/01/2023 11/9/2023 9:27:12 AM
Amendment T32CO3 04/05/2024 4/8/2024 4:13:06 PM
Amendment T33 08/31/2021 9/8/2021 10:06:32 AM
Amendment T34 12/15/2021 12/21/2021 12:39:54 PM
Amendment T34CO1 09/29/2022 10/6/2022 1:15:45 PM
Amendment T34CO2 12/13/2022 12/14/2022 9:24:54 AM
Amendment T34CO3 06/20/2023 6/26/2023 3:20:44 PM
Amendment T34CO4 12/20/2023 12/21/2023 3:27:21 PM
Amendment T35 12/01/2021 12/2/2021 3:15:16 PM
Amendment T36 12/22/2021 1/11/2022 9:56:40 AM
Amendment T37 02/08/2022 2/17/2022 10:23:21 AM
Amendment T38 04/26/2022 4/28/2022 1:00:11 PM
Amendment T39 03/04/2022 3/9/2022 1:59:16 PM
Amendment T39CO1 12/13/2022 12/14/2022 9:07:20 AM
Amendment T3CO1 06/09/2016 6/21/2016 1:43:25 PM
Amendment T4 09/23/2015 9/28/2015 1:29:14 PM
Amendment T40 04/26/2022 4/27/2022 4:53:01 PM
Amendment T41 05/06/2022 5/10/2022 2:10:15 PM
Amendment T41CO1 12/13/2022 12/14/2022 9:16:35 AM
Amendment T42 05/20/2022 5/26/2022 10:06:30 AM
Amendment T43 07/07/2022 7/14/2022 2:41:29 PM
Amendment T44 07/13/2022 7/19/2022 11:15:49 AM
Amendment T45 08/03/2022 8/5/2022 3:44:34 PM
Amendment T46 12/01/2022 12/2/2022 12:04:47 PM
Amendment T47 03/06/2023 3/8/2023 3:00:05 PM
Amendment T48 02/27/2023 2/28/2023 10:29:59 AM
Amendment T49 02/20/2023 2/23/2023 2:17:13 PM
Amendment T49CO1 12/18/2023 12/20/2023 10:21:03 AM
Amendment T5 10/06/2015 10/7/2015 11:11:44 AM
Amendment T50 03/15/2023 3/16/2023 9:40:22 AM
Amendment T51 03/08/2023 3/13/2023 11:29:56 AM
Amendment T51CO1 07/16/2024 7/18/2024 9:09:39 AM
Amendment T53 03/31/2023 4/5/2023 12:08:24 PM
Amendment T54 08/29/2023 9/7/2023 1:40:29 PM
Amendment T57 03/31/2023 4/5/2023 12:22:10 PM
Amendment T58 04/07/2023 4/11/2023 4:35:10 PM
Amendment T59 04/20/2023 4/24/2023 11:06:09 AM
Amendment T6 10/06/2015 10/7/2015 11:39:28 AM
Amendment T60 06/02/2023 6/5/2023 2:38:12 PM
Amendment T61 06/02/2023 6/5/2023 12:39:58 PM
Amendment T62 06/22/2023 6/27/2023 4:08:12 PM
Amendment T63 12/05/2023 12/7/2023 11:04:06 AM
Amendment T64 07/31/2023 8/2/2023 2:08:56 PM
Amendment T64CO1 11/08/2023 11/9/2023 2:21:19 PM
Amendment T65 11/21/2023 11/27/2023 9:08:56 AM
Amendment T66 10/17/2023 10/20/2023 3:01:05 PM
Amendment T67 05/07/2024 5/7/2024 2:43:35 PM
Amendment T68 06/25/2024 6/26/2024 2:42:20 PM
Amendment T69 06/25/2024 6/26/2024 3:08:37 PM
Amendment T7 12/22/2015 12/31/2015 2:21:16 PM
Amendment T70 07/08/2024 7/10/2024 9:52:14 AM
Amendment T71 08/02/2024 8/7/2024 8:27:17 AM
Amendment T72 09/20/2024 9/23/2024 4:19:04 PM
Amendment T73 09/20/2024 9/24/2024 11:29:33 AM
Amendment T74 09/20/2024 9/20/2024 4:47:33 PM
Amendment T75 10/15/2024 10/16/2024 9:41:47 AM
Amendment T76 01/08/2025 1/13/2025 11:05:16 AM
Amendment T77 10/28/2024 10/29/2024 10:30:42 AM
Amendment T78 11/26/2024 12/2/2024 8:25:06 AM
Amendment T79 11/20/2024 11/22/2024 8:39:50 AM
Amendment T7CO1 09/20/2017 9/21/2017 11:14:09 AM
Amendment T7CO2 11/07/2017 11/8/2017 12:27:49 PM
Amendment T7CO3 02/12/2018 2/13/2018 11:16:34 AM
Amendment T8 11/04/2015 11/6/2015 10:15:17 AM
Amendment T9 12/01/2015 12/10/2015 2:46:45 PM
Amendment TA1 06/18/2015 6/22/2015 9:35:18 AM
Amendment TA15 CO1 06/09/2021 6/10/2021 2:11:37 PM
Amendment TA1CO1 12/19/2016 1/5/2017 11:37:18 AM
Amendment TA25CO1 05/07/2021 5/12/2021 10:10:21 AM
Amendment TA26 04/05/2021 5/14/2021 2:30:08 PM
Amendment TA26CO1 05/13/2021 5/14/2021 2:41:50 PM
Amendment TA27 04/05/2021 5/14/2021 1:25:32 PM
Amendment TA27CO1 05/13/2021 5/14/2021 1:40:50 PM
Amendment TA28 05/21/2021 5/25/2021 2:26:08 PM
Amendment TA29 06/01/2021 6/4/2021 9:48:58 AM
Amendment TA30 05/21/2021 6/11/2021 2:07:25 PM


Audit results posted prior to June 30, 2012, appear in a summarized form. As of July 1, 2012, the audit reporting process was expanded to include additional questions and comments from the Bureau of Auditing. As audits are captured in electronic format, they will be posted to this system. If you are interested in seeing audit reports by Fiscal Year and Agency Action Plans, please click here to navigate to the Transparency Florida Contract Audit page.

  • No audits have been conducted on this contract at this time.