Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
Professional engineering services
|
Task 3: SESI will provide JGP with a geotechnical investigation report based on the on-site work. Th...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 3: SESI will provide JGP with a geotechnical investigation report based on the on-site work. The report will be submitted to the BDC project manager for review and comment. Fixed $10,073.00, Reimbursable $521.20 ($450.00 SESI, $71.20 JGP). Not to exceed $10,594.20
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: The BDC project manager will review the submitted geotechnical report and comment as needed to JGP. The review will ensure the work is being performed in accordance with the provided proposal. It is anticipated that the report will be submitted no later than four (4) weeks after receipt of our TA
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: TA3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3: JGP will submit the GPR letter indicating that the ground penetrating radar (GPR) investigat...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 3: JGP will submit the GPR letter indicating that the ground penetrating radar (GPR) investigation was complete. Additionally, information relative to the steel sheet piling will be provided. Fixed $9,330.00, Reimbursable $142.40 (mileage). Not to exceed $9,472.40
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: The BDC project manager will review the submitted letter and comment as needed to JGP. The review will ensure the work is being performed in accordance with the provided proposal. The GPR letter will be submitted no later than three (3) weeks after receipt of Task I BDC comments.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: TA3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 4: Final Design Documents and specifications will be revised to include:
• Final CS - Cover She...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 4: Final Design Documents and specifications will be revised to include:
• Final CS - Cover Sheet
• Final Structural repair plans and sections (Structural note sheet, Roof Framing Plan, Structural section and repair detail sheets)
• Any additional sheets and drawings required to fully convey the intent of the design development.
• The Final Design Documents and specification submittal will include four (4) sets (24""x36"" hardcopy Signed and Sealed and copies) suitable for submission to the permitting agencies.
• The Final Design Documents and specification submittal will include electronic file copies of the documents in PDF and Autocad compliant file format.
• The Final construction documents and technical specifications will be submitted to the BDC project manager no later than 14 days after receipt of our Task Assignment, · however, it is believed the drawings can be provided sooner. Fixed $4,680.00, Reimbursable $79.50. Not to exceed $4,759.50.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: The BDC project manager will review the submitted drawings and comment as needed to JGP. The review will ensure the work is being performed in accordance with the provided proposal. The drawings are to be submitted no later than 14 days after receipt
of our task assignment.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T4 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 4: Construction Administration services to include:
• Review and respond to contractor RFl's (r...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 4: Construction Administration services to include:
• Review and respond to contractor RFl's (request for information).
• Review and provide responses/comments to shop drawings submitted by the contractor.
• Provide on-site observation report after visiting the site during construction and at completion. Fixed $1,555.00, Reimbursable $62.30. Not to exceed $1,617.30.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: "The BDC project manager will review the submitted and approved shop drawings/observation reports and comment as needed to JGP and the Contractor. The review
will ensure the work is being performed in accordance with the submitted construction documents. Each observation report is to be submitted no later than three (3) days after completion of the field visit.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T4 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 9: JGP will submit the 60% Documents and draft technical specifications to the BDC project mana...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 9: JGP will submit the 60% Documents and draft technical specifications to the BDC project manager for review and comment. At a minimum the documents shall include: • CS - Cover Sheet, utilizing the standard format provided by BOC • Work in Progress Structural repair plans and sections (Structural note sheet, Roof Framing Plan, Structural section and repair detail sheet) • Any additional sheets and drawings required to fully convey the intent of the design development. • The design documents shall be formatted to the BOC 24""x36"" standard and shall include the standard BOC border. Each individual sheet shall be clearly labeled and dated. • The technical specifications shall be placed on the drawings or formatted to the BOC 8- 1 /2""x11 "" standard. The specification sections shall be clearly labeled and dated. • The documents shall be submitted to the BDC project manager via electronic file transfer in PDF format. • The documents shall contain sufficient information to clearly define the design of the proposed construction and scope of work. • The Design Development (60%) Documents and draft technical specifications will be submitted to the BDC project manager no later than six (6) weeks after receipt of our signed task assignment. Fixed $4,915.00; Reimbursables (mileage) $190.46. Cost not to exceed $5,105.46
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: The BDC project manager will review the submitted drawings and comment as needed to JGP. The review will ensure the work is being performed in accordance with the provided proposal Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. ff a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion. terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: TA9 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 9: Final Design Documents and specifications will be revised to include: • Final CS - Cover She...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 9: Final Design Documents and specifications will be revised to include: • Final CS - Cover Sheet • Final Structural repair plans and sections (Structural note sheet, Roof Framing Plan, Structural section and repair detail sheet) • Any additional sheets and drawings required to fully convey the intent of the design development.
• The Final Design Documents and specifications submittal will include six (6) sets (24""x36"" hardcopy Signed and Sealed and copies suitable for submission to the permitting agencies. • The Final Design Documents and specification submittal will include electronic file copies of the documents in PDF and AutoCAD compliant file format.
• The Final construction documents and technical specifications will be submitted to the BOC project manager no later than four (4) weeks after receipt of BOC comments at the completion of Task 1. Fixed Price $2,210.00; Reimbursable printing $19.20. Cost not to exceed $2,229.20.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: The BDC project manager will review the submitted drawings and comment as needed to JGP. The review will ensure the work is being performed in accordance with the provided proposal Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. if a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion. terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: TA9 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3; CO1: JGP will submit the 90% Documents and technical specifications to the BDC project manag...
|
Cost Reimbursement Plus Percentage of Cost
|
| Major Deliverable: Task 3; CO1: JGP will submit the 90% Documents and technical specifications to the BDC project manager for review and comment. At a minimum the documents will include:
• CS - Cover Sheet, utilizing the standard format provided by BDC
• 90% Repair plans and sections (Note sheet (S100), Plan sheets (S200, S201, S202) section and repair detail sheets (S301, S302, S303)
• The design documents shall be formatted to the BDC 24""x36"" standard and shall include the standard BDC border. Each individual sheet shall be clearly labeled and dated.
• The technical specifications will be included on the drawings.
• The documents shall be submitted to the BDC project manager via electronic file transfer in PDF format.
• The documents will contain information to define the 90% concepts of the proposed construction repair work.
• The 90% Documents and technical specifications will be submitted to the BDC project manager no later than five (5) weeks after receipt of our Task Assignment.
Fixed Price Cost $9,790.00; Reimbursable mileage $35.60. Cost not to exceed $9,825.60.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: The BDC project manager will review the submitted drawings and comment as needed to JGP. The review will ensure the work is being performed in accordance with the provided proposal. The drawings are to be submitted no later than five (5) weeks after receipt of our Task Assignment.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perfonn the services needed for submittal of a satisfactory deliverable, atno additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: page 2-3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 5: JGP will submit the 60% Documents and draft technical specifications to the BDC project mana...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 5: JGP will submit the 60% Documents and draft technical specifications to the BDC project manager for review and comment. At a minimum the documents shall include:
• CS - Cover Sheet, utilizing the standard format provided by BOC
• Work in Progress Structural repair plans and sections. (Modify existing Structural note sheets, Framing Plan Sheets, Structural section and repair detail sheets)
• Any additional sheets and drawings required to fully convey the intent of the design development.
• The design documents shall be formatted to the BDC 24""x36"" standard and shall include the standard BDC border. Each individual sheet shall be clearly labeled and dated.
• The technical specifications shall be placed on the drawings or formatted to the BDC 8- 1 /2""x11"" standard. The specification sections shall be clearly labeled and dated.
• The documents shall be submitted to the BDC project manager via electronic file transfer in PDF format.
• The documents shall contain sufficient information to clearly define the design of the proposed construction and scope of work.
• An initial cost opinion of probable construction budget will be provided.
• The Design Development (60%) Documents will be submitted to the BDC project manager no later than six (6) weeks after receipt of execution of the Task Assignment.
Fixed Price Cost $6,210.00; Cost reimbursable mileage $126.38.
Costs not to exceed $6,336.38
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: The BDC project manager will review the submitted drawings and comment as needed to JGP. The review will ensure the work is being performed in accordance with the provided proposal. The drawings are to be submitted no later than six (6) weeks after execution of the Task Assignment.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T5, 2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 5: Final Design Documents and specifications will be revised to include:
• Final CS - Cover She...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 5: Final Design Documents and specifications will be revised to include:
• Final CS - Cover Sheet
• Final Structural repair plans and sections (Modify existing Structural note sheets, Framing Plan Sheets, Structural section and repair detail sheets)
• Any additional sheets and drawings required to fully convey the intent of the design development.
• The documents shall include a finalized cost opinion of the probable construction budget.
• The Final Design Documents and specifications submittal will include six (6) sets (24""x36"" hardcopy Signed and Sealed and copies suitable for submission to the permitting agencies.
• The Final Design Documents and specification submittal will include electronic file copies of the documents in PDF and Autocad compliant file format.
• The Final construction documents and technical specifications will be submitted to the BDC project manager no later than four (4) weeks after receipt of BDC comments at the completion of Task II.
Fixed Price Cost $3,405.00; Cost reimbursable printing $28.80.
Costs not to exceed $3,433.80
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: The BDC project manager will review the submitted drawings and comment as needed to JGP. The review will ensure the work is being performed in accordance with the provided proposal. The drawings are to be submitted no later than four (4) weeks after receipt of BDC comments.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T5, 2-3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 5: Written clarifications and responses to the various bidders questions for items related to t...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 5: Written clarifications and responses to the various bidders questions for items related to the project will be provided to BDC for distribution. Principal Engineer 2 hrs @ $160/hr; Clerical 2 hrs @ $45/hr.
|
| Deliverable Price: $410.00 |
| Non Price Justification: |
| Performance Metrics: The BDC project manager will review the written clarifications and responses and distribute to the various bidders. JGP will provide responses to questions within 3 days after receipt of the questions.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T5, 3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 5: Construction Administration services to include: Review and respond to contractor RFl's (req...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 5: Construction Administration services to include: Review and respond to contractor RFl's (request for information); Review and provide responses/comments to shop drawings submitted by the contractor; Provide on-site observation reports after visiting the site during construction and at completion. Fixed Price $5,415.00 (Principal Engineer 14 hrs @ $160/hr, Project Engineer 32 hrs @ $95/hr, Clerical 3 hrs @ $45/hr); Reimbursable mileage $379.14. Costs not to exceed $5,794.14
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: "The BDC project manager will review the submitted and approved shop drawings/observation reports and comment as needed. JGP will subsequently review the
provided shop drawings and return within 1 week after receipt from BOC. The review will ensure
the work is being performed in accordance with the submitted construction documents. Each
observation report provided by JGP will be submitted no later than one (1) week after completion of the field visit."
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T5, 3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 10, Del. 1: JGP will submit the Updated Final Documents and technical specifications to the BDC...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 10, Del. 1: JGP will submit the Updated Final Documents and technical specifications to the BDC project manager for review and comment. At a minimum the documents shall include: Updated Final Structural repair documents. (Modify existing Cover sheet, Structural note sheet, Framing Plan Sheets, Structural section and repair detail sheets) A cost opinion of probable construction budget will be provided. Fixed Price $4,790.00; Reimbursables: Printing $33.60, Mileage $75.65, Bridge toll $5.00. Cost not to exceed $4,904.25
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 4 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 20 Subtask 1a - Review Existing Conditions: A summary list of repair items and information rega...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 20 Subtask 1a - Review Existing Conditions: A summary list of repair items and information regarding repair versus replacement will be provided to BDC for review for each of the buildings and structures, this list and information will be provided within 4 weeks after receipt of execution of the Task Assignment. Fixed price: $635.00; reimbursable mileage not to exceed $95.68. Total cost not to exceed $730.68. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the department to confirm they are complete, accurate, and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 20 Subtask 1b - Review Existing Conditions: A summary list of repair items and information rega...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 20 Subtask 1b - Review Existing Conditions: A summary list of repair items and information regarding repair versus replacement will be provided to BDC for review for each of the buildings and structures, this list and information will be provided within 4 weeks after receipt of execution of the Task Assignment. Fixed price $4,130.00; reimbursable mileage not to exceed $382.70. Total cost not to exceed $4,512.70. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the department to confirm they are complete, accurate, and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 22 Subtask 1a - Review Existing Conditions: A Summary list of repair items and information rega...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 22 Subtask 1a - Review Existing Conditions: A Summary list of repair items and information regarding repair versus replacement will be provided to BOC for review for each of the buildings and structures. This list and information will be provided within 4 weeks after receipt of execution of the Task Assignment. Fixed price $920.00; reimbursable mileage not to exceed $95.68. Total task not to exceed 1,015.68. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the department to confirm they are complete, accurate, and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 22 Subtask 1b - Review Existing Conditions: A Summary list of repair items and information rega...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 22 Subtask 1b - Review Existing Conditions: A Summary list of repair items and information regarding repair versus replacement will be provided to BOC for review for each of the buildings and structures. This list and information will be provided within 4 weeks after receipt of execution of the Task Assignment. Fixed price $11,240.00; reimbursable mileage not to exceed $574.05. Total task not to exceed 11,814.05. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the department to confirm they are complete, accurate, and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 17: Subtask 4 - final documents; provide pdf of final documents. Fixed Price Cost: $6650.00. Re...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 17: Subtask 4 - final documents; provide pdf of final documents. Fixed Price Cost: $6650.00. Reimbursable printing not to exceed $28.80. Total for subtask 4 not to exceed $6,678.80. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: Pages 4 and 5 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 27: Subtask 3: 60% Documents, Deliverable: 60% Documents (Drawings and OPC) in pdf format will ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 27: Subtask 3: 60% Documents, Deliverable: 60% Documents (Drawings and OPC) in pdf format will be provided to BDC for review within seven (7) weeks after receipt of the 30% DEP review comments. It is assumed that one (1) week will be allocated for DEP review and comments for the 60% documents. Reimbursable = 526 mi x .445 = $234.07 + $6 in tolls = $240.07 Subtask fee = $7,895.00 ; total not to exceed = $8,135.07 |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the department to confirm they are complete, accurate, and timely. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform. |
| Source Documentation Page Reference: Attachment 5 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 27: Subtask 1: 30% Documents, Deliverable: 30% Documents in pdf format will be provided to BOC ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 27: Subtask 1: 30% Documents, Deliverable: 30% Documents in pdf format will be provided to BOC for review within six {6} weeks after receipt of execution of the Task Assignment. It is assumed that one (1) week will be allocated for DEP review and comments for the 30% documents. Reimbursable = 526 mi x .445 = $240.07 + $6 in tolls = $1729.00 Subtask fee = $8,215.00 ; total not to exceed = $8,455.07 |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the department to confirm they are complete, accurate, and timely. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform. |
| Source Documentation Page Reference: CO1: Reimbursable Increase |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 10, Del. 2: Written clarifications and responses to the various bidder's questions for items re...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 10, Del. 2: Written clarifications and responses to the various bidder's questions for items related to the project will be provided to BDC within 3 days after receipt for distribution.
|
| Deliverable Price: $410.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 5 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 10, Del. 3: Construction Administration services include the following deliverable items. • Rev...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 10, Del. 3: Construction Administration services include the following deliverable items. • Review and respond to contractor RFl's (request for intonation) within 3 days after receipt of the information. • Review and provide responses/comments to shop drawings submitted by the contractor with 7 days after receipt of the information. • Provide two (2) site visits and provide on-site observation reports within 5 days after visiting the site during construction and at completion. Cost not to exceed $3,061.30
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 6 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3; CO1: JGP will submit the Final Documents and technical specifications to the BDC project man...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3; CO1: JGP will submit the Final Documents and technical specifications to the BDC project manager. At a minimum the documents will include:
• CS - Cover Sheet, utilizing the standard format provided by BOC
• Final Repair plans and sections (Note sheet (S100), Plan sheets (S200, S201 , S202)
section and repair detail sheets (S301, S302, S303)
• The design documents shall be formatted to the BOC 24""x36"" standard and shall include the standard BOC border. Each individual sheet shall be clearly labeled and dated.
• The technical specifications will be included on the drawings.
• The documents shall be submitted to the BOC project manager via electronic file transfer in PDF format. Final electronic CAD versions of the drawings will also be provided.
• The documents will contain information to define the Final concepts of the proposed construction repair work.
• A final cost opinion will be provided.
• The Final Documents and technical specifications will be submitted to the BDC project manager no later than two (2) weeks after receipt of BOC comments at the completion of
Task V.
|
| Deliverable Price: $1,430.00 |
| Non Price Justification: |
| Performance Metrics: The BDC project manager will review the submitted drawings and comment as needed to JGP. The review will ensure the work is being performed in accordance with the provided proposal. The drawings are to be submitted no later than two (2) weeks after receipt of Task V BOC comments.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perfonn the services needed for submittal of a satisfactory deliverable, atno additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: page 3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3; CO1: Written clarifications and responses to the various bidders questions for items related...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3; CO1: Written clarifications and responses to the various bidders questions for items related to the project will be provided to BOC for distribution.
|
| Deliverable Price: $1,390.00 |
| Non Price Justification: |
| Performance Metrics: The BOC project manager will review the written clarifications and responses and distribute to the various bidders. JGP will provide responses to questions within 3 days after receipt of the questions.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perfonn the services needed for submittal of a satisfactory deliverable, atno additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: page 3-4 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 9: The letter addressed to the building official regarding the project and the written clarific...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 9: The letter addressed to the building official regarding the project and the written clarifications and responses to the permitting agency having jurisdiction will be provided to BOC for distribution.
|
| Deliverable Price: $525.00 |
| Non Price Justification: |
| Performance Metrics: The BDC project manager will review the submitted drawings and comment as needed to JGP. The review will ensure the work is being performed in accordance with the provided proposal Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. ff a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion. terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: TA9 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 7: "Final Design Documents and specifications will be revised to include:
• Final CS - Cover Sh...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 7: "Final Design Documents and specifications will be revised to include:
• Final CS - Cover Sheet
• Final General Site Layout Dwg (non-survey)
• Final Structural repair plans and sections (Structural note sheets, Foundation Plan, First Floor Framing Plan, Second Floor Framing Plan, Roof Framing Plan, Structural section and repair detail sheets, Structural schedule sheets)
• Final Architectural restoration plans and details (Project Index and Location Plan, Site Plan, First Floor architectural plans, Second Floor architectural plans, Attic plan, Roof plan, door-window and finish schedules, ADA Restroom detail sheets, building elevation sheets, interior elevations, building and wall section sheets)
• Final MEP Design Documents and details (First and Second Floor plumbing and electrical plans, detail sheets, notes, equipment schedule sheets, including new septic system)
• Any additional sheets and drawings required to fully convey the intent of the design development.
• The documents shall include a finalized estimate of the probable construction budget.
• The Final Design Documents and specification submittal will include a six (6) sets (24""x36"" hardcopy Signed and Sealed and copies suitable for submission to the permitting agencies.
• The Final Design Documents and specification submittal will include electronic file copies of the documents in PDF and AutoCAD compliant file format.
• The Final construction documents and technical specifications will be submitted to the BDC project manager no later than seven (7) weeks after receipt of BOC comments at the completion of the Task. Cost not to exceed $25, 176.87. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: The BDC project manager will review the submitted drawings and comment as needed to JGP. The review will ensure the work is being performed in accordance with the provided proposal. The drawings are to be submitted no later than seven (7) weeks after receipt of BDC comments.
|
| Financial Consequences: The BDC project manager will review the submitted drawings and comment as needed to JGP. The review will ensure the work is being performed in accordance with the provided proposal. The drawings are to be submitted no later than seven (7) weeks after receipt of BDC comments.
|
| Source Documentation Page Reference: TA7 |
| Deliverable Number: |
|