| More |
Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
Professional engineering services
|
Task 2: Document set illustrating the extent of demolition, restoration, and
construction to the ex...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 2: Document set illustrating the extent of demolition, restoration, and
construction to the existing building. Anticipated sheets include: Cover, Notes, Plan View, Exterior Elevations, and Details. An estimate of probable cost will also be provided. Documents will be delivered in hard copy format and digitally in both pdf and native CAD format. Cost not to exceed: $3,966.21 |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform. |
| Source Documentation Page Reference: T2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
As indicated in individual task assignments.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: As indicated in individual task assignments.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Agreement without a financial exchange or impact |
| Performance Metrics: Prior to submission to the Department, the Consultant shall review all deliverables to ensure the same are accurate and complete at time of submittal and meet or exceed the specified deliverable.
|
| Financial Consequences: The Department will not pay for any unsatisfactory deliverables. In the event the Department deems a deliverable unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable at no additional cost to the Department within 15 consecutive days. If the Consultant fails to resubmit a satisfactory deliverable within the specified timeframe, the Department, in its sole discretion, may terminate the Task Assignment and/or Agreement for failure to perform.
|
| Source Documentation Page Reference: As indicated in individual task assignments |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 2 - Subtask 1B: Deliverable will consist of written meeting notes with recommendations. Fixed ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 2 - Subtask 1B: Deliverable will consist of written meeting notes with recommendations. Fixed Price: $1,090.35, Reimbursables: $44.50. Cost not to exceed: $1,134.85
CO1 - Additional task time |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: FDEP will review meeting notes for accuracy. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform. |
| Source Documentation Page Reference: T2CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 2 - Subtask 2A: Drawing set illustrating the extent of demolition, restoration, and constructio...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 2 - Subtask 2A: Drawing set illustrating the extent of demolition, restoration, and construction to the existing building, complete, signed and sealed for bidding. Anticipated sheets include: Cover, Notes, Plan View, Exterior Elevations, and Details. An estimate of probable cost will also be provided. Documents will be delivered in hard copy format and digitally in both pdf and native CAD format. Fixed Price: $3,288.36, Reimbursables: $37.50. Cost not to exceed: $3,325.86 |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform. |
| Source Documentation Page Reference: T2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1, Change Order 1: Time Extension Only
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1, Change Order 1: Time Extension Only |
| Deliverable Price: $0.00 |
| Non Price Justification: Agreement without a financial exchange or impact |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3 Subtask 1A: Historical Document & Materials Research- Deliverable will consist of recommendat...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3 Subtask 1A: Historical Document & Materials Research- Deliverable will consist of recommendations for brick, mortar and construction details to be used in repairs and rebuilding.
|
| Deliverable Price: $3,738.48 |
| Non Price Justification: |
| Performance Metrics: FDEP will review and select project materials from the research.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: TA3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3 Subtask 1B: Architectural Documents- Document set illustrating the extent of demolition, rest...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 3 Subtask 1B: Architectural Documents- Document set illustrating the extent of demolition, restoration, and construction to the existing Fort. Anticipated sheets include: Cover, Notes, Plan View, Sections, Elevations, and Details. An estimate of probable cost will also be provided. Documents will be delivered in hard copy format and digitally in both pdf and native CAD format. Fixed: $4,407.66; Reimbursables (10 sets of 11X17 $15 sheets/set=150 sheets X $0.50=$75): $75.00. Not to exceed $4,482.66 |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: TA3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3 Subtask 1C: Site Visit- Deliverable will consist of written meeting notes with recommendation...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 3 Subtask 1C: Site Visit- Deliverable will consist of written meeting notes with recommendations. Fixed Price $2,907.60; Reimbursables- 1 trip @ 100 miles $44.50. Not to exceed $2,952.10.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: FDEP will review meeting notes for accuracy.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: TA3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3 Subtask 2A: Architectural Documents- Drawing set illustrating the extent of demolition, resto...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 3 Subtask 2A: Architectural Documents- Drawing set illustrating the extent of demolition, restoration, and construction to the existing building, complete, signed and sealed for bidding. Anticipated sheets include: Cover, Notes, Plan View, Exterior Elevations, and Details. An estimate of probable cost will also be provided. Documents will be delivered in hard copy format and digitally in both pdf and native CAD format. Fixed Price: $4,223.04, Reimbursables: $37.50. Cost not to exceed: $4,260.54 |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform. |
| Source Documentation Page Reference: T3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3 Subtask 3A: Pre-Construction/Kick-Off Meeting- Deliverable will consist of written meeting n...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 3 Subtask 3A: Pre-Construction/Kick-Off Meeting- Deliverable will consist of written meeting notes. Fixed Price Cost $1,453.80; Reimbursable not to exceed $44.50. Cost not to exceed $1,498.30. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: FDEP will review meeting notes for accuracy.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: TA3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3 Subtask 3B: Site Visits- Deliverable will consist of written meeting notes. Fixed Price Cost...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 3 Subtask 3B: Site Visits- Deliverable will consist of written meeting notes. Fixed Price Cost $2,180.70; Reimbursable not to exceed $89.00. Cost not to exceed $2,269.70. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: FDEP will review meeting notes for accuracy. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3 Subtask 3C: RFIs/COs/As-Builts/Submittals- Deliverable will consist of written notes with rec...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 3 Subtask 3C: RFIs/COs/As-Builts/Submittals- Deliverable will consist of written notes with recommendations @ $7,615.44 |
| Deliverable Price: $7,615.44 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Timely, complete responses that facilitate construction.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: TA3 |
| Deliverable Number: |
|
|
|
|
Engineering and Research and Technology Based Services
|
Task 3 Subtask 3D: Punch List Inspection- Deliverable will consist of written notes with recommendat...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 3 Subtask 3D: Punch List Inspection- Deliverable will consist of written notes with recommendations. Fixed Price Cost $2,907.60; Reimbursable not to exceed $44.50. Costs not to exceed $2,952.10. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: FDEP will review meeting notes for accuracy. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1 Subtask 1B- Environmental/Wetland Surveys & Kickoffs (EGS): Deliverables will include surveye...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1 Subtask 1B- Environmental/Wetland Surveys & Kickoffs (EGS): Deliverables will include surveyed wetlands lines and preliminary assessment of impacts.
|
| Deliverable Price: $2,142.00 |
| Non Price Justification: |
| Performance Metrics: SJRWMD will review application and wetland lines in the field to ensure compliance with state wetland rules and regulations.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1 Subtask 1A - Geotechnical Engineering Services (Meskel): Report of Geotechnical Engineering i...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1 Subtask 1A - Geotechnical Engineering Services (Meskel): Report of Geotechnical Engineering including the results of the field exploration and engineering analyses. The results of the subsurface exploration will be presented in a written report signed and sealed by a professional engineer specializing in geotechnical engineering.
|
| Deliverable Price: $3,100.48 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1 Subtask 1C- Topographic, Hydrographic & Tree Survey (NCG): Deliverables will include full-siz...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1 Subtask 1C- Topographic, Hydrographic & Tree Survey (NCG): Deliverables will include full-size drawings at a standard scale on a standard 24""x36"" title block, certified, sealed, dated, and signed by a Florida Professional Surveyor and Mapper. Final survey will also be made available in electronic format, AutoCAD Civil3D version 2009 or later and Adobe PDF format. Fixed Price Cost $6,097.87; Reimbursables not to exceed $186.90. Total Subtask 1C not to exceed $6,284.77.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 2-3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1 Subtask 1D- Data Gathering/Kickoff Meeting (Pond): Deliverable includes a report summarizing ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1 Subtask 1D- Data Gathering/Kickoff Meeting (Pond): Deliverable includes a report summarizing the information requested and obtained during the investigation, formatted per BDC specifications and a post-kickoff meeting report that summarizes permitting discussions & findings, and a refined concept plan, formatted per BDC specifications. Fixed Price Cost $3,057.78; Reimbursables not to exceed $92.30. Total Subtask 1D not to exceed $3,150.08.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 3-4 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1 Subtask 2- Site Planning & Civil (Pond): Concept Plan 1. Hand drawn graphics/rendering. 2. CA...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1 Subtask 2- Site Planning & Civil (Pond): Concept Plan 1. Hand drawn graphics/rendering. 2. CAD drawings. 3. Written reports or notes such as general discussion notes; proposed options; existing condition concerns or opportunities. 4. A preliminary cost evaluation of the concept (high level/ 25% contingency) 30% CDs 1. Coversheet. 2. Schematic site layout plans. 3. Manufacturer's plans/details for prefabricated vault restroom and kayak/canoe launch system. 4. Outline of the technical specifications. 5. Draft estimate of the probable construction cost. 6. A status report concerning the acquisition of all permits. Florida Department of Environmental Protection - August 07, 2015 7. The design documents shall be formatted to the BDC 24""x36"" standard and shall include the standard BDC border. Each individual sheet shall be clearly labeled and dated. 8. The technical specifications outline shall be formatted to the BDC 8-1/2""xll"" standard and shall be clearly labeled and dated. 9. The documents shall be submitted to the BDC project manager via electronic file transfer in PDF format. Fixed Price Cost $5,965.38; Reimbursable not to exceed $72.30. Total Subtask 2 not to exceed $6,037.68.
|
| Deliverable Price: $6,037.68 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department and written approval provided to Consultant for the Concept Plan and subsequently the 30% CDs prior to proceeding to the next task.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 4-5 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1 Subtask 3A- Site Planning & Civil (Pond): Design development plans (cover, general notes, mas...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1 Subtask 3A- Site Planning & Civil (Pond): Design development plans (cover, general notes, master site plans, drainage maps, existing conditions, site layout plans, paving & drainage plans, water, kayak/canoe launch, fishing platform, vault restroom building, site civil details, and pollution prevention plans) in BDC 24""x36"" standard format; a draft of the Technical Specifications, an estimate of the probable construction cost of the work depicted by the 60% plans, and a report concerning the acquisition of all permits (all three in BDC 8-1/2""x11"" standard format). All will be delivered electronically in PDF format. Fixed Price $12,900.12. Reimbursables $387.60. The Department shall pay the Contractor on a cost reimbursement plus fixed fee basis not to exceed $13,287.72
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 5 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1 Subtask 3B- Site, Environmental & Stormwater Permitting (Pond & EGS): Drainage Report and wat...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1 Subtask 3B- Site, Environmental & Stormwater Permitting (Pond & EGS): Drainage Report and water quality analysis calculations. Submittal documentation to SJRWMD, FDEP and Putnam County. POND fixed cost $1880.79, EGS fixed cost $4124.58, & reimbursables not to exceed $2,209.00. 3B total not to exceed $8214.37.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 5-6 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1 Subtask 3C-Structural (G.M. Hill): Sketches and preliminary drawings with calculations. Draft...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1 Subtask 3C-Structural (G.M. Hill): Sketches and preliminary drawings with calculations. Draft of technical specifications in BDC format.
|
| Deliverable Price: $1,003.58 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 6 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1 Subtask 4A- Site Planning & Civil (Pond): Full bid documents, including Final Plans (cover, g...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1 Subtask 4A- Site Planning & Civil (Pond): Full bid documents, including Final Plans (cover, general notes, master site plans, drainage maps, existing conditions, site layout plans, paving & drainage plans, water, kayak/canoe launch, fishing platform, vault restroom building, site civil details, and pollution prevention plans) in BDC 24"x36" standard format; the Final Technical Specifications, a Final estimate of the probable construction cost of the work depicted by the bid documents, and a copy of all permits acquired (all three in BDC 8-1/2"x11" standard format). All will be delivered electronically in PDF format. Fixed Price Cost $4,598.07; Reimbursables not to exceed $980.00. Total Subtask 4A not to exceed $5,578.07.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 7 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1 Subtask 4B-Site/Environmental/Stormwater Permitting (Pond & EGS): Final permit applications. ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1 Subtask 4B-Site/Environmental/Stormwater Permitting (Pond & EGS): Final permit applications. Pond fixed price cost $1,603.86. EGS fixed price cost $329.76.
|
| Deliverable Price: $1,933.62 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 7-8 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1 Subtask 4C- Structural (G.M. Hill): Final design input
2. Final technical specifications in B...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1 Subtask 4C- Structural (G.M. Hill): Final design input
2. Final technical specifications in BOC format.
|
| Deliverable Price: $1,557.28 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 8 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1 Subtask 5- Post Design Services/Construction Administration: : 1. Shop Drawing documents 2. R...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1 Subtask 5- Post Design Services/Construction Administration: : 1. Shop Drawing documents 2. RFI documents 3. Approved/Disapproved Change Order documents 4. Reviewed As-built documents. Total Subtask 5 cost not to exceed $5,898.48
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 8 |
| Deliverable Number: |
|