Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
Nonresidential building construction services
|
Design Contract with Gresham Smith to complete the Tidal Connections Restoration at Curry Hammock St...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Design Contract with Gresham Smith to complete the Tidal Connections Restoration at Curry Hammock State Park in Monroe County, Florida.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Subtask 1: Survey Files in: o DGN format (Open Roads Designer (ORD)) o PDF format Signed a...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1: Subtask 1: Survey Files in: o DGN format (Open Roads Designer (ORD)) o PDF format Signed and sealed Design Survey, 24”x36”, 2 copies. Reimbursable Total Cost: $13,404.58 not to exceed $98,358.70.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Subtask 2: Concepts in PDF format.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Subtask 2: Concepts in PDF format.
|
| Deliverable Price: $17,599.31 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 3: Subsurface Utility Engineering: Paint markings in the field and a...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1: Change Order 1: Subtask 3: Subsurface Utility Engineering: Paint markings in the field and a field sketch of marked utilities. Reimbursable total cost is $2,640 not to exceed $17,770.41.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 4: Hydrological Services: Hydrological documents in PDF Format.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 1: Subtask 4: Hydrological Services: Hydrological documents in PDF Format.
|
| Deliverable Price: $115,522.27 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 5: 30% Design Documents: Copy of the 30% documents in PDF format.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 1: Subtask 5: 30% Design Documents: Copy of the 30% documents in PDF format.
|
| Deliverable Price: $95,319.31 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 6A: Environmental Services: Wetland Delineation Environmental Scienc...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1: Change Order 1: Subtask 6A: Environmental Services: Wetland Delineation Environmental Science Associates: GPS collected data in GIS format and summary of data collection. Reimbursable total cost is $1,713.75 not to exceed $9,246.45.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 6B: Environmental Services: Regulatory Agency Survey Requirements/Me...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 1: Subtask 6B: Environmental Services: Regulatory Agency Survey Requirements/Methodologies Coordination: Summary of Regulatory Agency Meeting Minutes in PDF format.
|
| Deliverable Price: $5,144.40 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 6C: Environmental Services: Ecological Resources Existing Conditions...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1: Change Order 1: Subtask 6C: Environmental Services: Ecological Resources Existing Conditions Assessment: Summary Technical Memorandum Addressing Ecological Resources. FKNMS-Specific Benthic Resources Report. All in pdf format. Reimbursable total cost is $5,077.75 not to exceed $34,207.41. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 6D: Environmental Services: SFWMD Permit Application: SFWMD Permit A...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 1: Subtask 6D: Environmental Services: SFWMD Permit Application: SFWMD Permit Application and supplemental documentation in PDF format.
|
| Deliverable Price: $7,516.24 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 6E: Environmental Services: SFWMD Permit Application Processing: Res...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1: Change Order 1: Subtask 6E: Environmental Services: SFWMD Permit Application Processing: Responses to SFWMD RAIs in PDF format. Reimbursable total cost is $1,123.75 not to exceed $6,979.15.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 6F: Environmental Services: USACE Nationwide Permit Application: USA...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1: Change Order 1: Subtask 6F: Environmental Services: USACE Nationwide Permit Application: USACE NWP #27 (PCN) and supplemental documentation in PDF format. Reimbursable total cost is $1,123.75 not to exceed $8,639.99.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 6G: Environmental Services: USACE Nationwide Permit Application Proc...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 1: Subtask 6G: Environmental Services: USACE Nationwide Permit Application Processing: Responses to USACE RAIs in PDF format.
|
| Deliverable Price: $5,855.40 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 6H: Environmental Services: FKNMS Approval Request and Coordination:...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 1: Subtask 6H: Environmental Services: FKNMS Approval Request and Coordination: FKNMS Approval Request and supplemental documentation in PDF format.
|
| Deliverable Price: $7,096.84 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 6I: Environmental Services: Ecological Design Support and Coordinati...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 1: Subtask 6I: Environmental Services: Ecological Design Support and Coordination: Progress summaries of coordination (initial, concept, 30%, 60%, 90%) in PDF format.
|
| Deliverable Price: $7,279.56 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 6J: Environmental Services: Preliminary Archaeological and Cultural ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 1: Subtask 6J: Environmental Services: Preliminary Archaeological and Cultural Resources Assessment: Memorandum documenting the desktop analysis results and DHR coordination in PDF format.
|
| Deliverable Price: $4,231.92 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 6K: Environmental Services: Modeling Support Field Data Collection: ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1: Change Order 1: Subtask 6K: Environmental Services: Modeling Support Field Data Collection: GIS data for mud mapping and sediment sample locations. Reimbursable total cost is $2,061.75 not to exceed $9,594.45.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 7: 60% Design Documents: Copy of the 60% design documents in PDF for...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 1: Subtask 7: 60% Design Documents: Copy of the 60% design documents in PDF format.
|
| Deliverable Price: $112,934.17 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 8A: Permitting and Utility Coordination: South Florida Water Managem...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 1: Subtask 8A: Permitting and Utility Coordination: South Florida Water Management District Permit Application: South Florida Water Management District Application Package in PDF format.
|
| Deliverable Price: $7,781.38 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 8B: Permitting and Utility Coordination: South Florida Water Managem...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 1: Subtask 8B: Permitting and Utility Coordination: South Florida Water Management District Permit Issuance: Copy of all RAI’s and final permit approval in PDF format.
|
| Deliverable Price: $3,419.26 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 8C: Permitting and Utility Coordination: Utility Coordination: Copy ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 1: Subtask 8C: Permitting and Utility Coordination: Utility Coordination: Copy of all Utility Correspondences in PDF format.
|
| Deliverable Price: $7,735.88 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 9: Geotechnical Services: Copy of all geotechnical service documents...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1: Change Order 1: Subtask 9: Geotechnical Services: Copy of all geotechnical service documents. Reimbursable total cost is $1,840 not to exceed $33,399.69.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 10A: Structural Services: Structural Concept: Included with Subtask ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 1: Subtask 10A: Structural Services: Structural Concept: Included with Subtask 4 submittal.
|
| Deliverable Price: $35,917.82 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 10B: Structural Services: 30% Structural: Plans included with Subtas...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 1: Subtask 10B: Structural Services: 30% Structural: Plans included with Subtask 5 submittal.
|
| Deliverable Price: $59,255.11 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 10C: Structural Services: 60% Structural: Plans included with Subtas...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 1: Subtask 10C: Structural Services: 60% Structural: Plans included with Subtask 7 submittal.
|
| Deliverable Price: $71,767.48 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|