Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
Nonresidential building construction services
|
Design Contract with K2M Design, Inc., to complete the Interpretive Center project at John Pennekamp...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Design Contract with K2M Design, Inc., to complete the Interpretive Center project at John Pennekamp Coral Reef State Park in Monroe County, Florida.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Subtask 1A: Concept Planning: Meeting minutes – PDF file in 81/2” x 11 paper electronically....
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Subtask 1A: Concept Planning: Meeting minutes – PDF file in 81/2” x 11 paper electronically.
|
| Deliverable Price: $4,775.32 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Subtask 1B: Concept Planning: Excel spreadsheet. Electronic copies will be sent to all stake...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Subtask 1B: Concept Planning: Excel spreadsheet. Electronic copies will be sent to all stakeholders.
|
| Deliverable Price: $7,116.48 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Subtask 1C: Concept Planning: (3) colored space diagram concepts formatted as an 11 x 17 she...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Subtask 1C: Concept Planning: (3) colored space diagram concepts formatted as an 11 x 17 sheet. Electronic copies will be sent to all stakeholders.
|
| Deliverable Price: $7,476.12 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Subtask 1D: Concept Planning: 3D basic colorization formatted as an 11 x 17 sheet depicting ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Subtask 1D: Concept Planning: 3D basic colorization formatted as an 11 x 17 sheet depicting the preferred space diagram concept.
|
| Deliverable Price: $15,166.48 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1 Change Order 1: Subtask 1E: Alternative Concept Planning: 1E – (2) colored space diagram conc...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1 Change Order 1: Subtask 1E: Alternative Concept Planning: 1E – (2) colored space diagram concepts formatted as an 11 x 17 sheet, along with a table and narrative summarizing the differences between each alternative and the concept provided based on the initial input from users regarding required functional space. Electronic copies will be sent to all stakeholders.
|
| Deliverable Price: $24,846.12 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1 CO2: Subtask 2A – Survey: Topographic Survey shall be submitted signed and sealed in pdf form...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1 CO2: Subtask 2A – Survey: Topographic Survey shall be submitted signed and sealed in pdf format to the BDC
project manager. AutoCAD files to be submitted via eTransmit. Submit point files
in ascii format and images of the field book in pdf format.
|
| Deliverable Price: $86,368.44 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1 CO2: Subtask 2B – Trip Generation Memo: Trip Generation memorandum shall be submitted signed ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1 CO2: Subtask 2B – Trip Generation Memo: Trip Generation memorandum shall be submitted signed and sealed in pdf format to the BDC project manager.
|
| Deliverable Price: $8,576.62 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1 CO2: Subtask 2C – Geotechnical Study: Report of results of geotechnical testing shall be subm...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1 CO2: Subtask 2C – Geotechnical Study: Report of results of geotechnical testing shall be submitted signed and sealed in pdf format to the BDC project manager.
|
| Deliverable Price: $16,049.65 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1 CO2: Subtask 2D – Landscape Master Plan Concepts: Preliminary Landscape Master Plan Concepts ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1 CO2: Subtask 2D – Landscape Master Plan Concepts: Preliminary Landscape Master Plan Concepts in a narrative and pictorial report presented in a memorandum shall be submitted in pdf format to the BDC project manager.
|
| Deliverable Price: $31,916.58 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1 CO2: Subtask 2E – Exhibit Design – 50% Concepts: Preliminary Exhibit/Aquarium Concepts with n...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1 CO2: Subtask 2E – Exhibit Design – 50% Concepts: Preliminary Exhibit/Aquarium Concepts with narrative and imagery shall be submitted in pdf format to the BDC project manager. Reimbursable Cos: $1,466.00 not to exceed $30,641.30.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1 CO2: Subtask 2F – Initial Coral Nursery Coordination: Preliminary considerations and requirem...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 1 CO2: Subtask 2F – Initial Coral Nursery Coordination: Preliminary considerations and requirements shall be submitted as a memorandum in pdf format to the BDC project manager.
|
| Deliverable Price: $2,734.38 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1 CO2: Subtask 2G – Conceptual (ROM) Estimate: Concept Level Estimate of Construction Costs sha...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1 CO2: Subtask 2G – Conceptual (ROM) Estimate: Concept Level Estimate of Construction Costs shall be submitted as a signed and sealed report in pdf format to the BDC project manager.
|
| Deliverable Price: $8,207.72 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1 CO2: Subtask 2H – Exhibit Design – 100% Concepts: Exhibit/Aquarium concepts in a report with ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1 CO2: Subtask 2H – Exhibit Design – 100% Concepts: Exhibit/Aquarium concepts in a report with narrative and imagery shall be submitted signed and sealed in pdf format to the BDC project manager.
|
| Deliverable Price: $29,175.30 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1 CO2: Subtask 3A - Preliminary SD Documents - Basic AE Services: Draft preliminary Design Docu...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1 CO2: Subtask 3A - Preliminary SD Documents - Basic AE Services: Draft preliminary Design Documents and Drawings, memo confirming project
requirements and details from team kick-off meeting shall be digitally submitted in pdf format to the BDC project manager. Reimbursable Cost: 1,720.60 not to exceed 49,617.71.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: CO2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 3: Subtask 3B – Civil Engineering Schematic Design (30% Documents) - ? Prelimin...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 3: Subtask 3B – Civil Engineering Schematic Design (30% Documents) - ? Preliminary Site Plan and Phasing Plan Documents shall be digitally submitted in
pdf format to the BDC project manager.
|
| Deliverable Price: $11,653.76 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 CO3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 3: Subtask 3C – Landscape Design –Schematic Design (30%) Documents - ? Delivera...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 3: Subtask 3C – Landscape Design –Schematic Design (30%) Documents - ? Deliverable
? 30% hardscape and landscape plans (to 100% Schematic Design level) shall be
digitally submitted in pdf format to the BDC project manager.
|
| Deliverable Price: $23,982.92 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 CO3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 3: Subtask 3D – Signage & Wayfinding – Schematic Design (30%) Documents - ? Del...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 3: Subtask 3D – Signage & Wayfinding – Schematic Design (30%) Documents - ? Deliverable
? Schematic layout showing signage/wayfinding shall be digitally submitted in pdf
format to BDC project manager.
|
| Deliverable Price: $4,127.13 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 CO3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 3: Subtask 3E – Exhibit – 50% Schematic Design Documents - ? Deliverable
? Draf...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1: Change Order 3: Subtask 3E – Exhibit – 50% Schematic Design Documents - ? Deliverable
? Draft exhibit and gallery plans to 50% Schematic Design level shall be digitally
submitted in pdf format to the BDC project manager. Fixed Price Cost: $66,413.10. Reimbursable Cost: $1,466.00.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 CO3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 3: Subtask 3F – Aquaria Life Support Systems – Schematic Design (30%) Docs - ? ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1: Change Order 3: Subtask 3F – Aquaria Life Support Systems – Schematic Design (30%) Docs - ? Deliverable
? Schematic design level plans and supporting documents for aquaria tanks and
back of house requirements shall be digitally submitted in pdf format to the BDC
project manager. Fixed Price Cost: $59,126.46. Reimbursable Cost: $1,466.00.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 CO3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 3: Subtask 3G – Acoustical Schematic Design Documents - ? Deliverable
? Memoran...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 3: Subtask 3G – Acoustical Schematic Design Documents - ? Deliverable
? Memorandum of preliminary acoustical planning goals, considerations and
requirements in pdf format shall be submitted to the BDC project manager.
|
| Deliverable Price: $5,323.86 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 CO3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 3: Subtask 3H – Schematic Coral Nursery Coordination - ? Deliverable
? Memorand...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 3: Subtask 3H – Schematic Coral Nursery Coordination - ? Deliverable
? Memorandum regarding issues and status of coral nursery development shall be
digitally submitted in pdf format to the BDC project manager.
|
| Deliverable Price: $3,098.08 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 CO3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 3: Subtask 3I – Final Design Renderings - ? Deliverable
? Five (5) three-dimens...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 3: Subtask 3I – Final Design Renderings - ? Deliverable
? Five (5) three-dimensional views, including exteriors and interiors of the
proposed project. Printable high resolution digital files shall be submitted to the
BDC project manager.
|
| Deliverable Price: $14,683.71 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 CO3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 3: Subtask 3J – Schematic Design Milestone Estimating - ? Deliverable
? Updated...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 3: Subtask 3J – Schematic Design Milestone Estimating - ? Deliverable
? Updated estimate of total construction cost based on SD Documents shall be
digitally submitted in pdf format to the BDC project manager.
|
| Deliverable Price: $13,470.44 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 CO3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 3: Subtask 3K – Basic Service – Schematic Design (30%) Documents - ? Deliverab...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 3: Subtask 3K – Basic Service – Schematic Design (30%) Documents - ? Deliverable
? 100% Schematic Design Documents and Drawings (30% Construction Documents)
shall be digitally submitted in pdf format to the BDC project manager.
|
| Deliverable Price: $221,072.28 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 CO3 |
| Deliverable Number: |
|