| More |
Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
Professional engineering services
|
Master Contract with Olsen Associates, Inc. to complete the Beach Re-nourishment project at Dr. Von ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Master Contract with Olsen Associates, Inc. to complete the Beach Re-nourishment project at Dr. Von D. Mizell-Eula Johnson State Park in Broward County, Florida.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
"Task 01: Subtask 1: Beach survey and Engineering Analysis of Fill Volume: Olsen shall prepare a mem...
|
Fixed Price - Lump Sum
|
| Major Deliverable: "Task 01: Subtask 1: Beach survey and Engineering Analysis of Fill Volume: Olsen shall prepare a memorandum of findings that summarizes the volllllles required
to fill the permitted templates and opinion of probable cost to constrnct."
|
| Deliverable Price: $31,429.01 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 01: Subtask 2: Evaluation of Need and Benefits of Pipeline Corridor Improvements: Olsen shall s...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 01: Subtask 2: Evaluation of Need and Benefits of Pipeline Corridor Improvements: Olsen shall summarize the findings and conclusions of this Task in a summary
memorandum. A conceptual level opinion of probable cost to construct will be provided. |
| Deliverable Price: $7,970.38 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 01: Subtask 3: Scope Development for Coastal Engineering Analysis of Structure Field Expansion:...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 01: Subtask 3: Scope Development for Coastal Engineering Analysis of Structure Field Expansion: Olsen shall prepare a memorandum that includes a scope of work and budget to complete
the subject study. |
| Deliverable Price: $5,706.40 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 01: Subtask 4: Evaluation of Scope and Budget for Dune Enhancements: Olsen shall summarize the ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 01: Subtask 4: Evaluation of Scope and Budget for Dune Enhancements: Olsen shall summarize the finding of this investigation in an engineering memorandum
of findings. A conceptual level opinion of probable cost to construct will be provided. |
| Deliverable Price: $11,054.10 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Professional Services agreement with Olsen Associates Inc.. Amendment name change to Foth Infrastruc...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Professional Services agreement with Olsen Associates Inc.. Amendment name change to Foth Infrastructure & Environment, LLC.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Agreement without a financial exchange or impact |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: AM1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 5A: Preliminary Planning, Site Analysis, Kickoff Workshop, and Land ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 1: Subtask 5A: Preliminary Planning, Site Analysis, Kickoff Workshop, and Land Use Plan. Summary Memorandum with Site Analysis Plans and Preliminary Vision Plans as Attachments (PDF).
|
| Deliverable Price: $31,385.57 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 5B: Conceptual Master Plan / Vision Plan. Summary Memorandum with Co...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 1: Subtask 5B: Conceptual Master Plan / Vision Plan. Summary Memorandum with Conceptual Master Plan / Vision Plan as an Attachment (PDF).
|
| Deliverable Price: $42,937.23 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 5C: Draft Detailed Master Planning. Draft Summary Memorandum and Rec...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 1: Subtask 5C: Draft Detailed Master Planning. Draft Summary Memorandum and Recommendations with Detailed Master Plan Presentation Booklet as an Attachment (PDF).
|
| Deliverable Price: $51,348.16 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 5D: Final Detailed Master Planning. Final Summary Memorandum and Rec...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 1: Subtask 5D: Final Detailed Master Planning. Final Summary Memorandum and Recommendations with Detailed Master Plan Presentation Booklet as an Attachment (PDF).
|
| Deliverable Price: $4,857.34 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 6A: Data Collection and Reporting. Reconnaissance, Permitting, and D...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1: Change Order 1: Subtask 6A: Data Collection and Reporting. Reconnaissance, Permitting, and Data Purchase. Reconnaissance trip report (PDF). Fixed Price Cost: $89,244.87. Reimbursable Cost for Data Purchase: $10,000.00, not to exceed $99,244.87.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 6B: Data Collection and Reporting. Initial Data Collection and Repor...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 1: Subtask 6B: Data Collection and Reporting. Initial Data Collection and Reporting. First deployment data collection report (PDF).
|
| Deliverable Price: $42,586.92 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 6C: Data Collection and Reporting. Second Data Collection and Report...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 1: Subtask 6C: Data Collection and Reporting. Second Data Collection and Reporting. Second deployment data collection report (PDF).
|
| Deliverable Price: $42,586.92 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 6D: Data Collection and Reporting. Final Data Summary Reporting. Dat...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 1: Subtask 6D: Data Collection and Reporting. Final Data Summary Reporting. Data summary report (PDF).
|
| Deliverable Price: $24,335.74 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 6E: Model Input and Reporting. Model Input and Reporting. Summary re...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 1: Subtask 6E: Model Input and Reporting. Model Input and Reporting. Summary report (PDF)
|
| Deliverable Price: $114,661.90 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 6F: Numerical Modeling. Numerical Modeling - Wave Model Setup, Calib...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 1: Subtask 6F: Numerical Modeling. Numerical Modeling - Wave Model Setup, Calibration and Reporting. An interim progress memorandum discussing wave model setup and calibration (PDF).
|
| Deliverable Price: $40,360.41 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 6G: Numerical Modeling. Numerical Modeling - Shoreline Model Setup, ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 1: Subtask 6G: Numerical Modeling. Numerical Modeling - Shoreline Model Setup, Calibration and Reporting. An interim progress memorandum discussing shoreline model setup and calibration (PDF).
|
| Deliverable Price: $70,291.47 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 6H: Numerical Modeling. Numerical Modeling - Model Production and Dr...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 1: Subtask 6H: Numerical Modeling. Numerical Modeling - Model Production and Draft Reporting. A draft numerical modeling production report (PDF).
|
| Deliverable Price: $57,326.46 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 6I : Numerical Modeling. Numerical Modeling - Model Production and F...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 1: Subtask 6I : Numerical Modeling. Numerical Modeling - Model Production and Final Reporting. A final numerical modeling production report (PDF).
|
| Deliverable Price: $28,903.09 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 6J: Engineering Reporting. Draft Engineering Report. A draft enginee...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 1: Subtask 6J: Engineering Reporting. Draft Engineering Report. A draft engineering report (PDF).
|
| Deliverable Price: $18,820.79 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 1: Change Order 1: Subtask 6K: Engineering Reporting. Final Engineering Report. A final enginee...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Change Order 1: Subtask 6K: Engineering Reporting. Final Engineering Report. A final engineering report (PDF).
|
| Deliverable Price: $15,913.69 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T1 CO1 |
| Deliverable Number: |
|