| More |
Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
Nonresidential building construction services
|
Master Contract with Mead and Hunt to complete AE Statewide projects at Florida State Parks.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Master Contract with Mead and Hunt to complete AE Statewide projects at Florida State Parks.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: 1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 4: SubTask 1 – Kirkpatrick Dam Alignment Survey: Mead & Hunt will provide the following deliver...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 4: SubTask 1 – Kirkpatrick Dam Alignment Survey: Mead & Hunt will provide the following deliverables to the FDEP:
Summary letter of survey procedures and data ................................................... 1 copy via email (PDF file)
|
| Deliverable Price: $13,707.06 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 4: SubTask 2A – Kirkpatrick Dam Field Inspection: Mead & Hunt will provide the following delive...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 4: SubTask 2A – Kirkpatrick Dam Field Inspection: Mead & Hunt will provide the following deliverables to the FDEP:
Inspection Summary Notes (Task 2A) .................................................................. 1 copy via email (PDF file)
|
| Deliverable Price: $6,930.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 4: SubTask 2B – Kirkpatrick Dam Inspection Report: Mead & Hunt will provide the following deliv...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 4: SubTask 2B – Kirkpatrick Dam Inspection Report: Mead & Hunt will provide the following deliverables to the FDEP: Draft and Final Inspection Reports (Task 2B) ....................................................... 1 copy via email (PDF file)
|
| Deliverable Price: $10,176.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 4: SubTask 3A – Buckman Lock Field Inspection: Mead & Hunt will provide the following deliverab...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 4: SubTask 3A – Buckman Lock Field Inspection: Mead & Hunt will provide the following deliverables to the FDEP:
Inspection Summary Notes (Task 3A) .................................................................. 1 copy via email (PDF file)
|
| Deliverable Price: $6,930.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 4: SubTask 3B – Buckman Lock Inspection Report: Mead & Hunt will provide the following delivera...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 4: SubTask 3B – Buckman Lock Inspection Report: Mead & Hunt will provide the following deliverables to the FDEP: Draft and Final Inspection Reports (Task 3B) ....................................................... 1 copy via email (PDF file)
|
| Deliverable Price: $9,501.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 4: SubTask 4 – Gate Inspections: Mead & Hunt will provide the following deliverables to the FDE...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 4: SubTask 4 – Gate Inspections: Mead & Hunt will provide the following deliverables to the FDEP:
Draft gate inspection reports and technical memorandum ................................... 1 copy via email (PDF file)
Final gate inspection reports and technical memorandum ................................... 1 copy via email (PDF file) |
| Deliverable Price: $36,927.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 4: SubTask 5 – Underwater Inspections: Mead & Hunt will provide the following deliverables to t...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 4: SubTask 5 – Underwater Inspections: Mead & Hunt will provide the following deliverables to the FDEP:
Underwater inspection reports and technical memorandum ................................ 1 copy via email (PDF file)
|
| Deliverable Price: $41,772.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 2: Subtask 1: Bridge Inspection Deliverable:
Subtask 1: Copy of field notes and photos from th...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 2: Subtask 1: Bridge Inspection Deliverable:
Subtask 1: Copy of field notes and photos from the inspection in pdf format.
|
| Deliverable Price: $9,594.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 2: Subtask 2: Alternatives Analysis/Recommendation/Conceptual Construction Cost
Estimate Delive...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 2: Subtask 2: Alternatives Analysis/Recommendation/Conceptual Construction Cost
Estimate Deliverable:
Subtask 2: PDF of an abbreviated report describing and comparing/contrasting the evaluated alternatives.
|
| Deliverable Price: $13,008.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3: SubTask 1 – Update EAP: Mead & Hunt will provide the following deliverables to the FDEP: Dra...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: SubTask 1 – Update EAP: Mead & Hunt will provide the following deliverables to the FDEP: Draft EAP1 copy via email
(PDF file) Final EAP 1 copy via email (PDF file).
|
| Deliverable Price: $7,029.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3: SubTask 2 – Underwater Inspection: Mead & Hunt will provide the following deliverables to th...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: SubTask 2 – Underwater Inspection: Mead & Hunt will provide the following deliverables to the FDEP:
Draft and Final Dive Inspection Reports 1 copy via email (PDF file.)
|
| Deliverable Price: $31,866.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3: SubTask 3 – Gate Inspection: Mead & Hunt will provide the following deliverables to the FDEP...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: SubTask 3 – Gate Inspection: Mead & Hunt will provide the following deliverables to the FDEP:
Draft and Final Gate Inspection Report 1 copy via email (PDF file)
|
| Deliverable Price: $37,602.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3: SubTask 4 – Survey: Mead & Hunt will provide the following deliverables to the FDEP:
Survey ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: SubTask 4 – Survey: Mead & Hunt will provide the following deliverables to the FDEP:
Survey Plots 1 copy via email (PDF file)
|
| Deliverable Price: $14,614.71 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3: SubTask 5 – DSSMR: Mead & Hunt will provide the following deliverables to the FDEP:
Draft DS...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: SubTask 5 – DSSMR: Mead & Hunt will provide the following deliverables to the FDEP:
Draft DSSMR 1 copy via email (PDF file)
Final DSSMR 1 copy via email (PDF file)
|
| Deliverable Price: $14,103.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3: SubTask 6A – Field Inspection: Mead & Hunt will provide the following deliverables to the FD...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: SubTask 6A – Field Inspection: Mead & Hunt will provide the following deliverables to the FDEP:
Inspection Summary Notes (Task 6A) 1 copy via email (PDF file)
|
| Deliverable Price: $20,385.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3: SubTask 6B – Inspection Report: Mead & Hunt will provide the following deliverables to the F...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: SubTask 6B – Inspection Report: Mead & Hunt will provide the following deliverables to the FDEP: Draft and Final Inspection Reports (Task 6B) 1 copy via email (PDF file)
|
| Deliverable Price: $20,997.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 6: Subtask 1: Survey: Digitally signed, sealed, and electronically sent pdf and CAD files for t...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 6: Subtask 1: Survey: Digitally signed, sealed, and electronically sent pdf and CAD files for the survey drawings
|
| Deliverable Price: $10,800.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T6 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 6: Subtask 2A: Desktop Environmental Review: Environmental Features ID Memorandum (PDF sent ele...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 6: Subtask 2A: Desktop Environmental Review: Environmental Features ID Memorandum (PDF sent electronically)
|
| Deliverable Price: $2,635.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T6 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 6: Subtask 2B: Wetland/Surface Water Delineation and FKNMS Benthic Resource Survey: GPS collect...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 6: Subtask 2B: Wetland/Surface Water Delineation and FKNMS Benthic Resource Survey: GPS collected wetland/surface waters limits and any other benthic resource data in GIS/table
format
FKNMS Benthic Survey Report (PDF sent electronically) Environmental Support Document (PDF sent
electronically)
|
| Deliverable Price: $16,687.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T6 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 6: Subtask 3: Geotechnical: PDF of electronically signed and sealed geotechnical report sent el...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 6: Subtask 3: Geotechnical: PDF of electronically signed and sealed geotechnical report sent electronically
|
| Deliverable Price: $17,511.12 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T6 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 6: Subtask 4: 30% Drawings and Construction Cost Estimate: PDF copy of 30% drawings and concept...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 6: Subtask 4: 30% Drawings and Construction Cost Estimate: PDF copy of 30% drawings and conceptual level construction cost estimate sent electronically
|
| Deliverable Price: $23,388.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T6 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 6: Subtask 5: 60% Drawings and Construction Cost Estimate: PDF of 60% bridge drawings and estim...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 6: Subtask 5: 60% Drawings and Construction Cost Estimate: PDF of 60% bridge drawings and estimate of probable construction cost sent electronically
|
| Deliverable Price: $82,992.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T6 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 6: Subtask 6A: Pre-Application Meetings: Pre-Application Meetings Summary (PDF sent electronica...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 6: Subtask 6A: Pre-Application Meetings: Pre-Application Meetings Summary (PDF sent electronically)
|
| Deliverable Price: $9,140.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T6 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 6: Subtask 6B: SFWMD General Permit 62-330.483 Application: FDEP General Permit Application Pac...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 6: Subtask 6B: SFWMD General Permit 62-330.483 Application: FDEP General Permit Application Package (PDF sent electronically) Reimbursable Cost: $250.00 not to exceed $3,251.00
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T6 |
| Deliverable Number: |
|