Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
Professional engineering services
|
Task 3: Subtask 1 Final documents. Deliverables: Final Design Documents will be provided in electro...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: Subtask 1 Final documents. Deliverables: Final Design Documents will be provided in electronic format to BDC for review. These documents will be provided within (3) weeks after receiving the new executed Task assignment and the 60% review comments. (1 week is assumed for BDC review)
|
| Deliverable Price: $6,410.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3: Subtask 2: Permitting Services: JGP will provide limited permitting services for this proje...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 3: Subtask 2: Permitting Services: JGP will provide limited permitting services for this project. Deliverables: The permitting portion of this proposal will consist of submitting the application and obtaining a general permit from FDEP and obtaining a concurrency letter from Escambia County. .Add reimbursable $100.00 not to exceed $3,475.00.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3: Subtask 3: Bidding - JGP will provide support during this phase of the project. Deliverable...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: Subtask 3: Bidding - JGP will provide support during this phase of the project. Deliverable: Written clarifications and responses to the various bidder's questions for items related to the project will be provided in pdf format to BOC within 3 days after receipt for distribution.
• Written clarifications will be provided in pdf format by JGP Structural Group, Inc.
|
| Deliverable Price: $510.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3: Subtask 4A: Construction Administration Services JGP will provide limited construction admi...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: Subtask 4A: Construction Administration Services JGP will provide limited construction administration for this project. Deliverable: Construction Administration services include the following:
• 4A-Review and respond to contractor RFl's (request for information) within 3 days of each item.
|
| Deliverable Price: $790.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3: Subtask 4B: Construction Administration Services Deliverable: 4B -Review and provide respon...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: Subtask 4B: Construction Administration Services Deliverable: 4B -Review and provide responses/comments on submitted shop drawings supplied by the contractor within 7 days of the receipt of each submittal.
|
| Deliverable Price: $1,870.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3: Subtask 4C: Construction Administration Services: Deliverable: 4C-4F Provide site visits to...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: Subtask 4C: Construction Administration Services: Deliverable: 4C-4F Provide site visits to the project during construction. An observation report of each visit will be provided to BDC within 3 days of each visit. Four (4) site visits will be performed.
|
| Deliverable Price: $1,710.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3: Subtask 4D: Construction Administration Services Deliverable: 4C-4F Provide site visits to ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: Subtask 4D: Construction Administration Services Deliverable: 4C-4F Provide site visits to the project during construction. An observation report of each visit will be provided to BDC within 3 days of each visit. Four (4) site visits will be performed.
|
| Deliverable Price: $1,710.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3: Subtask 4E: Construction Administration Services Deliverable: 4C-4F Provide site visits to ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: Subtask 4E: Construction Administration Services Deliverable: 4C-4F Provide site visits to the project during construction. An observation report of each visit will be provided to BDC within 3 days of each visit. Four (4) site visits will be performed.
|
| Deliverable Price: $1,710.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 3: Subtask 4F: Construction Administration Services Deliverable: 4C-4F Provide site visits to ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: Subtask 4F: Construction Administration Services Deliverable: 4C-4F Provide site visits to the project during construction. An observation report of each visit will be provided to BDC within 3 days of each visit. Four (4) site visits will be performed.
|
| Deliverable Price: $1,710.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 4: Subtask 1: Asbestos Survey and Lead Paint Testing. An Asbestos Survey and Lead Paint Testing...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 4: Subtask 1: Asbestos Survey and Lead Paint Testing. An Asbestos Survey and Lead Paint Testing Report for the structure will be provided to BOC for review. The survey proposed by SES is intended to be a full and comprehensive survey to meet the
NESHAP (National Emissions Standard for Hazardous Air Pollutants). Samples will be collected according to EPA guidelines. The report and information will be provided in PDF format within four (4) weeks after
receipt of execution of the Task Assignment for this work. If additional testing is required it will be performed at the provide rate as an additional service.. Fixed Price Cost: $1,780.00.
|
| Deliverable Price: $1,780.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T4 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 4: Subtask 2: Survey. An elevation survey of each boardwalk will be provided to BOC for review....
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 4: Subtask 2: Survey. An elevation survey of each boardwalk will be provided to BOC for review. This information will be provided in PDF format within four (4) weeks after receipt of execution of the Task Assignment. Fixed Price Cost: $3,670.00.
|
| Deliverable Price: $3,670.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T4 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 4: Subtask 3: Environmental Site Inspection and Report. An environmental summary report will be...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 4: Subtask 3: Environmental Site Inspection and Report. An environmental summary report will be prepared with an aerial map depicting the wetlands. This information and a digital file of the wetland points will be provided in PDF format within eight (8) weeks after receipt of execution of the Task Assignment. Fixed Price Cost: $5,334.50.
|
| Deliverable Price: $5,334.50 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T4 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 4: Subtask 4: 60% Documents. 60% Design Documents and the OPC will be provided in electronic pd...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 4: Subtask 4: 60% Documents. 60% Design Documents and the OPC will be provided in electronic pdf format to BDC for review. These documents will be provided within eight (8) weeks after receipt of execution of the Task Assignment . It is assumed that one (1) week that will be allocated for DEP review and comments for the 60% documents. Fixed Price Cost: $13,360.00.
|
| Deliverable Price: $13,360.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T4 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 4: Subtask 5: Final Documents. Final Design Documents will be provided in electronic (pdf) for...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 4: Subtask 5: Final Documents. Final Design Documents will be provided in electronic (pdf) format to BDC for bidding. These documents will be provided within six (6) weeks after receipt of the 60% comments. It is assumed that 1 week that will be allocated for DEP review and comments for the final documents.JGP will provide Final Design Documents-signed & sealed electronic copies of the construction documents. They shall be sent to BDC including final CAD drawings. The OPC will be provided in pdf format to the BOC project manager. Fixed Price Cost: $10,760.00.
|
| Deliverable Price: $10,760.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T4 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 4: Subtask 6: Permitting Services. For the permitting portion of this proposal will consist of ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 4: Subtask 6: Permitting Services. For the permitting portion of this proposal will consist of providing meeting minutes, the permit application and/or permit approvals from the various noted agencies. Fixed Price Cost: $5,315.00. Reimbursable Cost for permit: $100.00, not to exceed $5,415.00.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T4 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 4: Subtask 7: Bidding. Written clarifications and responses to the various bidder's questions f...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 4: Subtask 7: Bidding. Written clarifications and responses to the various bidder's questions for items related to the project will be provided to BDC within 3 days after receipt for distribution. Written clarifications provided by JGP Structural Group, Inc. Fixed Price Cost: $540.00.
|
| Deliverable Price: $540.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T4 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 4: Subtask 8A: Construction Administration Services. Review and respond to contractor RFl's (re...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 4: Subtask 8A: Construction Administration Services. Review and respond to contractor RFl's (request for infor.) within 3 days of each item. Fixed Price Cost: $1,175.00.
|
| Deliverable Price: $1,175.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T4 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 4: Subtask 8B: Construction Administration Services. Review and provide responses/comments on s...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 4: Subtask 8B: Construction Administration Services. Review and provide responses/comments on submitted shop drawings supplied by the contractor within 7 days of the receipt of each submittal. Fixed Price Cost: $1,125.00.
|
| Deliverable Price: $1,125.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T4 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 4: Subtask 8C Construction Administration Services. Provide eight (8) site visits (8C thru 8J) ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 4: Subtask 8C Construction Administration Services. Provide eight (8) site visits (8C thru 8J) to the project during construction. An observation report of each visit will be provided to BDC within 3 days of each visit. Fixed Price Cost: $1,315.00.
|
| Deliverable Price: $1,315.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T4 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 4: Subtask 8D: Construction Administration Services. Provide eight (8) site visits (8C thru 8J)...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 4: Subtask 8D: Construction Administration Services. Provide eight (8) site visits (8C thru 8J) to the project during construction. An observation report of each visit will be provided to BDC within 3 days of each visit. Fixed Price Cost: $1,315.00.
|
| Deliverable Price: $1,315.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T4 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 4: Subtask 8E: Construction Administration Services. Provide eight (8) site visits (8C thru 8J)...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 4: Subtask 8E: Construction Administration Services. Provide eight (8) site visits (8C thru 8J) to the project during construction. An observation report of each visit will be provided to BDC within 3 days of each visit. Fixed Price Cost: $1,315.00.
|
| Deliverable Price: $1,315.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T4 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 4: Subtask 8F: Construction Administration Services. Provide eight (8) site visits (8C thru 8J)...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 4: Subtask 8F: Construction Administration Services. Provide eight (8) site visits (8C thru 8J) to the project during construction. An observation report of each visit will be provided to BDC within 3 days of each visit. Fixed Price Cost: $1,315.00.
|
| Deliverable Price: $1,315.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T4 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 4: Subtask 8G: Construction Administration Services. Provide eight (8) site visits (8C thru 8J)...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 4: Subtask 8G: Construction Administration Services. Provide eight (8) site visits (8C thru 8J) to the project during construction. An observation report of each visit will be provided to BDC within 3 days of each visit. Fixed Price Cost: $1,315.00.
|
| Deliverable Price: $1,315.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T4 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 4: Subtask 8H: Construction Administration Services. Provide eight (8) site visits (8C thru 8J)...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 4: Subtask 8H: Construction Administration Services. Provide eight (8) site visits (8C thru 8J) to the project during construction. An observation report of each visit will be provided to BDC within 3 days of each visit. Fixed Price Cost: $1,315.00.
|
| Deliverable Price: $1,315.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T4 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 4: Subtask 8i: Construction Administration Services. Provide eight (8) site visits (8C thru 8J)...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 4: Subtask 8i: Construction Administration Services. Provide eight (8) site visits (8C thru 8J) to the project during construction. An observation report of each visit will be provided to BDC within 3 days of each visit. Fixed Price Cost: $1,315.00.
|
| Deliverable Price: $1,315.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: T4 |
| Deliverable Number: |
|