| More |
Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
CIVIL ENGINEERS
|
Task 6: Kick Off Meeting $520; Field Investigation $780; Utility Coordination $1,660; Preliminary De...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 6: Kick Off Meeting $520; Field Investigation $780; Utility Coordination $1,660; Preliminary Design $3,360; Permitting $2,300; Final Design $3,960; Bid/Construction Services $4,920; Field Survey $1,700; Geotechnical Testing $1,500;Reimbursement for Direct Cost $450. |
| Deliverable Price: $21,150.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in task assignment and applications complete. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 7: Schematic Design- $12,500; Design Development- $24,000; Contract Documents Phase- $11,000; P...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 7: Schematic Design- $12,500; Design Development- $24,000; Contract Documents Phase- $11,000; Permitting Coordination $4,600; Limited Construction Phase Services $10,400. |
| Deliverable Price: $62,500.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in task assignment and applications complete. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 8: Increase in building program requirements- design of additional footage for structure./Chang...
|
No Cost
|
| Major Deliverable: Task 8: Increase in building program requirements- design of additional footage for structure./Change Order No. 1 cancelled task. |
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in task assignment and applications complete. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 9: Hardcopies of Design Development Phase $19,600; Contract Documents $5,600; Limited Construct...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 9: Hardcopies of Design Development Phase $19,600; Contract Documents $5,600; Limited Construction Phase $3,729. |
| Deliverable Price: $28,900.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in task assignment and applications complete. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 10: Limited Construction Phase/CO #1 added two site visits and funding.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 10: Limited Construction Phase/CO #1 added two site visits and funding. |
| Deliverable Price: $4,888.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in task assignment and applications complete. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 11: 1 copy of final report to Bureau of Natural & Cultural Resources, 2 copies to the Park Mana...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 11: 1 copy of final report to Bureau of Natural & Cultural Resources, 2 copies to the Park Manager & 2 copies to the District 3 Administrative Office. |
| Deliverable Price: $30,000.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in task assignment and applications complete. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 13: GIS Survey of duck pond $2,250; Response to RAI #2 $2,998; Permit Extensions & Coordination...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 13: GIS Survey of duck pond $2,250; Response to RAI #2 $2,998; Permit Extensions & Coordination $603; Revise construction plans $2,911; Revise stormwater management calculations $880; Reveise ERP permit application $3,471; Prepare RAI #3 response & supporting data $1,440. |
| Deliverable Price: $14,553.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in task assignment and applications complete. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Architectural and Engineering services. Deliverables established on a task assignment basis.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Architectural and Engineering services. Deliverables established on a task assignment basis. |
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in task assignment and contract scope of services. |
| Financial Consequences: No payment for unsatisfactory services. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
TA#2 - Wekiwa Springs Bulkhead Study & Repair. Deliverables: Engineering Plan drawings, construction...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA#2 - Wekiwa Springs Bulkhead Study & Repair. Deliverables: Engineering Plan drawings, construction detail drawings, construction cost opinion, ACOE permit application, Final Construction Drawings, Final Technical Specifications, Final Construction Cost Opinion |
| Deliverable Price: $27,613.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in task assignment. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment 2 |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
TA#3 - DeLeon Springs Stormwater Improvements. Deliverables: Wastewater study, Schematic design sket...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA#3 - DeLeon Springs Stormwater Improvements. Deliverables: Wastewater study, Schematic design sketches, topographic survey, geotechnical investigation, wetlands delineation, design development site plan and details, construction documents, environmental resource permitting, response to one Request for Information. |
| Deliverable Price: $80,604.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in task assignment. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment 3 |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
TA#5 - Sebastian Inlet Concession Building. Deliverables: Schematic Design, design development drawi...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA#5 - Sebastian Inlet Concession Building. Deliverables: Schematic Design, design development drawings, final construction drawings, CCCL permit application, and Brevard County Building permit application. CO#1 added additional design elements. CO#2 added design elements. CO#3 added pre-construction meeting, 16 responses to requests for information, 11 site visits, and Certification of Completion. CO#4 added revisions to design. |
| Deliverable Price: $223,406.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in task assignment and applications complete. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment 5 & CO1 - CO4 |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 14: Submit meeting notes, from Kickoff Meeting with Park and BDC Staff, prepare and submit a re...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 14: Submit meeting notes, from Kickoff Meeting with Park and BDC Staff, prepare and submit a report findings of permit issues, develop and submit conceptual architectural plan and Rough Order Magnitude (ROM) Construction Cost Opinion $7,161; Prepare and submit 45% Construction documents $19,243; Resubmit 90% construction drawings from Park & BDC $9,946; Submit 100% construction drawings , Technical specifications and final update construction cost opinion $6,503; Hazardous Material Sampling and Reporting $5,062. |
| Deliverable Price: $47,915.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed to ensure drawings specifications, and opinion of construction costs were revised as needed and are submitted accurate and complete. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 12: 30% Schematic Design $76,454; 60% Design $51,173; 100% Design $30,264; Construction Adminis...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 12: 30% Schematic Design $76,454; 60% Design $51,173; 100% Design $30,264; Construction Administration $3,894; Survey & Archaeological Services $13,809; Geotechnical Services $1,782; Stormwater Calculations $6,942; Stormwater Design $1,615; ADA Dock Plans $5,160; ADA Dock Permits $1,490; ADA Dock Bidding Assistance $890; ADA Dock Construction Admin $2,859./Change Order No. 1 added Stormwater Pond, Separate Bid Documents for ADA Dock $34,547. The Department shall reimburse the Contractor on a cost reimbursement plus fixed fee basis not to exceed $196,332.00. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in task assignment and applications complete. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Civil engineering
|
Task 15: (1) Existing consitions Survey - Within 5 business days of the Kickoff Meeting with BDC an...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 15: (1) Existing consitions Survey - Within 5 business days of the Kickoff Meeting with BDC and Park staff, submit via email to the BDC Project Manager a report of the meeting meinute's document in 8 1/2x11 pdf format. At the Completion of the Existing Conditions Survey, submit via email to the BDC Project Manager, documentation of the facility toilet rooms existing conditions in the area fo the proposed modifications, including dimensioning of walls, fixtures, and equipment, etc. Documentation will include floor plan drawings as well as elevation drawings and photographs when appropriate, relevant to the proposed modifications. The existig conditions documents will be delivered to BDC in pdf and AutoCAD format. The pdf size will be scaled to fit an 11x17 format. Allowable costs $4,423.40 and reimbursable cost $842.55, total $5,265.95. (2) Concept Design Development (30%) - Submit conceptual architectural floor plans for the facility's two toilet rooms via email to the BDC Project Manager for BDC review and comments. Conceptual plans will include proposed plan layouts of modified toilet rooms. One conceptual plan layout for each toilet room will be developed. The pdf size will be scaled to fit an 11x17 format $3,532.95. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: (1) The BDC project manager will review the submittals; verify the tasks were completed and received as per the proposed time schedule; was in a legible format; contais on-site investigations including drawings, photographs and a description of the existing conditions; and contained sufficient information to fuly describe the existing conditions. (2) The BDC project manager will review the submittal and verify that it was received as per the proposed time schedule; was in a legible format and contains sufficient information to fully describe the design concepts (30%). |
| Financial Consequences: No payment will be made for deliverables deemed unsatisfactory by the Department. In the event that a deliverable is deemed unsatisfactory by the Department, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform. |
| Source Documentation Page Reference: Scope |
| Deliverable Number: |
|
|
|
|
Civil engineering
|
Task 15 CONTINUED: (3) Design Development (90%) - Submit to the BDC Design Development drawings in...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 15 CONTINUED: (3) Design Development (90%) - Submit to the BDC Design Development drawings in the BDC 24x36 standard that will include the standard BDC border. The drawing will be scale formatted to 11x17 pdf files and will consist of the following: cover sheet; abbrevations, legends, and general notes; existing conditions, photographs, and demolition plans; environmental notes and schedules; architectural plans, elevations, sections, schedules and details; mechanical plans, schedules and details; electrical plans, schedules, and details. Submit to BDC draft technical specifications in CSI format for environmental, architectural, mechanical, plumbing, and electrical design in MS Work in the BDC 8 1/2x11 standard format and delivered as pdf files. Submit to BDC a Rough Order of Magnitude (ROM) Construction Cost Opinion in MS Excel format and pdf formats. The deliverable will be written cost opinion containing line item descriptions, unit costs, quantities, line item totals, and aggregate totals $9,829.13. (4) Construction Documents Development (100%) - Submit to the BDC six sets of signed and sealed final Construction Document drawings (24x36 dated drawing sheets) incorporating BDC and Park staff coments from the Design Development Phase submittal. Three sets will be provided for State Fire Marshal review, and three sets will be provided for the Contractor's Building Department submittal. Drawing sheets will include the sheets listed in Design Development Phase. Submit to the BDC three copies of final technical specifications for environmental, architectural, technical, plumbing, and electrical design elements. Submit to the BDC three copies of a final ROM Construction Cost Opinion $1,516.71. The Department shall pay the Contractor on a cost reimbursement plus fixed fee basis not to exceed $20,144.74. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: (3) The BDC project manager will review the submittal and verify that it was received as per the proposed time schedule; was in a legible format and contains sufficient information to fully describe the design development (90%). (4) The BDC project manager will review the submittal and verify that it was received as per the proposed time schedule; was in a legible format and contains sufficient information to fully describe the design development (90%). |
| Financial Consequences: No payment will be made for deliverables deemed unsatisfactory by the Department. In the event that a deliverable is deemed unsatisfactory by the Department, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform. |
| Source Documentation Page Reference: Scope |
| Deliverable Number: |
|
|
|
|
Civil engineering
|
Task 16: (1) Existing Conditions Survey and Documentation - Drawing of the faciilty documenting exi...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 16: (1) Existing Conditions Survey and Documentation - Drawing of the faciilty documenting existing equipment and its condition in the areas of the proposed modifications, including the use of photographs; meeting minutes of the site visit/kickoff meeting to discuss site conditions and project intent/goals. The written meeting minutes will be in MS Word format to include: list of attendees including contact information, notes confirming the project intent and comments, project schedule, documentation of comments $5,166.41. (2) Schematic Design Phase - Coonceptual floor and roof plans, one-line drawings for duct work and electrical system, and schedules; written meeting minutes of a teleconference to review the Schematic Design documents; Documentation of discussions with State Historic Preservation Offices on requirements to obtain approval of the proposed redevelopment $6,806.88. (3) Design Development Phase - Design Development drawings 11x17 pdf data files consisting of: cover sheet; abbreviations, legend, and general notes sheet, location maps; existing conditions, photographs, and demolition plan; architectural plans, elevations, sections, and schedules as required; mechanical and plumbing plans, schedules, and details; electrical plans, schedules, and details; fire protection plan; draft written technical specification in CSI; written meeting minutes of a teleconference; written review comments and design input in email format $18,866.04. (4) Construction Document Phase - six sets of signed and sealed final construction document drawings 24x36 dated drawing sheets; three copies of final technical specifications for architetural, structral, mechanical, plumbing, electrical, and fire protection design elements; written review comments and design input regarding the CM's cost estimate in email fomat $10,210.97, reimbursables $547.25. The Department shall pay the Contractor on a cost reimbursement plus fixed fee basis not to exceed $41,597.55 |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverab le is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform. |
| Source Documentation Page Reference: Exhibit 1 |
| Deliverable Number: |
|
|
|
|
Civil engineering
|
Task 17: (1) Existing Conditions Survey and Documentation Phase - Topographic survey of the project...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 17: (1) Existing Conditions Survey and Documentation Phase - Topographic survey of the project area finished floors and surrounding walkways; Drawings of the facility documenting existing conditions in the areas of the proposed modifications, drawings will include floor plans and elevations relevant to the proposed modifications; meeting minutes of the site visit/kickoff meeting $6,939.17. (2) Schematic Design Phase - A conceptual architectural floor plan, elevations, and section will be developed and submitted; written meeting minutes of a teleconference to review the Schematic Deign documents; Documentation of discussinos with State Fire Marshall regarding proposed fire protection strategy; documentatin of discussions with State Historic Preservation Offices on requirements to obtain approval of the proposed redevelopment $13,077.06. (3) Design Development Phase - Design development drawings to include: coversheet; abgreviations, legend, and general notes shee, location maps; life safety and code compliance plan; existing conditions, photographs, and demolition plan; architectural plans, elevations, sections, and schedules; mechanical plans, schedules, and details; plumbing plans, schedules, and details; electrical plans, schedules, and details; fire protection plan (performance based). Draft written technical specification in CSI. Written meeting minutes of a teleconference to review the Design Development package. Written review comments and design input in email $25,438.74. (4) Construction Document Phase - six sets of signed and sealed final construction drawings; three copies of final technical specifications for architectural, structural, mechanical, plumbing, electrical, and fire protection design elements; written review comments and design input regarding cost estimate $18,690.28, reimbursables $547.25. The Department shall reimburse the Contractor on a cost reimbursement plus fixed fee basis not to exceed $64,692.50. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform. |
| Source Documentation Page Reference: Exhibit 1 |
| Deliverable Number: |
|
|
|
1
|
Professional engineering services
|
TA17; CO1: To be included in the Design Development Submittal as outlined in Task III of the origin...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA17; CO1: To be included in the Design Development Submittal as outlined in Task III of the original contract DC790 dated 12/1/14.
|
| Deliverable Price: $12,703.26 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by BDC to confirm they are complete, accurate, and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. If a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable at no additional cost to BDC within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, BDC may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: TA17CO1 |
| Deliverable Number: 1 |
|
|
|
2
|
Professional engineering services
|
TA17; CO1: Meeting minutes outlining the topics addressed at the meeting and agreed action items. Me...
|
Cost Reimbursement Plus Percentage of Cost
|
| Major Deliverable: TA17; CO1: Meeting minutes outlining the topics addressed at the meeting and agreed action items. Meeting minutes will be emailed to BDC in .pdf format.
|
| Deliverable Price: $2,639.34 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by BDC to confirm they are complete, accurate, and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. If a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable at no additional cost to BDC within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, BDC may, in its sole discretion, terminate the Contract for failure to perform. |
| Source Documentation Page Reference: TA17CO1 |
| Deliverable Number: 2 |
|
|
|
3
|
Professional engineering services
|
TA17; CO1: Review comments for submittals will be emailed to BDC in .pdf format. BDC will forward Jo...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA17; CO1: Review comments for submittals will be emailed to BDC in .pdf format. BDC will forward Jones Edmunds submittals electronically.
|
| Deliverable Price: $16,904.16 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by BDC to confirm they are complete, accurate, and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. If a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable at no additional cost to BDC within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, BDC may, in its sole discretion, terminate the Contract for failure to perform. |
| Source Documentation Page Reference: TA17CO1 |
| Deliverable Number: 3 |
|
|
|
4
|
Professional engineering services
|
TA17; CO1: Responses to RFIs will be emailed to BDC in .pdf format.
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA17; CO1: Responses to RFIs will be emailed to BDC in .pdf format.
|
| Deliverable Price: $4,007.62 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by BDC to confirm they are complete, accurate, and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. If a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable at no additional cost to BDC within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, BDC may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: TA17CO1 |
| Deliverable Number: 4 |
|
|
|
5
|
Professional engineering services
|
TA17; CO1: Photographs documenting construction activities and progress at the time of the visit an...
|
Cost Reimbursement Plus Percentage of Cost
|
| Major Deliverable: TA17; CO1: Photographs documenting construction activities and progress at the time of the visit and a Construction Observation Report to summarize observations from the site visit. Items will be emailed to BDC in .pdf format.
|
| Deliverable Price: $4,209.40 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by BDC to confirm they are complete, accurate, and timely.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. If a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable at no additional cost to BDC within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, BDC may, in its sole discretion, terminate the Contract for failure to perform.
|
| Source Documentation Page Reference: TA17CO1 |
| Deliverable Number: 5 |
|