| More |
Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
CIVIL ENGINEERS
|
Professional engineering services in Districts 3, 4 & 5. Deliverables established on a task assignm...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Professional engineering services in Districts 3, 4 & 5. Deliverables established on a task assignment basis. |
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in task assignment and contract scope of services. |
| Financial Consequences: No payment for unsatisfactory services/deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
TA#35 - Windley Key Segment (MM83.5 - 84.8). Deliverables - topographic survey, ecological investiga...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA#35 - Windley Key Segment (MM83.5 - 84.8). Deliverables - topographic survey, ecological investigation, revised permit documents, modified construction plans, |
| Deliverable Price: $28,150.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in task assignment. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment 35 |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
TA#37 - Various Trail Segment Projects. Deliverables: Re-established permits from SFWMD, permit exte...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA#37 - Various Trail Segment Projects. Deliverables: Re-established permits from SFWMD, permit extension from SFWMD, permit renewal from SFWMD, closed permit from SFWMD |
| Deliverable Price: $22,852.50 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in task assignment. |
| Financial Consequences: No payment for unsatisfactory deliverables. |
| Source Documentation Page Reference: Task Assignment 37 |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
TA#28 - Lower Sugarloaf Trail Extension Segment (MM15.7 - 16.5). Deliverables: data collection and ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA#28 - Lower Sugarloaf Trail Extension Segment (MM15.7 - 16.5). Deliverables: data collection and preliminary project research; topographic survey; project design; construction documents; FDOT construction permit submittal; NPDES NOI application; ecological field reconnaissance; Florida Master Site File search; cultural resources clearance; wetland mitigation program design; SFWMD permit application and processing support; USACE permit application and processsing support; and NEPA compliance documentation for environmental certification. CO#1 added terms and conditions required by the DOT LAP agreement. |
| Deliverable Price: $165,400.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in task assignment. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment 28 & CO#1 |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task Assignments were completed and closed prior to FACTS.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task Assignments were completed and closed prior to FACTS. |
| Deliverable Price: $56,940.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure specifications in Task have been met. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 29: Project Coordination $5,000; Pre-Design Survey Services- Update existing boundary survey $3...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 29: Project Coordination $5,000; Pre-Design Survey Services- Update existing boundary survey $3,500; Final Design and Permitting for SFWMD ERP Application and Support $16,500; Site Development Plan Preparation and Support $31,000; Services During Construction- attend pre construction meeting, periodic site visits, coordination meeting, review shop drawings, certifications and testing $9,500; Survey Stake Out and As-Built Services $10,000./ CO 1 added SDP permitting $2,700 and reimbursement of expenses not to exceed $1,500./ CO 2 additional funding for SFWMD ERP Application and Support $2,453.50 and additional funding for SDP Preparation and Support $6,172.50./CO 3 additional funding for SDP Preparation and Support $1,062, additional funding for engineering services $8,998, add Alternate Roadway Design SDPI Application and Preparation $2,524, and Permitting Support $1,602./CO 4 additional Survey Stakeout and As Builts $6,201. |
| Deliverable Price: $102,512.00 |
| Non Price Justification: |
| Performance Metrics: Deliverable reviewed to ensure specifications in scope have been met. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 34: Structural Design Services- engineering design for the foundation, building superstructure,...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 34: Structural Design Services- engineering design for the foundation, building superstructure, 50% construction documents, 100% construction documents $7,035; Geotechnical Services- geotechnical investigation conducted by installing three (3) deep borings $2,703. |
| Deliverable Price: $9,738.00 |
| Non Price Justification: |
| Performance Metrics: Deliverable reviewed to ensure specifications in scope have been met. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 37:Printed copy of closed permit extension from SFWMD for each permit application.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 37:Printed copy of closed permit extension from SFWMD for each permit application. |
| Deliverable Price: $22,852.00 |
| Non Price Justification: |
| Performance Metrics: Deliverable reviewed to ensure specifications in scope have been met. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 38: Geotechnical Investigation and Preliminary Site $8,020.18; Draft Feasibility Engineering Re...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 38: Geotechnical Investigation and Preliminary Site $8,020.18; Draft Feasibility Engineering Report $4,735; Final Feasibility Report $1,075. |
| Deliverable Price: $13,830.18 |
| Non Price Justification: |
| Performance Metrics: Deliverable reviewed to ensure reports complete, all information requests have been addressed, all shop drawings and product submittals have been approved and site observations were timely completed. |
| Financial Consequences: Consultant will not be paid for services not performed satisfactorily. Task Assignment will be terminated if the consultant fails to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 40: Survey & Schematic-- Prepare and attend meeting/calls to review conceptual layouts $175; P...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 40: Survey & Schematic-- Prepare and attend meeting/calls to review conceptual layouts $175; Prepare list of permits and documentation required related to boardwalk construction $500; Schematic drawings $3,200. Development Design Drawings to include FDEP comments from SD set of plans $3,382; Construction Document Drawings to include comments from DD set of plans $3,253; Volusia County Wetland Alteration Permit $2,100; Final determination on exemption from SJRWMD $446; Assist FDEP with bidding of site construction $838; Coordination & Meetings $2,930; Shop Drawing Review $500; Certification & Substantial Compliance Services $1,400; Geotechnical Exploration $6,624.47; Archaeological Research $4,338.70. |
| Deliverable Price: $27,186.67 |
| Non Price Justification: |
| Performance Metrics: Deliverable reviewed to ensure reports complete, all information requests have been addressed, all shop drawings and product submittals have been approved and site observations were timely completed. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 39: Task 1-Survey & Schematic Design Services-Survey to include existing site conditions adjace...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 39: Task 1-Survey & Schematic Design Services-Survey to include existing site conditions adjacent to the 6 identified areas $12,500; Meeting Minutes from Permitting Meetings/Conference Calls $3,500; Schematic Drawings to include base design survey along with proposed improvements for boardwalk layout, bathhouse boardwalk and walkway, site dune crossovers, boardwalk layout and outline of specifications $11,860 |
| Deliverable Price: $27,860.00 |
| Non Price Justification: |
| Performance Metrics: Deliverable reviewed to ensure reports complete, all information requests have been addressed, all shop drawings and product submittals have been approved and site observations were timely completed. |
| Financial Consequences: Consultant will not be paid for services not performed satisfactorily. Task Assignment will be terminated if the consultant fails to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 39:Task 2-Development of design drawings to include DEP comments from SD set of plans plus effo...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 39:Task 2-Development of design drawings to include DEP comments from SD set of plans plus efforts to the plan set general notes, existing conditions plan sheet, site boardwalk, plan and profile sheets, bathhouse boardwalk, side walk plan and profile sheets, site dune crossovers, grading and paving details, construction specs, and opinion of probable cost $16,976. |
| Deliverable Price: $16,976.00 |
| Non Price Justification: |
| Performance Metrics: Deliverable reviewed to ensure reports complete, all information requests have been addressed, all shop drawings and product submittals have been approved and site observations were timely completed. |
| Financial Consequences: Consultant will not be paid for services not performed satisfactorily. Task Assignment will be terminated if the consultant fails to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 39: Task 3-Construction Document Drawings including DEP comments from DD set of plans plus plan...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 39: Task 3-Construction Document Drawings including DEP comments from DD set of plans plus plan set FINAL general notes, existing conditions plan sheet, site boardwalk, plan and profile sheets, bathhouse boardwalk, side walk plan and profile sheets, site dune crossovers, grading and paving details, construction specs, and opinion of probable cost $16,512. |
| Deliverable Price: $16,512.00 |
| Non Price Justification: |
| Performance Metrics: Deliverable reviewed to ensure reports complete, all information requests have been addressed, all shop drawings and product submittals have been approved and site observations were timely completed. |
| Financial Consequences: Consultant will not be paid for services not performed satisfactorily. Task Assignment will be terminated if the consultant fails to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 39:Task 4: Permit Application & Support-Collier Co. Zoning Verification application submittal $...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 39:Task 4: Permit Application & Support-Collier Co. Zoning Verification application submittal $3,500; Collier Co. SDP permit application submittal $4,500; FDEP CCCL permit application submittal $4,500; Collier Co. response to Zoning Verification request $1,000; Collier Co. SDP permit response $2,180; FDEP CCCL permit response $2,180 |
| Deliverable Price: $17,860.00 |
| Non Price Justification: |
| Performance Metrics: Deliverable reviewed to ensure reports complete, all information requests have been addressed, all shop drawings and product submittals have been approved and site observations were timely completed. |
| Financial Consequences: Consultant will not be paid for services not performed satisfactorily. Task Assignment will be terminated if the consultant fails to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 39: Task 5 Bidding Assistance-Assist FDEP with bidding of site response $1,590
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 39: Task 5 Bidding Assistance-Assist FDEP with bidding of site response $1,590 |
| Deliverable Price: $1,590.00 |
| Non Price Justification: |
| Performance Metrics: Deliverable reviewed to ensure reports complete, all information requests have been addressed, all shop drawings and product submittals have been approved and site observations were timely completed. |
| Financial Consequences: Consultant will not be paid for services not performed satisfactorily. Task Assignment will be terminated if the consultant fails to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 39: Task 6 Construction Administrative Services-Coordination & Meetings, Shop Drawing Review, a...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 39: Task 6 Construction Administrative Services-Coordination & Meetings, Shop Drawing Review, and Certification and Substantial Compliance Services $1,542 |
| Deliverable Price: $1,542.00 |
| Non Price Justification: |
| Performance Metrics: Deliverable reviewed to ensure reports complete, all information requests have been addressed, all shop drawings and product submittals have been approved and site observations were timely completed. |
| Financial Consequences: Consultant will not be paid for services not performed satisfactorily. Task Assignment will be terminated if the consultant fails to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 39: Task 7 Geotechnical Exploration-Geotechnical Report to FDEP $6,635.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 39: Task 7 Geotechnical Exploration-Geotechnical Report to FDEP $6,635. |
| Deliverable Price: $6,635.00 |
| Non Price Justification: |
| Performance Metrics: Deliverable reviewed to ensure reports complete, all information requests have been addressed, all shop drawings and product submittals have been approved and site observations were timely completed.
|
| Financial Consequences: Consultant will not be paid for services not performed satisfactorily. Task Assignment will be terminated if the consultant fails to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 23: Post Design Services/Plan Update $9,950; Pre Construction Conference $5,600; Review of Shop...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 23: Post Design Services/Plan Update $9,950; Pre Construction Conference $5,600; Review of Shop Drawings $1,400; Construction Observations/Field Reviews $24,500; Respond to Contractor RFIs $2,900; As-Built Drawings & Substantial Completion Inspection $5,640; Plantings Survival Assessment Inspection $4,200; Old SR4A Survey Drawing $850; Regulatory Agency Construction Certification & Notifications $1,900./CO1- added terms and conditions required by the DOT LAP agreement. CO2 - reduced funding and closed out project. |
| Deliverable Price: $10,140.00 |
| Non Price Justification: |
| Performance Metrics: Deliverable reviewed to ensure specifications in scope have been met. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: T23CO2 |
| Deliverable Number: |
|