CIVIL ENGINEERS
|
TA#5 - Vault Toilet Permitting. Deliverables: 3 site visits, drawings, environmental permits and D...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA#5 - Vault Toilet Permitting. Deliverables: 3 site visits, drawings, environmental permits and DOH permits to Leon, Wakulla and Santa Rosa counties. |
| Deliverable Price: $19,844.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in Task Assignment. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment 5 |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
TA#2 - Design of Campground Improvements at Manatee Springs State Park. Deliverables: Conceptual Pl...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA#2 - Design of Campground Improvements at Manatee Springs State Park. Deliverables: Conceptual Plan, Topographic Survey, Final construction plans, Environmental Analysis, prepared permit application, certified As-Built drawings, geotechnical report, electrical plans, and 3 site visits. Change Order #1 added soil borings on road areas. Change Order #2 added permits for SRWMD & Levy County and additional survey work. Change Order #3 added additional information needed for SRWMD permit. |
| Deliverable Price: $91,358.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with Task Assignment specifications. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment 2, CO#1, 2 & 3 |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
TA#1 - Design of Campground Improvements at Manatee Springs State Park. Deliverables: Conceptual Pl...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA#1 - Design of Campground Improvements at Manatee Springs State Park. Deliverables: Conceptual Plan, Topographic Survey, Final construction plans, Environmental Analysis, prepared permit application, certified As-Built drawings, geotechnical report, electrical plans, and 3 site visits. Change Order #1 cancelled this Task Assignment. |
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverables reviewed to ensure compliance with Task Assignment specifications. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment 1 |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Civil and Structural engineering services. Deliverables established on a task assignment basis.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Civil and Structural engineering services. Deliverables established on a task assignment basis. |
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverables reviewed to ensure specifications in task assignment and contract scope of services have been met. |
| Financial Consequences: No payment for unsatisfactory services. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
TA#4 - Marjorie Harris Carr Cross Florida Greenway Trail Corridor Study. Deliverables: Limited horiz...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA#4 - Marjorie Harris Carr Cross Florida Greenway Trail Corridor Study. Deliverables: Limited horizontal survey, data acquisition, agency coordination meetings,environmental analysis, plan view and sketches, and public meeting. |
| Deliverable Price: $48,256.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in task assignment. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment 4 |
| Deliverable Number: |
|
|
|
|
Civil engineering
|
TA#3 - Marjorie Harris Carr Cross Florida Greenway-Dunnellon Trail Extension. Survey - to include st...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA#3 - Marjorie Harris Carr Cross Florida Greenway-Dunnellon Trail Extension. Survey - to include standard plan and profile sheets with plan scale, copies of signed and sealed drawints and sketch & descriptions, AutoCAD file set on CD $8,750; Mapping - skectch/description of easements $1,000; construction drawings $12,600; electrical plan $2,400; SWFWMD permit application $6,300; geotechnical analysis $4,514; environmental assessment $3,820; ERP Modifications $1,000 and other reimbursables $400; and local permit approvals and final construcion documents $3,469.48. CO1 added - Full tree survey $22,770; City of Dunnellon permit $4,900; Tree removal permit $2,955; Reimbursables not to exceed $350 for travel, permit fee, and miscellaneaous reproduction costs; Optional offiste mitigation plans $6,000; Optional Tree Marking $7,900. CO2 added time for completion. CO3 added - Design services $5,900; Consultant coordination $1,500; permitting $4,000; Reimbursables $1,200. CO4 added - Bid Service $3,166; Preconstruction Meeting $2,950.50; Shop Drawing Review $6,222; Construction Site Observation $11,635; Additional Construction Site Observation $3,694; Substantial Completion Observation $2,944; As-Built Review $4,007; Final Inspection $1,523.50; Permit Closeout $5,301; Coordination with PBS&J $4,800; Reimbursable expenses $3,000. CO5 added - Additional Permitting Services $6,995.66; Reimbursable expenses $3,300. |
| Deliverable Price: $147,547.06 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in Task Assignment. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment 3, CO#1,2, 3, 4 & 5 |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 6: Survey of Campground $1,959.95; Survey of Road Waterline $4,657.42; 30% Plans for waterline ...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 6: Survey of Campground $1,959.95; Survey of Road Waterline $4,657.42; 30% Plans for waterline improvements $4,519.08; 60% Plans for waterline improvements $5,743.55; Final Construction Plans $887.14; Utility Permitting $519.95; Additional Site Inspections as authorized by Project Manager $1,704.43 |
| Deliverable Price: $20,397.51 |
| Non Price Justification: |
| Performance Metrics: Deliverable reviewed to ensure reports complete, all information requests have been addressed, all shop drawings and product submittals have been approved and site observations were timely completed. |
| Financial Consequences: Consultant will not be paid for services not performed satisfactorily. Task Assignment will be terminated if the consultant fails to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
TASK 7 CONTINUED: CAMPGROUND RESTROOM SIDE WALK-- Survey of the Campground Restroom and the limits ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: TASK 7 CONTINUED: CAMPGROUND RESTROOM SIDE WALK-- Survey of the Campground Restroom and the limits of associated sidewalks to enable a redesign for proper ADA access $762.49; PDF Plans drawings to BDC $339.96; PDF plans of teh 60% drawings and the the Opinion of Probable Cost $551.18; PDF Plans of the Final drawings as well as 5 sets of signed and sealed plans and Final Opinion of Probable Cost $294.97; KAYAK LAUNCH-- Full topographic survey will include the establishment of no fewer thatn two permanent site benchmarks per area $962.49; PDF plans for BDC review $1,009.92; PDF plans of teh 60% drawings and the the Opinion of Probable Cost $1,168.64; PDF plans of the Final drawings and 5 sets of signed and sealed plans and a Final Engineers Opinion of Probable Cost $523.70; SITE PERMITTING-- Coordinate and submit permits to Gulf County and the NWFWMD for the propsed improvements and modifications $809.94; Follow up memo of the meeting $1, 632.31; Follow up memo for additional inspections $1,632.31. Reimbursement for permits not to exceed $500. The Department shall pay the Consultant on a fixed fee/cost reimbursement basisas specified in each executed Task Assignment as amended by an Change orders not to exceed $41923.44. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverable reviewed to ensure reports complete, all information requests have been addressed, all shop drawings and product submittals have been approved and site observations were timely completed. |
| Financial Consequences: Consultant will not be paid for services not performed satisfactorily. Task Assignment will be terminated if the consultant fails to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 7: ENTRANCE STATION & ADA ACCESS-- Full topographic survey encompassing the Entrance Station ef...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 7: ENTRANCE STATION & ADA ACCESS-- Full topographic survey encompassing the Entrance Station effectively covering 300' x 150' area to enable a redesign of parking and sidewalks for ADA access $962.49; PDF 30% plans $1,809.90; PDF plans of the 60% drawing and Opinion of Probable Cost $2,097.32; PDF plans of Final drawings and 5 sets of signed and sealed plans and a Final Engineers Opinion of Probable Cost $818.69; BEACH ADA ACCESS-- Full topographic survey encompassing the Picnic and ADA beach access $962.49; PDF plans $1,784.85; PDF plans of the 60% drawings and the Opinion of Probable Cost $3,218.47; PDF plans of the Final drawings and 5 sets of signed and sealed plans and Final Engineers Opinion of Probable Cost $1,063.64; ADA (BOARDWALK)-- Project horizontal and vertical control within the State Park and at each site $7,897.38; Field evaluation listed species habitat $2,198.03; Field eval listed species survey & map $304.98; Copy of all submittal items to BDC upon completion of task, any permits received forwarded to BDC $2,737.13; Summary of findings for listed species $2,662.97; PDF plans for 30% Beach picnic area improvements $219.98; PDF plans of the 60% drawings and the Opinion of Probable Cost to BDC $294.96; PDF plans of the Final drawings and 5 sets of signed and sealed plans, Final Engineers Opinion of Probable Cost $197.48; Topographic Survey of the end of the existing boardwalk and immediate area to the existing sidewalk enable a redesign of the structure for proper ADA access $762.49; Beach ADA 30% Plans-3 sets of printed plans and PDF plans included of revised drawings $879.93; PDF plans of the 60% drawings and the Opinion of Probable Cost $954.90; PDF plans of final drawings and 5 sets of signed and sealed plans and Final Engineers Opinion of Probable Cost $407.46.; CONTINUED |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverable reviewed to ensure reports complete, all information requests have been addressed, all shop drawings and product submittals have been approved and site observations were timely completed. |
| Financial Consequences: Financial Consequences: Consultant will not be paid for services not performed satisfactorily. Task Assignment will be terminated if the consultant fails to perform. |
| Source Documentation Page Reference: |