Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
CIVIL ENGINEERS
|
Task 3: Deliverable 3A.1- One copy, 24" x 36", of the 75% drawings along with an electronic PDF fo...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: Deliverable 3A.1- One copy, 24" x 36", of the 75% drawings along with an electronic PDF for review and comment to include structural notes, wind load design data, foundation plan and CMU wall section ($3,646); Deliverable 3A.2- Based on BDC review, three signed and sealed 24" x 36" sheet sets and electronic files of 100% drawings will be provided( $1,215); Deliverable B- One 8 1/2 x 11 page report addressing the presence of pipe clay or fill soils, if encountered, and the need for a special foundation ($2,077.54); Deliverable 3C- if the previous task (Task 3B) indicates an unsuitable area, an additional 8 1/2 x 11 one page report addressing the presence of pipe clay or fill soils, if encountered, and the need for a special foundation will be provided ($2,077.54). |
| Deliverable Price: $9,016.08 |
| Non Price Justification: |
| Performance Metrics: The plans, reports and all other components of these tasks will be reviewed to verify they were submitted timely, complete and meet or exceed the Task/Deliverable requirement. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 10 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform. |
| Source Documentation Page Reference: T3 |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Professional Services in District 1 and 2 will be established on a Task Assignment basis.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Professional Services in District 1 and 2 will be established on a Task Assignment basis. |
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in task assignment and applications complete. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 1: Pile and gangway replacement and partial removal of approach dock.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Pile and gangway replacement and partial removal of approach dock. |
| Deliverable Price: $7,512.80 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in task assignment and applications complete. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 2: 75% Plan Sheets and Draft Technical Specification $14,817; 100% Plan SHeets and Draft Techni...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 2: 75% Plan Sheets and Draft Technical Specification $14,817; 100% Plan SHeets and Draft Technical Specifications $4,939; Memo stating geotechnical designs parameters for the use in the design of the helical piles $921.48. |
| Deliverable Price: $20,677.48 |
| Non Price Justification: |
| Performance Metrics: Deliverable reviewed to ensure reports complete, all information requests have been addressed, all shop drawings and product submittals have been approved and site observations were timely completed. |
| Financial Consequences: Consultant will not be paid for services not performed satisfactorily. Task Assignment will be terminated if the consultant fails to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 4: Senior engineer/engineer to perform visual inspection focusing on the areas of deterioration...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 4: Senior engineer/engineer to perform visual inspection focusing on the areas of deterioration of the timber slide structures $5,856; Based on final inspection, provide a certified letter of the structural integrity of the repairs. Certification to be completed of Fl. Dept. of Ag Affidavit of Compliance and Nondestructive Testing Form $1,742. |
| Deliverable Price: $7,598.00 |
| Non Price Justification: |
| Performance Metrics: Assessment reviewed to verify they include satisfactory inspection and that the assessment is received within fouteen (14) days of execution. Certification will be reveiwed to verify the work has been performed and that the certification is received within fourteen (14) days of execution. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Civil engineering
|
Task 5: Review and provide four (4) hard copies of the stamped shop drawings for helical piles, bra...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 5: Review and provide four (4) hard copies of the stamped shop drawings for helical piles, brackets and epoxy material. Review the daily submitted pile log and review the As-Built drawing $3,770.00; Senior engineering to perform a project site visit to ensure proper installation $1,740.00. |
| Deliverable Price: $5,510.00 |
| Non Price Justification: |
| Performance Metrics: Project manager will ensure the proper installation along as well as shop drawings, pile logs and As-Built drawings will be reviewed to ensure specifications and emails provided are a per the task assignment. |
| Financial Consequences: No payment will be made for deliverables deemed unsatisfactory by the Department. In the event that a deliverable is deemed unsatisfactory by the Department, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract far failure to perform. |
| Source Documentation Page Reference: T5 |
| Deliverable Number: |
|