Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
ENGINEERING SERVICES NOT OTHERWISE
|
Task 9: Site Investigation/Data Collection, Baseline Systems Energy Model, Proposed Systems Energy ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 9: Site Investigation/Data Collection, Baseline Systems Energy Model, Proposed Systems Energy Modeling, Proposed Systems Cost Estimating and FLCCA Form Development. |
| Deliverable Price: $6,924.00 |
| Non Price Justification: |
| Performance Metrics: Deliverable reviewed to ensure reports complete, all information requests have been addressed, all shop drawings and product submittals have been approved and site observations were timely completed. |
| Financial Consequences: Consultant will not be paid for services not performed satisfactorily. Task Assignment will be terminated if the consultant fails to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENGINEERING SERVICES NOT OTHERWISE
|
Professional architectural, structural, civil, mechanical, and plumbing engineering services. Delive...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Professional architectural, structural, civil, mechanical, and plumbing engineering services. Deliverables established on a task assignment basis. |
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverables reviewed to ensure compliance with contract scope of work and task assignment specifications. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
TA#7 - Terra Ceia Preserve Boat Ramp. Deliverables: conceptual alternative plans, togographic survey...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: TA#7 - Terra Ceia Preserve Boat Ramp. Deliverables: conceptual alternative plans, togographic survey, geotechnical evaluation, schematic payout, ERP and Manatee County permits. CO# 1 & 2 added time. CO#3 added hydrographic survey, resource survey, natural resource survey, permitting application for Channel, and response to 1 request for information. CO#4 added volumetric calculations, geotechnical investigation, ERP application update for dredging, and responses to 2 request for additional information. CO#5 added sediment sampling and analysis, sediment borings, and response to 1 request for additional information. CO#6 added ERP application and maintenance dredging ERPapplication. CO#7 added Notice of Agency Action, Notice of District's Receipt of ERP Application, and response to Request for Additional Information. |
| Deliverable Price: $145,856.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed for completeness and compliance with specifications in task assignment. |
| Financial Consequences: No payment for unsatisfactory deliverables. Task assignment can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment 7 & CO# 1-7 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 11: (st 1) Verify Existing conditions and perform structural evaluation $8,371.88. (st 2) Pro...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 11: (st 1) Verify Existing conditions and perform structural evaluation $8,371.88. (st 2) Provide Schematic 30% Design Documents and Outline Technical Specifications $7,981.62. (st 3) Provide Final Construction Documents and Specifications $11,740.41. (st 4) Construction Administration Services $7,476.02. Topographic survey $3,374.96. CO1 - added deliverable and increased funding. |
| Deliverable Price: $38,944.89 |
| Non Price Justification: |
| Performance Metrics: Deliverable reviewed to ensure reports complete, all information requests have been addressed, all shop drawings and product submittals have been approved and site observations were timely completed. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may at its sole discretion, terminate the Contract for failure to perform. |
| Source Documentation Page Reference: Exhibit 1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 10: Prepare the tech specs for Dredging and Dewartering Activities & Approval Review $3,900; In...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 10: Prepare the tech specs for Dredging and Dewartering Activities & Approval Review $3,900; Incorporate tech specs into 100% Bid/Construction plans in both .pdf & dwg formats $565; Perform SAV Survey of Project Area $6,644.75; Permit Extension Application petition $770.55. CO1 - increased funding and added permitting services. |
| Deliverable Price: $11,880.30 |
| Non Price Justification: |
| Performance Metrics: Deliverable reviewed to ensure reports complete, all information requests have been addressed, all shop drawings and product submittals have been approved and site observations were timely completed. |
| Financial Consequences: Consultant will not be paid for services not performed satisfactorily. Task Assignment will be terminated if the consultant fails to perform. |
| Source Documentation Page Reference: T10CO1 |
| Deliverable Number: |
|