| More |
Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
CIVIL ENGINEERS
|
Civil engineering services. Deliverables will be established on a task assignment basis.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Civil engineering services. Deliverables will be established on a task assignment basis. |
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in task assignment and contract scope of work. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
TA#1 - St. George Island Road Stabilization. Deliverables: Topographic Survey, Project Design and Co...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA#1 - St. George Island Road Stabilization. Deliverables: Topographic Survey, Project Design and Construction Plans, NWFWMD exemptions request, CCCL exemptions request, DEP and USACE permit applications. CO#1 added pre-construction meeting, review of submittal data and samples and 3 site visits. |
| Deliverable Price: $91,383.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in task assignment. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment 1 & CO1 |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
TA#2 - Peacock Slough Potable Well Certification. Deliverables: I field inspection/site visit and we...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA#2 - Peacock Slough Potable Well Certification. Deliverables: I field inspection/site visit and well certification package. Cost paid by SRWMD. |
| Deliverable Price: $4,998.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with task assignment specifications. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment 2 |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
TA#3 - Grassy Key Site Work. Deliverables: identification of existing utilities, existing tide eleva...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA#3 - Grassy Key Site Work. Deliverables: identification of existing utilities, existing tide elevation data, design of concrete pile foundation, preliminary design plans, City of Marathon permit application, SFWMD letter for no General Environmental Resource Permit, FDOT utility permit, Monroe County utility permit, DEP permits, and final design plans. CO#1 added wetland survey and Manufactured Home floor plans for DCA. CO#2 added preconstruction meeting, shop drawing review, 4 site visits, responses to requests for information, 1 substantial completion site visit, and certificates of completion. CO#3 added wind load calculations, re-alignment of driveway and stairway, fence, and revisions to City of Marathon permit application. |
| Deliverable Price: $100,802.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with task assignment specifications and that permits are complete. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment 3 & CO#1 - 3 |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
TA#4 - St. Marks Historic Railroad State Trail Observation Tower. Deliverables: Conceptual Design, D...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA#4 - St. Marks Historic Railroad State Trail Observation Tower. Deliverables: Conceptual Design, Design plan and construction documents, responses to requests for information, preconstruction conference, review of shop drawings, 3 site visits, As-Built Drawings, amd Substantial Completion inspection. CO#1 added design work and removed some construction administration. No change in overall cost. |
| Deliverable Price: $49,800.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure complete and in compliance with specifications in task assignment. |
| Financial Consequences: No payment for unsatisfactory services. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment 4 & CO#1 |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
TA#5 - Long Key State Park Shop Replacement. Deliverables: structural design including foundation, r...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA#5 - Long Key State Park Shop Replacement. Deliverables: structural design including foundation, retaining wall, boardwalk and geotechnical investigation; permit applications and on-site meeting. |
| Deliverable Price: $24,373.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed for completeness and compliance with task assignment specifications. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment 5 |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
TA#6 - Long Key State Park Shop Building Replacement. Deliverables: 1.1.1 Structural Design $5,338; ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA#6 - Long Key State Park Shop Building Replacement. Deliverables: 1.1.1 Structural Design $5,338; 1.1.2 Geotechnical Report $2,945; 1.2.1 Drawing Review $340; 1.2.2 Jurisdictional Determination $890; 1.2.3 On-site Meetings $645; 1.2.4 Preapp Meeting $645; 1.2.5 Completed Applications $1,210; 1.2.6 Local Presence $645; 1.2.7 RFI Letters $645; 1.2.8 Status Update $890; 1.2.9 Local Permit $645; 1.2.10 Letter of Understanding $298. |
| Deliverable Price: $15,135.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in task assignment and contract scope of services. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform.
|
| Source Documentation Page Reference: Task Assignment 6 |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
TA#7 - Long Key State Park Shop Replacement Services related to New Code. Deliverables: 1.1.1 Modifi...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA#7 - Long Key State Park Shop Replacement Services related to New Code. Deliverables: 1.1.1 Modified Drawings $2,532; 1.1.2 Barrier Cable Design $2,457. |
| Deliverable Price: $4,989.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in task assignment and contract scope of services.
|
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform.
|
| Source Documentation Page Reference: Task Assignment 7 |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 8: Schematic Design Services $6,712.00; Development Design Services $4,833.00; Construction Doc...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 8: Schematic Design Services $6,712.00; Development Design Services $4,833.00; Construction Document Drawings $4,573; Permit Application & Support -- Preparation and submittal to City of Marianna Permit Application Exemption $500, preparation and submittal of City of Marianna Building Permit $500, preparation and submittal of NWFWMD exemption $1,758; Bidding Assistance Services $838; Construction Admin Services -- 1 pre-construction meeting $650.00, 1 monthly site visit $1,200.00, shop drawing review $464.00, Certification & Substantial Completion Services $600.00; Geotechnical Exploration Report $6,529.77. |
| Deliverable Price: $29,157.77 |
| Non Price Justification: |
| Performance Metrics: Deliverable reviewed to ensure reports complete, all information requests have been addressed, all shop drawings and product submittals have been approved and site observations were timely completed. |
| Financial Consequences: Consultant will not be paid for services not performed satisfactorily. Task Assignment will be terminated if the consultant fails to perform. |
| Source Documentation Page Reference: TA8 and TACO1 |
| Deliverable Number: |
|