Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
Civil engineering
|
Task 8: (1) A Site Visit Report that includes photographs of existing conditions, a summary of obse...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 8: (1) A Site Visit Report that includes photographs of existing conditions, a summary of observations, and any design issues and constraints will be delivered by email within one (1) week of the site visit $3,091.37. (2) Two hardcopies of Signed and Sealed Survey Drawings - 22"x34" will be delivered to project manager at the Park. The survey drawings will also be delivered to the project manager in electronic .pdf and ACAD format via emails. The Signed and Sealed Survey Drawings, electronic and hardcopy survey will be delivered within six (6) weeks of task assignment execution $4,089.14 ($21 reimbursable costs for mailing and printing) total $4,110.14. (3) Two hardcopies of Signed and Sealed Geotechnical Report will be delivered to project manager at the Park. The geotechnical report will be delivered within six (6) weeks of task assignment execution $2,407.40. (4A) TKW will submit 60% Design drawings that include: 3 drawing sheets - Site Plan & Utilities Drawing sheet, 2 structural drawings that include 2 hardcopy sets of 11"x17" drawings that will be delivered to the project manager at the Park and the drawings will also be delivered to the Bureau project manager and Collier County in electronic .pdf format via emails. TKW will submit 60% Cost Estimate in electronic .pdf format via email to the Bureau project manager. Submittal of the drawings and cost estimate will be delivered within one (1) month of Task 3 Geotechnical Report $8,019.80 ($27 reimbursable costs for mailing and printing). CONTINUED |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: (1) The project manager will review the Site Visit Report to verify that it was submitted complete and includes a summary of observations, design issues and constraints, photographs and was emailed within one (1) week of the site visit. (2) The project manager will review the submitted survey drawings both hardcopy and electronic, to verify they are accurate, complete and include the above mentioned surveyed items and was submitted within six (6) weeks of task assignment execution. (3) The project manager will review the submitted geotechnical report both hardcopy and electronic, to verify they are accurate, complete and include the above mentioned items and was submitted within six (6) weeks of task assignment execution. (4A) The project manager will review the submitted drawings and cost estimate, in electronic format, to verify that they are accurate, complete and include the specified drawings sheets and cost estimate and was submitted within one (1) month from the completion of Task 3 Geotechnical Report. |
| Financial Consequences: No payment for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within 15 days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, at its sole discretion, terminate the contract for failure to perform. |
| Source Documentation Page Reference: Exhibit 1 |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Professional Engineering Services will be established on a Task Assignment basis.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Professional Engineering Services will be established on a Task Assignment basis. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Consultant will not be paid for services not performed satisfactorily. Task Assignment will be terminated if the consultant fails to perform. |
| Financial Consequences: No payment will be made for deliverables deemed unsatisfactory by the Department. In the event that a deliverable is deemed unsatisfactory by the Department, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe the Department may, in it sole discretion, terminate the Contract for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task Assignment 1 through 5 were executed and completely prior to FACTS.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task Assignment 1 through 5 were executed and completely prior to FACTS. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Consultant will not be paid for services not performed satisfactorily. Task Assignment will be terminated if the consultant fails to perform. |
| Financial Consequences: No payment will be made for deliverables deemed unsatisfactory by the Department. In the event that a deliverable is deemed unsatisfactory by the Department, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe the Department may, in it sole discretion, terminate the Contract for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 6: CONTINUED ST IV- (a) meeting minutes will be submitted to project manager and Sarasota Count...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 6: CONTINUED ST IV- (a) meeting minutes will be submitted to project manager and Sarasota County in electronic format within one week of meeting $819; (b) a hard copy 8 1\2 x 11 form will be delivered to Sarasota County utilities and the project manager, and 16 drawings, 4 sets 22 x 34 drawings, will be delivered to Sarasota County Utilities within two weeks of completion of Permit Pre application meeting with County, electronic copy of entire permit application package will be emailed to the project manager within two weeks of completion of Permit pre-application meeting $946, reimbursement for mailing and printing not to exceed $102; (c) TKW will submit to the project manager a copy of the RAI Responses in hardcopy and PDF within 8 weeks of completion of pre application meeting $1,751, reimbursement for mailings and printing $21; (d) 2 hard copies 8 1\2 x 11 form will be deliveredc to DEP and manager and 16 drawings, 2 sets of 22" x 34" drawings will be delivered to DEP within twelve weeks of completion of the Permit Pre application meeting $1,116, reimbursement for mailing and printing $70; (e) copy of the RAI Responses in hardcopy and electronic format within 18 weeks of pre application meeting $2,512, reimbursement for mailing and printing $21; (f) Copy of the check sent to Sarasota County utilities within 2 weeks of completion of pre application process not to exceed $100; (g) Copy of check sent to DEP for this project within twelve weeks of completion of Permit Pre application meeting not to exceed $1,500. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Consultant will not be paid for services not performed satisfactorily. Task Assignment will be terminated if the consultant fails to perform. |
| Financial Consequences: No payment will be made for deliverables deemed unsatisfactory by the Department. In the event that a deliverable is deemed unsatisfactory by the Department, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe the Department may, in it sole discretion, terminate the Contract for failure to perform |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 6: ST I- Site Visit Report that includes photographs of existing conditions, a summary of obser...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 6: ST I- Site Visit Report that includes photographs of existing conditions, a summary of observations, any design issues and constraints will be delivered by email with one week of site visit $2,560; ST II- Two hardcopies of Signed and Sealed Survey Drawings 22"x34" will be delivered to project manager at the Park in PDF and ACAD format $6,929, reimbursement for mailing and printing cost not to exceed $21; ST III- (a)60% Design drawings that include 12 drawing sheets, cover, title and Drawing index, General notes, Symbols, Abbreviasions, & Overall Site Plan/Key Map $35,754, allowable cost for printing and mailing not to exceed $43; (b) Design review meeting report deliverable will be submitted to project manager in electronic PDF format via email within one week of meeting $804; (c) Engineering ZSite Visit will be performed by TKW within six weeks after completion of 60 % design documents, report deliverable will be submitted to project manager in electronic PDF format via email, within one week $1,144; (d) 90% drawings include 16 drawing sheets, 2 hardcopy sets of 22"x 34" drawings will be delivered to the project manager $15,971, reimbursement for cost for mailing and printing not to exceed $115; (e) Meeting minutes will be submitted to project manager and Sarasota County in electronic PDF format via emails within one week of meeting $634; (f) Final drawings including 16 drawings, 3 sets of 22" x 34" drawings will be delivered to the project manager $8,502, reimbursement for mailing and printing not to exceed $112; CONTINUED |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Consultant will not be paid for services not performed satisfactorily. Task Assignment will be terminated if the consultant fails to perform.
|
| Financial Consequences: No payment will be made for deliverables deemed unsatisfactory by the Department. In the event that a deliverable is deemed unsatisfactory by the Department, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe the Department may, in it sole discretion, terminate the Contract for failure to perform |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Civil engineering
|
Task 7: (1) A Site Visit Report that includes photographs of existing conditions, a summary of obser...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 7: (1) A Site Visit Report that includes photographs of existing conditions, a summary of observations, any design issues and constraints, and additional anticipated WWTP flows as a result of the anticipated additional EDU's will be delivered by email within one (1) week of the site visit $3,293.47. (2) Tow hardcopies of Signed and Sealed Survey Drawings - 22"x34" will be delivered to project manager at the Park. The survey drawings will also be delivered to the project manager in electronic .PDF and ACAD format via emails. The Signed and Sealed survey drawings, electronic and hardcopy identifying the location of the force mains, proposed and existing lift stations sites, cleanouts, and finished floor elevations of the relevant buildings to be connected will be delivered within six (6) weeks of task assignment execution $8,461.60 (reimbursable cost $21 mailing and printing). (3A) TKW will submit 30% Design drawing that includes: Drawing sheet-Preliminary Overall Site Plan Drawing at approximately 1"=200' or 300', 11"x17", which will depict the proposed new wastewater improvements will be delivered to the Park Manager and the DEP project manager in electronic .pdf format via emails. Submittal of the drawing will be delivered within one (1) month of Task 2 Survey $1,396.80. CONTINUED |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: (1) The project manager will review the Site Visit Report to verify that it was submitted completed and includes a summary of observations, design issues and constraints, photographs and was emailed within one (1) week of the site visit. (2) The project manager will review the submitted survey drawings both hardcopy and electronic, to verify they are accurate, complete and include the above mentioned surveyed items and was submitted within six (6) weeks of task assignment execution. (3A) The project manager will review the submitted drawing, in electronic format, to verify it is accurate, complete and was submitted within one (1) month from the completion of Task 2 Survey. |
| Financial Consequences: No payment will be made for deliverables deemed unsatisfactory by the Department. In the event that a deliverable is deemed unsatisfactory by the Department, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe the Department may, in it sole discretion, terminate the Contract for failure to perform. |
| Source Documentation Page Reference: Exhibit 1 |
| Deliverable Number: |
|
|
|
|
Civil engineering
|
Task 8: CONTINUED: (4B) Design review meeting report deliverable will be submitted to project manage...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 8: CONTINUED: (4B) Design review meeting report deliverable will be submitted to project manager in electronic .pdf format via email, within one (1) week of the meeting $1,287.17. (4C) 90% Design drawings include: 5 Drawings sheets, 2 hardcopy sets of 22"x34" drawings will be delivered to the project manager at the Park and the technical specifications will include: 1 hardcopy set of 8 1/2"x11" to be delivered to project manager and a copy of the technical specifications will also be delivered to the project manager and Collier County in electronic .pdf format via emails within three (3) months after completion of Task 3 Geotechnical Report $6,223.60 ($35 reimbursable costs for mailing and printing). (4D) The Meeting minutes will be submitted to project manager, park manager, and Collier County in electronic .pdf format via emails within one (1) week of the meeting $1,141.67. (4E) Final drawings include: 5 Drawings, 3 sets of 22"x34" drawings will be delivered to the project manager at the Park, to the project manager and to Collier County in electronic .pdf format via emails. Final drawings will also be delivered to project manager in electronic ACAD format via email. Additionally, 1 hardcopy set of the Final Cost Estimate and Specifications 8 1/2"x11" will be delivered to project manager. The specifications will also be delivered to project manager and Collier County in electronic .pdf format along will all of the above mentioned Deliverables within two (2) months of the 90% Design Review Meeting $3,270.25 ($45 reimbursable costs for mailing and printing). CONTINUED. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: (4B) The project manager will review the design review meeting report to verify the design review meeting was conducted, the appropriate information was documented and that the report was submitted accurate, complete and within one (1) week of the meeting. (4C) The project manager will review the revised and new 90% design drawings and technical specifications both hardcopy and electronic format to verify they are accurate, complete, and included the specified sheets and was submitted within three (3) months from the completion of Task 3 Geotechnical Report. (4D) The project manager will review the meeting minutes to verify they were submitted timely, complete and include the decisions and issues discussed and was submitted within one (1) week of the meeting. (4E) The project manager will review the Drawings, Specifications and Final Cost Estimate in hardcopy and electronic format to verify they were submitted accurately, competed and include discussed revisions and was submitted within four (4) months from the completion of Task 3 Geotechnical Report. |
| Financial Consequences: No payment for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within 15 days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, at its sole discretion, terminate the contract for failure to perform. |
| Source Documentation Page Reference: Exhibit 1 |
| Deliverable Number: |
|
|
|
|
Civil engineering
|
Task 8: CONTINUED: (5A) The Meeting minutes will be submitted to project manager, Park Manager, and ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 8: CONTINUED: (5A) The Meeting minutes will be submitted to project manager, Park Manager, and Collier County in electronic .pdf format via emails within one (1) week of the meeting $996.17. (5B) 1 hardcopy 8 1/2"x11" form will be delivered to Collier County Building Department and the project manager, 6 Drawings, 4 sets of 22"x34" drawings, and a permit application fee of $100 will be delivered to Collier County Building Department within two (2) weeks of completion of the Permit Pre-application Meeting with Collier County. An electronic .pdf copy of the entire permit application package will be emailed to the project manager within four (4) weeks of completion of the Permit Pre-application Meeting with Collier County $1,025.90 ($182 reimbursable costs for mailing and printing). (5C) TKW will submit to the project manager a copy of the RAI Response(s) in hardcopy and .pdf electronic format within six (6) weeks of submittal to the Collier County Building Department $1,973 ($33 reimbursable costs for mailing and printing). (5D) 2 hardcopies 8 1/2"x11" form will be delivered to FDEP and the project manager, 6 Drawings, 2 sets of 22"x34" drawings, and a permit application fee of $100 will be delivered to SFWMD within two (2) weeks of completion of the Permit Pre-application Meeting with Collier county performed under Task 5A. An electronic .pdf copy of the entire permit application package will be emailed to the project manager within two (2) weeks of completion of the Permit Pre-application Meeting with Collier County $1,193.45 ($141 reimbursable costs for mailing and printing). (6) TKW will submit to the project manager an electronic .pdf format a Pre-Bid Meeting summary letter and will provide electronically formatted RFI Addenda Responses within three (3) months of completion of Collier County permitting tasks $1,990.42. CONTINUED |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: (5A) The project manager will review the Meeting Minutes to verify they were accurate, complete the identified staff attended the meeting and the appropriate information was documented and that the meeting minutes were submitted within one (1) week of the meeting. (5B) The project manager will review the application form and permit drawings to verify they were submitted accurately and complete and within four (4) weeks of completion of the Permit Pre-application Meeting with Collier County. (5C) The project manager will review the copies the RAI Response to verify they were submitted complete and correct and within six (6) weeks of completion of submittal to Collier County Building Department. (5D) The project manager will review the application form and permit drawings to verify they were submitted accurately and complete and within two (2) weeks of completion of the Permit Pre-application Meeting with Collier County. (6) The project manager will review the copies the Pre-Bid Meeting Minutes and RAI Responses to verify they were submitted complete and correct and within three (3) months of completion of Collier County permitting tasks. |
| Financial Consequences: No payment for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within 15 days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, at its sole discretion, terminate the contract for failure to perform. |
| Source Documentation Page Reference: Exhibit 1 |
| Deliverable Number: |
|
|
|
|
Civil engineering
|
Task 8: CONTINUED: (7) TKW will submit to the project manager in electronic .pdf format all construc...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 8: CONTINUED: (7) TKW will submit to the project manager in electronic .pdf format all construction administration deliverables outlined above during the course of construction. Construction is assumed to be a seven month overall construction period $11,263.02 ($96.50 reimbursable costs for mailing and printing). |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: (7) The project manager will review the construction administration documentation to verify they were submitted complete and correct and within the construction schedule timeframes. |
| Financial Consequences: No payment for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within 15 days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, at its sole discretion, terminate the contract for failure to perform. |
| Source Documentation Page Reference: Exhibit 1 |
| Deliverable Number: |
|
|
|
|
Civil engineering
|
Task 7: CONTINUED: (3B) TKW will submit 60% Design drawings that include: 6 Drawing sheets-Cover, T...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 7: CONTINUED: (3B) TKW will submit 60% Design drawings that include: 6 Drawing sheets-Cover, Title & Drawing Index, Overall Site Plan/Key Map, 2 Plan & Profile drawings of sanitary sewer systems, and 2 Plan-only drawings of the Force Mains sheets that include 2 hardcopy sets of 22"x34" drawings will be delivered tot he project manager at the Park, and the drawings will also be delivered to the project manager and Sarasota County in electronic .pdf format via emails. TKW will submit 60% Cost Estimate in electronic .pdf format via email to the project manager. Submittal of the drawings and cost estimate will be delivered within four (4) weeks after receipt of BDC comments on the 30% Design Drawing $9,011.30 ($31 reimbursable cost for mailing and printing). (3D) Engineering Site Visit will be performed by TKW within six (6) weeks after completion of 60% design documents. Report deliverable will be submitted to project manager in electronic .pdf format via email within one (1) week of the site visit $819.97. (3E) 90% Design drawings include; 11 Drawing sheets, 2 hardcopy sets of 22"x34" drawings will be delivered to the project manager at the Park and the technical specifications will include: 1 hardcopy set of 8 1/2"x11" to be delivered to project manager and a copy of the technical specifications will also be delivered to the project manager and Sarasota County in electronic .pdf format via emails within two (2) months after receipt of BDC comments on the 60% Design $8,315.10 ($41 allowable costs for mailing and printing). CONTINUED |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: (3B) The project manager will review the submitted drawings and cost estimate, hardcopy and electronic format to verify they are accurate, complete and include the specified drawing sheets and cost estimate and was submitted within four (4) weeks after completion of 30% Design Drawing. (3C) The project manager will review the design review meeting report to verify the design review meeting was conducted, the appropriate information was document and that the report was submitted accurate, complete and within one (1) week of the meeting. (3D) The project manager will review the site visit report to verify the identified staff visited the site and the appropriate information was documented and that the report was submitted accurate, complete and submitted within one (1) week of the site visit. (3E) The project manager will review the revised and new 90% design drawings and technical specifications both hardcopy and electronic format to verify they are accurate, complete, and included the specified sheets and was submitted within two (2) months after receipt of BDC comments on the 60% Design. |
| Financial Consequences: No payment will be made for deliverables deemed unsatisfactory by the Department. In the event that a deliverable is deemed unsatisfactory by the Department, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe the Department may, in it sole discretion, terminate the Contract for failure to perform. |
| Source Documentation Page Reference: TA7CO1 |
| Deliverable Number: |
|
|
|
|
Civil engineering
|
Task 7: CONTINUED: (3G) Final Drawings include: 11 Drawings, 3 sets of 22"x34" drawings will be deli...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 7: CONTINUED: (3G) Final Drawings include: 11 Drawings, 3 sets of 22"x34" drawings will be delivered to the project manager at the Park. The drawings will also be delivered to the project manager and Sarasota County in electronic .pdf format via emails. Final drawings will also be delivered to project manager in electronic ACAD format via email. Additionally, 1 hardcopy set of the Final Cost Estimate and Specifications 8 1/2"x11" will be delivered to project manager. The specifications will also be delivered to project manager and Sarasota County in electronic .pdf format via email. The Final Cost Estimate will be delivered to the project manager in .pdf format along with all of the above mentioned deliverables within four (4) weeks after completion of the 90% Design Review Meeting $4,796.65 ($97 reimbursable costs for mailing and printing). CONTINUED. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: (3F) The project manager will review the meeting minutes to verify they were submitted timely, complete and include the decisions and issues discussed and was submitted within one (1) week of the meeting. (3G) The project manager will review the Drawings, Specifications and Final Cost Estimate in hardcopy and electronic format to verify they were submitted accurately, complete and include discussed revisions and was submitted within four (4) weeks after completion of the 90% Design Review Meeting. |
| Financial Consequences: No payment will be made for deliverables deemed unsatisfactory by the Department. In the event that a deliverable is deemed unsatisfactory by the Department, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe the Department may, in it sole discretion, terminate the Contract for failure to perform. |
| Source Documentation Page Reference: TA7CO1 |
| Deliverable Number: |
|
|
|
|
Civil engineering
|
Task 7: CONTINUED: (4F) TKW will provide a copy of the check sent to Sarasota County for this projec...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 7: CONTINUED: (4F) TKW will provide a copy of the check sent to Sarasota County for this project within four (4) weeks of completion of the Permit Pre-application Meeting with Sarasota County Utilities $100. (4G) TKW will provide a copy of the check sent to FDEP for this project within twelve (12) weeks of completion of the Permit Pre-application Meeting with Sarasota County Utilities performed under Task 4A $1,500; CO1 - Decrease task amount |
| Deliverable Price: $42,585.76 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: (4F) The project manager will review copies of the checks to verify they were submitted as required and within four (4) weeks of completion of the Permit Pre-application Meeting with Sarasota County Utilities. (4G) The project manager will review copies of the check to verify it was submitted as a required and within twelve (12) weeks of completion of the Permit Pre-application Meeting with Sarasota County Utilities performed under Task 4A. |
| Financial Consequences: No payment for unsatisfactory services/deliverables. |
| Source Documentation Page Reference: TA7CO1 |
| Deliverable Number: |
|
|
|
|
Civil engineering
|
Task 7: CONTINUED: (4A) The Meeting minutes will be submitted to project manager and Sarasota County...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 7: CONTINUED: (4A) The Meeting minutes will be submitted to project manager and Sarasota County in electronic .pdf format via emails within one (1) week of the meeting $761.77. (4B) 1 hardcopy 8 1/2"x11" form will be delivered to Sarasota County Utilities within two (2) weeks of completion of the Permit Pre-application Meeting with Sarasota County Utilities. An electronic .pdf copy of the entire permit application package will be emailed to the project manager within five (5) weeks of completion of the Permit Pre-application Meeting with Sarasota County Utilities $712.50 ($82 reimbursable costs for mailing and printing). (4C) TKW will submit to the project manager a copy of the RAI Response(s) in hardcopy and .pdf electronic format within eight (8) weeks of completion of the Permit Pre-application Meeting with Sarasota County Utilities $1,187.30 ($33 reimbursable costs for mailing and printing). (4D) 2 hardcopies 8 1/2"x11" form will be delivered to FDEP within twelve (12) weeks of completion of the Permit Pre-application Meeting with Sarasota County Utilities performed under Task 4A. An electronic .pdf copy of the entire permit application package will be emailed to the project manager within twelve (12) weeks of completion of the Permit Pre-application Meeting with Sarasota County Utilities $1,011 ($41 reimbursable costs for mailing and printing). (4E) TKW will submit to the project manager a copy of the RAI Response(s) in hardcopy and .pdf electronic format within four (4) weeks of completion of submitting the FDEP Permit Application to the FDEP $1,187.30 ($33 mailing and printing). CONTINUED. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: (4A) The project manager will review the Meeting Minutes to verify they were accurate, complete the identified staff attended the meeting and the appropriate information was documented and that the meeting minutes were submitted within one (1) week of the meeting. (4B) The project manager will review the application form and permit drawings to verify they were submitted accurately and complete and within five (5) weeks of completion of the Permit Pre-application Meeting with Sarasota County Utilities.(4C) The project manager will review the copies the RAI Response to verify they were submitted complete and correct and within eight (8) weeks of completion of the Permit Pre-application Meeting with Sarasota County Utilities. (4D) The project manager will review the application form and permit drawings to verify they were submitted accurately and complete within twelve (12) weeks of completion of the Permit Pre-application Meeting with Sarasota County Utilities. (4E) The project manager will review the copies the RAI Response to verify they were submitted complete and correct and within four (4) weeks of completion of submitting the FDEP Permit Application to the FDEP. |
| Financial Consequences: No payment for unsatisfactory services/deliverables. |
| Source Documentation Page Reference: Exhibit 1 |
| Deliverable Number: |
|