| More |
Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
STRUCTURAL ENGINEERS
|
Task 14: Concrete repair details and stairway construction details and stairway construction plans t...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 14: Concrete repair details and stairway construction details and stairway construction plans to meet the 2012 Florida Building Code. Provide FDEP with electronic copies of 90% drawings and three sets of final drawings and two sets signed and sealed by Registered Professional Engineer. |
| Deliverable Price: $4,572.64 |
| Non Price Justification: |
| Performance Metrics: Deliverable reviewed to ensure reports complete, all information requests have been addressed, all shop drawings and product submittals have been approved and site observations were timely completed. |
| Financial Consequences: Consultant will not be paid for services not performed satisfactorily. Task Assignment will be terminated if the consultant fails to perform.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
STRUCTURAL ENGINEERS
|
Professional structural engineering services. Deliverables established on a task assignment basis.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Professional structural engineering services. Deliverables established on a task assignment basis. |
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in task assignment and contract scope of work. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
STRUCTURAL ENGINEERS
|
Task 15: Construction Plans to meet the 2010 Florida Building Code, 90% drawings for review, and aft...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 15: Construction Plans to meet the 2010 Florida Building Code, 90% drawings for review, and after approval of design and drawings,provide three sets of final drawings and two sets signed and sealed by a Registered Professional Engineer. |
| Deliverable Price: $1,513.80 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure performance in a proper and satisfactory manner as determined by DEP. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
STRUCTURAL ENGINEERS
|
Task 16: Letter report with repair recommendations to include photos and a description of the curren...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 16: Letter report with repair recommendations to include photos and a description of the current status of the roof building envelop structural conditions $4,113.14 |
| Deliverable Price: $4,113.14 |
| Non Price Justification: |
| Performance Metrics: Deliverable reviewed to ensure reports complete, all information requests have been addressed, all shop drawings and product submittals have been approved and site observations were timely completed. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
STRUCTURAL ENGINEERS
|
Task 17: Construction plans to meet the 2010 Florida Building Code. Electronic PCF format 90% drawin...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 17: Construction plans to meet the 2010 Florida Building Code. Electronic PCF format 90% drawings and after approval of design and drawings, three sets of final drawings and two sets signed and sealed by a Registered Professional Engineer. |
| Deliverable Price: $2,270.70 |
| Non Price Justification: |
| Performance Metrics: Bathhouse and Family Bathhouse structural plans meet the 2010 Florida building Code. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
STRUCTURAL ENGINEERS
|
Task 18: Three (3) sets of signed and sealed structural plans $3,603.52; Limited Contractors Reques...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 18: Three (3) sets of signed and sealed structural plans $3,603.52; Limited Contractors Request for Information in email in a PDF format $1,395.84; Truss Shop drawing review, Concrete Design Mix review, Connector review, Pile Driving Equipment $1,980.84; Short letter report for each inspection highlighting the critical items noted in email attachment PDF format $7,405.47. The Department shall pay the Contractor on a cost reimbursement plus fixed fee basis not to exceed $14,385.67. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in task assignment and contract scope of work. |
| Financial Consequences: No payment for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may at its sole discretion, terminate the Contract for failure to perform. |
| Source Documentation Page Reference: TA18 |
| Deliverable Number: |
|
|
|
|
Structural engineering
|
Task 13: Lake Kissimmee State Park Cow Camp Bridge Replacement. Deliverables: Presentation sheet of...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 13: Lake Kissimmee State Park Cow Camp Bridge Replacement. Deliverables: Presentation sheet of bridge rendering, design plans and specifications for bridge, Noticed General ERP to SFWMD, responses to questions during bidding process and pre-construction meeting, shop drawing review, material test and pile driving data, and 5 site inspections. CO1 - reduced funding. |
| Deliverable Price: $25,266.10 |
| Non Price Justification: |
| Performance Metrics: Deiverables reviewed to verify that they are accurate,complete and submitted timely. |
| Financial Consequences: No payment for unsatisfactory deliverables. |
| Source Documentation Page Reference: T13CO1 |
| Deliverable Number: |
|
|
|
|
Structural engineering
|
Task 1: Bahia Honda Historic Bridge. Deliverables: Revised bridge design.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Bahia Honda Historic Bridge. Deliverables: Revised bridge design. |
| Deliverable Price: $7,509.30 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure completeness and compliance specifications in with task assignment. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment 1 |
| Deliverable Number: |
|
|
|
|
Structural engineering
|
Task 2: Missouri/Little Duck Historic Bridge. Deliverables: Re-design of bridge superstructure.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 2: Missouri/Little Duck Historic Bridge. Deliverables: Re-design of bridge superstructure. |
| Deliverable Price: $13,680.70 |
| Non Price Justification: |
| Performance Metrics: Deliverable reviewed to ensure completeness and compliance with specifications in task assignment. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment 2 |
| Deliverable Number: |
|
|
|
|
Structural engineering
|
Task 3: Ohio/Missouri Historic Bridge. Deliverables: structural redesign of superstructures of brid...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: Ohio/Missouri Historic Bridge. Deliverables: structural redesign of superstructures of bridges. |
| Deliverable Price: $45,075.80 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure completeness and compliance with specifications in task assignment. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment 3 |
| Deliverable Number: |
|
|
|
|
Structural engineering
|
Task 4: Bahia Honda State Park Building Structural Repair. Deliverables: site visit, structural anal...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 4: Bahia Honda State Park Building Structural Repair. Deliverables: site visit, structural analysis of concrete rook system, wind load analysis, construction drawings for roof system, structural design and detail drawing for bathroom floor repair. |
| Deliverable Price: $9,075.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure completeness and compliance with specifications in task assignment. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment 4 |
| Deliverable Number: |
|
|
|
|
Structural engineering
|
Task 5: Colt Creek State Park Development. Deliverables: Wind load analysis, foundation design, an...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 5: Colt Creek State Park Development. Deliverables: Wind load analysis, foundation design, and structural plans for range station building and large pavilion/restroom; and truss shop drawings. CO#1 added responses to requests for information. |
| Deliverable Price: $8,471.47 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure completeness and compliance with specifications in task assignment. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment 5 & CO#1 |
| Deliverable Number: |
|
|
|
|
Structural engineering
|
Task 7: Atlantic Ridge Preserve Day use Restroom and Picnic Pavilion. Deliverables: wind load analy...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 7: Atlantic Ridge Preserve Day use Restroom and Picnic Pavilion. Deliverables: wind load analysis, foundation design and structural review for day-use restroom; foundation design for pavilion, and geotechnical report. |
| Deliverable Price: $5,463.93 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure completeness and compliance with specifications in task assignment. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment 7 |
| Deliverable Number: |
|
|
|
|
Structural engineering
|
Task 8: Lake Kissimmee Cow Camp Bridge. Deliverables: design plans and specifications for concrete ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 8: Lake Kissimmee Cow Camp Bridge. Deliverables: design plans and specifications for concrete bridge structure, responses to questions during bid process, and pre-construction site meeting. |
| Deliverable Price: $10,022.26 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure completeness and compliance with specifications in task assignment. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment 8 |
| Deliverable Number: |
|
|
|
|
Structural engineering
|
Task 9: Blue Springs Day Use Restroom. Deliverables: wind load analysis, foundation design and stru...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 9: Blue Springs Day Use Restroom. Deliverables: wind load analysis, foundation design and structural review for 2 bathhouses; and geotechnical report. |
| Deliverable Price: $6,256.67 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure completeness and compliance with specifications in task assignment. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment 9 |
| Deliverable Number: |
|
|
|
|
Structural engineering
|
Task 11: Florida Keys Overseas Heritage Trail Key Largo Residence Renovation. Deliverables: 2 signe...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 11: Florida Keys Overseas Heritage Trail Key Largo Residence Renovation. Deliverables: 2 signed, sealed sets of structural drawings |
| Deliverable Price: $1,320.67 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to verify that drawings are accurate, complete and submitted timely. |
| Financial Consequences: No payment for unsatisfactory deliverables. |
| Source Documentation Page Reference: Task Assignment 11 |
| Deliverable Number: |
|
|
|
|
Structural engineering
|
Task 12: Florida Keys Overseas Heritage Trail Bridge Inspection Services. Deliverables: Inspection ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 12: Florida Keys Overseas Heritage Trail Bridge Inspection Services. Deliverables: Inspection Report in FDOT format for each of the 23 bridges to be inspected. |
| Deliverable Price: $247,978.92 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed to verify they contain information required in the task assignment. |
| Financial Consequences: No payment for unsatisfactory deliverables. |
| Source Documentation Page Reference: Task Assignment 12 |
| Deliverable Number: |
|
|
|
|
Structural engineering
|
Task 10: North Peninsula State Park Overlook Design. Deliverables: Structural plans and signed,seal...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 10: North Peninsula State Park Overlook Design. Deliverables: Structural plans and signed,sealed structural and foundation plans including cover sheet, site plan and layout, and projectdetails. Topographic survey. |
| Deliverable Price: $11,188.66 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure they are accurate and complete. |
| Financial Consequences: No payment for unsatisfactory deliverables. |
| Source Documentation Page Reference: Task Assignment 10 |
| Deliverable Number: |
|
|
|
|
Structural engineering
|
Task 6: Wind Load, Structural Design and Pile Foundation Design $ 7,728.75; Truss Shop Drawing revie...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 6: Wind Load, Structural Design and Pile Foundation Design $ 7,728.75; Truss Shop Drawing review, Pile Driving Equipment Review $ 1,322.58; Construction Administration 3 site visits @ $2,550 each = $ 7,650.00. CO2- Updated Architectural Drawings $2,996.36.
|
| Deliverable Price: $19,697.69 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed for completeness and compliance with specifications in task assignment. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment 6 |
| Deliverable Number: |
|
|
|
|
Structural engineering
|
Task 20: (1) RSE will provide construction plans to meet the 2010 Florida Building Code. RSE will p...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 20: (1) RSE will provide construction plans to meet the 2010 Florida Building Code. RSE will provide FDEP with electronic (pdf format) 90% drawings for review. After approval of structural design and drawings, RSE will provide three sets signed and sealed by a Registered Professional Engineer; 7 hrs Sr Engineer $193.13/hr, 10 Sr Designer $92.66/hr not to exceed $2,278.51. (2) RSE will provide up to two responses in email format that will include both the Contractor's RFI's and EOR's answers/clarification; 4 hrs Sr. Engineer $193.13 not to exceed $772.52. (3) RSE will provide FDEP with the reviewed truss drawings to forward to the contractor; 2 hrs Sr. Engineer $193.13, 6 hrs Sr. Designer $92.66 not to exceed $942.22. (4) RSE will provide FDEP with the reviewed shop drawings/cut sheets to forward to the contractor; 3 hrs Sr. Engineer $193.13, 6 hrs Sr. Designer $92.66 not to exceed $1,135.35. |
| Deliverable Price: $5,128.60 |
| Non Price Justification: |
| Performance Metrics: (1) Bathhouse structural plans shall meet the 2010 Florida Building Code criteria. (2) Up to two responses, which will include both the contractor's RFI's and EOR's answers/clarification, will be forwarded to FDEP. (3) Truss drawing will be marked "Approved" as meeting the structural plan requirements or will be marked "Revise and Resubmit" and forwarded to FDEP. (4) Connector shop drawings/cut sheets and concrete mix design will be marked "Approved" as meeting the structural plan requirements or will be marked "Revise and Resubmit" and forwarded to FDEP. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified time frame, the Department may, in its sole discretion, terminate the Contract for failure to perform. |
| Source Documentation Page Reference: TA20 |
| Deliverable Number: |
|
|
|
|
Structural engineering
|
Task 22: (1) Bridge Field Review and Re-evaluation - One page report in pdf format including photos ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 22: (1) Bridge Field Review and Re-evaluation - One page report in pdf format including photos of the structure and field notes. (Hourly rates: Sr. Engineer @ $193.13/hr, Project Manager @ $173.90/hr, Engineer @ $75.61/hr, Engineer Intern @ $57.44/hr and travel reimbursement not to exceed $142.40). (2) Design Plans Update - RSE will provide FDEP with electronic (pdf format) 90% drawings for review. After approval of design and drawings, RSE will provide three sets of final drawings and two sets signed and sealed by a Registered Professional Engineer. The Department shall pay the Contractor on a cost reimbursement plus fixed fee basis not to exceed $24,199.67. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: (1) Project Manager will review report to ensure report is accurate and field review is complete. (2) Project Manager will perform plan review to ensure submitted plans address all structural aspects included in the listed scope. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform. |
| Source Documentation Page Reference: TA22 |
| Deliverable Number: |
|
|
|
|
Structural engineering
|
Task 21: Provide pdf of shop drawing stamped as approved, approved as noted, revise and resubmit, o...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 21: Provide pdf of shop drawing stamped as approved, approved as noted, revise and resubmit, or not approved. Provide responses to contractor RFI. This task will take 1 day to complete. Engineer $75.61/hr and Senior Engineer $193.13/hr. |
| Deliverable Price: $798.01 |
| Non Price Justification: |
| Performance Metrics: Deliverables will be reviewed by the Department to confirm they are complete, accurate and timely. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, the Consultant shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department within 15 consecutive days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Contract for failure to perform. |
| Source Documentation Page Reference: Exhibit 1 |
| Deliverable Number: |
|