CIVIL ENGINEERS
|
Professional civil engineering services. Deliverables established on a task assignment basis.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Professional civil engineering services. Deliverables established on a task assignment basis. |
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in task assignment and contract scope of services.
|
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform.
|
| Source Documentation Page Reference: Contract |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 1 - Rodman Campground Expansion. Deliverables: stormwater pond inspection for closeout of WMD p...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1 - Rodman Campground Expansion. Deliverables: stormwater pond inspection for closeout of WMD permit. |
| Deliverable Price: $4,666.85 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in task assignment and contract scope of services.
|
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment #1 |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 2 - Van Fleet State Trail Vault Toilets. Deliverables: site selection, erosion and sedimentatio...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 2 - Van Fleet State Trail Vault Toilets. Deliverables: site selection, erosion and sedimentation control plan, drainage plan, and permits. |
| Deliverable Price: $24,911.00 |
| Non Price Justification: |
| Performance Metrics: : Deliverables reviewed to ensure compliance with specifications in task assignment and contract scope of services.
|
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment #2 |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 3 CONTINUED: Subtask IV-- Letter Report answering contractor questions will be issued to BDC $1...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3 CONTINUED: Subtask IV-- Letter Report answering contractor questions will be issued to BDC $1,014.00; Letter report answering contractor questions will be issued to BDC $1,014.00.
Subtask V-- Minutes including summary of conversations and any direction provided during the Preconstruction meeting $1,850.83; All approved, revised, marked up for resubmittal or rejected shop drawings and summary report $4,077.90; RFI Response Report $2,867.88; Site Visit Summary Report for visits at 25%, 50%, 75% and construction observation for water/sewer @$1,775.83 each visit for a total of $7,103.32; Substantial Completion Site Visit $1,775.83; As-Built Review $1,226.85; Final Completion Report $2,375.83; Copies of all final certifications $2,173.86; Additional Site Visits @ $1,775.83 per visit (up to 2) for a total of $3551.66; Additional Meetings with BDC (up to 2) @ $613.98 per meeting for a total of $1227.96. |
| Deliverable Price: $69,087.73 |
| Non Price Justification: |
| Performance Metrics: Review of deliverable |
| Financial Consequences: No payment. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
CIVIL ENGINEERS
|
Task 3: Subtask I-- 30% - Provide 3 (24 x 36) sets of plans and a CD $4,724.84; 60% - Provide the r...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: Subtask I-- 30% - Provide 3 (24 x 36) sets of plans and a CD $4,724.84; 60% - Provide the revised Opinion of Probable Cost, 3 sets of printed plans as well as a CD with PDF plans $10,388.64; 90% - Provide 3 sets of printed plans as well as a CD with PDF plans $6,549.02; Final - Final Opinion of Probable Cost, five (5) sets of signed and sealed plans to the client for construction purposes as well as electronic ACAD files and PDF files of the drawings both of with will be on CD $1,868.86.
Subtask II-- Progress Plans for 60% preliminary electrical site plans $2,515,15; 90% progress plans $961.68; 100% construction plans $517,83; Shop Drawing Review summary sheet $295.90; Field Observation Report for Rough-in Inspection $443.85; and Filed Observation Report for Substantial Completion Inspection $769.34.
Subtask III-- One (1) Copy of all information provided to the SRWMD for permit submittal including copy of payment receipt $4,346.93; SRWMD Permit $424.95; One (1) Copy of all information provided to the FDEP for water distribution permit submittal $1,326.98; FDEP Water Line Distribution Permit $184.98; FDEP Sewer Collection System Coordination $1,326.98; FDEP Sewer Permit $184.97; One (1) Copy of all information provided to the DOH for Septic Tank permit submittal $1,626.95; Septic System Permit $369.96.
|
| Deliverable Price: $69,087.73 |
| Non Price Justification: |
| Performance Metrics: Deliverable reviewed to ensure reports complete, all information requests have been addressed, all shop drawings and product submittals have been approved and site observations were timely completed. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |