Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
T1
|
Civil engineering
|
TA#1 - Oleta River State Park ADA Walkway and Parking Improvements. Deliverables: Construction plans...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: TA#1 - Oleta River State Park ADA Walkway and Parking Improvements. Deliverables: Construction plans, North Miami and Miami-Dade DERM permit application, pre-construction conference, response to Requests for Information, site inspections, final inspection and punch list. |
| Deliverable Price: $14,618.10 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed for completeness and compliance with specifications in task assignment. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment 1 & CO#1 |
| Deliverable Number: T1 |
|
|
|
T2
|
Mechanical engineering
|
TA#2 - John Pennekamp Coral Reef State Park Sewer Connection. Deliverables: field review, engineerin...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: TA#2 - John Pennekamp Coral Reef State Park Sewer Connection. Deliverables: field review, engineering investigation, concept alternative design & sketches, concept cost estimate, construction documents, permitting assistance, pre-construction conference, site inspections, final inspection and punch list. CO#1 added preparation of operating permit. CO#2 added engineering inspection of 6 lift stations and changes to construction documents. CO#3 added shop drawing review, 3 monthly progress meetings, electrical inspections, review of pay requests, change orders and tie-ins, and attendance at testings and start-up. |
| Deliverable Price: $63,186.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed for completeness and compliance with specifications in task assignment. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment 2 & CO#1 - 3 |
| Deliverable Number: T2 |
|
|
|
T3
|
Mechanical engineering
|
TA#3 - John Pennekamp Coral Reef State Park Campground Sewage System. Deliverables: Site and electr...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: TA#3 - John Pennekamp Coral Reef State Park Campground Sewage System. Deliverables: Site and electrical review; geometrical design; drainage design and report; paving, grading and drainage plans; lift station reconfiguration; electrical system refurbishment plan; construction plans; and permitting coordination. CO#1 added modification to the SFWMD permit. CO#2 added shop drawing review; response to request for informations; 3 monthly progress meetings; site inspections; electrical inspections; review of pay requests, change orders and tie-ins; attendance at testing and start-up; and final inspection and punch lists. |
| Deliverable Price: $57,415.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed for completeness and compliance with specifications in task assignment. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment 3 & CO#1 & 2 |
| Deliverable Number: T3 |
|
|
|
T4
|
Mechanical engineering
|
TA#4 - Bill Baggs Cape Florida Main Lift Station Repairs. Deliverables: field review, electrical eng...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: TA#4 - Bill Baggs Cape Florida Main Lift Station Repairs. Deliverables: field review, electrical engineer analysis, hydraulic analysis, equipment and site plan recommendation, concept cost estimate, technical memo, design drawings, electrical design, construction specifications, permitting assistance, pre-construction conference,response to requests for information, site inspections, punch list, final inspection, start-up testing, and project certification. |
| Deliverable Price: $29,100.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure completeness and compliance with specifications in task assignment. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment 4 |
| Deliverable Number: T4 |
|
|
|
T5
|
Structural engineering
|
TA#5 - Bill Baggs Cape Florida Seawall Failure Investigation. Deliverables: underwater inspection, ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: TA#5 - Bill Baggs Cape Florida Seawall Failure Investigation. Deliverables: underwater inspection, underwater biological assessment, above water inspection, analysis, conceptual design for alternatives to repair and/or replace wall, preliminary construction estimate, and engineering report. |
| Deliverable Price: $12,675.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to verify that they are submitted timely and are complete. |
| Financial Consequences: No payment for unsatisfactory deliverables. Task assignment will be terminated for failure to perform. |
| Source Documentation Page Reference: Task Assignment 5 |
| Deliverable Number: T5 |
|
|
|
T6
|
Professional engineering services
|
Task 6: Structural Design, Repair Methodologies $5,800; 50% plans preparation $15,050; 100% plans pr...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 6: Structural Design, Repair Methodologies $5,800; 50% plans preparation $15,050; 100% plans preparation $10,235; Construction Cost Estimates $2,230; Permitting (FDEP, ACOE, DERM) $7,632; Reimbursement for Printing/Permitting & Permits Allowance not to exceed $1,000-$20,000./ CO1- increased permitting allowance. CO2- decrease task funding due to administrative error. |
| Deliverable Price: $61,947.00 |
| Non Price Justification: |
| Performance Metrics: Deliverable reviewed to ensure reports complete, all information requests have been addressed, all shop drawings and product submittals have been approved and site observations were timely completed. |
| Financial Consequences: Consultant will not be paid for services not performed satisfactorily. Task Assignment will be terminated if the consultant fails to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: T6 |
|
|
|
T7
|
Civil engineering
|
TA7: Establish Base sheets and include but not limited to floor plans, elevations, and existing sch...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA7: Establish Base sheets and include but not limited to floor plans, elevations, and existing schedules for both bathrooms and utility chase $1,651.11; Plan and Code review pertaining to ADA, plumbing, mechanical and electrical compliance $2,044.15; Develop Construction Documents to include Demolition, Floor, Interior Elevations and Fixture Schedule, Plumbing, Mechanical and Electrical plans $11,121.18; Construction administration services to include preconstruction conference, answering RFIs, reviewing shop drawings and other relation reviews (one interim and one final inspection) $1,695.93 |
| Deliverable Price: $16,512.37 |
| Non Price Justification: |
| Performance Metrics: Deliverable reviewed to ensure reports complete, all information requests have been addressed, all shop drawings and product submittals have been approved and site observations were timely completed. |
| Financial Consequences: Consultant will not be paid for services not performed satisfactorily. Task Assignment will be terminated if the consultant fails to perform. |
| Source Documentation Page Reference: TA7 |
| Deliverable Number: T7 |
|