| More |
Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
Professional engineering services
|
The Contractor shall have the ability and resources to provide staff augmentation services for site ...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: The Contractor shall have the ability and resources to provide staff augmentation services for site management for the Petroleum Restoration Program (PRP) and to respond to the events, as described more fully in Attachment 3, Scope of Work.As consideration for the services rendered by Contractor under the terms of this Contract, the Department shall pay the
Contractor on a fixed unit rate basis per Attachment 5. Price Sheet for the completion of services as specified in the
Scope of Work. |
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Report monthly to verify that E&E is meeting the established review time frames for the sites and invoices managed by E&E. Additionally, E&E is responsible for the data entry into the STCM database and the insertion of all documents into OCULUS for all sites managed by E&E. The Contract Manager will review 10% of the STCM data entry and OCULUS insertion during the monthly evaluation period.
|
| Financial Consequences: "Retainage - The Department reserves the right to establish the amount and application of
retainage on a task assignment basis. A maximum of 6% from each payment to the Contractor may be retained pending satisfactory completion of a task assignment and approval of all
deliverables. "
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task Assignment Number 1- Deliverable 1: July Summary Report. Site Management FY20-21. Deliverable:...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task Assignment Number 1- Deliverable 1: July Summary Report. Site Management FY20-21. Deliverable: Monthly Summary Reports. Eligible costs: salaries. See Attachment 5 of original contract and rates listed in the FACTS system.
Total task not to exceed:138,575.20 |
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Report monthly to verify that E&E is meeting the established review time frames for the sites and invoices managed by E&E. Additionally, E&E is responsible for the data entry into the STCM database and the insertion of all documents into OCULUS for all sites managed by E&E. The Contract Manager will review 10% of the STCM data entry and OCULUS insertion during the monthly evaluation period.
|
| Financial Consequences: "Retainage - The Department reserves the right to establish the amount and application of
retainage on a task assignment basis. A maximum of 6% from each payment to the Contractor may be retained pending satisfactory completion of a task assignment and approval of all
deliverables. "
|
| Source Documentation Page Reference: Retainage - Page 3 of 11 in the Contract Task Assignment. Performance Metrics - Page3 of 11 in the current Task Assignment GC121 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task Assignment Number 1- Deliverable 2: August Summary Report. Site Management FY20-21. Deliverable...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task Assignment Number 1- Deliverable 2: August Summary Report. Site Management FY20-21. Deliverable: Monthly Summary Reports. Eligible costs: salaries. See Attachment 5 of original contract and rates listed in the FACTS system. Total task not to exceed:$582,015.84
|
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Report monthly to verify that E&E is meeting the established review time frames for the sites and invoices managed by E&E. Additionally, E&E is responsible for the data entry into the STCM database and the insertion of all documents into OCULUS for all sites managed by E&E. The Contract Manager will review 10% of the STCM data entry and OCULUS insertion during the monthly evaluation period.
|
| Financial Consequences: "Retainage - The Department reserves the right to establish the amount and application of
retainage on a task assignment basis. A maximum of 6% from each payment to the Contractor may be retained pending satisfactory completion of a task assignment and approval of all
deliverables. "
|
| Source Documentation Page Reference: Retainage - Page 3 of 11 in the Contract Task Assignment. Performance Metrics - Page3 of 11 in the current Task Assignment GC121 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task Assignment Number 1-Deliverable 3: September Summary Report. Site Management FY20-21. Deliver...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task Assignment Number 1-Deliverable 3: September Summary Report. Site Management FY20-21. Deliverable: Monthly Summary Reports. Eligible costs: salaries. See Attachment 5 of original contract and rates listed in the FACTS system. Total task not to exceed:$582,015.84
|
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Report monthly to verify that E&E is meeting the established review time frames for the sites and invoices managed by E&E. Additionally, E&E is responsible for the data entry into the STCM database and the insertion of all documents into OCULUS for all sites managed by E&E. The Contract Manager will review 10% of the STCM data entry and OCULUS insertion during the monthly evaluation period.
|
| Financial Consequences: "Retainage - The Department reserves the right to establish the amount and application of
retainage on a task assignment basis. A maximum of 6% from each payment to the Contractor may be retained pending satisfactory completion of a task assignment and approval of all
deliverables. "
|
| Source Documentation Page Reference: Retainage - Page 3 of 10 in the Original Contract. No Payment and CAP- Renewal (A2). Performance Metrics - Page 6 of 9 in the current Task Assignment 001LL |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task Assignment Number 1-Deliverable 4: October Summary Report.Site Management FY20-21. Deliverable...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task Assignment Number 1-Deliverable 4: October Summary Report.Site Management FY20-21. Deliverable: Monthly Summary Reports. Eligible costs: salaries. See Attachment 5 of original contract and rates listed in the FACTS system. Total task not to exceed:$609,730.88
|
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Report monthly to verify that E&E is meeting the established review time frames for the sites and invoices managed by E&E. Additionally, E&E is responsible for the data entry into the STCM database and the insertion of all documents into OCULUS for all sites managed by E&E. The Contract Manager will review 10% of the STCM data entry and OCULUS insertion during the monthly evaluation period.
|
| Financial Consequences: "Retainage - The Department reserves the right to establish the amount and application of
retainage on a task assignment basis. A maximum of 6% from each payment to the Contractor may be retained pending satisfactory completion of a task assignment and approval of all
deliverables. "
|
| Source Documentation Page Reference: Retainage - Page 3 of 10 in the Original Contract. No Payment and CAP- Renewal (A2). Performance Metrics - Page 6 of 9 in the current Task Assignment 001LL |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task Assignment Number 1-Deliverable 5: November Summary Report.Site Management FY20-21. Deliverable...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task Assignment Number 1-Deliverable 5: November Summary Report.Site Management FY20-21. Deliverable: Monthly Summary Reports. Eligible costs: salaries. See Attachment 5 of original contract and rates listed in the FACTS system. . Total task not to exceed$526,585.76
|
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Report monthly to verify that E&E is meeting the established review time frames for the sites and invoices managed by E&E. Additionally, E&E is responsible for the data entry into the STCM database and the insertion of all documents into OCULUS for all sites managed by E&E. The Contract Manager will review 10% of the STCM data entry and OCULUS insertion during the monthly evaluation period.
|
| Financial Consequences: "Retainage - The Department reserves the right to establish the amount and application of
retainage on a task assignment basis. A maximum of 6% from each payment to the Contractor may be retained pending satisfactory completion of a task assignment and approval of all
deliverables. "
|
| Source Documentation Page Reference: Retainage - Page 3 of 10 in the Original Contract. No Payment and CAP- Renewal (A2). Performance Metrics - Page 6 of 9 in the current Task Assignment 001LL |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task Assignment Number 1-Deliverable 6: December Summary Report.Site Management FY20-21. Deliverable...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task Assignment Number 1-Deliverable 6: December Summary Report.Site Management FY20-21. Deliverable: Monthly Summary Reports. Eligible costs: salaries. See Attachment 5 of original contract and rates listed in the FACTS system. Total task not to exceed$609,730.88
|
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Report monthly to verify that E&E is meeting the established review time frames for the sites and invoices managed by E&E. Additionally, E&E is responsible for the data entry into the STCM database and the insertion of all documents into OCULUS for all sites managed by E&E. The Contract Manager will review 10% of the STCM data entry and OCULUS insertion during the monthly evaluation period.
|
| Financial Consequences: "Retainage - The Department reserves the right to establish the amount and application of
retainage on a task assignment basis. A maximum of 6% from each payment to the Contractor may be retained pending satisfactory completion of a task assignment and approval of all
deliverables. "
|
| Source Documentation Page Reference: Retainage - Page 3 of 10 in the Original Contract. No Payment and CAP- Renewal (A2). Performance Metrics - Page 6 of 9 in the current Task Assignment 001LL |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task Assignment Number 1-Deliverable 7: January Summary Report. Site Management FY20-21. Deliverable...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task Assignment Number 1-Deliverable 7: January Summary Report. Site Management FY20-21. Deliverable: Monthly Summary Reports. Eligible costs: salaries. See Attachment 5 of original contract and rates listed in the FACTS system. Total task not to exceed:$554,300.80
|
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Report monthly to verify that E&E is meeting the established review time frames for the sites and invoices managed by E&E. Additionally, E&E is responsible for the data entry into the STCM database and the insertion of all documents into OCULUS for all sites managed by E&E. The Contract Manager will review 10% of the STCM data entry and OCULUS insertion during the monthly evaluation period.
|
| Financial Consequences: "Retainage - The Department reserves the right to establish the amount and application of
retainage on a task assignment basis. A maximum of 6% from each payment to the Contractor may be retained pending satisfactory completion of a task assignment and approval of all
deliverables. "
|
| Source Documentation Page Reference: Retainage - Page 3 of 10 in the Original Contract. No Payment and CAP- Renewal (A2). Performance Metrics - Page 6 of 9 in the current Task Assignment 001LL |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task Assignment Number 1 - Deliverable 8: February Summary Report. Site Management FY20-21. Deliver...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task Assignment Number 1 - Deliverable 8: February Summary Report. Site Management FY20-21. Deliverable: Monthly Summary Reports. Eligible costs: salaries. See Attachment 5 of original contract and rates listed in the FACTS system. Total task not to exceed$526,585.76
|
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Report monthly to verify that E&E is meeting the established review time frames for the sites and invoices managed by E&E. Additionally, E&E is responsible for the data entry into the STCM database and the insertion of all documents into OCULUS for all sites managed by E&E. The Contract Manager will review 10% of the STCM data entry and OCULUS insertion during the monthly evaluation period.
|
| Financial Consequences: "Retainage - The Department reserves the right to establish the amount and application of
retainage on a task assignment basis. A maximum of 6% from each payment to the Contractor may be retained pending satisfactory completion of a task assignment and approval of all
deliverables. "
|
| Source Documentation Page Reference: Retainage - Page 3 of 10 in the Original Contract. No Payment and CAP- Renewal (A2). Performance Metrics - Page 6 of 9 in the current Task Assignment 001LL |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task Assignment Number 1-Deliverable 9: March Summary Report. Site Management FY20-21. Deliverable:...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task Assignment Number 1-Deliverable 9: March Summary Report. Site Management FY20-21. Deliverable: Monthly Summary Reports. Eligible costs: salaries. See Attachment 5 of original contract and rates listed in the FACTS system. Total task not to exceed:637,445.92
|
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Report monthly to verify that E&E is meeting the established review time frames for the sites and invoices managed by E&E. Additionally, E&E is responsible for the data entry into the STCM database and the insertion of all documents into OCULUS for all sites managed by E&E. The Contract Manager will review 10% of the STCM data entry and OCULUS insertion during the monthly evaluation period.
|
| Financial Consequences: "Retainage - The Department reserves the right to establish the amount and application of
retainage on a task assignment basis. A maximum of 6% from each payment to the Contractor may be retained pending satisfactory completion of a task assignment and approval of all
deliverables. "
|
| Source Documentation Page Reference: Retainage - Page 3 of 10 in the Original Contract. No Payment and CAP- Renewal (A2). Performance Metrics - Page 6 of 9 in the current Task Assignment 001LL |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task Assignment Number 1 - Deliverable 10: April Summary Report. Site Management FY20-21. Deliverab...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task Assignment Number 1 - Deliverable 10: April Summary Report. Site Management FY20-21. Deliverable: Monthly Summary Reports. Eligible costs: salaries. See Attachment 5 of original contract and rates listed in the FACTS system. Total task not to exceed$609,730.88
|
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Report monthly to verify that E&E is meeting the established review time frames for the sites and invoices managed by E&E. Additionally, E&E is responsible for the data entry into the STCM database and the insertion of all documents into OCULUS for all sites managed by E&E. The Contract Manager will review 10% of the STCM data entry and OCULUS insertion during the monthly evaluation period.
|
| Financial Consequences: "Retainage - The Department reserves the right to establish the amount and application of
retainage on a task assignment basis. A maximum of 6% from each payment to the Contractor may be retained pending satisfactory completion of a task assignment and approval of all
deliverables. "
|
| Source Documentation Page Reference: Retainage - Page 3 of 10 in the Original Contract. No Payment and CAP- Renewal (A2). Performance Metrics - Page 6 of 9 in the current Task Assignment 001LL |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task Assignment Number 1 - Delieverable 11: May Summary Report. Site Management FY20-21. Deliverable...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task Assignment Number 1 - Delieverable 11: May Summary Report. Site Management FY20-21. Deliverable: Monthly Summary Reports. Eligible costs: salaries. See Attachment 5 of original contract and rates listed in the FACTS system. Total task not to exceed$554,300.70.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Report monthly to verify that E&E is meeting the established review time frames for the sites and invoices managed by E&E. Additionally, E&E is responsible for the data entry into the STCM database and the insertion of all documents into OCULUS for all sites managed by E&E. The Contract Manager will review 10% of the STCM data entry and OCULUS insertion during the monthly evaluation period.
|
| Financial Consequences: "Retainage - The Department reserves the right to establish the amount and application of
retainage on a task assignment basis. A maximum of 6% from each payment to the Contractor may be retained pending satisfactory completion of a task assignment and approval of all
deliverables. "
|
| Source Documentation Page Reference: Retainage - Page 3 of 10 in the Original Contract. No Payment and CAP- Renewal (A2). Performance Metrics - Page 6 of 9 in the current Task Assignment 001LL |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task Assignment Number 1 - Deliverable 12: June Summary Report. Site Management FY20-21. Deliverab...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task Assignment Number 1 - Deliverable 12: June Summary Report. Site Management FY20-21. Deliverable: Monthly Summary Reports. Eligible costs: salaries. See Attachment 5 of original contract and rates listed in the FACTS system. Total task not to exceed$609,730.88
|
| Deliverable Price: $0.00 |
| Non Price Justification: Revenue Generating Agreement |
| Performance Metrics: Report monthly to verify that E&E is meeting the established review time frames for the sites and invoices managed by E&E. Additionally, E&E is responsible for the data entry into the STCM database and the insertion of all documents into OCULUS for all sites managed by E&E. The Contract Manager will review 10% of the STCM data entry and OCULUS insertion during the monthly evaluation period.
|
| Financial Consequences: "Retainage - The Department reserves the right to establish the amount and application of
retainage on a task assignment basis. A maximum of 6% from each payment to the Contractor may be retained pending satisfactory completion of a task assignment and approval of all
deliverables. "
|
| Source Documentation Page Reference: Retainage - Page 3 of 10 in the Original Contract. No Payment and CAP- Renewal (A2). Performance Metrics - Page 6 of 9 in the current Task Assignment 001LL |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task Assignment Number 02Q4 - Deliverable April 2022: Site Management 7/1/21 - 6/30/22. Deliverable:...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task Assignment Number 02Q4 - Deliverable April 2022: Site Management 7/1/21 - 6/30/22. Deliverable: Monthly Summary Reports. Eligible costs: salaries. Labor rates: Project Manager $137.66; P.E. Upper Level $110.27; P.E. Middle Level $96.51; P.G; Upper Level $103.41; P.G. Middle Level $88.96; Env. Spec Upper Level $89.65; Env. Spec Middle Level $77.94; Env Spec Lower Level $64.21; O&M Inspector $66.27; Field Inspector Level $61.43; Admin Asst. II $51.13; and Admin Asst. I $40.12. Embedded: P.E. Upper Level $93.94; P.E. Middle Level $82.22; P.G. Upper Level $88.09; P.G. Middle Level $75.78; Upper Level Environ. Specialist $76.37; Lower Level Environ. Specialist $54.70; Admin Assist. II $43.57; Admin Assist. I $34.18.
|
| Deliverable Price: $461,057.86 |
| Non Price Justification: |
| Performance Metrics: Report monthly to verify that WSP is meeting the established review time frames for the sites and invoices managed by WSP. Additionally, WSP is responsible for the data entry into the STCM database and the insertion of all documents into OCULUS for all sites managed by WSP. The Contract Manager will review 10% of the STCM data entry and OCULUS insertion during the monthly evaluation period.
|
| Financial Consequences: Retainage - The Department reserves the right to establish the amount and application of
retainage on a task assignment basis. A maximum of 6% from each payment to the Contractor may be retained pending satisfactory completion of a task assignment and approval of all
deliverables.
|
| Source Documentation Page Reference: Retainage Page 3 of 10 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task Assignment Number 02Q4 - Deliverable May 2022: Site Management 7/1/21 - 6/30/22. Deliverable: M...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task Assignment Number 02Q4 - Deliverable May 2022: Site Management 7/1/21 - 6/30/22. Deliverable: Monthly Summary Reports. Eligible costs: salaries. Labor rates: Project Manager $137.66; P.E. Upper Level $110.27; P.E. Middle Level $96.51; P.G; Upper Level $103.41; P.G. Middle Level $88.96; Env. Spec Upper Level $89.65; Env. Spec Middle Level $77.94; Env Spec Lower Level $64.21; O&M Inspector $66.27; Field Inspector Level $61.43; Admin Asst. II $51.13; and Admin Asst. I $40.12. Embedded: P.E. Upper Level $93.94; P.E. Middle Level $82.22; P.G. Upper Level $88.09; P.G. Middle Level $75.78; Upper Level Environ. Specialist $76.37; Lower Level Environ. Specialist $54.70; Admin Assist. II $43.57; Admin Assist. I $34.18.
|
| Deliverable Price: $461,057.86 |
| Non Price Justification: |
| Performance Metrics: Report monthly to verify that WSP is meeting the established review time frames for the sites and invoices managed by WSP. Additionally, WSP is responsible for the data entry into the STCM database and the insertion of all documents into OCULUS for all sites managed by WSP. The Contract Manager will review 10% of the STCM data entry and OCULUS insertion during the monthly evaluation period.
|
| Financial Consequences: Retainage - The Department reserves the right to establish the amount and application of
retainage on a task assignment basis. A maximum of 6% from each payment to the Contractor may be retained pending satisfactory completion of a task assignment and approval of all
deliverables.
|
| Source Documentation Page Reference: Retainage Page 3 of 10 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task Assignment Number 02Q4 - Deliverable June 2022: Site Management 7/1/21 - 6/30/22. Deliverable: ...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task Assignment Number 02Q4 - Deliverable June 2022: Site Management 7/1/21 - 6/30/22. Deliverable: Monthly Summary Reports. Eligible costs: salaries. Labor rates: Project Manager $137.66; P.E. Upper Level $110.27; P.E. Middle Level $96.51; P.G; Upper Level $103.41; P.G. Middle Level $88.96; Env. Spec Upper Level $89.65; Env. Spec Middle Level $77.94; Env Spec Lower Level $64.21; O&M Inspector $66.27; Field Inspector Level $61.43; Admin Asst. II $51.13; and Admin Asst. I $40.12. Embedded: P.E. Upper Level $93.94; P.E. Middle Level $82.22; P.G. Upper Level $88.09; P.G. Middle Level $75.78; Upper Level Environ. Specialist $76.37; Lower Level Environ. Specialist $54.70; Admin Assist. II $43.57; Admin Assist. I $34.18.
|
| Deliverable Price: $483,012.99 |
| Non Price Justification: |
| Performance Metrics: Report monthly to verify that WSP is meeting the established review time frames for the sites and invoices managed by WSP. Additionally, WSP is responsible for the data entry into the STCM database and the insertion of all documents into OCULUS for all sites managed by WSP. The Contract Manager will review 10% of the STCM data entry and OCULUS insertion during the monthly evaluation period.
|
| Financial Consequences: Retainage - The Department reserves the right to establish the amount and application of
retainage on a task assignment basis. A maximum of 6% from each payment to the Contractor may be retained pending satisfactory completion of a task assignment and approval of all
deliverables.
|
| Source Documentation Page Reference: Retainage Page 3 of 10 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task Assignment Number 02Q3 - Deliverable January 2022: Site Management 7/1/21 - 6/30/22. Deliverabl...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task Assignment Number 02Q3 - Deliverable January 2022: Site Management 7/1/21 - 6/30/22. Deliverable: Monthly Summary Reports. Eligible costs: salaries. Labor rates: Project Manager $137.66; P.E. Upper Level $110.27; P.E. Middle Level $96.51; P.G; Upper Level $103.41; P.G. Middle Level $88.96; Env. Spec Upper Level $89.65; Env. Spec Middle Level $77.94; Env Spec Lower Level $64.21; O&M Inspector $66.27; Field Inspector Level $61.43; Admin Asst. II $51.13; and Admin Asst. I $40.12. Embedded: P.E. Upper Level $93.94; P.E. Middle Level $82.22; P.G. Upper Level $88.09; P.G. Middle Level $75.78; Upper Level Environ. Specialist $76.37; Lower Level Environ. Specialist $54.70; Admin Assist. II $43.57; Admin Assist. I $34.18.
|
| Deliverable Price: $441,649.92 |
| Non Price Justification: |
| Performance Metrics: Report monthly to verify that WSP is meeting the established review time frames for the sites and invoices managed by WSP. Additionally, WSP is responsible for the data entry into the STCM database and the insertion of all documents into OCULUS for all sites managed by WSP. The Contract Manager will review 10% of the STCM data entry and OCULUS insertion during the monthly evaluation period.
|
| Financial Consequences: Retainage - The Department reserves the right to establish the amount and application of retainage on a task assignment basis. A maximum of 6% from each payment to the Contractor may be retained pending satisfactory completion of a task assignment and approval of all
deliverables.
|
| Source Documentation Page Reference: T02Q3 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task Assignment Number 02Q3 - Deliverable February 2022: Site Management 7/1/21 - 6/30/22. Deliverab...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task Assignment Number 02Q3 - Deliverable February 2022: Site Management 7/1/21 - 6/30/22. Deliverable: Monthly Summary Reports. Eligible costs: salaries. Labor rates: Project Manager $137.66; P.E. Upper Level $110.27; P.E. Middle Level $96.51; P.G; Upper Level $103.41; P.G. Middle Level $88.96; Env. Spec Upper Level $89.65; Env. Spec Middle Level $77.94; Env Spec Lower Level $64.21; O&M Inspector $66.27; Field Inspector Level $61.43; Admin Asst. II $51.13; and Admin Asst. I $40.12. Embedded: P.E. Upper Level $93.94; P.E. Middle Level $82.22; P.G. Upper Level $88.09; P.G. Middle Level $75.78; Upper Level Environ. Specialist $76.37; Lower Level Environ. Specialist $54.70; Admin Assist. II $43.57; Admin Assist. I $34.18.
|
| Deliverable Price: $441,649.92 |
| Non Price Justification: |
| Performance Metrics: Report monthly to verify that WSP is meeting the established review time frames for the sites and invoices managed by WSP. Additionally, WSP is responsible for the data entry into the STCM database and the insertion of all documents into OCULUS for all sites managed by WSP. The Contract Manager will review 10% of the STCM data entry and OCULUS insertion during the monthly evaluation period.
|
| Financial Consequences: Retainage - The Department reserves the right to establish the amount and application of retainage on a task assignment basis. A maximum of 6% from each payment to the Contractor may be retained pending satisfactory completion of a task assignment and approval of all
deliverables.
|
| Source Documentation Page Reference: T02Q3 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task Assignment Number 02Q3 - Deliverable March 2022: Site Management 7/1/21 - 6/30/22. Deliverable:...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task Assignment Number 02Q3 - Deliverable March 2022: Site Management 7/1/21 - 6/30/22. Deliverable: Monthly Summary Reports. Eligible costs: salaries. Labor rates: Project Manager $137.66; P.E. Upper Level $110.27; P.E. Middle Level $96.51; P.G; Upper Level $103.41; P.G. Middle Level $88.96; Env. Spec Upper Level $89.65; Env. Spec Middle Level $77.94; Env Spec Lower Level $64.21; O&M Inspector $66.27; Field Inspector Level $61.43; Admin Asst. II $51.13; and Admin Asst. I $40.12. Embedded: P.E. Upper Level $93.94; P.E. Middle Level $82.22; P.G. Upper Level $88.09; P.G. Middle Level $75.78; Upper Level Environ. Specialist $76.37; Lower Level Environ. Specialist $54.70; Admin Assist. II $43.57; Admin Assist. I $34.18.
|
| Deliverable Price: $520,397.41 |
| Non Price Justification: |
| Performance Metrics: Report monthly to verify that WSP is meeting the established review time frames for the sites and invoices managed by WSP. Additionally, WSP is responsible for the data entry into the STCM database and the insertion of all documents into OCULUS for all sites managed by WSP. The Contract Manager will review 10% of the STCM data entry and OCULUS insertion during the monthly evaluation period.
|
| Financial Consequences: Retainage - The Department reserves the right to establish the amount and application of retainage on a task assignment basis. A maximum of 6% from each payment to the Contractor may be retained pending satisfactory completion of a task assignment and approval of all
deliverables. |
| Source Documentation Page Reference: T02Q3 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task Assignment Number 0301 - Deliverable September 2022: Site Management 7/1/22 - 6/30/23. Delivera...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task Assignment Number 0301 - Deliverable September 2022: Site Management 7/1/22 - 6/30/23. Deliverable: Monthly Summary Reports. Eligible costs: salaries. Labor rates: Project Manager $137.66; P.E. Upper Level $110.27; P.E. Middle Level $96.51; P.G; Upper Level $103.41; P.G. Middle Level $88.96; Env. Spec Upper Level $89.65; Env. Spec Middle Level $77.94; Env Spec Lower Level $64.21; O&M Inspector $66.27; Field Inspector Level $61.43; Admin Asst. II $51.13; and Admin Asst. I $40.12. Embedded: P.E. Upper Level $93.94; P.E. Middle Level $82.22; P.G. Upper Level $88.09; P.G. Middle Level $75.78; Lower Level Environ. Specialist $54.70; Admin Assist. II $43.57; Admin Assist. I $34.18.
|
| Deliverable Price: $465,045.44 |
| Non Price Justification: |
| Performance Metrics: Report monthly to verify that WSP is meeting the established review time frames for the sites and invoices managed by WSP. Additionally, WSP is responsible for the data entry into the STCM database and the insertion of all documents into OCULUS for all sites managed by WSP. The Contract Manager will review 10% of the STCM data entry and OCULUS insertion during the monthly evaluation period.
|
| Financial Consequences: Retainage - The Department reserves the right to establish the amount and application of retainage on a task assignment basis. A maximum of 6% from each payment to the Contractor may be retained pending satisfactory completion of a task assignment and approval of all
deliverables.
|
| Source Documentation Page Reference: T03-01 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task Assignment Number 03-02 - Deliverable January 2023: Site Management 1/1/2023 - 6/30/2023. Deliv...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task Assignment Number 03-02 - Deliverable January 2023: Site Management 1/1/2023 - 6/30/2023. Deliverable: Monthly Summary Reports. Eligible costs: salaries. Labor rates: Project Manager $137.66; P.E. Upper Level $110.27; P.E. Middle Level $96.51; P.G; Upper Level $103.41; P.G. Middle Level $88.96; Env. Spec Upper Level $89.65; Env. Spec Middle Level $77.94; Env Spec Lower Level $64.21; O&M Inspector $66.27; Field Inspector Level $61.43; Admin Asst. II $51.13; and Admin Asst. I $40.12. Embedded: P.E. Upper Level $93.94; P.E. Middle Level $82.22; P.G. Upper Level $88.09; P.G. Middle Level $75.78; Lower Level Environ. Specialist $54.70; Admin Assist. II $43.57; Admin Assist. I $34.18.
|
| Deliverable Price: $444,620.43 |
| Non Price Justification: |
| Performance Metrics: Report monthly to verify that WSP is meeting the established review time frames for the sites and invoices managed by WSP. Additionally, WSP is responsible for the data entry into the STCM database and the insertion of all documents into OCULUS for all sites managed by WSP. The Contract Manager will review 10% of the STCM data entry and OCULUS insertion during the monthly evaluation period.
|
| Financial Consequences: Retainage - The Department reserves the right to establish the amount and application of retainage on a task assignment basis. A maximum of 6% from each payment to the Contractor may be retained pending satisfactory completion of a task assignment and approval of all
deliverables.
|
| Source Documentation Page Reference: T03-02 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task Assignment Number 03-02 - Deliverable February 2023: Site Management 1/1/2023 - 6/30/2023. Deli...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task Assignment Number 03-02 - Deliverable February 2023: Site Management 1/1/2023 - 6/30/2023. Deliverable: Monthly Summary Reports. Eligible costs: salaries. Labor rates: Project Manager $137.66; P.E. Upper Level $110.27; P.E. Middle Level $96.51; P.G; Upper Level $103.41; P.G. Middle Level $88.96; Env. Spec Upper Level $89.65; Env. Spec Middle Level $77.94; Env Spec Lower Level $64.21; O&M Inspector $66.27; Field Inspector Level $61.43; Admin Asst. II $51.13; and Admin Asst. I $40.12. Embedded: P.E. Upper Level $93.94; P.E. Middle Level $82.22; P.G. Upper Level $88.09; P.G. Middle Level $75.78; Lower Level Environ. Specialist $54.70; Admin Assist. II $43.57; Admin Assist. I $34.18.
|
| Deliverable Price: $444,620.43 |
| Non Price Justification: |
| Performance Metrics: Report monthly to verify that WSP is meeting the established review time frames for the sites and invoices managed by WSP. Additionally, WSP is responsible for the data entry into the STCM database and the insertion of all documents into OCULUS for all sites managed by WSP. The Contract Manager will review 10% of the STCM data entry and OCULUS insertion during the monthly evaluation period.
|
| Financial Consequences: Retainage - The Department reserves the right to establish the amount and application of retainage on a task assignment basis. A maximum of 6% from each payment to the Contractor may be retained pending satisfactory completion of a task assignment and approval of all
deliverables.
|
| Source Documentation Page Reference: T03-02 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task Assignment Number 03-02 - Deliverable March 2023: Site Management 1/1/2023 - 6/30/2023. Deliver...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task Assignment Number 03-02 - Deliverable March 2023: Site Management 1/1/2023 - 6/30/2023. Deliverable: Monthly Summary Reports. Eligible costs: salaries. Labor rates: Project Manager $137.66; P.E. Upper Level $110.27; P.E. Middle Level $96.51; P.G; Upper Level $103.41; P.G. Middle Level $88.96; Env. Spec Upper Level $89.65; Env. Spec Middle Level $77.94; Env Spec Lower Level $64.21; O&M Inspector $66.27; Field Inspector Level $61.43; Admin Asst. II $51.13; and Admin Asst. I $40.12. Embedded: P.E. Upper Level $93.94; P.E. Middle Level $82.22; P.G. Upper Level $88.09; P.G. Middle Level $75.78; Lower Level Environ. Specialist $54.70; Admin Assist. II $43.57; Admin Assist. I $34.18.
|
| Deliverable Price: $510,688.49 |
| Non Price Justification: |
| Performance Metrics: Report monthly to verify that WSP is meeting the established review time frames for the sites and invoices managed by WSP. Additionally, WSP is responsible for the data entry into the STCM database and the insertion of all documents into OCULUS for all sites managed by WSP. The Contract Manager will review 10% of the STCM data entry and OCULUS insertion during the monthly evaluation period.
|
| Financial Consequences: Retainage - The Department reserves the right to establish the amount and application of retainage on a task assignment basis. A maximum of 6% from each payment to the Contractor may be retained pending satisfactory completion of a task assignment and approval of all
deliverables.
|
| Source Documentation Page Reference: T03-02 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task Assignment Number 03-02 - Deliverable April 2023: Site Management 1/1/2023 - 6/30/2023. Deliver...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task Assignment Number 03-02 - Deliverable April 2023: Site Management 1/1/2023 - 6/30/2023. Deliverable: Monthly Summary Reports. Eligible costs: salaries. Labor rates: Project Manager $137.66; P.E. Upper Level $110.27; P.E. Middle Level $96.51; P.G; Upper Level $103.41; P.G. Middle Level $88.96; Env. Spec Upper Level $89.65; Env. Spec Middle Level $77.94; Env Spec Lower Level $64.21; O&M Inspector $66.27; Field Inspector Level $61.43; Admin Asst. II $51.13; and Admin Asst. I $40.12. Embedded: P.E. Upper Level $93.94; P.E. Middle Level $82.22; P.G. Upper Level $88.09; P.G. Middle Level $75.78; Lower Level Environ. Specialist $54.70; Admin Assist. II $43.57; Admin Assist. I $34.18.
|
| Deliverable Price: $444,620.43 |
| Non Price Justification: |
| Performance Metrics: Report monthly to verify that WSP is meeting the established review time frames for the sites and invoices managed by WSP. Additionally, WSP is responsible for the data entry into the STCM database and the insertion of all documents into OCULUS for all sites managed by WSP. The Contract Manager will review 10% of the STCM data entry and OCULUS insertion during the monthly evaluation period.
|
| Financial Consequences: Retainage - The Department reserves the right to establish the amount and application of retainage on a task assignment basis. A maximum of 6% from each payment to the Contractor may be retained pending satisfactory completion of a task assignment and approval of all
deliverables.
|
| Source Documentation Page Reference: T03-02 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task Assignment Number 03-02 - Deliverable May 2023: Site Management 1/1/2023 - 6/30/2023. Deliverab...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task Assignment Number 03-02 - Deliverable May 2023: Site Management 1/1/2023 - 6/30/2023. Deliverable: Monthly Summary Reports. Eligible costs: salaries. Labor rates: Project Manager $137.66; P.E. Upper Level $110.27; P.E. Middle Level $96.51; P.G; Upper Level $103.41; P.G. Middle Level $88.96; Env. Spec Upper Level $89.65; Env. Spec Middle Level $77.94; Env Spec Lower Level $64.21; O&M Inspector $66.27; Field Inspector Level $61.43; Admin Asst. II $51.13; and Admin Asst. I $40.12. Embedded: P.E. Upper Level $93.94; P.E. Middle Level $82.22; P.G. Upper Level $88.09; P.G. Middle Level $75.78; Lower Level Environ. Specialist $54.70; Admin Assist. II $43.57; Admin Assist. I $34.18.
|
| Deliverable Price: $488,665.80 |
| Non Price Justification: |
| Performance Metrics: Report monthly to verify that WSP is meeting the established review time frames for the sites and invoices managed by WSP. Additionally, WSP is responsible for the data entry into the STCM database and the insertion of all documents into OCULUS for all sites managed by WSP. The Contract Manager will review 10% of the STCM data entry and OCULUS insertion during the monthly evaluation period.
|
| Financial Consequences: Retainage - The Department reserves the right to establish the amount and application of retainage on a task assignment basis. A maximum of 6% from each payment to the Contractor may be retained pending satisfactory completion of a task assignment and approval of all
deliverables.
|
| Source Documentation Page Reference: T03-02 |
| Deliverable Number: |
|