Contract Information

 

Summary

Agency Name: DEPARTMENT OF ENVIRONMENTAL PROTECTION

Agency Contract ID: GC130

Long Title: PETRO Service Agreement

Vendor Name: NORTHSTAR CONTRACTING GROUP, IN

Total Contract Amount: $16,814,458.96

Total Budgetary Amount: $16,814,458.96

Total Payment To Date: $11,160,053.32

Date of Execution: 03/23/2018

General Description: To provide Petroleum Restoration Program administrative services.

Main Information

Agency Contract ID: GC130

FLAIR Contract ID: GC130

Short Title: PETRO

Long Title: PETRO Service Agreement

Contract Type: Master Agreement

Contract Status: Renewed

Date of Execution: 03/23/2018

Date of Beginning: 03/23/2018

Original End Date: 03/22/2023

New Ending Date: 03/22/2028

Agency Service Area: DWM

Statutory Authority: 376.30711, F.S.

Contract Involves State or Federal Financial Assistance: No

Recipient Type:

Provide for Administrative Cost: No

Provide for Periodic Increase: No

Procurement Information

Authorized Advanced Payment: No

Method of Procurement: Agency Request For Proposals [s. 287.057(1)(b), F.S.]

State Term Contract ID:

Contract’s Exemption Justification:

Agency Reference Number: 2018022REBID

Business Case Study Done: No

Legal Challenges to Procurement: No

Outsourcing / Capital Improvements

Was the Contracted Function Previously Performed by the State: No

Was the Contracted Function Considered for Insourcing back to the State: No

Did the Vendor Make Capital Improvements on State Property: No

Budget Information

Original Contract Amount: $0.00

Total Contract Amount: $16,814,458.96

Total Recurring Budgetary Amount: $595,799.32

Total Non-Recurring Budgetary Amount: $16,218,659.64

Total Budgetary Amount: $16,814,458.96

Total Unfunded Amount: $0.00

As of Date: 10/7/2026

Recurring Budgetary Amount Account Code Fiscal Year Effective Date FY Cost Accumulator Agency Amendment Reference
$206,600.00 37-20-2-212001-37450300-00-104132-00 07/01/2026 2026-2027 4562 PCAP12
$204,120.80 37-20-2-212001-37450300-00-104132-00 07/01/2024 2024-2025 4562 PCAP11
$163,425.60 37-20-2-212001-37450300-00-104132-00 07/01/2024 2024-2025 4562 PCAP10
$0.00 37-10-1-000286-37450300-00-088502-23 07/01/2022 2022-2023
$0.00 37-20-2-261019-37450300-00-101494-00 07/01/2022 2022-2023
$0.00 37-20-2-212001-37450300-00-100029-00 07/01/2019 2019-2020
$0.00 37-20-2-212001-37450300-00-104132-00 07/01/2019 2019-2020
$21,652.92 37-20-2-780001-37450300-00-101492-00 07/01/2018 2018-2019 T3


Non-Recurring Budgetary Amount Account Code Fiscal Year Effective Date FY Cost Accumulator Agency Amendment Reference
$527,039.93 37-20-2-212001-37450300-00-087889-25 07/01/2027 2027-2028 4773 T16
$44,217.00 37-20-2-780001-37450300-00-080524-27 07/01/2026 2026-2027 D000 WCP12CO1
$4,132.00 37-20-2-212001-37450300-00-087889-25 07/01/2026 2026-2027 WP500 EBD12
$210,641.64 37-20-2-780001-37450300-00-088502-27 07/01/2026 2026-2027 H000 WCP12
$57,924.70 37-20-2-780001-37450300-00-080524-27 07/01/2026 2026-2027 D000 WCP12
$192,551.84 37-20-2-780001-37450300-00-101492-00 07/01/2026 2026-2027 WCP12
$531,055.45 37-20-2-212001-37450300-00-087889-25 07/01/2026 2026-2027 4773 T15
$529,047.69 37-20-2-212001-37450300-00-087889-25 07/01/2025 2025-2026 4773 T14
($26.84) 37-20-2-212001-37450300-00-087889-25 07/01/2025 2025-2026 4773 T13CO1
$519,779.76 37-20-2-212001-37450300-00-087889-25 07/01/2025 2025-2026 T13
$209,838.44 37-20-2-780001-37450300-00-088502-26 07/01/2025 2025-2026 H000 WCP11
$47,382.36 37-20-2-780001-37450300-00-080524-26 07/01/2025 2025-2026 D000 WCP11
$143,559.36 37-20-2-780001-37450300-00-101492-00 07/01/2025 2025-2026 WCP11
$4,132.00 37-20-2-212001-37450300-00-087889-25 07/01/2024 2024-2025 WP500 PCAP11
$2,145.18 37-20-2-780001-37450300-00-088502-25 07/01/2024 2024-2025 H000 WCP10CO1
$3,249.12 37-20-2-780001-37450300-00-080524-25 07/01/2024 2024-2025 D000 WCP10CO1
$0.00 37-20-2-780001-37450300-00-080524-22 11/05/2024 2024-2025 D000
$11,872.80 37-20-2-212001-37450300-00-087889-25 07/01/2024 2024-2025 WP500 PCAP10
$18,123.30 37-20-2-212001-37450300-00-087889-24 07/01/2024 2024-2025 T10CO1
$139,147.40 37-20-2-780001-37450300-00-088502-25 07/01/2024 2024-2025 H000 WCP10
$41,487.38 37-20-2-780001-37450300-00-080524-25 07/01/2024 2024-2025 D000 WCP10
$126,812.16 37-20-2-780001-37450300-00-101492-00 07/01/2024 2024-2025 130 WCP10
$293,171.26 37-20-2-212001-37450300-00-087889-24 07/01/2024 2024-2025 T10
$576,877.78 37-20-2-212001-37450300-00-087889-24 07/01/2023 2023-2024 4773 T12
$254,638.10 37-20-2-212001-37450300-00-087889-24 07/01/2023 2023-2024 4773 T11
($59,221.00) 37-20-2-212001-37450300-00-087889-22 07/01/2023 2023-2024 T9CO2
$95,871.34 37-20-2-212001-37450300-00-087889-22 07/01/2023 2023-2024 4713 T9CO1
$11,872.80 37-20-2-212001-37450300-00-087889-23 07/01/2023 2023-2024 WP500 PCAPEBD9
$174,600.00 37-20-2-212001-37450300-00-104132-00 07/01/2023 2023-2024 4562 PCAPEBD9
$139,147.40 37-20-2-780001-37450300-00-088502-23 07/01/2023 2023-2024 H000 WCP9
$67,510.00 37-20-2-780001-37450300-00-080524-23 07/01/2023 2023-2024 D000 WCP9
$116,408.32 37-20-2-780001-37450300-00-101492-00 07/01/2023 2023-2024 130 WCP9
$1,457,414.46 37-20-2-212001-37450300-00-087889-22 07/01/2023 2023-2024 4713 T9
$0.00 37-10-1-000286-37450300-00-088502-23 07/01/2022 2022-2023
$0.00 37-20-2-780001-37450300-00-088502-23 07/01/2022 2022-2023
$29,494.30 37-20-2-780001-37450300-00-088502-22 07/01/2022 2022-2023 T8
$12,696.25 37-20-2-780001-37450300-00-080524-22 07/01/2022 2022-2023 T8
$17,460.00 37-20-2-212001-37450300-00-087889-22 07/01/2022 2022-2023 T8
$51,681.60 37-20-2-212001-37450300-00-104132-00 07/01/2022 2022-2023 T8
$67,298.56 37-20-2-780001-37450300-00-101492-00 07/01/2022 2022-2023 T8
$522,167.17 37-20-2-212001-37450300-00-087889-21 07/01/2022 2022-2023 T8
$61,371.50 37-20-2-212001-37450300-00-087889-21 10/03/2022 2022-2023 4713 T7CO1
$20,640.00 37-20-2-212001-37450300-00-087889-22 07/01/2022 2022-2023 WP500 T7
$97,540.25 37-20-2-780001-37450300-00-088502-22 07/01/2022 2022-2023 H000 T7
$69,694.90 37-20-2-780001-37450300-00-080524-22 07/01/2022 2022-2023 D000 T7
$112,144.00 37-20-2-212001-37450300-00-104132-00 07/01/2022 2022-2023 4562 T7
$47,488.00 37-20-2-780001-37450300-00-101492-00 07/01/2022 2022-2023 130 T7
$1,136,113.44 37-20-2-212001-37450300-00-087889-21 07/01/2022 2022-2023 4713 T7
$0.00 37-10-1-000286-37450300-00-080524-23 07/01/2021 2021-2022
($11.09) 37-20-2-212001-37450300-00-087889-21 07/01/2021 2021-2022 4713 T7CO2
($25,026.00) 37-20-2-212001-37450300-00-087889-22 07/01/2021 2021-2022 WP500 T6CO4
$1,174.00 37-20-2-212001-37450300-00-087889-21 07/01/2021 2021-2022 4713 T6CO4
$25,026.00 37-20-2-212001-37450300-00-104132-00 07/01/2021 2021-2022 4562 T6CO4
$20,640.00 37-20-2-780001-37450300-00-088502-22 07/01/2021 2021-2022 H000 T6CO3
$31,270.65 37-20-2-780001-37450300-00-080524-22 07/01/2021 2021-2022 D000 T6CO3
$38,912.00 37-20-2-212001-37450300-00-087889-21 07/01/2021 2021-2022 4713 T6CO3
$41,280.00 37-20-2-212001-37450300-00-087889-22 07/01/2021 2021-2022 WP500 T6CO1
$36,308.25 37-20-2-780001-37450300-00-080524-22 07/01/2021 2021-2022 D000 T6
$36,308.25 37-20-2-780001-37450300-00-088502-22 07/01/2021 2021-2022 H000 T6
$173,376.00 37-20-2-212001-37450300-00-100029-00 07/01/2021 2021-2022 4562 T6
$113,792.00 37-20-2-780001-37450300-00-101492-00 07/01/2021 2021-2022 130 T6
$1,288,488.25 37-20-2-212001-37450300-00-087889-19 07/01/2021 2021-2022 4713 T6
($41,280.00) 37-20-2-212001-37450300-00-100029-00 07/01/2020 2020-2021 4562 T6CO1
$0.00 37-20-2-212001-37450300-00-087889-21 07/01/2020 2020-2021
($161,277.68) 37-20-2-212001-37450300-00-087889-18 07/01/2020 2020-2021 4713 T5CO1
$1,393,076.20 37-20-2-212001-37450300-00-087889-18 07/01/2020 2020-2021 4713 T5
$174,064.00 37-20-2-212001-37450300-00-100029-00 07/01/2020 2020-2021 4562 T5
$113,792.00 37-20-2-780001-37450300-00-101492-00 07/01/2020 2020-2021 130 T5
$39,873.06 37-20-2-780001-37450300-00-080524-21 07/01/2020 2020-2021 D000 T5
$39,873.06 37-20-2-780001-37450300-00-088502-21 07/01/2020 2020-2021 H000 T5
($100,464.00) 37-20-2-212001-37450300-00-104138-00 07/01/2019 2019-2020 4562 T4CO3
($254,928.32) 37-20-2-212001-37450300-00-104138-00 07/01/2019 2019-2020 4562 T4CO2
$198,000.00 37-20-2-212001-37450300-00-104138-00 07/01/2019 2019-2020 T4CO1
$89,440.00 37-20-2-212001-37450300-00-104138-00 07/01/2019 2019-2020 T4
$0.00 37-20-2-780001-37450300-00-080524-20 07/01/2019 2019-2020
$0.00 37-20-2-780001-37450300-00-088502-20 07/01/2019 2019-2020
$0.00 37-20-2-212001-37450300-00-087889-19 07/01/2018 2018-2019
$116,480.00 37-20-2-780001-37450300-00-101492-00 07/01/2018 2018-2019 130 T4
$40,665.24 37-20-2-780001-37450300-00-080524-19 07/01/2018 2018-2019 D000 T4
$21,652.92 37-20-2-780001-37450300-00-101492-00 07/01/2018 2018-2019 130 T4
$40,665.24 37-20-2-780001-37450300-00-088502-19 07/01/2018 2018-2019 H000 T4
$1,664,615.82 37-20-2-212001-37450300-00-087889-17 07/01/2018 2018-2019 4713 T4
$93,000.00 37-20-2-780001-37450300-00-101492-00 07/01/2018 2018-2019 T3CO3
$40,665.24 37-20-2-780001-37450300-00-080524-18 07/01/2018 2018-2019 T3
$40,665.24 37-20-2-780001-37450300-00-088502-18 07/01/2018 2018-2019 T3
$42,534.63 37-20-2-212001-37450300-00-087889-16 07/01/2017 2017-2018 T1
$0.00 37-20-2-212001-37450300-00-087889-18 07/01/2017 2017-2018
$0.00 37-20-2-212001-37450300-00-087889-17 07/01/2016 2016-2017
$61,686.00 37-20-2-212001-37450300-00-087889-16 07/01/2016 2016-2017 4713 T3CO2
$54,642.00 37-20-2-212001-37450300-00-087889-16 07/01/2016 2016-2017 4713 T3CO1
$1,786,034.32 37-20-2-212001-37450300-00-087889-16 07/01/2016 2016-2017 T3
$205,453.26 37-20-2-212001-37450300-00-087889-16 07/01/2016 2016-2017 T2

Contract Change

Change Type Amendment Amount Agency Amendment Reference Change Description Amendment Effective Date Amendment Execution Date New Ending Date
Amendment $527,039.93 T16 Encumbers $527,039.93 Funding for TA 16PRP 01/01/2027 10/07/2026
Amendment $44,217.00 WCP12CO1 funding increase 09/22/2026 09/22/2026
Amendment $0.00 EBD 12 Entered in error 07/01/2026 06/29/2026
Amendment $4,132.00 EBD12 New TA 12 for EDB 07/01/2026 06/29/2026
Amendment $206,600.00 PCAP12 New TA 12 for PCAP Compliance 07/01/2026 06/29/2026
Amendment $531,055.45 T15 Encumbers $531,055.45 Funding for TA 15PRP 07/01/2026 06/15/2026
Amendment $461,118.18 WCP12 Encumbers Funds for Administrative Services 06/12/2026 06/12/2026
Amendment $0.00 A3 Renews the Contract GC130 through March 22, 2028 06/11/2026 06/11/2026 03/22/2028
Amendment $0.00 CMC2 Contract Manager Change 02/19/2026 02/19/2026
Amendment $529,047.69 T14 Encumbers $529,047.69 Funding for TA 14 PRP 01/01/2026 12/09/2025
Amendment ($26.84) T13CO1 Unencumbers $26.84 Funding for TA 13 PRP 10/15/2025 10/15/2025
Amendment $0.00 GC130 Entered in Error 07/01/2025 06/30/2025
Amendment $400,780.16 WCP11 Encumbers Funds for Administrative Services 07/01/2025 06/30/2025
Amendment $208,252.80 PCAP11 New TA PCAP11 Compliance & EDB 07/01/2024 06/30/2025
Amendment $519,779.76 T13 Encumbers $519,779.76 Funding for TA 13 PRP 07/01/2025 06/10/2025
Amendment $5,394.30 WCP10CO1 Increase in cost 01/28/2025 01/28/2025
Amendment $576,877.78 T12 Encumbers $576,877.78 Funding for TA 12 PRP 01/01/2025 11/14/2024
Renewal $0.00 A2R2 Renews Contract for 18 months 03/23/2025 10/11/2024 09/26/2026
Amendment $254,638.10 T11 Encumbers $254638.10 Funding for TA 11 PRP 10/01/2024 09/24/2024
Amendment $0.00 CMC1 Contract Manager Change 09/11/2024 09/11/2024
Amendment $18,123.30 T10CO1 Encumbers additional $18,123.30 Funding for TA 10 PRP 08/06/2024 08/06/2024
Amendment $175,298.40 PCAP10 Encumbers $175,298.40 Funding for TA PCAP 10 07/01/2024 06/28/2024
Amendment $293,171.26 T10 Encumbers $293,171.26 Funding for TA 10 PRP 07/01/2024 06/25/2024
Amendment $307,446.94 WCP10 Administrative Services 07/01/2024 06/24/2024
Amendment ($59,221.00) T9CO2 Unencumbers funds for PRP 05/14/2024 05/14/2024
Amendment $95,871.34 T9CO1 Adds funds to PRP 12/11/2023 12/11/2023
Amendment $186,472.80 PCAPEBD9 Encumbers $186,472.80 Funding for TA PCAPEBD 9 07/01/2023 06/29/2023
Amendment $1,457,414.46 T9 Encumbers $1457414.46 Funding for TA 9 PRP 07/01/2023 06/20/2023
Amendment $323,065.72 WCP9 Encumbers $323065.72 Funding for TA WCP9 VCTC DSCP WCP/ODBS 07/01/2023 06/16/2023
Amendment $700,797.88 T8 Encumbers $700797.88 Funding for Task Assignment 8 03/19/2023 03/02/2023
Amendment ($11.09) T7CO2 Moves and unencumbers -$11.09 funds in PRP 02/01/2023 02/01/2023
Amendment $0.00 A1R1 Renews Contract for 2 years 03/23/2023 01/05/2023 03/22/2025
Amendment $61,371.50 T7CO1 Adds funds to PRP 10/03/2022 10/03/2022
Amendment $1,483,620.59 T7 Encumbers $1,483,620.59 Funding for Task Assignment 7 07/01/2022 06/10/2022
Amendment $1,174.00 T6CO4 Moves funds PCAP to Ethanol/Biodiesel adds funds to PRP. 05/23/2022 05/23/2022
Amendment $90,822.65 T6CO3 Adds funds to PCAP to PRP, DSCP, and WCP 03/30/2022 03/30/2022
Amendment $0.00 T6CO2 Move funds within PRP 02/09/2022 02/09/2022
Amendment $0.00 T6CO1 Moves funds from PCAP to Ethanol/BioDiesel, and within PRP. 01/14/2022 01/14/2022
Amendment $1,648,272.75 T6 Encumbers $1,648,272.75 06/14/2021 06/14/2021
Amendment ($161,277.68) T5CO1 Reduce funding for Task Assignment 5 03/10/2021 03/10/2021
Amendment $1,760,678.32 T5 Encumber Funding for Task Assignment 5 07/01/2020 07/01/2020
Amendment ($100,464.00) T4CO3 Unencumbers $100,464.00 Funding For Task Assignment 4 04/23/2020 04/23/2020
Amendment ($254,928.32) T4CO2 Unencumbers $254,928.32 03/17/2020 03/17/2020
Amendment $198,000.00 T4CO1 Amends Cat&EO, moves funds, to new Cat&EO, adds 198,000.00 07/29/2019 07/29/2019
Amendment $1,973,519.22 T4 Encumbers Funds for Task Assignment 4 05/30/2019 05/30/2019
Amendment $93,000.00 T3CO3 Funding Increase 01/29/2019 01/29/2019
Amendment $61,686.00 T3CO2 Additional Funding 12/07/2018 12/07/2018
Amendment $54,642.00 T3CO1 Funding Increase 10/04/2018 10/04/2018
Amendment $1,889,017.72 T3 Encumbers Funds For Task Assignment 3 06/27/2018 06/27/2018
Amendment $0.00 T2CO1 Moves fund from Task 15 to Task 7A and 7E 06/21/2018 06/21/2018
Amendment $205,453.26 T2 Encumbers Funds For Task Assignment 2 04/11/2018 04/11/2018
Amendment $42,534.63 T1 Encumbers Funds For Task Assignment 1 03/27/2018 03/27/2018

Vendor

Name Line 1Name Line 2City State ZipMinority Vendor Designation
NORTHSTAR CONTRACTING GROUP, IN TALLAHASSEE FL 323030000 Non-Minority

CFDA

No CFDA Codes found for the contract.

CSFA

No CSFA Codes found for the contract.
More Deliverable Number      Commodity/Service Type Major Deliverable Method of Payment
     
Management and Business Professionals and Administrative Services Task WCP9: The Contractor will provide administrative staff and services to the Department according... Fixed Fee / Unit Rate
     
Management and Business Professionals and Administrative Services Task assignments will be executed for work. Fixed Fee / Unit Rate
     
Management and Business Professionals and Administrative Services TASK 1: OCULUS and STCM/ERIC Review and Preparation of Site Manager Summary Report (SMSR) and Geogr... Fixed Fee / Unit Rate
     
Management and Business Professionals and Administrative Services TASK 2: OCULUS and STCM/ERIC Review and Preparation of Site Manager Summary Report (SMSR) and Geogra... Fixed Fee / Unit Rate
     
Management and Business Professionals and Administrative Services TASK 3: Deliverables (Tasks) 1-10, Task 11- 17 CONTINUED IN NEXT SECTIONS: "(TASK 1): OCULUS and STC... Fixed Fee / Unit Rate
     
Management and Business Professionals and Administrative Services TASK 3: CONTINUED TASKS 14-17 (TASK 14): Conditional Closure Application (CCA) Processing and Track... Fixed Fee / Unit Rate
     
Management and Business Professionals and Administrative Services TASK 3: CONTINUED TASKS 11-13 (TASK 11): Processing and Tracking Off-Site Contamination Notification... Fixed Fee / Unit Rate
     
Management and Business Professionals and Administrative Services TASK 4: Task 1: OCULUS and STCM/ERIC Review and Preparation of Site Manager Summary Report (SMSR) an... Fixed Fee / Unit Rate
     
Management and Business Professionals and Administrative Services TASK 4 CONTINUED: Task 10C: Well Survey Request Tracking; up to 800 X $11.67 each = $9,336.00. Task ... Fixed Fee / Unit Rate
     
Management and Business Professionals and Administrative Services TASK 4 CONTINUED: Task 14: Conditional Closure Application (CCA) Processing and Tracking (Ch. 62-772... Fixed Fee / Unit Rate
     
Management and Business Professionals and Administrative Services Task 4 CONTINUED: SUBTASK 15: General Administrative and Accounting Support; Sub-task 15 Hourly Rat... Fixed Fee / Unit Rate
     
Management and Business Professionals and Administrative Services Task 5: Task 1: OCULUS and STCM/ERIC Review and Preparation of Site Manager Summary Report (SMSR) an... Fixed Fee / Unit Rate
     
Management and Business Professionals and Administrative Services Task 5 CONTINUED: Task 14: Conditional Closure Application (CCA) Processing and Tracking (Ch. 62-77... Fixed Fee / Unit Rate
     
Management and Business Professionals and Administrative Services Task 7 CO2: Adds the following Items: Task 7B 175 x $11.74 = $2,054.50; Removes the following Items:... Fixed Fee / Unit Rate
     
Management and Business Professionals and Administrative Services TASK 7: The Contractor will provide administrative staff and services to the Department according to... Fixed Fee / Unit Rate
     
Management and Business Professionals and Administrative Services TASK 7 CONTINUED: Task 14B: CCA Application processed to completion - 30 Units @ $368.83= $11,064.... Fixed Fee / Unit Rate
     
Management and Business Professionals and Administrative Services TASK 7 CONTINUED: Total VCTC Expenses = $47,488.00. Waste Cleanup - Permitting and Compliance Assis... Fixed Fee / Unit Rate
     
Management and Business Professionals and Administrative Services Task PCAPEBD9: The Contractor will provide administrative staff and services to the Department accor... Fixed Fee / Unit Rate
     
Management and Business Professionals and Administrative Services Task 6: Task 1: OCULUS and STCM/ERIC Review and Preparation of Site Manager Summary Report (SMSR) an... Fixed Fee / Unit Rate
     
Management and Business Professionals and Administrative Services Task 6 CONTINUED Task 14: Conditional Closure Application (CCA) Processing and Tracking (Ch. 62-772,... Fixed Fee / Unit Rate
     
Management and Business Professionals and Administrative Services Task 6 CONTINUED Task 10C: Well Survey Request Tracking; up to 1,500 at $11.67 each = $17,505.00. Ta... Fixed Fee / Unit Rate
     
Management and Business Professionals and Administrative Services Task 6 CONTINUED: Task 4 100 x $117.64 = $11,764.00 Task 7A 100 x $122.33 = $12,233.00 Task 7B 125 x... Fixed Fee / Unit Rate
     
Management and Business Professionals and Administrative Services TASK 7 (continued) CO1: Adds the following Items: Task 7A 200 x $122.33 = $24,466.00 Task 7B 300 x ... Fixed Fee / Unit Rate
     
Management and Business Professionals and Administrative Services Task 8: The Contractor will provide administrative staff and services to the Department according to... Fixed Fee / Unit Rate
     
Management and Business Professionals and Administrative Services Task 10:The Contractor will provide administrative staff and services to the Department according to... Fixed Fee / Unit Rate
 Displaying 1 to 25 of 40     1 2 Next  Last


Payments are also referred to as expenditures (creating or incurring a legal obligation to disburse money) or disbursements (the payment of expenditures). Payments include disbursements and accounting adjustments made on a contract. Payments are always positive amounts while accounting adjustments may be positive or negative depending on the type of adjustment.

Payment Details

"Date" in the listing below indicates the date the payment voucher was recorded in the system, not the date the payment was issued.
More Fiscal Year Total Amount
     
2026-2027 $380,552.17
     
2025-2026 $1,043,059.28
     
2024-2025 $1,048,935.96
     
2023-2024 $1,411,441.57
     
2022-2023 $1,616,559.76
     
2021-2022 $1,390,397.09
     
2020-2021 $1,413,548.90
     
2019-2020 $1,454,363.53
     
2018-2019 $1,330,357.79
     
2017-2018 $70,837.27

If a payment or adjustment to a contract was made before July 1, 2012, the information may not be posted in this system.

Contract Documents


Click on the pdf icon or Agency Document Link to view the document
Document Type Document Reference # Executed Date Document Add Date Agency Document Link View
Original Contract Original Contract - GC130 03/23/2018 3/28/2018 2:51:05 PM
Procurement Original Contract - GC130 2/12/2019 10:04:35 AM
Amendment A1R1 01/05/2023 1/6/2023 4:30:09 PM
Renewal A2R2 10/11/2024 10/14/2024 3:44:07 PM
Amendment A3 06/11/2026 6/11/2026 2:31:56 PM
Amendment CMC1 09/11/2024 9/11/2024 10:47:58 AM
Amendment CMC2 02/19/2026 2/19/2026 4:05:01 PM
Amendment EBD12 06/29/2026 8/19/2026 11:21:21 AM
Amendment PCAP10 06/28/2024 9/20/2024 3:57:47 PM
Amendment PCAP11 06/30/2025 2/27/2026 9:04:55 AM
Amendment PCAP12 06/29/2026 8/19/2026 11:32:32 AM
Amendment PCAPEBD9 06/29/2023 6/30/2023 1:59:58 PM
Amendment T1 03/27/2018 4/3/2018 2:23:45 PM
Amendment T10 06/25/2024 6/26/2024 1:15:38 PM
Amendment T10CO1 08/06/2024 8/14/2024 4:01:53 PM
Amendment T11 09/24/2024 9/30/2024 10:25:29 AM
Amendment T12 11/14/2024 11/15/2024 8:32:05 AM
Amendment T13 06/10/2025 7/11/2025 4:20:25 PM
Amendment T13CO1 10/15/2025 10/17/2025 1:44:12 PM
Amendment T14 12/09/2025 12/10/2025 2:33:54 PM
Amendment T15 06/15/2026 6/15/2026 1:40:09 PM
Amendment T16 10/07/2026 10/7/2026 9:14:41 AM
Amendment T2 04/11/2018 4/13/2018 8:48:44 AM
Amendment T2CO1 06/21/2018 6/22/2018 8:42:07 AM
Amendment T3 06/27/2018 7/2/2018 10:51:48 AM
Amendment T3CO1 10/04/2018 10/4/2018 3:30:13 PM
Amendment T3CO2 12/07/2018 12/11/2018 10:01:40 AM
Amendment T3CO3 01/29/2019 2/4/2019 4:55:12 PM
Amendment T4 05/30/2019 6/10/2019 3:41:12 PM
Amendment T4CO1 07/29/2019 7/29/2019 2:12:59 PM
Amendment T4CO2 03/17/2020 3/30/2020 3:24:53 PM
Amendment T4CO3 04/23/2020 4/27/2020 4:47:29 PM
Amendment T5 07/01/2020 7/2/2020 4:13:33 PM
Amendment T5CO1 03/10/2021 3/16/2021 3:27:42 PM
Amendment T6 06/14/2021 6/23/2021 3:59:06 PM
Amendment T6CO1 01/14/2022 1/28/2022 8:06:58 AM
Amendment T6CO2 02/09/2022 2/15/2022 10:55:12 AM
Amendment T6CO3 03/30/2022 4/7/2022 11:52:23 AM
Amendment T6CO4 05/23/2022 6/2/2022 2:49:14 PM
Amendment T7 06/10/2022 6/24/2022 12:08:40 PM
Amendment T7CO1 10/03/2022 10/7/2022 8:25:06 AM
Amendment T7CO2 02/01/2023 2/2/2023 4:34:59 PM
Amendment T8 03/02/2023 3/7/2023 1:05:10 PM
Amendment T9 06/20/2023 6/30/2023 1:49:01 PM
Amendment T9CO1 12/11/2023 2/12/2024 10:13:03 AM
Amendment T9CO2 05/14/2024 5/23/2024 4:35:20 PM
Amendment WCP10 06/24/2024 7/18/2024 9:57:10 AM
Amendment WCP10CO1 01/28/2025 1/29/2025 9:29:58 AM
Amendment WCP11 06/30/2025 7/1/2025 3:18:39 PM
Amendment WCP12 06/12/2026 7/8/2026 8:16:53 AM
Amendment WCP12CO1 09/22/2026 9/22/2026 1:32:39 PM
Amendment WCP9 06/16/2023 6/30/2023 1:53:44 PM


Audit results posted prior to June 30, 2012, appear in a summarized form. As of July 1, 2012, the audit reporting process was expanded to include additional questions and comments from the Bureau of Auditing. As audits are captured in electronic format, they will be posted to this system. If you are interested in seeing audit reports by Fiscal Year and Agency Action Plans, please click here to navigate to the Transparency Florida Contract Audit page.
Audit Type Review Date Fiscal Year View
Contract Review 02/13/2019 2018-2019 View