| More |
Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 57A: Field Notes & Site Characterization Screening Report- $10,566.27.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 57A: Field Notes & Site Characterization Screening Report- $10,566.27. |
| Deliverable Price: $10,566.27 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 58A: Maps/Tables & Field Notes- $11,254.46; Site Characterization Screening Report- $4,094.28.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 58A: Maps/Tables & Field Notes- $11,254.46; Site Characterization Screening Report- $4,094.28. |
| Deliverable Price: $15,348.74 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 42G: First Event- Baseline Sampling Report $6,928.25; Event 2- Field Notes, Well Construction L...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 42G: First Event- Baseline Sampling Report $6,928.25; Event 2- Field Notes, Well Construction Logs $96,260.36; Event 3- Letter or NPDES Report $115,161.53. |
| Deliverable Price: $218,350.14 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 59A: Site Characterization Screening Report
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 59A: Site Characterization Screening Report |
| Deliverable Price: $14,392.87 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 61A: Groundwater Sampling, Logs, Lab Report, Maps and H&S Plan $6,319.21; Boring Logs, Groundwa...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 61A: Groundwater Sampling, Logs, Lab Report, Maps and H&S Plan $6,319.21; Boring Logs, Groundwater Sampling Logs, Lab Report $13,332.97. |
| Deliverable Price: $19,652.18 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 65A: Boring Logs, Chain of Custody, Lab Reports, and Site Characterization Screening Report $15...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 65A: Boring Logs, Chain of Custody, Lab Reports, and Site Characterization Screening Report $15,379.71. |
| Deliverable Price: $15,379.71 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 16C: Field Notes, Groundwater Sampling Logs, Lab Reports, Site Characterization Report $13,101....
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 16C: Field Notes, Groundwater Sampling Logs, Lab Reports, Site Characterization Report $13,101.37. |
| Deliverable Price: $13,101.37 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 64A: Field Notes, SB Logs, Chain of Custody, LSSI Report $12,081.35; Groundwater Logs, MW Logs,...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 64A: Field Notes, SB Logs, Chain of Custody, LSSI Report $12,081.35; Groundwater Logs, MW Logs, Chain of Custody, Field Notes, LSSI Report $11,883.57. |
| Deliverable Price: $23,964.92 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 42F: Bid Package and Construction Drawings
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 42F: Bid Package and Construction Drawings |
| Deliverable Price: $5,850.81 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 44E: Field Notes and Letter Report.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 44E: Field Notes and Letter Report. |
| Deliverable Price: $23,402.38 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 44F: Remedial Action Interim Report.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 44F: Remedial Action Interim Report. |
| Deliverable Price: $8,171.02 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 47D: Letter Report, Well Abandonment Report, Photo Documentation, and Remedial Action Interim R...
|
Cost Reimbursement Plus Incentive Fee
|
| Major Deliverable: Task 47D: Letter Report, Well Abandonment Report, Photo Documentation, and Remedial Action Interim Report. |
| Deliverable Price: $242,914.77 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 47E: Photo Documentation and Remedial Action Interim Report.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 47E: Photo Documentation and Remedial Action Interim Report. |
| Deliverable Price: $238,034.02 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 47F: Photo Documentation & Remedial Action Interim Report.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 47F: Photo Documentation & Remedial Action Interim Report. |
| Deliverable Price: $224,291.50 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 47H: Source Removal Report and Remedial Action Interim Report.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 47H: Source Removal Report and Remedial Action Interim Report. |
| Deliverable Price: $166,476.91 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 48C: Letter Report, Well Abandonment Report, and Remedial Action Interim Report.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 48C: Letter Report, Well Abandonment Report, and Remedial Action Interim Report. |
| Deliverable Price: $249,637.15 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 48D: Photo Documentation and Remedial Action Interim Report.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 48D: Photo Documentation and Remedial Action Interim Report. |
| Deliverable Price: $248,228.64 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 48E: Photo Documentation and Remedial Action Interim Report.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 48E: Photo Documentation and Remedial Action Interim Report. |
| Deliverable Price: $247,968.25 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 48F: Photo Documentation and Remedial Action Interim Report.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 48F: Photo Documentation and Remedial Action Interim Report. |
| Deliverable Price: $247,223.77 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 48G: Photo Documentation and Remedial Action Interim Report.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 48G: Photo Documentation and Remedial Action Interim Report. |
| Deliverable Price: $249,530.25 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Petroleum Contamination Site Cleanup. Deliverables will be established on a Task Assignment basis.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Petroleum Contamination Site Cleanup. Deliverables will be established on a Task Assignment basis. |
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverables reviewed to ensure specifications in Task have been met. |
| Financial Consequences: No payment for unsatisfactory deliverable or services. In addition, contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 39F: NA Quarterly Reports
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 39F: NA Quarterly Reports |
| Deliverable Price: $5,206.48 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure specifications in Task have been met. |
| Financial Consequences: No payment for unsatisfactory deliverable or services. In addition, contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 47G: Photo Documentation and Remedial Action Interim Report.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 47G: Photo Documentation and Remedial Action Interim Report. |
| Deliverable Price: $220,886.25 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 48M: Photo Documentation & Remedial Action Interim Report.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 48M: Photo Documentation & Remedial Action Interim Report. |
| Deliverable Price: $249,288.25 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 44G: Supplemental Site Assessment Report.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 44G: Supplemental Site Assessment Report. |
| Deliverable Price: $3,498.06 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|