| More |
Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
Hazardous waste disposal
|
Task 104A: Event 1-Office Activities $2,676.12. The department reserves the right to establish 10% ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 104A: Event 1-Office Activities $2,676.12. The department reserves the right to establish 10% retainage from each payment (noted on the task assignment template) to the contractor pending satisfactory completion of a task assignment and approval of all deliverables. |
| Deliverable Price: $2,676.12 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: T104A |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 82E: 1st Event-Chain of Custody, Field Notes and Laboratory Report $2902.41; 2nd Event-Pilot Te...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 82E: 1st Event-Chain of Custody, Field Notes and Laboratory Report $2902.41; 2nd Event-Pilot Test Report $4012.86; 3rd Event- Field Activities and Subcontract costs $3,384.09; 4th Event-Field Activities, Field Work, and Subcontractor costs $7,447.98. Verbal change order authorized and/or invoices with changes to events 1, 2, 3 and 4. The department reserves the right to establish 10% retainage from each payment (noted on the task assignment template) to the contractor pending satisfactory completion of a task assignment and approval of all deliverables. The Department shall pay the Contractor on a cost reimbursement plus fixed fee basis not to exceed $17,747.34 |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 58G: Event 1- Source Removal Report $89,132.20. Event 2- Field Activities, Subcontractor Costs,...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 58G: Event 1- Source Removal Report $89,132.20. Event 2- Field Activities, Subcontractor Costs, Office Activities $14,416.35. Event 3-Field Activities, Subcontractor Costs, Office Activities $6,428.73. Verbal change order authorized with change to events 1, 2 & 3. The department reserves the right to establish 10% retainage from each payment (noted on the task assignment template) to the contractor pending satisfactory completion of a task assignment and approval of all deliverables. |
| Deliverable Price: $109,977.28 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 25K: Quarter 1 PARM Report $2,758.32; Quarter 2 PARM Report $2,758.32; Quarter 3 PARM Repor...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 25K: Quarter 1 PARM Report $2,758.32; Quarter 2 PARM Report $2,758.32; Quarter 3 PARM Report $2,948.51; Quarter 4 PARM Report $3,576.48. Verbal change order authorized with change to events 3 & 4. The department reserves the right to establish 10% retainage from each payment (noted on the task assignment template) to the contractor pending satisfactory completion of a task assignment and approval of all deliverables. |
| Deliverable Price: $12,041.63 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 71H: Event 1- NA Semi Annual Report $9,839.90; Event 2- Semi Annual LTNAM Report $2,973.41; Eve...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 71H: Event 1- NA Semi Annual Report $9,839.90; Event 2- Semi Annual LTNAM Report $2,973.41; Event 3- Office Activities, Field Activities, Subcontractor Costs, Office Activities $7,681.07; Event 5- Office Activities, Field Activities, Subcontractor Costs, Office Activities $4,188.02. Verbal change order authorized with change to events 3 & 5. The department reserves the right to establish 10% retainage from each payment (noted on the task assignment template) to the contractor pending satisfactory completion of a task assignment and approval of all deliverables. |
| Deliverable Price: $24,682.40 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 44M: Event 1- General RA Report $14,883.69; Event 2- Pilot Test Report $$10,774.40; Event 3- Ot...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 44M: Event 1- General RA Report $14,883.69; Event 2- Pilot Test Report $$10,774.40; Event 3- Other Report Type (backup spreadsheet) $83,201.34. Verbal change order authorized with changes to events 1, 2 and 3. The department reserves the right to establish 10% retainage from each payment (noted on the task assignment template) to the contractor pending satisfactory completion of a task assignment and approval of all deliverables. |
| Deliverable Price: $108,859.43 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 38K: Event 1- Chain of Custody, Field Notes, Groundwater Sampling Logs, Disposal Manifest, and ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 38K: Event 1- Chain of Custody, Field Notes, Groundwater Sampling Logs, Disposal Manifest, and General Remedial Action Report $3,680.75. Event 2- General SA Report $3,680.75 Verbal change order authorized with change to events 1 and 2. The department reserves the right to establish 10% retainage from each payment (noted on the task assignment template) to the contractor pending satisfactory completion of a task assignment and approval of all deliverables. |
| Deliverable Price: $7,361.50 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 81F: Letter Report $6,698.64. CO&I - Decrease in funds.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 81F: Letter Report $6,698.64. CO&I - Decrease in funds. |
| Deliverable Price: $6,698.64 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: 81FCO&I |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 101A: Scope of Work Plan
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 101A: Scope of Work Plan |
| Deliverable Price: $4,396.05 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 46M: Limited Scope RAP
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 46M: Limited Scope RAP |
| Deliverable Price: $8,770.31 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 100A: Site Characterization Screening Report
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 100A: Site Characterization Screening Report |
| Deliverable Price: $15,140.28 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 81G: Event 1: Letter Report $11,355.33; Event 2-Level 2 RAP $17,540.62; Event 3-Construction Dr...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 81G: Event 1: Letter Report $11,355.33; Event 2-Level 2 RAP $17,540.62; Event 3-Construction Drawings $3,707.61; Event 4-RAC Bid Package Solicitation/Evaluation $2,091.24. Verbal change order authorized and/or invoices with changes to event 1. The department reserves the right to establish 10% retainage from each payment (noted on the task assignment template) to the contractor pending satisfactory completion of a task assignment and approval of all deliverables. |
| Deliverable Price: $34,694.80 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 103A: Remedial Action Plan Modification
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 103A: Remedial Action Plan Modification |
| Deliverable Price: $8,770.31 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: T103A |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 25I: Event 1 - Quarterly O&M Report - $11,130.37. Event 2 - Annual O&M Report - $11,341.57
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 25I: Event 1 - Quarterly O&M Report - $11,130.37. Event 2 - Annual O&M Report - $11,341.57 |
| Deliverable Price: $22,471.94 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: Task 25I |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 87A: Verification Sampling Report and Chain of Custody Documentation
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 87A: Verification Sampling Report and Chain of Custody Documentation |
| Deliverable Price: $7,205.32 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: T87A |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 88A: Site Characterization Screening Report
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 88A: Site Characterization Screening Report |
| Deliverable Price: $8,546.42 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: Task 088A |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Petroleum Cleanup Services. Deliverables established on a task assignment basis.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Petroleum Cleanup Services. Deliverables established on a task assignment basis. |
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 89A: Letter/NPDES Report
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 89A: Letter/NPDES Report |
| Deliverable Price: $3,488.46 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: Task 89A |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 38I: Chain of Custody, Field Notes, Groundwater Sampling Logs, Disposal Manifest, and Supplemen...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 38I: Chain of Custody, Field Notes, Groundwater Sampling Logs, Disposal Manifest, and Supplemental Site Assessment Report. |
| Deliverable Price: $3,686.08 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 84A: Remedial Action Interim Report.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 84A: Remedial Action Interim Report. |
| Deliverable Price: $4,307.32 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 71G: Post RA Monitoring Semi Annual Reports.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 71G: Post RA Monitoring Semi Annual Reports. |
| Deliverable Price: $5,672.32 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task Assignment Completed and Closed Prior to FACTS.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task Assignment Completed and Closed Prior to FACTS. |
| Deliverable Price: $3,753,289.72 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 25J: Year 2, Quarter 1 O&M Report- $9321.01; Year 2, Quarter 2 O&M Report- $9179.37.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 25J: Year 2, Quarter 1 O&M Report- $9321.01; Year 2, Quarter 2 O&M Report- $9179.37. |
| Deliverable Price: $18,500.38 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 90A: Site Characterization Screening Report.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 90A: Site Characterization Screening Report. |
| Deliverable Price: $6,734.22 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task 38J: Chain of Custody, Field Notes, Groundwater Sampling Logs, Disposal Manifest, and General R...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 38J: Chain of Custody, Field Notes, Groundwater Sampling Logs, Disposal Manifest, and General Remedial Action Report. |
| Deliverable Price: $3,686.08 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|