ENVIRONMENTAL CLEANUP AND RESTORATION
|
Task 1: Reported discharge inspections, installation inspections, closure inspections, and re-inspe...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Reported discharge inspections, installation inspections, closure inspections, and re-inspections for at least 85% of listed facilities. |
| Deliverable Price: $115,176.98 |
| Non Price Justification: |
| Performance Metrics: The CONTRACTOR should have completed the following required routine compliance inspections unless otherwise indicated in the Task Assignment;
1.After Four Months should have completed 33% of inspections.
2.After 8 months should have completed 66% of inspections.
3.After 12 months should have completed 100% of inspections
If number of required routine compliance inspections falls below twenty percent (20%) for the fourth month, thirty percent (30%) for the fifth month, forty percent (40%) for the sixth month, forty-eight percent (48%) for the seventh month, fifty-seven percent (57%) for the eighth month, sixty-five percent (65%) for the ninth month, seventy-three percent (73%) for the tenth month or eighty-two percent for (82%) the eleventh month, then the CONTRACTOR shall submit a Corrective Action Plan, within ten (10) days of receipt of a written request from the DEP Task Manager.
|
| Financial Consequences: If the CONTRACTOR does not successfully implement the Plan as approved by the DEP Task Manager for the remaining months of the Task Assignment, the DEP may withhold further payment of monthly invoices until such time as the CONTRACTOR comes into compliance with those performance levels as outlined in the Performance Metrics. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL CLEANUP AND RESTORATION
|
Task 2: Reported discharge inspections, installation inspections, closure inspections, and re-inspec...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 2: Reported discharge inspections, installation inspections, closure inspections, and re-inspections for at least 75% of listed facilities. |
| Deliverable Price: $111,299.70 |
| Non Price Justification: |
| Performance Metrics: The CONTRACTOR should have completed the following required routine compliance inspections unless otherwise indicated in the Task Assignment;
1.After Four Months should have completed 33% of inspections.
2.After 8 months should have completed 66% of inspections.
3.After 12 months should have completed 100% of inspections
If number of required routine compliance inspections falls below twenty percent (20%) for the fourth month, thirty percent (30%) for the fifth month, forty percent (40%) for the sixth month, forty-eight percent (48%) for the seventh month, fifty-seven percent (57%) for the eighth month, sixty-five percent (65%) for the ninth month, seventy-three percent (73%) for the tenth month or eighty-two percent for (82%) the eleventh month, then the CONTRACTOR shall submit a Corrective Action Plan, within ten (10) days of receipt of a written request from the DEP Task Manager.
|
| Financial Consequences: If the CONTRACTOR does not successfully implement the Plan as approved by the DEP Task Manager for the remaining months of the Task Assignment, the DEP may withhold further payment of monthly invoices until such time as the CONTRACTOR comes into compliance with those performance levels as outlined in the Performance Metrics. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL CLEANUP AND RESTORATION
|
Task 3: Reported discharge inspections, installation inspections, closure inspections, and re-inspec...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: Reported discharge inspections, installation inspections, closure inspections, and re-inspections for at least 75% of listed facilities. |
| Deliverable Price: $107,354.04 |
| Non Price Justification: |
| Performance Metrics: The CONTRACTOR should have completed the following required routine compliance inspections unless otherwise indicated in the Task Assignment;
1.After Four Months should have completed 33% of inspections.
2.After 8 months should have completed 66% of inspections.
3.After 12 months should have completed 100% of inspections
If number of required routine compliance inspections falls below twenty percent (20%) for the fourth month, thirty percent (30%) for the fifth month, forty percent (40%) for the sixth month, forty-eight percent (48%) for the seventh month, fifty-seven percent (57%) for the eighth month, sixty-five percent (65%) for the ninth month, seventy-three percent (73%) for the tenth month or eighty-two percent for (82%) the eleventh month, then the CONTRACTOR shall submit a Corrective Action Plan, within ten (10) days of receipt of a written request from the DEP Task Manager.
|
| Financial Consequences: If the CONTRACTOR does not successfully implement the Plan as approved by the DEP Task Manager for the remaining months of the Task Assignment, the DEP may withhold further payment of monthly invoices until such time as the CONTRACTOR comes into compliance with those performance levels as outlined in the Performance Metrics. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL CLEANUP AND RESTORATION
|
Task 4: Reported discharge inspections, installation inspections, closure inspections, and re-inspec...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 4: Reported discharge inspections, installation inspections, closure inspections, and re-inspections for at least 90% of listed facilities. |
| Deliverable Price: $103,306.28 |
| Non Price Justification: |
| Performance Metrics: The CONTRACTOR should have completed the following required routine compliance inspections unless otherwise indicated in the Task Assignment;
1.After Four Months should have completed 33% of inspections.
2.After 8 months should have completed 66% of inspections.
3.After 12 months should have completed 100% of inspections
If number of required routine compliance inspections falls below twenty percent (20%) for the fourth month, thirty percent (30%) for the fifth month, forty percent (40%) for the sixth month, forty-eight percent (48%) for the seventh month, fifty-seven percent (57%) for the eighth month, sixty-five percent (65%) for the ninth month, seventy-three percent (73%) for the tenth month or eighty-two percent for (82%) the eleventh month, then the CONTRACTOR shall submit a Corrective Action Plan, within ten (10) days of receipt of a written request from the DEP Task Manager.
|
| Financial Consequences: If the CONTRACTOR does not successfully implement the Plan as approved by the DEP Task Manager for the remaining months of the Task Assignment, the DEP may withhold further payment of monthly invoices until such time as the CONTRACTOR comes into compliance with those performance levels as outlined in the Performance Metrics. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL CLEANUP AND RESTORATION
|
Task 5: Reported discharge inspections, installation inspections, closure inspections, and re-inspe...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 5: Reported discharge inspections, installation inspections, closure inspections, and re-inspections for at least 60% of listed facilities. |
| Deliverable Price: $73,526.73 |
| Non Price Justification: |
| Performance Metrics: The CONTRACTOR should have completed the following required routine compliance inspections unless otherwise indicated in the Task Assignment;
1.After Four Months should have completed 33% of inspections.
2.After 8 months should have completed 66% of inspections.
3.After 12 months should have completed 100% of inspections
If number of required routine compliance inspections falls below twenty percent (20%) for the fourth month, thirty percent (30%) for the fifth month, forty percent (40%) for the sixth month, forty-eight percent (48%) for the seventh month, fifty-seven percent (57%) for the eighth month, sixty-five percent (65%) for the ninth month, seventy-three percent (73%) for the tenth month or eighty-two percent for (82%) the eleventh month, then the CONTRACTOR shall submit a Corrective Action Plan, within ten (10) days of receipt of a written request from the DEP Task Manager.
|
| Financial Consequences: If the CONTRACTOR does not successfully implement the Plan as approved by the DEP Task Manager for the remaining months of the Task Assignment, the DEP may withhold further payment of monthly invoices until such time as the CONTRACTOR comes into compliance with those performance levels as outlined in the Performance Metrics. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL CLEANUP AND RESTORATION
|
Task 9: Routine $357.45, UST System Install $1,157.79, UST Piping Install $385.93, Component Install...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 9: Routine $357.45, UST System Install $1,157.79, UST Piping Install $385.93, Component Install $192.96, UST System Closure $771.85, UST Piping Closure $385.93, Component Closure $192.96, AST System Install $578.89, AST Piping Install $192.96, AST Piping Closure $192.96, AST System Closure $385.93., Compliant $190.11,Discharge $190.11 Enforcement $190.11, Non-Compliance $190.11. |
| Deliverable Price: $9,264.54 |
| Non Price Justification: |
| Performance Metrics: The CONTRACTOR should have completed the following required routine compliance inspections unless otherwise indicated in the Task Assignment;
1.After 4 months should have completed 33% of inspections due October 2013.
2.After 8 months should have completed 66% of inspections due February 2014.
3.After 12 months should have completed 100% of inspections due June 2014.
If number of required routine compliance inspections falls below twenty percent (20%) for the fourth month, thirty percent (30%) for the fifth month, forty percent (40%) for the sixth month, forty-eight percent (48%) for the seventh month, fifty-seven percent (57%) for the eighth month, sixty-five percent (65%) for the ninth month, seventy-three percent (73%) for the tenth month or eighty-two percent for (82%) the eleventh month, then the CONTRACTOR shall submit a Corrective Action Plan, within ten (10) days of receipt of a written request from the DEP Task Manager.
|
| Financial Consequences: If the CONTRACTOR does not successfully implement the Plan as approved by the DEP Task Manager for the remaining months of the Task Assignment, the DEP may withhold further payment of monthly invoices until such time as the CONTRACTOR comes into compliance with those performance levels as outlined in the Performance Metrics. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL CLEANUP AND RESTORATION
|
Task 10: Routine $357.45, UST System Install $1,157.79, UST Piping Install $385.93, Component Instal...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 10: Routine $357.45, UST System Install $1,157.79, UST Piping Install $385.93, Component Install $192.96, UST System Closure $771.85, UST Piping Closure $385.93, Component Closure $192.96, AST System Install $578.89, AST Piping Install $192.96, AST Piping Closure $192.96, AST System Closure $385.93., Compliant $190.11,Discharge $190.11 Enforcement $190.11, Non-Compliance $190.11. |
| Deliverable Price: $53,039.08 |
| Non Price Justification: |
| Performance Metrics: The CONTRACTOR should have completed the following required routine compliance inspections unless otherwise indicated in the Task Assignment;
1.After Four Months should have completed 33% of inspections. (Due Oct 2013)
2.After 8 months should have completed 66% of inspections. (Due Feb 2014)
3.After 12 months should have completed 100% of inspections (Due June 2014)
If number of required routine compliance inspections falls below twenty percent (20%) for the fourth month, thirty percent (30%) for the fifth month, forty percent (40%) for the sixth month, forty-eight percent (48%) for the seventh month, fifty-seven percent (57%) for the eighth month, sixty-five percent (65%) for the ninth month, seventy-three percent (73%) for the tenth month or eighty-two percent for (82%) the eleventh month, then the CONTRACTOR shall submit a Corrective Action Plan, within ten (10) days of receipt of a written request from the DEP Task Manager.
|
| Financial Consequences: If the CONTRACTOR does not successfully implement the Plan as approved by the DEP Task Manager for the remaining months of the Task Assignment, the DEP may withhold further payment of monthly invoices until such time as the CONTRACTOR comes into compliance with those performance levels as outlined in the Performance Metrics. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL CLEANUP AND RESTORATION
|
Task 7: Reported discharge inspections, installation inspections, closure inspections, and re-inspec...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 7: Reported discharge inspections, installation inspections, closure inspections, and re-inspections for 128 of the 224 facilities.Fee Schedule Basis: Routine $352.17, UST System Install $1,140.68, UST Piping Install $380.23, Component Install $190.11, UST System Closure $760.45, UST Piping Closure $380.23, Component Closure $190.11, AST System Install $570.34, AST Piping Install $190.11, AST System Closure $190.11, Compliant $190.11,Discharge $190.11 Enforcement $190.11, Non-Compliance $190.11./CO1- additional inspections. |
| Deliverable Price: $58,993.96 |
| Non Price Justification: |
| Performance Metrics: The CONTRACTOR should have completed the following required routine compliance inspections unless otherwise indicated in the Task Assignment;
1.After Four Months should have completed 33% of inspections.
2.After 8 months should have completed 66% of inspections.
3.After 12 months should have completed 100% of inspections
If number of required routine compliance inspections falls below twenty percent (20%) for the fourth month, thirty percent (30%) for the fifth month, forty percent (40%) for the sixth month, forty-eight percent (48%) for the seventh month, fifty-seven percent (57%) for the eighth month, sixty-five percent (65%) for the ninth month, seventy-three percent (73%) for the tenth month or eighty-two percent for (82%) the eleventh month, then the CONTRACTOR shall submit a Corrective Action Plan, within ten (10) days of receipt of a written request from the DEP Task Manager.
|
| Financial Consequences: If the CONTRACTOR does not successfully implement the Plan as approved by the DEP Task Manager for the remaining months of the Task Assignment, the DEP may withhold further payment of monthly invoices until such time as the CONTRACTOR comes into compliance with those performance levels as outlined in the Performance Metrics. |
| Source Documentation Page Reference: Task 7 |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL CLEANUP AND RESTORATION
|
Task 6: Perform compliance inspections on storage tank systems in Madison, Dixie, Lafayette, Suwanne...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 6: Perform compliance inspections on storage tank systems in Madison, Dixie, Lafayette, Suwannee and Taylor counties. Fee Schedule Basis: Routine $352.17, UST System Install $1,140.68, UST Piping Install $380.23, Component Install $190.11, UST System Closure $760.45, UST Piping Closure $380.23, Component Closure $190.11, AST System Install $570.34, AST Piping Install $190.11, AST System Closure $190.11, Compliant $190.11,Discharge $190.11 Enforcement $190.11, Non-Compliance $190.11./CO1- additional inspections. |
| Deliverable Price: $11,437.75 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: The CONTRACTOR should have completed the following required routine compliance inspections unless otherwise indicated in the Task Assignment;
1.After Four Months should have completed 33% of inspections.
2.After 8 months should have completed 66% of inspections.
3.After 12 months should have completed 100% of inspections
If number of required routine compliance inspections falls below twenty percent (20%) for the fourth month, thirty percent (30%) for the fifth month, forty percent (40%) for the sixth month, forty-eight percent (48%) for the seventh month, fifty-seven percent (57%) for the eighth month, sixty-five percent (65%) for the ninth month, seventy-three percent (73%) for the tenth month or eighty-two percent for (82%) the eleventh month, then the CONTRACTOR shall submit a Corrective Action Plan, within ten (10) days of receipt of a written request from the DEP Task Manager.
|
| Financial Consequences: If the CONTRACTOR does not successfully implement the Plan as approved by the DEP Task Manager for the remaining months of the Task Assignment, the DEP may withhold further payment of monthly invoices until such time as the CONTRACTOR comes into compliance with those performance levels as outlined in the Performance Metrics. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Hazardous waste disposal
|
Task 11: Reported discharge inspections, installation inspections, closure inspections, and re-insp...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 11: Reported discharge inspections, installation inspections, closure inspections, and re-inspections for 33 facilities within Jefferson County. Fee Schedule Basis: Routine $357.45, UST System Install $1,157.79, UST Piping Install $385.93, Component Install $192.96, UST System Closure $771.85, UST Piping Closure $385.93, Component Closure $192.96, AST System Install $578.89, AST Piping Install $192.96, AST Piping Closure $192.96, AST System Closure $385.93., Compliant $190.11,Discharge $190.11 Enforcement $190.11, Non-Compliance $190.11. |
| Deliverable Price: $14,744.81 |
| Non Price Justification: |
| Performance Metrics: The CONTRACTOR should have completed the following required routine compliance inspections unless otherwise indicated in the Task Assignment;
1. After Four Months should have completed 33% of inspections.
2. After 8 months should have completed 66% of inspections.
3. After 12 months should have completed 100% of inspections
If number of required routine compliance inspections falls below twenty percent (20%) for the fourth month, thirty percent (30%) for the fifth month, forty percent (40%) for the sixth month, forty-eight percent (48%) for the seventh month, fifty-seven percent (57%) for the eighth month, sixty-five percent (65%) for the ninth month, seventy-three percent (73%) for the tenth month or eighty-two percent for (82%) the eleventh month, then the CONTRACTOR shall submit a Corrective Action Plan, within ten (10) days of receipt of a written request from the DEP Task Manager.
|
| Financial Consequences: If the CONTRACTOR does not successfully implement the Plan as approved by the DEP Task Manager for the remaining months of the Task Assignment, the DEP may withhold further payment of monthly invoices until such time as the CONTRACTOR comes into compliance with those performance levels as outlined in the Performance Metrics. |
| Source Documentation Page Reference: Attachment B |
| Deliverable Number: |
|
|
|
|
Hazardous waste disposal
|
Task 12: Reported discharge inspections, installation inspections, closure inspections, and re-insp...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 12: Reported discharge inspections, installation inspections, closure inspections, and re-inspections for 136 facilities. Fee Schedule Basis: Routine $357.45, UST System Install $1,157.79, UST Piping Install $385.93, Component Install $192.96, UST System Closure $771.85, UST Piping Closure $385.93, Component Closure $192.96, AST System Install $578.89, AST Piping Install $192.96, AST Piping Closure $192.96, AST System Closure $385.93., Compliant $190.11,Discharge $190.11 Enforcement $190.11, Non-Compliance $190.11. |
| Deliverable Price: $60,766.50 |
| Non Price Justification: |
| Performance Metrics: The CONTRACTOR should have completed the following required routine compliance inspections unless otherwise indicated in the Task Assignment;
1. After Four Months should have completed 33% of inspections.
2. After 8 months should have completed 66% of inspections.
3. After 12 months should have completed 100% of inspections
If number of required routine compliance inspections falls below twenty percent (20%) for the fourth month, thirty percent (30%) for the fifth month, forty percent (40%) for the sixth month, forty-eight percent (48%) for the seventh month, fifty-seven percent (57%) for the eighth month, sixty-five percent (65%) for the ninth month, seventy-three percent (73%) for the tenth month or eighty-two percent for (82%) the eleventh month, then the CONTRACTOR shall submit a Corrective Action Plan, within ten (10) days of receipt of a written request from the DEP Task Manager. |
| Financial Consequences: If the CONTRACTOR does not successfully implement the Plan as approved by the DEP Task Manager for the remaining months of the Task Assignment, the DEP may withhold further payment of monthly invoices until such time as the CONTRACTOR comes into compliance with those performance levels as outlined in the Performance Metrics. |
| Source Documentation Page Reference: Attachment B |
| Deliverable Number: |
|
|
|
|
Inspection
|
Task 14 : The Contractor shall complete the following services in accordance with the requirements i...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 14 : The Contractor shall complete the following services in accordance with the requirements in DEP Contract No. GC 704: - Conduct routine compliance inspections at the 105 facilities identified in Exhibit #1 (provided electronically). Perform inspections for all reported complaints, discharges, installations and closures involving storage tank systems within Madison, Taylor, Lafayette, Suwanee and Dixie Counties.
Compensation will only occur for routine annual compliance inspections conducted at the facilities explicitly identified in Exhibit Fees: Routine - $464.00 UST System Install - $1,140.68 UST Piping install - $380.23 Component install - $190.11 UST System closure - $760.45 UST Piping closure - $380.23 Component closure - $190.11 AST System install - $570.34 AST Piping install - $190.11 AST Piping closure - $190.11 AST System closure- $380.23 Compliant - $190.11 Discharge - $190.11 Enforcement - $190.11 Non-compliance - $190.11.
CO1 - decrease task amount. |
| Deliverable Price: $56,770.40 |
| Non Price Justification: |
| Performance Metrics: The Contractor must perform all Enforcement Actions in accordance with Guidance Document F (Level of Effort). The contractor is reminded of the Performance Levels stated in paragraph 7B of the contract: Following the effective date of Each Task Assignment, the CONTRACTOR shall complete the following percentage of the required routine compliance inspections unless otherwise indicated in the Task Assignment:(1) After four (4) months, thirty-three percent (33%) of inspections shall be completed.
(2) After eight (8) months, sixty-six (66%) of inspections shall be completed.
(3) After (12) months, one hundred percent (100%) of inspections shall be completed.
The Contractor will not conduct the Discharge Prevention Response Certificate (DPRC) inspections detailed in Paragraph 9 of the contract.
The FDEP will adjust the funding level of this task assignment as needed to complete the scope of services described within this Task Assignment. |
| Financial Consequences: If the CONTRACTOR fails to perform in a timely and proper manner, in the judgment of the DEP, the DEP may terminate this Contract by thirty (30) days written notice, specifying the effective time/date of termination. In this event, the CONTRACTOR shall be compensated for any work satisfactorily completed. |
| Source Documentation Page Reference: Att B |
| Deliverable Number: |
|
|
|
|
Inspection
|
Task 13 : The Contractor shall complete the following services in accordance with the requirements i...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 13 : The Contractor shall complete the following services in accordance with the requirements in DEP Contract No. GC 704: - Conduct routine compliance inspections at the 25 facilities identified in Exhibit #1 (provided electronically). Perform inspections for all reported complaints, discharges, installations and closures involving storage tank systems within Jefferson County.
Compensation will only occur for routine annual compliance inspections conducted at the facilities explicitly identified in Exhibit Fees: Routine - $464.00 UST System Install - $1,140.68 UST Piping install - $380.23 Component install - $190.11 UST System closure - $760.45 UST Piping closure - $380.23 Component closure - $190.11 AST System install - $570.34 AST Piping install - $190.11 AST Piping closure - $190.11 AST System closure- $380.23 Compliant - $190.11 Discharge - $190.11 Enforcement - $190.11 Non-compliance - $190.11. |
| Deliverable Price: $14,732.00 |
| Non Price Justification: |
| Performance Metrics: The Contractor must perform all Enforcement Actions in accordance with Guidance Document F (Level of Effort). The contractor is reminded of the Performance Levels stated in paragraph 7B of the contract: Following the effective date of Each Task Assignment, the CONTRACTOR shall complete the following percentage of the required routine compliance inspections unless otherwise indicated in the Task Assignment:(1) After four (4) months, thirty-three percent (33%) of inspections shall be completed.
(2) After eight (8) months, sixty-six (66%) of inspections shall be completed.
(3) After (12) months, one hundred percent (100%) of inspections shall be completed.
The Contractor will not conduct the Discharge Prevention Response Certificate (DPRC) inspections detailed in Paragraph 9 of the contract.
The FDEP will adjust the funding level of this task assignment as needed to complete the scope of services described within this Task Assignment.
|
| Financial Consequences: If the CONTRACTOR fails to perform in a timely and proper manner, in the judgment of the DEP, the DEP may terminate this Contract by thirty (30) days written notice, specifying the effective time/date of termination. In this event, the CONTRACTOR shall be compensated for any work satisfactorily completed.
|
| Source Documentation Page Reference: T13 |
| Deliverable Number: |
|
|
|
|
Inspection
|
Task 15 : The Contractor shall complete the following services in accordance with the requirements i...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 15 : The Contractor shall complete the following services in accordance with the requirements in DEP Contract No. GC 704: - Conduct routine compliance inspections at the 20 facilities identified in Exhibit #1 (provided electronically). Perform inspections for all reported complaints, discharges, installations and closures involving storage tank systems within Jefferson County.
Compensation will only occur for routine annual compliance inspections conducted at the facilities explicitly identified in Exhibit Fees: Routine - $464.00 UST System Install - $1,140.68 UST Piping install - $380.23 Component install - $190.11 UST System closure - $760.45 UST Piping closure - $380.23 Component closure - $190.11 AST System install - $570.34 AST Piping install - $190.11 AST Piping closure - $190.11 AST System closure- $380.23 Compliant - $190.11 Discharge - $190.11 Enforcement - $190.11 Non-compliance - $190.11. |
| Deliverable Price: $12,036.16 |
| Non Price Justification: |
| Performance Metrics: The Contractor must perform all Enforcement Actions in accordance with Guidance Document F (Level of Effort). The contractor is reminded of the Performance Levels stated in paragraph 7B of the contract: Following the effective date of Each Task Assignment, the CONTRACTOR shall complete the following percentage of the required routine compliance inspections unless otherwise indicated in the Task Assignment:(1) After four (4) months, thirty-three percent (33%) of inspections shall be completed.
(2) After eight (8) months, sixty-six (66%) of inspections shall be completed.
(3) After (12) months, one hundred percent (100%) of inspections shall be completed.
The Contractor will not conduct the Discharge Prevention Response Certificate (DPRC) inspections detailed in Paragraph 9 of the contract.
The FDEP will adjust the funding level of this task assignment as needed to complete the scope of services described within this Task Assignment. |
| Financial Consequences: If the CONTRACTOR fails to perform in a timely and proper manner, in the judgment of the DEP, the DEP may terminate this Contract by thirty (30) days written notice, specifying the effective time/date of termination. In this event, the CONTRACTOR shall be compensated for any work satisfactorily completed. |
| Source Documentation Page Reference: T15 |
| Deliverable Number: |
|
|
|
|
Inspection
|
Task 16 : The Contractor shall complete the following services in accordance with the requirements i...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 16 : The Contractor shall complete the following services in accordance with the requirements in DEP Contract No. GC 704: - Conduct routine compliance inspections at the 105 facilities identified in Exhibit #1 (provided electronically). Perform inspections for all reported complaints, discharges, installations and closures involving storage tank systems within Madison,Taylor, Lafayette, Suwanee and Dixie Counties.
Compensation will only occur for routine annual compliance inspections conducted at the facilities explicitly identified in Exhibit Fees: Routine - $464.00 UST System Install - $1,140.68 UST Piping install - $380.23 Component install - $190.11 UST System closure - $760.45 UST Piping closure - $380.23 Component closure - $190.11 AST System install - $570.34 AST Piping install - $190.11 AST Piping closure - $190.11 AST System closure- $380.23 Compliant - $190.11 Discharge - $190.11 Enforcement - $190.11 Non-compliance - $190.11. |
| Deliverable Price: $63,189.84 |
| Non Price Justification: |
| Performance Metrics: The Contractor must perform all Enforcement Actions in accordance with Guidance Document F (Level of Effort). The contractor is reminded of the Performance Levels stated in paragraph 7B of the contract: Following the effective date of Each Task Assignment, the CONTRACTOR shall complete the following percentage of the required routine compliance inspections unless otherwise indicated in the Task Assignment:(1) After four (4) months, thirty-three percent (33%) of inspections shall be completed.
(2) After eight (8) months, sixty-six (66%) of inspections shall be completed.
(3) After (12) months, one hundred percent (100%) of inspections shall be completed.
The Contractor will not conduct the Discharge Prevention Response Certificate (DPRC) inspections detailed in Paragraph 9 of the contract.
The FDEP will adjust the funding level of this task assignment as needed to complete the scope of services described within this Task Assignment. |
| Financial Consequences: If the CONTRACTOR fails to perform in a timely and proper manner, in the judgment of the DEP, the DEP may terminate this Contract by thirty (30) days written notice, specifying the effective time/date of termination. In this event, the CONTRACTOR shall be compensated for any work satisfactorily completed. |
| Source Documentation Page Reference: T16 |
| Deliverable Number: |
|
|
|
1
|
Inspection
|
T17 - Reference Standard books for GC704 for FY 16-17.
$1,451.00.
|
Fixed Price - Lump Sum
|
| Major Deliverable: T17 - Reference Standard books for GC704 for FY 16-17.
$1,451.00. |
| Deliverable Price: $1,451.00 |
| Non Price Justification: |
| Performance Metrics: The Contractor must perform all Enforcement Actions in accordance with Guidance Document F (Level of Effort). The contractor is reminded of the Performance Levels stated in paragraph 7B of the contract: Following the effective date of Each Task Assignment, the CONTRACTOR shall complete the following percentage of the required routine compliance inspections unless otherwise indicated in the Task Assignment:(1) After four (4) months, thirty-three percent (33%) of inspections shall be completed.
(2) After eight (8) months, sixty-six (66%) of inspections shall be completed.
(3) After (12) months, one hundred percent (100%) of inspections shall be completed.
The Contractor will not conduct the Discharge Prevention Response Certificate (DPRC) inspections detailed in Paragraph 9 of the contract.
The FDEP will adjust the funding level of this task assignment as needed to complete the scope of services described within this Task Assignment. |
| Financial Consequences: If the CONTRACTOR fails to perform in a timely and proper manner, in the judgment of the DEP, the DEP may terminate this Contract by thirty (30) days written notice, specifying the effective time/date of termination. In this event, the CONTRACTOR shall be compensated for any work satisfactorily completed. |
| Source Documentation Page Reference: Attachment B |
| Deliverable Number: 1 |
|