| More |
Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
ENVIRONMENTAL STUDIES SERVICES &
|
Potable Water Quality Monitoring Services on a task assignment basis. Deliverables established per ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Potable Water Quality Monitoring Services on a task assignment basis. Deliverables established per task. |
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverables shall be reviewed by the respective DEP Contract Coodinator to verify satisfactory completion of the services rendered under a Task Assignment and to ensure compliance with the requirements set forth in Chapter 62-160, F.A.C., the DEP Standard Operating Procedure Manual that is applicable to the sampling being performed, and the DEP Quality Assurance Requirements. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to DEP. All CAPs must be able to be implemented and performed in no more than sixty (60) days.
i. A CAP shall be submitted within ten (10) business days of the date of the letter request from DEP. The CAP shall be sent to the DEP Contract Manager for review and approval. Within ten (10) business days of receipt of a CAP, the DEP shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) business days from receipt of the DEP letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain DEP approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: Attachment C |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL STUDIES SERVICES &
|
Task PET1: PETRO- July -- Dec 2013- WC001- Administrative Costs for the Petroleum Cleanup Program. ...
|
Cost Reimbursement
|
| Major Deliverable: Task PET1: PETRO- July -- Dec 2013- WC001- Administrative Costs for the Petroleum Cleanup Program. Administrative Services shall be compensated on a cost reimbursement basis as specified in the Task Assignment. Allowable costs include salaries, benefits, 5% indirect cost. Shall be prorated on a percentage basis for part time positions and for periods of vacancy. Max Admin Costs for Petroleum Cleanup for 7/1/13 - 12/31/13 (Task Assignment Pet1) shall be $290,905.00 and shall be invoiced quarterly. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure performance in a proper and satisfactory manner as determined by DEP. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL STUDIES SERVICES &
|
Task 18DC: Administrative Costs for the Drycleaning Solvent Cleanup Program. Administrative Service...
|
Cost Reimbursement
|
| Major Deliverable: Task 18DC: Administrative Costs for the Drycleaning Solvent Cleanup Program. Administrative Services shall be compensated on a cost reimbursement basis as specified in the Task Assignment. Allowable costs include salaries, benefits, 5% indirect cost. Shall be prorated on a percentage basis for part time positions and for periods of vacancy. Max Admin Costs for Drycleaning Solvent Cleanup (Task Assignment 18DC) shall be $6,611.00 and shall be invoiced quarterly. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL STUDIES SERVICES &
|
Task TOX1: Administrative Costs for the Certification and Restoration Program. Administrative Servi...
|
Cost Reimbursement
|
| Major Deliverable: Task TOX1: Administrative Costs for the Certification and Restoration Program. Administrative Services shall be compensated on a cost reimbursement basis as specified in the Task Assignment. Allowable costs include salaries, benefits, 5% indirect cost. Shall be prorated on a percentage basis for part time positions and for periods of vacancy. Max Admin Costs for Certification and Restoration (Task Assignment TOX01) shall be $66,115.00 and shall be invoiced quarterly. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure performance in a proper and satisfactory manner as determined by DEP. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL STUDIES SERVICES &
|
Task 17DC: Drycleaning- Well Survey Requests $155/per survey; GPS Well Location on Well Property Loc...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 17DC: Drycleaning- Well Survey Requests $155/per survey; GPS Well Location on Well Property Location (or if >10 wells per request) $12.50/per well; Three or less water samples from the same well $89/well; More than three Water Samples from the same well $99/well; Our of County (additional fee for above services) $23/survey/location/sample. Max for task assignment = $50,000.00. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 31DC: Completed surveys with sampling results will be provided via Compact Disk (CD), quarterly...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 31DC: Completed surveys with sampling results will be provided via Compact Disk (CD), quarterly to the FDEP Contract Manager. The CD must be compatible with GIS, Access and Excel databases as appropriate. Surveys $217 ea; wells $12.50 ea; 3 or less water samples $93/well; more than 3 water samples $103/well; out of county survey/location/sample $23 ea. Quarterly billing of allowable cost shall not exceed $99,983.00
|
| Deliverable Price: $99,983.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task PET3: PETRO- Jan -- June 2014- - Administrative Costs for the Petroleum Cleanup Program. Admini...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task PET3: PETRO- Jan -- June 2014- - Administrative Costs for the Petroleum Cleanup Program. Administrative Services shall be compensated on a cost reimbursement basis as specified in the Task Assignment. Allowable costs include salaries, benefits, 5% indirect cost. Shall be prorated on a percentage basis for part time positions and for periods of vacancy. Max Admin Costs for Petroleum Cleanup for 7/1/13 - 12/31/13 (Task Assignment Pet3) shall be $290,905.00 and shall be invoiced quarterly. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL STUDIES SERVICES &
|
Task TOX2: Department of Health statewide discretional water quality sampling for potable well surve...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task TOX2: Department of Health statewide discretional water quality sampling for potable well surveys and sampling. 130 well surveys @ $155/well; 2748 samples @ $89/sample; and 601 Out of County fees @ $23 each; Over Three Samples 48 @ $99; Well Points 500 @ $12.50; Field assistance 8 @ $41 |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure performance in a proper and satisfactory manner as determined by DEP. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: TOX2CO1 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task PET5: Quarterly invoice with applicable backup documentation for the Petroleum Restoration Pro...
|
Cost Reimbursement
|
| Major Deliverable: Task PET5: Quarterly invoice with applicable backup documentation for the Petroleum Restoration Program not to exceed $200,777.00. 5% indirect cost |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed and evaluated by DEP Contract Manager to determine if stated deliverables have been satisfied. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: PET5 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task 21DC: Completed surveys with sampling results will be provided via Compact Disk (CD), to the Pr...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 21DC: Completed surveys with sampling results will be provided via Compact Disk (CD), to the Project Manager. The CD must be compatible with GIS, Access and Excel databases as appropriate. Potable well survey @ $217.00 each; Sampling events @ $93.00 each; Out-of-County units @ $23.00 each. Costs not to exceed $24,995.75. CO1 - Increase funding & increase task time. |
| Deliverable Price: $24,995.75 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: 21DCCO1 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task PET 9: The contractor will provide administrative services for nine months at a quarterly cost ...
|
Cost Reimbursement
|
| Major Deliverable: Task PET 9: The contractor will provide administrative services for nine months at a quarterly cost reimbursement of $297,054.81 for the Petroleum Restoration Program. The contractor is not authorized to perform any services that exceed this annual funding amount. CO1 - Increase funding. The Department shall pay the Contractor on a cost reimbursement basis not to exceed $396,073.05 |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: All work must be in accordance with the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract
|
| Source Documentation Page Reference: PET9CO1 |
| Deliverable Number: |
|
|
|
|
Water testing services
|
TOX8: Administrative Services costs shall be compensated on a cost reimbursement basis in the amount...
|
Cost Reimbursement
|
| Major Deliverable: TOX8: Administrative Services costs shall be compensated on a cost reimbursement basis in the amount specified in each Task Assignment Notification Form and Change Order as outlined in paragraph 5A of the Contract and Section VII of the Scope of Services. These costs shall be invoiced on a quarterly basis. Cost not to exceed $204,433.00 |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverable reviewed to ensure services were performed in accordance with specifications |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract |
| Source Documentation Page Reference: Attachment A-2 |
| Deliverable Number: |
|
|
|
|
Water testing services
|
TOX 9 - 4: Drinking Water Well Survey Request (as outlined in Attachment C, Scope of Services) as o...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: TOX 9 - 4: Drinking Water Well Survey Request (as outlined in Attachment C, Scope of Services) as outlined in Contract # GW283, Attachment C, Scope of Services. $217.00/Survey |
| Deliverable Price: $217.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverable reviewed to ensure services were performed in accordance with specifications |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract |
| Source Documentation Page Reference: Attachment A-2 |
| Deliverable Number: |
|
|
|
|
Water testing services
|
TOX 9 - 5: Drinking Water Well Location (as outlined in Attachment D, Fee Schedule for Well Survey a...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: TOX 9 - 5: Drinking Water Well Location (as outlined in Attachment D, Fee Schedule for Well Survey and Sampling Services). GPS Well Location or Well Property Location (or if >10 wells per request). $12.50/Well |
| Deliverable Price: $12.50 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverable reviewed to ensure services were performed in accordance with specifications. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: Attachment A-2 |
| Deliverable Number: |
|
|
|
|
Water testing services
|
TOX 9 - 6: Drinking Water Sample Collection. Three or Less Water Samples from the same well. $93.00...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: TOX 9 - 6: Drinking Water Sample Collection. Three or Less Water Samples from the same well. $93.00/well |
| Deliverable Price: $93.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverable reviewed to ensure services were performed in accordance with specifications. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: Attachment A-2 |
| Deliverable Number: |
|
|
|
|
Water testing services
|
TOX 9 - 7: Drinking Water Sample Collection. More than three Water Samples from the same well. $10...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: TOX 9 - 7: Drinking Water Sample Collection. More than three Water Samples from the same well. $103.00/Well |
| Deliverable Price: $103.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverable reviewed to ensure services were performed in accordance with specifications. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: Attachment A-2 |
| Deliverable Number: |
|
|
|
|
Water testing services
|
TOX 9 - 8: Out of County (additional fee for above services) Price per survey/location/sample. $23...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: TOX 9 - 8: Out of County (additional fee for above services) Price per survey/location/sample. $23.00/Survey/Location/Sample |
| Deliverable Price: $23.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverable reviewed to ensure services were performed in accordance with specifications. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: Attachment A-2 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task WC009:In accordance with DEP Contract GW283, Attachment C-1 Revised Scope of Services and attac...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task WC009:In accordance with DEP Contract GW283, Attachment C-1 Revised Scope of Services and attachment D-1 Revised Fee Schedule for Well Survey & Sampling Services Section V paragraphs A through D, the contractor shall provide administrative services for one year at a monthly cost reimbursement basis for the Waste Cleanup Program. The contractor is not authorized to perform any services that exceed this contract amount. The Department shall pay the Contractor on a cost reimbursement basis not to exceed $5,486.04
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: All work must be in accordance with the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract
|
| Source Documentation Page Reference: page 1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 25DC: Completed surveys with sampling results provided via Compact Disc (CD). Well Survey Reque...
|
Cost Reimbursement
|
| Major Deliverable: Task 25DC: Completed surveys with sampling results provided via Compact Disc (CD). Well Survey Request $217.00/survey; GPS Well Location $12.50/well; Three or Less Water Samples from the same well $93.00/well; More than three Water Samples from the same well $103.00/well; Out of County $23/survey/location/sample. Deliverables to be submitted quarterly. Costs not to exceed $99,983.00 |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: 25DC |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
PET 13 Del 1: The contractor will provide administrative services for twelve months at a quarterly c...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: PET 13 Del 1: The contractor will provide administrative services for twelve months at a quarterly cost reimbursement of $63,184.75 for the Petroleum Restoration Program. The contractor is not authorized to perform any services that exceed this annual funding amount. Total costs not to exceed $252,739.00 |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: All work must be in accordance with the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract
|
| Source Documentation Page Reference: PET 13 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task 27DC: Completed surveys with sampling results will be provided via Compact Disk (CD), quarterly...
|
Cost Reimbursement
|
| Major Deliverable: Task 27DC: Completed surveys with sampling results will be provided via Compact Disk (CD), quarterly to the FDEP Contract Manager. The CD must be compatible with GIS, Access and Excel databases as appropriate. The first deliverable is due on or before December 30, 2017. Subsequent deliverables will be due each 90 days until Task Assignment Completion. Surveys $217 ea; wells $12.50 ea; 3 or less water samples $93/well; more than 3 water samples $103/well; out of county survey/location/sample $23 ea. Task not to exceed $96,085.00 |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: T27DC |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task WC011: In accordance with DEP Contract GW283 and Amendments 1 through 4, the contractor shall p...
|
Cost Reimbursement
|
| Major Deliverable: Task WC011: In accordance with DEP Contract GW283 and Amendments 1 through 4, the contractor shall provide administrative services for one year at a quarterly cost reimbursement of $2,467.00 for the Waste Cleanup Program. The contractor is not authorized to perform any services that exceed this quarterly amount. Total costs not to exceed $9,868.00 |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: All work must be in accordance with the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract
|
| Source Documentation Page Reference: WC 011 |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Task PET4: Department of Health statewide discretional water quality sampling for potable well surve...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task PET4: Department of Health statewide discretional water quality sampling for potable well surveys and sampling. Jan-Jun 2014: 1054 potable well surveys @ $155 each; 2059 sampling events @ $89 each; and 761 Out of County fees @ $23 each. Max for task assignment = $364,124.00. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL STUDIES SERVICES &
|
Task TOX3: Administrative Costs for the Certification and Restoration Program. Administrative Servi...
|
Cost Reimbursement
|
| Major Deliverable: Task TOX3: Administrative Costs for the Certification and Restoration Program. Administrative Services shall be compensated on a cost reimbursement basis as specified in the Task Assignment. Allowable costs include salaries, benefits, 5% indirect cost. Shall be prorated on a percentage basis for part time positions and for periods of vacancy. Max Admin Costs for Certification and Restoration shall be $139,302.00 and shall be invoiced quarterly. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure services tasked were performed. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
WC004: Portable Well Surveys and Sampling with sampling results. Eight (8) potable well survey @ $2...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: WC004: Portable Well Surveys and Sampling with sampling results. Eight (8) potable well survey @ $217 each for a total of $1,736; 35 sampling events @ $93 each for a total of $3,255; 10 Out of County units @ $23 each for a total of $230. |
| Deliverable Price: $5,221.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: WC004 |
| Deliverable Number: |
|