Amendment
|
$250,000.00
|
A5
|
Funding increase and vendor name change
|
09/05/2014
|
09/05/2014
|
|
|
Amendment
|
$0.00
|
DC02CCO3
|
Time and Funding Increase
|
06/26/2017
|
06/26/2017
|
|
|
Amendment
|
$0.00
|
DC09ACO1
|
Work Change Directive
|
06/13/2017
|
06/13/2017
|
|
|
Amendment
|
$0.00
|
CM
|
Contract manager change
|
06/24/2022
|
06/24/2022
|
|
|
Amendment
|
$0.00
|
DC34CCO3
|
Reconcile subcontractor costs
|
06/02/2022
|
06/02/2022
|
|
|
Amendment
|
$0.00
|
DC05iCO1
|
Reduction in scope of work
|
04/27/2022
|
04/27/2022
|
|
|
Amendment
|
($730,000.00)
|
A10
|
Funding Decrease
|
04/21/2022
|
04/21/2022
|
|
|
Amendment
|
$0.00
|
HW10BCO2
|
Reduction in scope of work
|
04/19/2022
|
04/19/2022
|
|
|
Amendment
|
$0.00
|
DC10iCO1
|
Soil vapor extraction system shutdown procedures
|
04/11/2022
|
04/11/2022
|
|
|
Amendment
|
$0.00
|
DC27FCO1
|
reduction in analytical costs
|
03/31/2022
|
03/31/2022
|
|
|
Amendment
|
$0.00
|
DC22DCO3
|
Reconcile subcontractor costs
|
03/29/2022
|
03/29/2022
|
|
|
Amendment
|
$0.00
|
DC07GCO4
|
Reduction in scope of work
|
03/23/2022
|
03/23/2022
|
|
|
Amendment
|
$0.00
|
DC20GCO1
|
Addition of site visit
|
03/23/2022
|
03/23/2022
|
|
|
Amendment
|
$0.00
|
HW16ACO1
|
Cost Decrease
|
03/23/2022
|
03/23/2022
|
|
|
Amendment
|
$0.00
|
HW09BCO1
|
Reduction in scope of work
|
03/14/2022
|
03/14/2022
|
|
|
Amendment
|
$0.00
|
DC31FCO1
|
Reduction in scope of work/Cost
|
03/09/2022
|
03/09/2022
|
|
|
Amendment
|
$0.00
|
DC29DCO2
|
Reconcile lab costs
|
01/24/2022
|
01/24/2022
|
|
|
Amendment
|
$0.00
|
DC33DCO2
|
Reduction in scope of work
|
01/13/2022
|
01/13/2022
|
|
|
Amendment
|
$0.00
|
DC22DCO2
|
Reconcile work change directive WCD#2
|
01/11/2022
|
01/11/2022
|
|
|
Amendment
|
$0.00
|
DC25FCO1
|
Reduction in operation and maintenance costs
|
12/29/2021
|
12/29/2021
|
|
|
Amendment
|
$0.00
|
DC026E
|
operation and maintenance
|
12/21/2021
|
12/21/2021
|
|
|
Amendment
|
$0.00
|
DC10i
|
Operation and maintenance (3 months)
|
12/20/2021
|
12/20/2021
|
|
|
Amendment
|
$0.00
|
DC19i
|
Operation and maintenance
|
12/17/2021
|
12/17/2021
|
|
|
Amendment
|
$0.00
|
DC27G
|
Three months of O&M
|
12/16/2021
|
12/16/2021
|
|
|
Amendment
|
$0.00
|
DC34CCO2
|
Time extension
|
12/16/2021
|
12/16/2021
|
|
|
Amendment
|
$0.00
|
DC26DCO2
|
Reconcile WCD #2 and authorize additional costs
|
12/16/2021
|
12/16/2021
|
|
|
Amendment
|
$0.00
|
HW13ACO1
|
Reconcile investigation derived waste costs
|
12/15/2021
|
12/15/2021
|
|
|
Amendment
|
$0.00
|
DC39C
|
Well abandonment
|
12/10/2021
|
12/10/2021
|
|
|
Amendment
|
$0.00
|
HW10BCO1
|
Addition of soil sampling
|
12/07/2021
|
12/07/2021
|
|
|
Amendment
|
$0.00
|
HW01ZCO1
|
Reconcile work change directive WCD #1
|
12/26/2021
|
12/07/2021
|
|
|
Amendment
|
$0.00
|
HW16A
|
PFAS screening
|
12/02/2021
|
12/02/2021
|
|
|
Amendment
|
$0.00
|
DC030C
|
Well abandonment
|
12/01/2021
|
12/01/2021
|
|
|
Amendment
|
$0.00
|
DC07GCO3
|
Time extension
|
11/22/2021
|
11/22/2021
|
|
|
Amendment
|
$0.00
|
DC31DCO4
|
Time extension
|
11/22/2021
|
11/22/2021
|
|
|
Amendment
|
$0.00
|
DC31ECO1
|
Reconcile pre-excavation site activity costs
|
11/22/2021
|
11/22/2021
|
|
|
Amendment
|
$0.00
|
DC19HCO1
|
Operation and Maintenance
|
11/15/2021
|
11/15/2021
|
|
|
Amendment
|
$0.00
|
DC05HCO3
|
Time extension
|
10/29/2021
|
10/29/2021
|
|
|
Amendment
|
$0.00
|
DC21FCO2
|
Time extension
|
10/29/2021
|
10/29/2021
|
|
|
Amendment
|
$0.00
|
DC26DCO1
|
Reconcile WCD #1 and authorize additional assessment costs
|
10/26/2021
|
10/26/2021
|
|
|
Amendment
|
$0.00
|
DC18HCO1
|
Reduction in IDW costs
|
10/19/2021
|
10/19/2021
|
|
|
Amendment
|
$0.00
|
DC31CCO5
|
Reconcile WCD #5
|
10/19/2021
|
10/19/2021
|
|
|
Amendment
|
$0.00
|
HW11ACO1
|
Reduction in IDW costs
|
10/19/2021
|
10/19/2021
|
|
|
Amendment
|
$0.00
|
HW01YCO1
|
Reconcile subcontrator costs and extend completion date
|
10/05/2021
|
10/05/2021
|
|
|
Amendment
|
$0.00
|
DC38BCO2
|
Cost Increase
|
09/29/2021
|
09/29/2021
|
|
|
Amendment
|
$0.00
|
DC10H
|
Operation and maintenance (3 months)
|
09/27/2021
|
09/27/2021
|
|
|
Amendment
|
$0.00
|
DC01ACO7
|
Cost Increase
|
09/27/2021
|
09/27/2021
|
|
|
Amendment
|
$0.00
|
HW01VCO5
|
Cost Decrease
|
09/27/2021
|
09/27/2021
|
|
|
Amendment
|
$0.00
|
DC30BCO8
|
Cost Decrease/Reconciliation
|
09/23/2021
|
09/23/2021
|
|
|
Amendment
|
$0.00
|
HW015A
|
PFAS groundwater screening
|
09/22/2021
|
09/22/2021
|
|
|
Amendment
|
$0.00
|
HW007C
|
PFAS groundwater screening
|
09/22/2021
|
09/22/2021
|
|
|
Amendment
|
$0.00
|
DC22DCO1
|
Reconcile work change directive WCD#1
|
09/20/2021
|
09/20/2021
|
|
|
Amendment
|
$0.00
|
HW05BCO4
|
Cost Decrease
|
09/13/2021
|
09/13/2021
|
|
|
Amendment
|
$0.00
|
DC20FCO3
|
Cost Increase
|
09/10/2021
|
09/10/2021
|
|
|
Amendment
|
$0.00
|
DC31F
|
Interim Source Removal Work Plan - Interior
|
09/10/2021
|
09/10/2021
|
|
|
Amendment
|
$0.00
|
HW001Z
|
Annual groundwater sampling
|
09/03/2021
|
09/03/2021
|
|
|
Amendment
|
$0.00
|
DC018H
|
Groundwater monitoring
|
09/03/2021
|
09/03/2021
|
|
|
Amendment
|
$0.00
|
HW014A
|
PFAS screening
|
09/02/2021
|
09/02/2021
|
|
|
Amendment
|
$0.00
|
HW013A
|
PFAS screening
|
09/02/2021
|
09/02/2021
|
|
|
Amendment
|
$0.00
|
HW012A
|
PFAS screening
|
09/02/2021
|
09/02/2021
|
|
|
Amendment
|
$0.00
|
HW011A
|
PFAS screening
|
08/31/2021
|
08/31/2021
|
|
|
Amendment
|
$0.00
|
DC37BCO4
|
Time Extension
|
08/16/2021
|
08/16/2021
|
|
|
Amendment
|
$0.00
|
DC25EC03
|
Task Time Extension
|
08/13/2021
|
08/13/2021
|
|
|
Amendment
|
$0.00
|
HW05BCO3
|
Reconcile work change directive WCD #1
|
08/12/2021
|
08/12/2021
|
|
|
Amendment
|
$0.00
|
DC29DCO1
|
Additional restoration costs
|
08/12/2021
|
08/12/2021
|
|
|
Amendment
|
$0.00
|
DC12GCO2
|
Reconcile O&M and extend completion date
|
08/07/2021
|
08/07/2021
|
|
|
Amendment
|
$0.00
|
DC027F
|
Six months of O&M
|
08/02/2021
|
08/02/2021
|
|
|
Amendment
|
$0.00
|
DC34CCO1
|
Subcontractor change
|
08/02/2021
|
08/02/2021
|
|
|
Amendment
|
$0.00
|
DC10GCO1
|
Reconcile work change directive WCD #1
|
07/12/2021
|
07/12/2021
|
|
|
Amendment
|
$0.00
|
DC39BCO1
|
Reconciles site assessment
|
07/09/2021
|
07/09/2021
|
|
|
Amendment
|
$0.00
|
DC21FCO1
|
Decrease in site assessment costs
|
07/09/2021
|
07/09/2021
|
|
|
Amendment
|
$800,000.00
|
FIL20
|
Funding Increment Increase
|
07/01/2021
|
07/01/2021
|
|
|
Amendment
|
$0.00
|
HW07BCO2
|
Reconcile drilling costs
|
06/28/2021
|
06/28/2021
|
|
|
Amendment
|
$0.00
|
HW010B
|
Groundwater monitoring
|
06/28/2021
|
06/28/2021
|
|
|
Amendment
|
$0.00
|
HW10ACO1
|
Authorize preparation of offsite notification package
|
06/23/2021
|
06/23/2021
|
|
|
Amendment
|
$0.00
|
DC20FCO2
|
Reconcile WCDs #2-6 and excavation costs
|
06/22/2021
|
06/22/2021
|
|
|
Amendment
|
$0.00
|
DC31E
|
Pre-excavation site preparation
|
06/17/2021
|
06/17/2021
|
|
|
Amendment
|
$0.00
|
DC31DCO3
|
Time extension
|
06/14/2021
|
06/14/2021
|
|
|
Amendment
|
$0.00
|
DC30BCO7
|
Additional Assessment costs
|
06/14/2021
|
06/14/2021
|
|
|
Amendment
|
$0.00
|
HW04FCO5
|
Additional sampling and offsite notification
|
06/11/2021
|
06/11/2021
|
|
|
Amendment
|
$0.00
|
DC026D
|
Interim source removal implementation
|
06/11/2021
|
06/11/2021
|
|
|
Amendment
|
$0.00
|
DC36BCO4
|
Time extension
|
06/11/2021
|
06/11/2021
|
|
|
Amendment
|
$0.00
|
DC34C
|
Supplemental site assessment
|
06/10/2021
|
06/10/2021
|
|
|
Amendment
|
$0.00
|
DC07GCO2
|
Time extension
|
06/03/2021
|
06/03/2021
|
|
|
Amendment
|
$0.00
|
DC01ACO6
|
Time extension
|
06/03/2021
|
06/03/2021
|
|
|
Amendment
|
$0.00
|
DC03HCO1
|
Reconcile costs for stolen IDW drum
|
05/27/2021
|
05/27/2021
|
|
|
Amendment
|
$0.00
|
A 9
|
Time Extension
|
05/27/2021
|
05/27/2021
|
|
|
Amendment
|
$0.00
|
DC33DCO1
|
Additional assessment and time extension
|
05/25/2021
|
05/25/2021
|
|
|
Amendment
|
$0.00
|
DC19H
|
Operation and maintenance
|
05/24/2021
|
05/24/2021
|
|
|
Amendment
|
$0.00
|
DC10FCO4
|
Reconcile lab and utility costs
|
05/24/2021
|
05/24/2021
|
|
|
Amendment
|
$0.00
|
DC35C
|
Supplemental site assessment
|
05/20/2021
|
05/20/2021
|
|
|
Amendment
|
$200,000.00
|
FIL19
|
Funding Increment Increase
|
05/19/2021
|
05/19/2021
|
|
|
Amendment
|
$0.00
|
DC029E
|
Operation and maintenance 6 months
|
05/18/2021
|
05/18/2021
|
|
|
Amendment
|
$0.00
|
DC005i
|
Operation and maintenance 6 months
|
05/17/2021
|
05/17/2021
|
|
|
Amendment
|
$0.00
|
HW05BCO2
|
Additional solvent sampling
|
05/10/2021
|
05/10/2021
|
|
|
Amendment
|
$0.00
|
HW04FCO4
|
Reconciles costs and extends completion date
|
05/04/2021
|
05/04/2021
|
|
|
Amendment
|
$0.00
|
DC38BCO1
|
Reconcile subcontractor costs
|
04/30/2021
|
04/30/2021
|
|
|
Amendment
|
$0.00
|
DC31CcO4
|
Reconcile WCD #4
|
04/29/2021
|
04/29/2021
|
|
|
Amendment
|
$0.00
|
HW05BCO1
|
Time Extension
|
04/27/2021
|
04/27/2021
|
|
|
Amendment
|
$0.00
|
HW05ACO6
|
Reconcile lab and IDW costs
|
04/19/2021
|
04/19/2021
|
|
|
Amendment
|
$0.00
|
HW002H
|
Annual groundwater sampling
|
04/12/2021
|
04/12/2021
|
|
|
Amendment
|
$0.00
|
BF562E
|
Waste Disposal Activities
|
04/12/2021
|
04/12/2021
|
|
|
Amendment
|
$0.00
|
DC27DCO2
|
Reconcile subcontractor costs
|
04/08/2021
|
04/08/2021
|
|
|
Amendment
|
$0.00
|
DC30BCO6
|
Reconcile subcontractor costs
|
04/07/2021
|
04/07/2021
|
|
|
Amendment
|
$0.00
|
HW010A
|
Site review and path forward report
|
03/24/2021
|
03/24/2021
|
|
|
Amendment
|
$0.00
|
DC010G
|
Operation and Maintenance (6 months)
|
03/15/2021
|
03/15/2021
|
|
|
Amendment
|
$0.00
|
DC021F
|
Supplemental Site Assessment
|
03/12/2021
|
03/12/2021
|
|
|
Amendment
|
$0.00
|
DC12H
|
Soil vapor extraction system removal
|
03/11/2021
|
03/11/2021
|
|
|
Amendment
|
$0.00
|
DC28D
|
Groundwater sampling
|
03/10/2021
|
03/10/2021
|
|
|
Amendment
|
$0.00
|
DC18G
|
Soil vapor extraction system removal
|
03/10/2021
|
03/10/2021
|
|
|
Amendment
|
$0.00
|
DC25ECO2
|
Invoice Schedule Correction
|
03/10/2021
|
03/10/2021
|
|
|
Amendment
|
$0.00
|
DC36BCO3
|
Reconcile subcontractor costs
|
03/10/2021
|
03/10/2021
|
|
|
Amendment
|
$0.00
|
DC007H
|
Annual Groundwater Sampling
|
03/09/2021
|
03/09/2021
|
|
|
Amendment
|
$0.00
|
DC39B
|
Site Assessment
|
03/05/2021
|
03/05/2021
|
|
|
Amendment
|
$0.00
|
DC022E
|
Operation and maintenance
|
03/05/2021
|
03/05/2021
|
|
|
Amendment
|
$0.00
|
DC25ECO1
|
Additional cost for electrical hookup
|
03/04/2021
|
03/04/2021
|
|
|
Amendment
|
$0.00
|
DC01K
|
Remedial Action Plan review
|
03/01/2021
|
03/01/2021
|
|
|
Amendment
|
$0.00
|
DC22D
|
Remedial action plan implementation
|
02/24/2021
|
02/24/2021
|
|
|
Amendment
|
$0.00
|
DC20G
|
Operation and maintenance
|
02/24/2021
|
02/24/2021
|
|
|
Amendment
|
$0.00
|
DC34BCO4
|
Time extension
|
02/24/2021
|
02/24/2021
|
|
|
Amendment
|
$0.00
|
HW05ACO5
|
Time extension
|
02/23/2021
|
02/23/2021
|
|
|
Amendment
|
$100,000.00
|
FIL18
|
Funding Increment Increase
|
02/22/2021
|
02/22/2021
|
|
|
Amendment
|
$0.00
|
BF562D
|
Site Reconnaissance and for sampling of contents
|
02/19/2021
|
02/19/2021
|
|
|
Amendment
|
$0.00
|
DC05HCO2
|
Reconcile utility costs and extend completion date
|
02/12/2021
|
02/12/2021
|
|
|
Amendment
|
$0.00
|
DC14E
|
Annual groundwater sampling
|
02/12/2021
|
02/12/2021
|
|
|
Amendment
|
$0.00
|
DC37BCO3
|
Time extension
|
02/11/2021
|
02/11/2021
|
|
|
Amendment
|
$0.00
|
DC03H
|
Annual groundwater sampling
|
02/11/2021
|
02/11/2021
|
|
|
Amendment
|
$0.00
|
DC35B
|
CO1-Reconcile assessment costs
|
02/05/2021
|
02/05/2021
|
|
|
Amendment
|
$0.00
|
HW07BCO1
|
Authorize additional site assessment activities
|
02/05/2021
|
02/05/2021
|
|
|
Amendment
|
$0.00
|
DC28CCO1
|
Groundwater monitoring report
|
02/04/2021
|
02/04/2021
|
|
|
Amendment
|
$0.00
|
HW09A
|
File Review
|
01/29/2021
|
01/29/2021
|
|
|
Amendment
|
$0.00
|
HW009A
|
File review
|
01/29/2021
|
01/29/2021
|
|
|
Amendment
|
$0.00
|
HW009B
|
File review
|
01/29/2021
|
01/29/2021
|
|
|
Amendment
|
$0.00
|
HW04CCO4
|
Add groundwater sampling
|
01/28/2021
|
01/28/2021
|
|
|
Amendment
|
$0.00
|
DC10FCO3
|
Reconcile WCD #2
|
01/27/2021
|
01/27/2021
|
|
|
Amendment
|
$0.00
|
HW04FCO3
|
Authorizes additional assessment
|
01/25/2021
|
01/25/2021
|
|
|
Amendment
|
$0.00
|
DC12GCO1
|
Reconcile WCD and utilities
|
01/22/2021
|
01/22/2021
|
|
|
Amendment
|
$0.00
|
HW01VCO4
|
Authorize additional assessment
|
01/19/2021
|
01/19/2021
|
|
|
Amendment
|
$0.00
|
HW01Y
|
Authorizes HSW to conduct additional soil assessment
|
01/19/2021
|
01/19/2021
|
|
|
Amendment
|
$0.00
|
DC30BCO
|
Made in error
|
01/13/2021
|
01/13/2021
|
|
|
Amendment
|
$0.00
|
DC30BCO5
|
Reconcile WCD #2 and adjust schedule
|
01/13/2021
|
01/13/2021
|
|
|
Amendment
|
$0.00
|
DC19G
|
Operation and maintenance
|
01/12/2021
|
01/12/2021
|
|
|
Amendment
|
$0.00
|
CO5
|
"Change in Paragraph 24 regarding
|
01/08/2021
|
01/08/2021
|
|
|
Amendment
|
$0.00
|
DC27DCO1
|
Peterson Cleaners
|
01/08/2021
|
01/08/2021
|
|
|
Amendment
|
$0.00
|
DC027E
|
Peterson Cleaners
|
01/08/2021
|
01/08/2021
|
|
|
Amendment
|
$0.00
|
DC20FCO1
|
White Sands Cleaners
|
12/29/2020
|
12/29/2020
|
|
|
Amendment
|
$0.00
|
DC31CCO3
|
Reconcile WCD #2, WCD #3, and subcontractor costs
|
12/21/2020
|
12/21/2020
|
|
|
Amendment
|
$400,000.00
|
FIL 17
|
Funding Increment Increase
|
12/18/2020
|
12/18/2020
|
|
|
Amendment
|
$0.00
|
HW05CCO2
|
Multiple
|
12/17/2020
|
12/17/2020
|
|
|
Amendment
|
$0.00
|
DC31DCO2
|
Reconcile WCD #1 and assessment
|
12/14/2020
|
12/14/2020
|
|
|
Amendment
|
$0.00
|
DC19FCO1
|
Addition of O&M and utility costs for December 2020
|
12/08/2020
|
12/08/2020
|
|
|
Amendment
|
$0.00
|
HW07ACO2
|
Adjust deliverable requirement for subtask 3
|
12/08/2020
|
12/08/2020
|
|
|
Amendment
|
$0.00
|
DC01ACO5
|
Reconciles work change directive WCD#6
|
12/04/2020
|
12/04/2020
|
|
|
Amendment
|
$0.00
|
DC36BCO2
|
Reconcile assessment costs and authorize well installation
|
11/20/2020
|
11/20/2020
|
|
|
Amendment
|
$0.00
|
DC07GCO1
|
Increase in task time
|
11/20/2020
|
11/20/2020
|
|
|
Amendment
|
$0.00
|
DC10FCO2
|
Reconcile WCD #1
|
11/20/2020
|
11/20/2020
|
|
|
Amendment
|
$0.00
|
DC38B
|
Cardno, Inc.
|
11/18/2020
|
11/18/2020
|
|
|
Amendment
|
$0.00
|
HW07B
|
Site Assessment
|
11/17/2020
|
11/17/2020
|
|
|
Amendment
|
$0.00
|
HW05CCO1
|
Reconcile WCDs 1-3
|
11/12/2020
|
11/12/2020
|
|
|
Amendment
|
$0.00
|
DC18FCO1
|
McSherry's Dry Cleaner, Inc.
|
11/06/2020
|
11/06/2020
|
|
|
Extension
|
$0.00
|
A8
|
Time Extension
|
11/03/2020
|
11/03/2020
|
06/26/2021
|
|
Amendment
|
$0.00
|
HW07ACO1
|
Reconcile groundwater sampling costs
|
10/30/2020
|
10/30/2020
|
|
|
Amendment
|
$0.00
|
DC37BCO2
|
Reconcile assessment costs
|
10/30/2020
|
10/30/2020
|
|
|
Amendment
|
$0.00
|
DC26CCO2
|
Plaza Dry Cleaners & Laundry
|
10/29/2020
|
10/29/2020
|
|
|
Amendment
|
$0.00
|
DC29CCO2
|
Star Cleaners Depot
|
10/29/2020
|
10/29/2020
|
|
|
Amendment
|
$0.00
|
HW04CCO3
|
Former Revivation & Gulf Coast Metal Finishing, Inc
|
10/12/2020
|
10/12/2020
|
|
|
Amendment
|
$0.00
|
DC30BCO4
|
Former Dry Cleaner
|
10/12/2020
|
10/12/2020
|
|
|
Amendment
|
$0.00
|
HW06ACO2
|
Touch of Class Cleaners
|
10/12/2020
|
10/12/2020
|
|
|
Amendment
|
$0.00
|
HW004E
|
Former Revivation & Gulf Coast Metal Finishing, Inc.
|
10/09/2020
|
10/09/2020
|
|
|
Amendment
|
$0.00
|
HW04ECO2
|
Former Revivation & Gulf Coast Metal Finishing, Inc.
|
10/09/2020
|
10/09/2020
|
|
|
Amendment
|
$0.00
|
DC34BCO3
|
Bay's Cleaners
|
10/08/2020
|
10/08/2020
|
|
|
Amendment
|
$0.00
|
DC033D
|
Supplemental Site Assessment
|
10/05/2020
|
10/05/2020
|
|
|
Amendment
|
$0.00
|
DC30BCO3
|
Reconcile assessment costs
|
09/25/2020
|
09/25/2020
|
|
|
Amendment
|
$0.00
|
HW008A
|
Post & Lumber Preserving Co.
|
09/24/2020
|
09/24/2020
|
|
|
Amendment
|
$0.00
|
DC22BCo5
|
Touch of Class Cleaners
|
09/22/2020
|
09/22/2020
|
|
|
Amendment
|
$0.00
|
HW001X
|
Former Lakeland Tanning
|
09/21/2020
|
09/21/2020
|
|
|
Amendment
|
$0.00
|
DC31DCO1
|
Reconcile subcontractor costs
|
09/15/2020
|
09/15/2020
|
|
|
Amendment
|
$0.00
|
HW05ACO4
|
Supplemental Assessment
|
09/11/2020
|
09/11/2020
|
|
|
Amendment
|
$0.00
|
HW05AC4
|
Supplemental Assessment
|
09/11/2020
|
09/11/2020
|
|
|
Amendment
|
$0.00
|
DC29CCO1
|
Time extension
|
08/31/2020
|
08/31/2020
|
|
|
Amendment
|
$0.00
|
HW01VCO3
|
Former Lakeland Tannery
|
08/26/2020
|
08/26/2020
|
|
|
Amendment
|
$0.00
|
DC001J
|
Multiple
|
08/20/2020
|
08/20/2020
|
|
|
Amendment
|
$0.00
|
DC12FCO3
|
Reconcile investigation derived waste costs
|
08/13/2020
|
08/13/2020
|
|
|
Amendment
|
$0.00
|
BF563B
|
Redevelopment Conceptual Plan
|
08/11/2020
|
08/11/2020
|
|
|
Amendment
|
$0.00
|
HW05C
|
Supplemental site assessment
|
08/11/2020
|
08/11/2020
|
|
|
Amendment
|
$0.00
|
HW07A
|
Site Assessment Work Plan
|
08/07/2020
|
08/07/2020
|
|
|
Amendment
|
$0.00
|
DC06HCO2
|
Reconcile operation and maintenance costs
|
08/03/2020
|
08/03/2020
|
|
|
Amendment
|
$0.00
|
BF562C
|
Cardno
|
07/31/2020
|
07/31/2020
|
|
|
Amendment
|
$0.00
|
BF563A-2
|
Reduction due to change in scope
|
07/29/2020
|
07/29/2020
|
|
|
Amendment
|
$0.00
|
HW06ACO1
|
Reconcile WCD#1 and extend completion date
|
07/24/2020
|
07/24/2020
|
|
|
Amendment
|
$0.00
|
DC36BCO1
|
Additional assessment costs
|
07/22/2020
|
07/22/2020
|
|
|
Amendment
|
$0.00
|
HW04FCO2
|
Authorizes additional assessment
|
07/13/2020
|
07/13/2020
|
|
|
Amendment
|
$0.00
|
DC035B
|
Initial site assessment
|
07/09/2020
|
07/09/2020
|
|
|
Amendment
|
$0.00
|
DC27D
|
Interim source removal plan implementation
|
07/07/2020
|
07/07/2020
|
|
|
Amendment
|
$1,275,000.00
|
FIL16
|
Funding Increment Increase
|
07/02/2020
|
07/02/2020
|
|
|
Amendment
|
$0.00
|
DC10FCO1
|
Addition of sampling and schedule amendments
|
07/01/2020
|
07/01/2020
|
|
|
Amendment
|
$0.00
|
DC28C
|
Remedial Alternatives Evaluation
|
06/29/2020
|
06/29/2020
|
|
|
Amendment
|
$0.00
|
DC37BCO1
|
Reconcile WCD #1
|
06/26/2020
|
06/26/2020
|
|
|
Amendment
|
$0.00
|
DC36B
|
Initial site assessment
|
06/23/2020
|
06/23/2020
|
|
|
Amendment
|
$0.00
|
HW05ACO3
|
Reconcile WCD 9 and 10 and add assessment
|
06/16/2020
|
06/16/2020
|
|
|
Amendment
|
$0.00
|
DC23CCO2
|
Increase cost for sampling and offsite notice
|
06/11/2020
|
06/11/2020
|
|
|
Amendment
|
$0.00
|
DC26CCO1
|
Time Extension
|
06/08/2020
|
06/08/2020
|
|
|
Amendment
|
$0.00
|
DC33CCO1
|
Reconcile IDW costs
|
06/05/2020
|
06/05/2020
|
|
|
Amendment
|
$0.00
|
HW01WCO1
|
Reconcile work change directives 1 through 6
|
06/04/2020
|
06/04/2020
|
|
|
Amendment
|
$0.00
|
DC07FCO1
|
Reconcile subcontractor costs
|
06/04/2020
|
06/04/2020
|
|
|
Amendment
|
$0.00
|
DC31D
|
Additional groundwater assessment
|
05/29/2020
|
05/29/2020
|
|
|
Amendment
|
$0.00
|
DC20F
|
Interim source removal implementation
|
05/28/2020
|
05/28/2020
|
|
|
Amendment
|
$0.00
|
HW05B
|
Preparation of white paper
|
05/22/2020
|
05/22/2020
|
|
|
Amendment
|
$0.00
|
DC30BCO2
|
Additional Assessment costs
|
05/20/2020
|
05/20/2020
|
|
|
Amendment
|
$0.00
|
HW01VCO2
|
Reconcile WCD #3
|
05/18/2020
|
05/18/2020
|
|
|
Amendment
|
$0.00
|
DC34BCO2
|
Reconcile WCDs 3-7 and add additional assessment
|
05/14/2020
|
05/14/2020
|
|
|
Amendment
|
$0.00
|
DC05HCO1
|
Increase in time task amount
|
05/14/2020
|
05/14/2020
|
|
|
Amendment
|
$0.00
|
BF563A-1
|
TOWN OF ESTO SMALL COMMUNITY TECH ASSISTANCE
|
05/12/2020
|
05/12/2020
|
|
|
Amendment
|
$250,000.00
|
FIL 15
|
Funding Increment Increase
|
05/12/2020
|
05/12/2020
|
|
|
Amendment
|
$0.00
|
DC27CCO1
|
Cost increase related to equipment selection
|
05/11/2020
|
05/11/2020
|
|
|
Amendment
|
$0.00
|
HW04FCO1
|
Authorizes additional assessment
|
05/11/2020
|
05/11/2020
|
|
|
Amendment
|
$0.00
|
HW04ECO1
|
Reconcile waste disposal costs
|
05/07/2020
|
05/07/2020
|
|
|
Amendment
|
$0.00
|
DC10ECO3
|
Reconcile WCD #2
|
05/07/2020
|
05/07/2020
|
|
|
Amendment
|
$0.00
|
DC18ECO3
|
reconcile work change directive WCD #1
|
05/04/2020
|
05/04/2020
|
|
|
Amendment
|
$0.00
|
DC18F
|
Operation and maintenance (12 months)
|
05/01/2020
|
05/01/2020
|
|
|
Amendment
|
$0.00
|
DC25F
|
Operation and maintenance (12 months)
|
05/01/2020
|
05/01/2020
|
|
|
Amendment
|
$0.00
|
DC012G
|
Operation and maintenance (12 months)
|
05/01/2020
|
05/01/2020
|
|
|
Amendment
|
$0.00
|
DC31CCO2
|
Reconcile WCD #1 and soil sampling
|
04/29/2020
|
04/29/2020
|
|
|
Amendment
|
$0.00
|
DC25E
|
Interim source removal implementation
|
04/27/2020
|
04/27/2020
|
|
|
Amendment
|
$0.00
|
DC38ACO1
|
Time extension
|
04/20/2020
|
04/20/2020
|
|
|
Amendment
|
$0.00
|
DC17E
|
Site restoration
|
04/17/2020
|
04/17/2020
|
|
|
Amendment
|
$0.00
|
DC24CCO1
|
Adds cost for waste disposal
|
04/16/2020
|
04/16/2020
|
|
|
Amendment
|
$0.00
|
DC23CCO1
|
Increase in cost for waste disposal
|
04/16/2020
|
04/16/2020
|
|
|
Amendment
|
$0.00
|
DC37B
|
Site Assessment
|
04/15/2020
|
04/15/2020
|
|
|
Amendment
|
$0.00
|
DC28BCO4
|
Decrease in cost
|
04/14/2020
|
04/14/2020
|
|
|
Amendment
|
$0.00
|
HW05ACO2
|
Cost increase for additional assessment
|
04/13/2020
|
04/13/2020
|
|
|
Amendment
|
$0.00
|
DC007G
|
Interim source removal plan
|
04/06/2020
|
04/06/2020
|
|
|
Amendment
|
$0.00
|
DC33C
|
Supplemental site assessment
|
04/06/2020
|
04/06/2020
|
|
|
Amendment
|
$0.00
|
HW04CCO2
|
Decrease in task amount
|
04/06/2020
|
04/06/2020
|
|
|
Amendment
|
$0.00
|
DC29BCO3
|
Reconcile assessment costs
|
03/23/2020
|
03/23/2020
|
|
|
Amendment
|
$0.00
|
DC39A
|
Site Assessment Work Plan
|
03/20/2020
|
03/20/2020
|
|
|
Amendment
|
$0.00
|
DC10ECO2
|
Reconcile WCD #1
|
03/19/2020
|
03/19/2020
|
|
|
Amendment
|
$0.00
|
DC21DCO5
|
Task Time Extension
|
03/18/2020
|
03/18/2020
|
|
|
Amendment
|
$0.00
|
DC22BCO4
|
Reconcile work change directive WCD #1
|
03/17/2020
|
03/17/2020
|
|
|
Amendment
|
$0.00
|
DC25DCO1
|
Task Time Extension
|
03/17/2020
|
03/17/2020
|
|
|
Amendment
|
$0.00
|
DC029D
|
Star Cleaners Depot
|
03/11/2020
|
03/11/2020
|
|
|
Amendment
|
$0.00
|
HW01W
|
Former Lakeland Tannery
|
03/10/2020
|
03/10/2020
|
|
|
Amendment
|
$0.00
|
HW01VCO1
|
Reconcile WCD #1 and WCD #2
|
03/10/2020
|
03/10/2020
|
|
|
Amendment
|
$0.00
|
DC33BCO1
|
Reconcile WCD #1 and analytical costs
|
03/09/2020
|
03/09/2020
|
|
|
Amendment
|
$0.00
|
DC02FCO1
|
Reduce subcontractor costs
|
03/05/2020
|
03/05/2020
|
|
|
Amendment
|
$0.00
|
DC16DCO1
|
Reconcile work change directive WCD #1
|
03/05/2020
|
03/05/2020
|
|
|
Amendment
|
$0.00
|
DC24C
|
Well installation and groundwater sampling
|
03/02/2020
|
03/02/2020
|
|
|
Amendment
|
$0.00
|
DC14D
|
Annual groundwater sampling
|
03/02/2020
|
03/02/2020
|
|
|
Amendment
|
$0.00
|
DC23C
|
North Trail Laundryland
|
03/02/2020
|
03/02/2020
|
|
|
Amendment
|
$0.00
|
DC06HCO1
|
Increase in task amount
|
02/28/2020
|
02/28/2020
|
|
|
Amendment
|
$0.00
|
DC19ECO3
|
Time extension
|
02/26/2020
|
02/26/2020
|
|
|
Amendment
|
$0.00
|
DC003G
|
Annual groundwater sampling
|
02/21/2020
|
02/21/2020
|
|
|
Amendment
|
$0.00
|
HW02G
|
Annual groundwater sampling
|
02/20/2020
|
02/20/2020
|
|
|
Amendment
|
$0.00
|
BF563A
|
Brownfields Site Inventory Package
|
02/19/2020
|
02/19/2020
|
|
|
Amendment
|
$0.00
|
DC34BCO1
|
Addition of sonic well installation
|
02/18/2020
|
02/18/2020
|
|
|
Amendment
|
$700,000.00
|
FIL 14
|
Funding Increment Increase
|
02/17/2020
|
02/17/2020
|
|
|
Amendment
|
$0.00
|
DC05GCO4
|
Cost Adjustment & WCD Reconciliation
|
02/17/2020
|
02/17/2020
|
|
|
Amendment
|
$0.00
|
HW05ACO1
|
Reconcile work change directives 1 - 5
|
02/11/2020
|
02/11/2020
|
|
|
Amendment
|
$0.00
|
HW004F
|
PFAS groundwater sampling
|
01/31/2020
|
01/31/2020
|
|
|
Amendment
|
$0.00
|
BF562B
|
former Lamb's Recycling Facility
|
01/29/2020
|
01/29/2020
|
|
|
Amendment
|
$0.00
|
DC20BCO5
|
Time Extension, Additional Costs & Correction
|
01/21/2020
|
01/21/2020
|
|
|
Amendment
|
$0.00
|
DC26BCO5
|
Reconcile subcontractor costs
|
01/17/2020
|
01/17/2020
|
|
|
Amendment
|
$0.00
|
DC06GCO7
|
Reconcile IDW costs
|
01/14/2020
|
01/14/2020
|
|
|
Amendment
|
$0.00
|
DC21ECO1
|
Reconcile IDW costs
|
01/14/2020
|
01/14/2020
|
|
|
Amendment
|
$0.00
|
DC22BCO3
|
Additional Groundwater Sampling
|
01/10/2020
|
01/10/2020
|
|
|
Amendment
|
$0.00
|
DC12FCO2
|
Reconcile laboratory costs
|
01/07/2020
|
01/07/2020
|
|
|
Amendment
|
$0.00
|
DC16D
|
Pronto Cleaners
|
12/30/2019
|
12/30/2019
|
|
|
Amendment
|
$0.00
|
DC10ECO1
|
Time extension
|
12/30/2019
|
12/30/2019
|
|
|
Amendment
|
$0.00
|
DC20BCO4
|
Time extension
|
12/20/2019
|
12/20/2019
|
|
|
Amendment
|
$0.00
|
HW04DCO1
|
Sampling Cost Reconciliation
|
12/17/2019
|
12/17/2019
|
|
|
Amendment
|
$0.00
|
DC026C
|
Interim source removal work plan
|
12/17/2019
|
12/17/2019
|
|
|
Amendment
|
$0.00
|
DC29C
|
Interim source removal work plan
|
12/17/2019
|
12/17/2019
|
|
|
Amendment
|
$0.00
|
DC05GCO3
|
Additional subcontractor costs
|
12/12/2019
|
12/12/2019
|
|
|
Amendment
|
$0.00
|
DC21E
|
Supplemental site assessment
|
12/03/2019
|
12/03/2019
|
|
|
Amendment
|
$0.00
|
DC18ECO2
|
Utility cost adjustment
|
12/03/2019
|
12/03/2019
|
|
|
Amendment
|
$0.00
|
HW01V
|
PFAS expanded pilot sampling
|
12/02/2019
|
12/02/2019
|
|
|
Amendment
|
$0.00
|
DC036A
|
Site Assessment Work Plan
|
11/25/2019
|
11/25/2019
|
|
|
Amendment
|
$0.00
|
DC037A
|
Site Assessment Work Plan
|
11/25/2019
|
11/25/2019
|
|
|
Amendment
|
$0.00
|
DC038A
|
Site Assessment Work Plan
|
11/25/2019
|
11/25/2019
|
|
|
Amendment
|
$0.00
|
DC035A
|
Site Assessment Work Plan
|
11/22/2019
|
11/22/2019
|
|
|
Amendment
|
$0.00
|
HW01PCO3
|
Time extension
|
11/22/2019
|
11/22/2019
|
|
|
Amendment
|
$0.00
|
DC02F
|
Annual Groundwater Monitoring
|
11/21/2019
|
11/21/2019
|
|
|
Amendment
|
$0.00
|
HW005A
|
Supplemental PFAS assessment
|
11/18/2019
|
11/18/2019
|
|
|
Amendment
|
$0.00
|
DC26BCO4
|
Reconcile subcontractor costs
|
11/18/2019
|
11/18/2019
|
|
|
Amendment
|
$0.00
|
DC21DCO4
|
Reconciles WCD #4
|
11/18/2019
|
11/18/2019
|
|
|
Amendment
|
$0.00
|
DC17DCO3
|
Invoice Schedule Error Correction
|
11/18/2019
|
11/18/2019
|
|
|
Amendment
|
$0.00
|
DC20ECO1
|
Reconcile WCD #1 and WCD #2
|
11/18/2019
|
11/18/2019
|
|
|
Amendment
|
$0.00
|
HW06A
|
PFAS quarterly sampling
|
11/15/2019
|
11/15/2019
|
|
|
Amendment
|
$0.00
|
HW04E
|
PFAS quarterly sampling
|
11/15/2019
|
11/15/2019
|
|
|
Amendment
|
$0.00
|
DC31CCO1
|
Additional soil sampling
|
11/13/2019
|
11/13/2019
|
|
|
Amendment
|
$0.00
|
DC07F
|
Supplemental site assessment
|
11/13/2019
|
11/13/2019
|
|
|
Amendment
|
$0.00
|
DC30BCO1
|
Reconcile WCD and sampling costs
|
11/08/2019
|
11/08/2019
|
|
|
Amendment
|
$0.00
|
DC05GCO2
|
Time Extension
|
11/01/2019
|
11/01/2019
|
|
|
Amendment
|
$0.00
|
DC17DCO2
|
Reconciles operation and maintenance costs
|
10/29/2019
|
10/29/2019
|
|
|
Amendment
|
$0.00
|
DC034B
|
Initial site assessment
|
10/29/2019
|
10/29/2019
|
|
|
Amendment
|
$0.00
|
DC33B
|
Comet Dry Cleaners
|
10/28/2019
|
10/28/2019
|
|
|
Amendment
|
$0.00
|
DC28BCO3
|
Additional well installation
|
10/28/2019
|
10/28/2019
|
|
|
Amendment
|
$0.00
|
DC19F
|
Cardno,Inc. Operation and maintenance
|
10/24/2019
|
10/24/2019
|
|
|
Amendment
|
$0.00
|
DC27C
|
Interim source removal plan
|
10/22/2019
|
10/22/2019
|
|
|
Amendment
|
$0.00
|
DC29BCO2
|
Add additional drilling costs
|
10/15/2019
|
10/15/2019
|
|
|
Amendment
|
$0.00
|
HW01U
|
Annual groundwater monitoring
|
10/08/2019
|
10/08/2019
|
|
|
Amendment
|
$0.00
|
DC06GCO6
|
Reconcile WCD #3 and utilities
|
10/01/2019
|
10/01/2019
|
|
|
Amendment
|
$0.00
|
HW04CCO1
|
Reconcile supplemental assessment costs
|
10/01/2019
|
10/01/2019
|
|
|
Amendment
|
$0.00
|
DC01ACO4
|
Cost Reconciliation
|
09/26/2019
|
09/26/2019
|
|
|
Amendment
|
$0.00
|
DC32ACO3
|
Cost Reduction
|
09/23/2019
|
09/23/2019
|
|
|
Amendment
|
$0.00
|
DC01I
|
Multiple Sites
|
09/23/2019
|
09/23/2019
|
|
|
Amendment
|
$0.00
|
HW01SCO1
|
Cost Reduction/Reconciliation
|
09/20/2019
|
09/20/2019
|
|
|
Amendment
|
$0.00
|
DC31BCO2
|
Cost Reconciliation
|
09/20/2019
|
09/20/2019
|
|
|
Amendment
|
$0.00
|
DC21DCO3
|
Cost Reconciliation
|
09/19/2019
|
09/19/2019
|
|
|
Amendment
|
$0.00
|
DC26BCO3
|
Additional Costs Re: Well Installation
|
09/19/2019
|
09/19/2019
|
|
|
Amendment
|
$0.00
|
DC28BCO2
|
Cost Reconciliation
|
09/18/2019
|
09/18/2019
|
|
|
Amendment
|
$0.00
|
DC27BCO1
|
Cost Reconciliation
|
09/18/2019
|
09/18/2019
|
|
|
Amendment
|
$0.00
|
DC18ECO1
|
Utility and laboratory cost adjustment
|
09/10/2019
|
09/10/2019
|
|
|
Amendment
|
$0.00
|
DC29BCO1
|
Reconcile WCD #1 and add assessment costs
|
09/09/2019
|
09/09/2019
|
|
|
Amendment
|
$0.00
|
DC20E
|
White Sands Cleaners
|
09/06/2019
|
09/06/2019
|
|
|
Amendment
|
$0.00
|
DC17DCO1
|
Reconcile WCD #1
|
09/03/2019
|
09/03/2019
|
|
|
Amendment
|
$0.00
|
HW04D
|
Groundwater sampling
|
08/27/2019
|
08/27/2019
|
|
|
Amendment
|
$0.00
|
DC19ECO2
|
Increase in task time
|
08/22/2019
|
08/22/2019
|
|
|
Amendment
|
$0.00
|
DC22CCO2
|
Decrease in task amount/Reconcile sampling costs
|
08/20/2019
|
08/20/2019
|
|
|
Amendment
|
$0.00
|
DC06GCO5
|
Increase in task amount increase in task time
|
08/19/2019
|
08/19/2019
|
|
|
Amendment
|
$0.00
|
DC21DCO2
|
Cost Increase
|
08/19/2019
|
08/19/2019
|
|
|
Amendment
|
$0.00
|
HW03CCO4
|
Cost Reduction
|
08/16/2019
|
08/16/2019
|
|
|
Amendment
|
$0.00
|
DC32ACO2
|
Increase in task amount
|
08/08/2019
|
08/08/2019
|
|
|
Amendment
|
$0.00
|
DC24BCO2
|
Decrease in task amount
|
08/08/2019
|
08/08/2019
|
|
|
Amendment
|
$0.00
|
DC34A
|
Bay's Cleaners
|
08/01/2019
|
08/01/2019
|
|
|
Amendment
|
$0.00
|
DC33A
|
Comet Dry Cleaners
|
08/01/2019
|
08/01/2019
|
|
|
Amendment
|
$2,043,000.00
|
FIL 13
|
Funding Increment Increase
|
07/01/2019
|
07/01/2019
|
|
|
Amendment
|
$0.00
|
DC21CCO2
|
Cost Reconciliation
|
06/28/2019
|
06/28/2019
|
|
|
Amendment
|
$0.00
|
BF562A
|
Town of Esto- Former Lambs Recycling
|
06/28/2019
|
06/28/2019
|
|
|
Amendment
|
$0.00
|
DC32ACO1
|
Cost Reconciliation
|
06/27/2019
|
06/27/2019
|
|
|
Amendment
|
$0.00
|
DC28BCO1
|
Cost Reconciliation
|
06/27/2019
|
06/27/2019
|
|
|
Amendment
|
$0.00
|
DC31BCO1
|
Cost Increase
|
06/26/2019
|
06/26/2019
|
|
|
Amendment
|
$0.00
|
DC21DCO1
|
Cost Increase & Reconciliation
|
06/24/2019
|
06/24/2019
|
|
|
Amendment
|
$0.00
|
DC06GCO4
|
Cost Increase & Reconciliation
|
06/24/2019
|
06/24/2019
|
|
|
Amendment
|
$0.00
|
HW04C
|
Former Revivation & Gulf Coast Metal Finishing, Inc.
|
06/21/2019
|
06/21/2019
|
|
|
Amendment
|
$0.00
|
DC31C
|
Jasper Laundry and Dry Cleaners
|
06/21/2019
|
06/21/2019
|
|
|
Amendment
|
$0.00
|
DC06H
|
Harris Drive In Cleaners
|
06/18/2019
|
06/18/2019
|
|
|
Amendment
|
$0.00
|
DC10F
|
Merlin's Custom Cleaners
|
06/13/2019
|
06/13/2019
|
|
|
Amendment
|
$0.00
|
DC23BCO2
|
Cost Reconciliation
|
06/11/2019
|
06/11/2019
|
|
|
Amendment
|
$0.00
|
HW02FCO1
|
Cost Reconciliation
|
06/10/2019
|
06/10/2019
|
|
|
Amendment
|
$0.00
|
HW01T
|
Former Lakeland Tannery
|
06/06/2019
|
06/06/2019
|
|
|
Amendment
|
$0.00
|
DC26BCO2
|
Cost Reconciliation & Additional Costs
|
06/05/2019
|
06/05/2019
|
|
|
Amendment
|
$0.00
|
DC12ECO1
|
Reconcile ISRP implementation costs
|
05/30/2019
|
05/30/2019
|
|
|
Amendment
|
$0.00
|
DC032A
|
PFAS sampling pilot study
|
05/30/2019
|
05/30/2019
|
|
|
Amendment
|
$0.00
|
DC22BCO2
|
Task Time Extension
|
05/28/2019
|
05/28/2019
|
|
|
Amendment
|
$0.00
|
DC14CCO3
|
Reconciles costs related to well installation
|
05/28/2019
|
05/28/2019
|
|
|
Amendment
|
$0.00
|
DC31B
|
Jasper Laundry and Dry Cleaners
|
05/23/2019
|
05/23/2019
|
|
|
Amendment
|
$0.00
|
HW01PCO2
|
Cost Adjustment & Time Extension
|
05/21/2019
|
05/21/2019
|
|
|
Amendment
|
$0.00
|
DC30B
|
Dry Cleaner - Former
|
05/16/2019
|
05/16/2019
|
|
|
Amendment
|
$0.00
|
DC20BCO3
|
Task Time Extension
|
05/15/2019
|
05/15/2019
|
|
|
Amendment
|
$0.00
|
DC22CCO1
|
Cost Reconciliation, Additional Sampling & Time Extension
|
05/15/2019
|
05/15/2019
|
|
|
Amendment
|
$0.00
|
DC02ECO4
|
Cost Reconciliation
|
05/14/2019
|
05/14/2019
|
|
|
Amendment
|
$0.00
|
DC25D
|
Mango Cleaners
|
05/14/2019
|
05/14/2019
|
|
|
Amendment
|
$0.00
|
DC26BCO1
|
Cost Increase
|
05/01/2019
|
05/01/2019
|
|
|
Amendment
|
$0.00
|
DC29B
|
Star Cleaners Depot
|
04/29/2019
|
04/29/2019
|
|
|
Amendment
|
$0.00
|
DC028B
|
East Bay Dry Cleaners, Inc.
|
04/24/2019
|
04/24/2019
|
|
|
Amendment
|
$0.00
|
DC010E
|
Merlin's Custom Cleaners
|
04/20/2019
|
04/20/2019
|
|
|
Amendment
|
$0.00
|
DC05GCO1
|
Additional Costs
|
04/18/2019
|
04/18/2019
|
|
|
Amendment
|
$0.00
|
DC20DCO1
|
Reconciliation of WCD 1 & 2
|
04/18/2019
|
04/18/2019
|
|
|
Amendment
|
$0.00
|
DC19ECO1
|
Increase in task time and increase in task amount
|
04/12/2019
|
04/12/2019
|
|
|
Amendment
|
$0.00
|
DC21D
|
Former Royal Dry Cleaner
|
04/05/2019
|
04/05/2019
|
|
|
Amendment
|
$0.00
|
DC21CCO1
|
Reconciliation of WCDs & Additional Costs
|
04/02/2019
|
04/02/2019
|
|
|
Amendment
|
$0.00
|
DC12FCO1
|
Additional Costs
|
04/01/2019
|
04/01/2019
|
|
|
Amendment
|
$0.00
|
HW01S
|
Former Lakeland Tannery
|
03/19/2019
|
03/19/2019
|
|
|
Amendment
|
$0.00
|
DC027B
|
Peterson Cleaners
|
03/15/2019
|
03/15/2019
|
|
|
Amendment
|
$0.00
|
DC02ECO3
|
Additional Costs
|
03/15/2019
|
03/15/2019
|
|
|
Amendment
|
$0.00
|
HW04BCO3
|
Reconciliation of Work Change Directives
|
03/13/2019
|
03/13/2019
|
|
|
Amendment
|
$0.00
|
DC18DCO3
|
Reconciliation of WCD #2
|
03/12/2019
|
03/12/2019
|
|
|
Amendment
|
$0.00
|
DC031A
|
Jasper Laundry and Dry Cleaners
|
03/11/2019
|
03/11/2019
|
|
|
Amendment
|
$0.00
|
DC015D
|
Well Abandonment
|
03/11/2019
|
03/11/2019
|
|
|
Amendment
|
$0.00
|
DC26B
|
Plaza Dry Cleaners & Laundry
|
03/11/2019
|
03/11/2019
|
|
|
Amendment
|
$0.00
|
DC24ACO3
|
time extension
|
03/07/2019
|
03/07/2019
|
|
|
Amendment
|
$0.00
|
DC24BCO1
|
Supplemental Site Assessment
|
03/05/2019
|
03/05/2019
|
|
|
Amendment
|
$0.00
|
DC22BCO1
|
Increase in task time
|
03/01/2019
|
03/01/2019
|
|
|
Amendment
|
$0.00
|
DC23BCO1
|
Monitoring well installation and sampling
|
03/01/2019
|
03/01/2019
|
|
|
Amendment
|
$0.00
|
HW03CCO3
|
Cabot Carbon/Koppers Site
|
02/22/2019
|
02/22/2019
|
10/31/2019
|
|
Amendment
|
$0.00
|
DC06GCO3
|
Cost Reconciliation
|
02/18/2019
|
02/18/2019
|
|
|
Amendment
|
$0.00
|
DC18DCO2
|
Time Extension
|
02/18/2019
|
02/18/2019
|
|
|
Amendment
|
$0.00
|
DC030A
|
Dry Cleaner - Former
|
02/14/2019
|
02/14/2019
|
|
|
Amendment
|
$0.00
|
DC16CCO1
|
Pronto Cleaners
|
02/14/2019
|
02/14/2019
|
|
|
Amendment
|
$0.00
|
DC022C
|
Touch of Class Cleaners
|
02/14/2019
|
02/14/2019
|
|
|
Amendment
|
$0.00
|
DC029A
|
Star Cleaners Depot
|
02/12/2019
|
02/12/2019
|
|
|
Amendment
|
$0.00
|
DC025C
|
Mango Cleaners
|
02/12/2019
|
02/12/2019
|
|
|
Amendment
|
$0.00
|
DC21BCO1
|
decrease costs
|
02/07/2019
|
02/07/2019
|
|
|
Amendment
|
$0.00
|
DC05H
|
Phenix Supply Company
|
02/07/2019
|
02/07/2019
|
|
|
Amendment
|
$0.00
|
HW002F
|
Olive Street East (South Central Avenue)
|
01/31/2019
|
01/31/2019
|
|
|
Amendment
|
$0.00
|
DC007E
|
Nelsons Cleaners
|
01/31/2019
|
01/31/2019
|
|
|
Amendment
|
$0.00
|
DC003F
|
Carriage Trade Dry Cleaners
|
01/31/2019
|
01/31/2019
|
|
|
Amendment
|
$500,000.00
|
FIL12
|
Funding Increment Increase
|
01/29/2019
|
01/29/2019
|
|
|
Amendment
|
$0.00
|
DC05G
|
Phenix Supply Company
|
01/28/2019
|
01/28/2019
|
|
|
Amendment
|
$0.00
|
DC020D
|
White Sands Cleaners
|
01/25/2019
|
01/25/2019
|
|
|
Amendment
|
$0.00
|
HW01QCO2
|
cost decrease
|
01/24/2019
|
01/24/2019
|
|
|
Amendment
|
$0.00
|
DC14CCO2
|
increase costs
|
01/24/2019
|
01/24/2019
|
|
|
Amendment
|
$0.00
|
HW04BCO2
|
cost increase
|
01/15/2019
|
01/15/2019
|
|
|
Amendment
|
$0.00
|
BF561A
|
Cardno
|
01/02/2019
|
01/02/2019
|
|
|
Amendment
|
$0.00
|
DC20BCO2
|
Time Extension
|
12/21/2018
|
12/21/2018
|
|
|
Amendment
|
$0.00
|
DC02ECO2
|
Time Extension
|
12/20/2018
|
12/20/2018
|
|
|
Amendment
|
$0.00
|
DC028A
|
East Bay Dry Cleaners, Inc.
|
12/20/2018
|
12/20/2018
|
|
|
Amendment
|
$0.00
|
DC22ACO4
|
Time Extension
|
12/20/2018
|
12/20/2018
|
|
|
Amendment
|
$0.00
|
DC26ACO1
|
Time Extension
|
12/20/2018
|
12/20/2018
|
|
|
Amendment
|
$0.00
|
DC20CCO2
|
Time Extension
|
12/19/2018
|
12/19/2018
|
|
|
Amendment
|
$0.00
|
DC012E
|
Spring Fresh Dry Cleaning
|
12/19/2018
|
12/19/2018
|
|
|
Amendment
|
$0.00
|
DC012F
|
Spring Fresh Dry Cleaning
|
12/19/2018
|
12/19/2018
|
|
|
Amendment
|
$0.00
|
HW03CCO2
|
time extension
|
12/10/2018
|
12/10/2018
|
|
|
Amendment
|
$0.00
|
DC19DCO1
|
Subcontractor Equipment Cost Reconciliation
|
12/10/2018
|
12/10/2018
|
|
|
Amendment
|
$0.00
|
DC18DCO1
|
increase costs
|
11/29/2018
|
11/29/2018
|
|
|
Amendment
|
$0.00
|
DC21C
|
Cardno, Inc
|
11/26/2018
|
11/26/2018
|
|
|
Amendment
|
$0.00
|
DC26A
|
Plaza Dry Cleaners and Laundry
|
11/14/2018
|
11/14/2018
|
|
|
Amendment
|
$0.00
|
DC27A
|
Cardno Inc
|
11/14/2018
|
11/14/2018
|
|
|
Amendment
|
$0.00
|
DC01ACO3
|
cost increase
|
11/14/2018
|
11/14/2018
|
|
|
Amendment
|
$0.00
|
DC20CCO1
|
increase costs
|
11/14/2018
|
11/14/2018
|
|
|
Amendment
|
$0.00
|
DC14CCO1
|
increase costs
|
11/08/2018
|
11/08/2018
|
|
|
Amendment
|
$0.00
|
DC12D
|
Spring Fresh Dry Cleaning
|
11/06/2018
|
11/06/2018
|
|
|
Amendment
|
$0.00
|
HW04BCO1
|
cost increase & time extension
|
11/06/2018
|
11/06/2018
|
06/28/2019
|
|
Amendment
|
$0.00
|
DC016C
|
Pronto Cleaners
|
10/30/2018
|
10/30/2018
|
|
|
Amendment
|
$0.00
|
DC16BCO2
|
Cost Reconciliation
|
10/26/2018
|
10/26/2018
|
|
|
Amendment
|
$0.00
|
HW01QCO1
|
Cost Reconciliation
|
10/25/2018
|
10/25/2018
|
|
|
Amendment
|
$0.00
|
DC24ACO2
|
Time Extension
|
10/25/2018
|
10/25/2018
|
|
|
Amendment
|
$0.00
|
HW01PCO1
|
Time Extension
|
10/23/2018
|
10/23/2018
|
|
|
Amendment
|
$0.00
|
DC24B
|
Supplemental site assessment
|
10/22/2018
|
10/22/2018
|
|
|
Amendment
|
$0.00
|
HW01R
|
Annual groundwater monitoring
|
10/08/2018
|
10/08/2018
|
|
|
Amendment
|
$0.00
|
HW03CCO1
|
Time Extension
|
10/05/2018
|
10/05/2018
|
|
|
Amendment
|
$0.00
|
DC25BCO2
|
Decrease in task amount
|
10/05/2018
|
10/05/2018
|
|
|
Amendment
|
$0.00
|
DC23B
|
North Trail Laundryland
|
10/04/2018
|
10/04/2018
|
|
|
Amendment
|
$0.00
|
DC10D
|
Merlin's Custom Cleaners
|
10/01/2018
|
10/01/2018
|
|
|
Amendment
|
$0.00
|
DC22ACO3
|
decrease funding
|
10/01/2018
|
10/01/2018
|
|
|
Amendment
|
$0.00
|
DC001H
|
Multiple Sites
|
09/27/2018
|
09/27/2018
|
|
|
Amendment
|
$0.00
|
DC06GCO2
|
Additional Utility Costs
|
09/27/2018
|
09/27/2018
|
|
|
Amendment
|
$0.00
|
DC11CCO1
|
Well Abandonment
|
09/18/2018
|
09/18/2018
|
|
|
Amendment
|
$0.00
|
DC001G
|
Multiple Sites
|
09/12/2018
|
09/12/2018
|
|
|
Amendment
|
$0.00
|
DC17CCO1
|
Reconciliation of Work Change Directive
|
09/06/2018
|
09/06/2018
|
|
|
Amendment
|
$0.00
|
HW02ECO3
|
Olive Street East (South Central Avenue)
|
09/06/2018
|
09/06/2018
|
|
|
Amendment
|
$0.00
|
DC001F
|
Multiple
|
09/04/2018
|
09/04/2018
|
|
|
Amendment
|
$0.00
|
DC06FCO2
|
Harris Drive In Cleaners
|
08/21/2018
|
08/21/2018
|
|
|
Amendment
|
$0.00
|
DC13CO2
|
Decrease in funds
|
08/20/2018
|
08/20/2018
|
|
|
Amendment
|
$0.00
|
DC21B
|
Former Royal Dry Cleaner
|
08/20/2018
|
08/20/2018
|
|
|
Amendment
|
$0.00
|
DC02ECO1
|
Additional well installation costs
|
08/10/2018
|
08/10/2018
|
|
|
Amendment
|
$0.00
|
HW556
|
Former 3D Oil Site
|
08/10/2018
|
08/10/2018
|
|
|
Amendment
|
$0.00
|
BF004F
|
Former 3D Oil Site
|
08/10/2018
|
08/10/2018
|
|
|
Amendment
|
$0.00
|
DC05FCO2
|
Additional labor related to system evaluation
|
08/09/2018
|
08/09/2018
|
12/31/2018
|
|
Amendment
|
$0.00
|
DC25BCO1
|
Reconciles work change directives WCD #1 and WCD #2
|
08/06/2018
|
08/06/2018
|
|
|
Amendment
|
$0.00
|
DC10CCO2
|
decrease in costs
|
07/31/2018
|
07/31/2018
|
10/31/2018
|
|
Amendment
|
$0.00
|
DC12CO1
|
change in costs & increase time
|
07/23/2018
|
07/23/2018
|
01/31/2019
|
|
Amendment
|
$0.00
|
DC13C
|
Classic Cleaners 2
|
07/23/2018
|
07/23/2018
|
|
|
Amendment
|
$0.00
|
DC13CCO1
|
increase in cost & time
|
07/23/2018
|
07/23/2018
|
10/31/2018
|
|
Amendment
|
$0.00
|
HW03C
|
Cabot Carbon/Koppers Site
|
07/20/2018
|
07/20/2018
|
|
|
Amendment
|
$0.00
|
DC06FCO1
|
increase in time, decrease in costs
|
07/19/2018
|
07/19/2018
|
01/31/2019
|
|
Amendment
|
$0.00
|
HW01NCO2
|
time extension
|
07/17/2018
|
07/17/2018
|
12/31/2018
|
|
Amendment
|
$0.00
|
DC06GCO1
|
increase in time and costs
|
07/17/2018
|
07/17/2018
|
11/29/2019
|
|
Amendment
|
$0.00
|
HW02ECO2
|
time extension
|
07/16/2018
|
07/16/2018
|
02/28/2019
|
|
Amendment
|
$0.00
|
DC22ACO2
|
time extension
|
07/16/2018
|
07/16/2018
|
12/31/2018
|
|
Amendment
|
$0.00
|
DC19D
|
University Cleaners, Inc.
|
07/16/2018
|
07/16/2018
|
|
|
Amendment
|
$0.00
|
DC19E
|
University Cleaners, Inc.
|
07/16/2018
|
07/16/2018
|
|
|
Amendment
|
$1,400,000.00
|
FIL11
|
Funding Increase
|
07/12/2018
|
07/12/2018
|
|
|
Amendment
|
$0.00
|
DC22B
|
Touch of Class Dry Cleaners
|
07/05/2018
|
07/05/2018
|
|
|
Amendment
|
$0.00
|
DC20C
|
White Sands Cleaners
|
06/27/2018
|
06/27/2018
|
|
|
Amendment
|
$0.00
|
DC14C
|
Former Victoria Cleaners
|
06/27/2018
|
06/27/2018
|
|
|
Amendment
|
$0.00
|
DC11C
|
Rose Dry Cleaners
|
06/27/2018
|
06/27/2018
|
|
|
Amendment
|
$0.00
|
DC011C
|
Rose Dry Cleaners
|
06/27/2018
|
06/27/2018
|
|
|
Amendment
|
$0.00
|
DC10CCO1
|
Former Merlin's Custom Cleaners
|
06/27/2018
|
06/27/2018
|
|
|
Amendment
|
$0.00
|
DC18BCO2
|
McSherry's Dry Cleaner
|
06/27/2018
|
06/27/2018
|
|
|
Amendment
|
$0.00
|
DC20BCO1
|
White Sands Cleaners
|
06/27/2018
|
06/27/2018
|
|
|
Amendment
|
$0.00
|
DC018D
|
McSherry's Dry Cleaner, Inc.
|
06/14/2018
|
06/14/2018
|
|
|
Amendment
|
$0.00
|
DC018E
|
McSherry's Dry Cleaner, inc.
|
06/12/2018
|
06/12/2018
|
|
|
Amendment
|
$0.00
|
DC05ECO2
|
Decrease in task amount
|
06/07/2018
|
06/07/2018
|
|
|
Amendment
|
$0.00
|
DC21ACO1
|
FORMER ROYAL DRY CLEANER
|
06/05/2018
|
06/05/2018
|
|
|
Amendment
|
$0.00
|
HW01OCO1
|
Decrease in task amount
|
06/05/2018
|
06/05/2018
|
|
|
Amendment
|
$0.00
|
DC019C
|
UNIVERSITY CLEANERS, INC.
|
06/04/2018
|
06/04/2018
|
|
|
Amendment
|
$0.00
|
DC19ACO1
|
Time Extension
|
05/31/2018
|
05/31/2018
|
09/28/2018
|
|
Amendment
|
$0.00
|
DC20ACO3
|
Decrease in task amount
|
05/22/2018
|
05/22/2018
|
|
|
Amendment
|
$0.00
|
DC06ECO1
|
Decrease in task amount
|
05/22/2018
|
05/22/2018
|
|
|
Amendment
|
$0.00
|
DC25B
|
Cardno, Inc.
|
05/21/2018
|
05/21/2018
|
|
|
Amendment
|
$0.00
|
DC02E
|
Cardno, Inc.
|
05/15/2018
|
05/15/2018
|
|
|
Amendment
|
$0.00
|
HW04B
|
Cardno, Inc
|
05/14/2018
|
05/14/2018
|
|
|
Amendment
|
$0.00
|
HW02ECO1
|
Olive Street East (South Central Avenue)
|
05/04/2018
|
05/04/2018
|
10/31/2018
|
|
Amendment
|
$0.00
|
DC05FCO1
|
Phenix Supply Company
|
04/30/2018
|
04/30/2018
|
08/31/2018
|
|
Amendment
|
$0.00
|
DC22ACO1
|
Touch of Class Cleaners
|
04/23/2018
|
04/23/2018
|
11/30/2018
|
|
Amendment
|
$0.00
|
DC24ACO1
|
Increase in task amount
|
04/20/2018
|
04/20/2018
|
|
|
Amendment
|
$0.00
|
DC018C
|
McSherry's Dry Cleaner, Inc.
|
04/20/2018
|
04/20/2018
|
|
|
Amendment
|
$0.00
|
DC16BCO1
|
Increase in task time and task amount
|
04/16/2018
|
04/16/2018
|
|
|
Amendment
|
$0.00
|
DC17BCO1
|
Decrease in task amount
|
04/16/2018
|
04/16/2018
|
|
|
Amendment
|
$0.00
|
DC18BCO1
|
Increase in task time and increase in task amount
|
04/13/2018
|
04/13/2018
|
|
|
Amendment
|
$0.00
|
DC19BCO1
|
Decrease in task amount
|
04/13/2018
|
04/13/2018
|
|
|
Amendment
|
$0.00
|
DC013C
|
Classic Cleaners II
|
04/13/2018
|
04/13/2018
|
|
|
Amendment
|
$0.00
|
DC010C
|
Former Merlin's Custom Cleaners
|
04/13/2018
|
04/13/2018
|
|
|
Amendment
|
$0.00
|
BF008C
|
Boynton Beach Redevelopment Properties
|
04/13/2018
|
04/13/2018
|
|
|
Amendment
|
$0.00
|
DC017D
|
ERIC_4707
|
04/12/2018
|
04/12/2018
|
|
|
Amendment
|
$0.00
|
DC017C
|
Snowhite of Tampa Bay, Inc
|
04/12/2018
|
04/12/2018
|
|
|
Amendment
|
$0.00
|
DC20ACO2
|
Supplemental assessment Decrease in task amount
|
04/06/2018
|
04/06/2018
|
|
|
Amendment
|
$0.00
|
DC18ACO1
|
McSherry's Dry Cleaner, Inc.
|
03/28/2018
|
03/28/2018
|
07/30/2018
|
|
Amendment
|
$0.00
|
HW01P
|
Former Lakeland Tannery
|
03/23/2018
|
03/23/2018
|
|
|
Amendment
|
$0.00
|
HW01Q
|
Former Lakeland Tannery
|
03/23/2018
|
03/23/2018
|
|
|
Amendment
|
$0.00
|
HW01NCO1
|
FORMER LAKELAND TANNERY
|
03/23/2018
|
03/23/2018
|
|
|
Amendment
|
$0.00
|
CO4
|
Contractor Contract Manager Change
|
03/22/2018
|
03/22/2018
|
|
|
Amendment
|
$0.00
|
HW004A
|
Former Revivation & Gulf Coast Metal Finishing, Inc.
|
03/16/2018
|
03/16/2018
|
|
|
Amendment
|
$0.00
|
HW01MCO1
|
Former Lakeland Tannery
|
03/16/2018
|
03/16/2018
|
|
|
Amendment
|
$0.00
|
DC23ACO1
|
North Trail Laundryland
|
03/14/2018
|
03/14/2018
|
|
|
Amendment
|
$0.00
|
DC025A
|
Mango Cleaners
|
03/13/2018
|
03/13/2018
|
|
|
Amendment
|
$0.00
|
HW001O
|
Former Lakeland Tannery
|
03/13/2018
|
03/13/2018
|
|
|
Amendment
|
$0.00
|
DC02DCO1
|
Former Gulf States Beauty Supply
|
03/13/2018
|
03/13/2018
|
06/29/2018
|
|
Amendment
|
$0.00
|
DC20ACO1
|
Decrease in task time White Sands Cleaners
|
02/28/2018
|
02/28/2018
|
|
|
Amendment
|
$0.00
|
DC17ACO1
|
Entered in error
|
02/09/2018
|
02/09/2018
|
|
|
Amendment
|
$0.00
|
DC11BCO2
|
Rose Dry Cleaners and Laundromat
|
02/09/2018
|
02/09/2018
|
|
|
Amendment
|
$0.00
|
BF11A
|
UACDC-GROUP E
|
02/05/2018
|
02/05/2018
|
|
|
Amendment
|
$0.00
|
DC012C
|
Spring Fresh Dry Cleaning
|
02/02/2018
|
02/02/2018
|
|
|
Amendment
|
$0.00
|
DC17B
|
Snowhite of Tampa Bay, Inc
|
02/01/2018
|
02/01/2018
|
|
|
Amendment
|
$0.00
|
DC016B
|
Pronto Cleaners
|
01/29/2018
|
01/29/2018
|
|
|
Amendment
|
$0.00
|
DC10BCO4
|
Former Merlin's Custom Cleaners
|
01/26/2018
|
01/26/2018
|
|
|
Amendment
|
$0.00
|
HW03BCO2
|
Cabot Carbon / Koppers Site
|
01/23/2018
|
01/23/2018
|
06/21/2018
|
|
Amendment
|
$0.00
|
DC05ECO1
|
Phenix Supply Company
|
01/18/2018
|
01/18/2018
|
06/29/2018
|
|
Amendment
|
$0.00
|
HW002E
|
Olive Street East (South Central Avenue)
|
01/18/2018
|
01/18/2018
|
|
|
Amendment
|
$0.00
|
DC06G
|
Harris Drive In Cleaners
|
01/11/2018
|
01/11/2018
|
|
|
Amendment
|
$0.00
|
HW01N
|
Former Lakeland Tannery
|
01/11/2018
|
01/11/2018
|
|
|
Amendment
|
$0.00
|
DC15C
|
Meri Cleaner Inc
|
01/08/2018
|
01/08/2018
|
|
|
Amendment
|
$0.00
|
DC15BCO1
|
Meri Cleaner Inc
|
01/02/2018
|
01/02/2018
|
06/29/2018
|
|
Amendment
|
$0.00
|
DC006F
|
Harris Drive In Cleaners
|
12/19/2017
|
12/19/2017
|
|
|
Amendment
|
$0.00
|
DC14BCO2
|
Former Victoria Cleaners Reconciles site assessment costs
|
12/18/2017
|
12/18/2017
|
|
|
Amendment
|
$0.00
|
DC11BCO1
|
Time extension and additional assessment costs
|
12/15/2017
|
12/15/2017
|
06/01/2018
|
|
Amendment
|
$0.00
|
HW03BCO1
|
Cabot Carbon/Kopper site
|
12/15/2017
|
12/15/2017
|
|
|
Amendment
|
$0.00
|
BF004E
|
Former 3-D Oil Site
|
12/15/2017
|
12/15/2017
|
|
|
Amendment
|
$0.00
|
BF1A
|
UACDC
|
12/08/2017
|
12/08/2017
|
|
|
Amendment
|
$0.00
|
DC24A
|
Touch of Class Cleaners
|
11/22/2017
|
11/22/2017
|
|
|
Amendment
|
$0.00
|
HW002DCO
|
Funding Increase
|
11/20/2017
|
11/20/2017
|
|
|
Amendment
|
$0.00
|
DC05F
|
Phenix Supply Company
|
11/17/2017
|
11/17/2017
|
|
|
Amendment
|
$0.00
|
DC22A
|
Touch of Class Cleaners
|
11/16/2017
|
11/17/2017
|
|
|
Amendment
|
$0.00
|
DC23A
|
North Trail Laundryland
|
11/16/2017
|
11/16/2017
|
|
|
Amendment
|
$0.00
|
DC21A
|
Former Royal Dry Cleaner
|
11/16/2017
|
11/16/2017
|
|
|
Amendment
|
$0.00
|
DC19B
|
University Cleaners Inc
|
11/09/2017
|
11/09/2017
|
|
|
Amendment
|
$0.00
|
HW01M
|
Former Lakeland Tannery
|
11/09/2017
|
11/09/2017
|
|
|
Amendment
|
$0.00
|
DC05E
|
Phenix Supply Company
|
11/07/2017
|
11/07/2017
|
|
|
Amendment
|
$0.00
|
DC20B
|
White Sands Cleaners
|
11/07/2017
|
11/07/2017
|
|
|
Amendment
|
$0.00
|
DC20A
|
White Sands Cleaners
|
11/07/2017
|
11/07/2017
|
|
|
Amendment
|
$0.00
|
DC018B
|
McSherry's Dry Cleaner, Inc
|
11/07/2017
|
11/07/2017
|
|
|
Amendment
|
$0.00
|
BF009B
|
Entered in error
|
11/02/2017
|
11/02/2017
|
|
|
Amendment
|
$0.00
|
BF08B
|
Boynton Beach Town Square Project
|
11/02/2017
|
11/02/2017
|
|
|
Amendment
|
$0.00
|
BF09B
|
Tangerine Greenway
|
11/02/2017
|
11/02/2017
|
|
|
Amendment
|
$0.00
|
DC10BCO3
|
Former Merlin's Custom Cleaners
|
11/01/2017
|
11/01/2017
|
|
|
Amendment
|
$0.00
|
BF04DCO4
|
Former 3-D Oil Site, South Daytona
|
10/30/2017
|
10/30/2017
|
|
|
Amendment
|
$0.00
|
DC14BCO1
|
Funding Increase
|
10/26/2017
|
10/26/2017
|
|
|
Amendment
|
$0.00
|
HW01ICO1
|
Time Extension
|
10/26/2017
|
10/26/2017
|
|
|
Amendment
|
$0.00
|
DC19A
|
University Cleaners, Inc.
|
10/25/2017
|
10/25/2017
|
|
|
Amendment
|
$0.00
|
DC018A
|
McSherry's Dry Cleaner, Inc.
|
10/25/2017
|
10/25/2017
|
|
|
Amendment
|
$0.00
|
DC17A
|
Snowhite of Tampa, Inc
|
10/16/2017
|
10/16/2017
|
|
|
Amendment
|
$0.00
|
DC16A
|
Pronto Cleaners
|
10/16/2017
|
10/16/2017
|
|
|
Amendment
|
$0.00
|
HW01JCO2
|
Funding Decrease
|
10/10/2017
|
10/10/2017
|
|
|
Amendment
|
$0.00
|
DC01ACO2
|
Funding Increase
|
10/09/2017
|
10/09/2017
|
|
|
Amendment
|
$0.00
|
DC07D
|
Nelsons Cleaners
|
09/20/2017
|
09/20/2017
|
|
|
Amendment
|
$0.00
|
HW02DCO1
|
Time Extension
|
09/20/2017
|
09/20/2017
|
|
|
Amendment
|
$0.00
|
DC13BCO1
|
Increase in funds
|
09/15/2017
|
09/15/2017
|
|
|
Amendment
|
$0.00
|
CO3
|
Contractor Contract Manager Change
|
09/09/2017
|
09/09/2017
|
|
|
Amendment
|
$0.00
|
DC12BCO1
|
Funding Increase
|
09/07/2017
|
09/07/2017
|
|
|
Amendment
|
$0.00
|
HW001L
|
Former Lakeland Tannery
|
09/05/2017
|
09/05/2017
|
|
|
Amendment
|
$0.00
|
BF04DCO3
|
Task assignment end date extension
|
08/30/2017
|
08/30/2017
|
|
|
Amendment
|
$0.00
|
DC015B
|
Meri Cleaner Inc.
|
08/29/2017
|
08/29/2017
|
|
|
Amendment
|
$0.00
|
DC006E
|
Harris Drive In Cleaners
|
08/29/2017
|
08/29/2017
|
|
|
Amendment
|
$0.00
|
DC001E
|
Site Review Meeting
|
08/22/2017
|
08/22/2017
|
|
|
Amendment
|
$0.00
|
DC06CCO2
|
Increase in time
|
08/22/2017
|
08/22/2017
|
|
|
Amendment
|
$0.00
|
DC001D
|
Site Review Meeting
|
08/21/2017
|
08/21/2017
|
|
|
Amendment
|
$0.00
|
DC014B
|
Former Victoria Cleaners
|
08/10/2017
|
08/10/2017
|
|
|
Amendment
|
$0.00
|
DC004F
|
MAJIC TOUCH CLEANERS AND LAUNDRY
|
08/10/2017
|
08/10/2017
|
|
|
Amendment
|
$0.00
|
DC10BCO2
|
Costs for additional assessment and time extension
|
07/28/2017
|
07/28/2017
|
01/31/2018
|
|
Amendment
|
$0.00
|
DC03E
|
Carrige Trade Dry Cleaners
|
07/28/2017
|
07/28/2017
|
|
|
Amendment
|
$0.00
|
DC02D
|
Gulf States Beauty Supply (Formerly)
|
07/28/2017
|
07/28/2017
|
|
|
Amendment
|
$0.00
|
DC07CCO1
|
Decrease in funds
|
07/28/2017
|
07/28/2017
|
|
|
Amendment
|
$0.00
|
DC01ACO1
|
Funding Increase
|
07/27/2017
|
07/27/2017
|
|
|
Amendment
|
$0.00
|
HW01HCO1
|
Time Extension
|
07/27/2017
|
07/27/2017
|
|
|
Amendment
|
$0.00
|
HW01JCO1
|
Increase in funds
|
07/20/2017
|
07/20/2017
|
|
|
Amendment
|
$2,020,000.00
|
FIL 10
|
Increase in funding
|
07/13/2017
|
07/13/2017
|
|
|
Amendment
|
$0.00
|
HW003B
|
Cabot Carbon/Koppers Site
|
07/13/2017
|
07/13/2017
|
02/22/2018
|
|
Amendment
|
$0.00
|
HW001K
|
Former Lakeland Tannery
|
06/26/2017
|
06/26/2017
|
|
|
Amendment
|
$0.00
|
DC11B
|
Rose Dry Cleaners and Laundromat
|
06/22/2017
|
06/22/2017
|
|
|
Amendment
|
$0.00
|
DC13B
|
Classic Cleaners 2
|
06/21/2017
|
06/21/2017
|
|
|
Amendment
|
$0.00
|
DC12B
|
Spring Fresh Dry Cleaning
|
06/15/2017
|
06/15/2017
|
|
|
Amendment
|
$0.00
|
DC10BCO1
|
Increase in funds
|
06/13/2017
|
06/13/2017
|
|
|
Amendment
|
$0.00
|
DC15A
|
Meri Cleaner Inc.
|
06/07/2017
|
06/07/2017
|
|
|
Amendment
|
$0.00
|
BF009A
|
Tangerine Greenway
|
05/30/2017
|
05/30/2017
|
|
|
Amendment
|
$0.00
|
BF008A
|
Boynton Beach Redevelopment Property
|
05/25/2017
|
05/25/2017
|
|
|
Amendment
|
$0.00
|
DC009D
|
White Sands & North Trail Laundryland
|
05/16/2017
|
05/16/2017
|
|
|
Amendment
|
$0.00
|
DC14ACO1
|
Time Extension
|
05/16/2017
|
05/16/2017
|
|
|
Amendment
|
$0.00
|
DC06CCO1
|
Harris Drive In Cleaners
|
05/16/2017
|
05/16/2017
|
|
|
Amendment
|
$0.00
|
DC005D
|
Phenix Supply Company
|
05/08/2017
|
05/08/2017
|
|
|
Amendment
|
$0.00
|
HW001J
|
Additional Soil Sampling
|
05/04/2017
|
05/04/2017
|
|
|
Amendment
|
$0.00
|
DC014A
|
Former Victoria Cleaners
|
04/28/2017
|
04/28/2017
|
|
|
Amendment
|
$0.00
|
HW002D
|
Olive Street East
|
04/25/2017
|
04/25/2017
|
|
|
Amendment
|
$0.00
|
DC03DCO2
|
Carriage Trade Dry Cleaners
|
04/25/2017
|
04/25/2017
|
|
|
Amendment
|
$0.00
|
DC013A
|
Classicc Cleaners
|
04/17/2017
|
04/17/2017
|
|
|
Amendment
|
$0.00
|
DC012A
|
Spring Fresh Dry Cleaning
|
04/14/2017
|
04/14/2017
|
|
|
Amendment
|
$0.00
|
HW001I
|
Former Lakeland Tannery
|
04/10/2017
|
04/10/2017
|
|
|
Amendment
|
$0.00
|
DC007C
|
Nelsons Cleaners
|
04/05/2017
|
04/05/2017
|
|
|
Amendment
|
$0.00
|
HW01GCO2
|
Former Lakeland Tannery
|
04/05/2017
|
04/05/2017
|
|
|
Amendment
|
$0.00
|
HW02CCO3
|
Olive Street East
|
04/05/2017
|
04/05/2017
|
|
|
Amendment
|
$0.00
|
DC02CC02
|
Gulf States Beauty Supply
|
04/03/2017
|
04/03/2017
|
|
|
Amendment
|
$0.00
|
DC010B
|
Former Merline's Custom Cleaners
|
03/30/2017
|
03/30/2017
|
|
|
Amendment
|
$0.00
|
DC011A
|
ERIC 5378
|
03/28/2017
|
03/28/2017
|
|
|
Amendment
|
$0.00
|
CO2
|
Change contract manager name
|
03/23/2017
|
03/23/2017
|
|
|
Amendment
|
$0.00
|
HW03ACO1
|
Cabot Carbon
|
03/17/2017
|
03/17/2017
|
|
|
Amendment
|
$270,000.00
|
FIL 9
|
Funding Increase
|
03/15/2017
|
03/15/2017
|
|
|
Amendment
|
$0.00
|
DC009C
|
Multiple
|
03/13/2017
|
03/13/2017
|
|
|
Amendment
|
$0.00
|
HW02CCO2
|
Olive Street East
|
03/10/2017
|
03/10/2017
|
|
|
Amendment
|
$0.00
|
DC006D
|
Harris Drive In Cleaners
|
03/01/2017
|
03/01/2017
|
|
|
Amendment
|
$0.00
|
BF06BCO2
|
126th Ave. Landfill
|
02/21/2017
|
02/21/2017
|
|
|
Amendment
|
$0.00
|
BF06BCO4
|
126th Ave. Landfill
|
02/14/2017
|
02/14/2017
|
|
|
Amendment
|
$0.00
|
BF007A
|
Health Care Center for the Homeless
|
02/14/2017
|
02/14/2017
|
|
|
Amendment
|
$0.00
|
DC03DCO1
|
Carriage Trade Dry Cleaners
|
02/13/2017
|
02/13/2017
|
|
|
Amendment
|
$0.00
|
DC009B
|
Assessment
|
02/13/2017
|
02/13/2017
|
|
|
Amendment
|
$0.00
|
DC010A
|
Former Merlin's Custom Cleaners
|
02/07/2017
|
02/07/2017
|
|
|
Amendment
|
$0.00
|
BF04DCO2
|
3-D Oil Site
|
02/06/2017
|
02/06/2017
|
|
|
Amendment
|
$0.00
|
BF06BCO3
|
126th Ave. Landfill
|
01/27/2017
|
01/27/2017
|
|
|
Amendment
|
$0.00
|
HW003A
|
Cabot Carbon/Koppers Site
|
01/26/2017
|
01/26/2017
|
|
|
Amendment
|
$0.00
|
DC006C
|
Harris Drive In Cleaners
|
01/23/2017
|
01/23/2017
|
|
|
Amendment
|
$0.00
|
DC06BCO2
|
Harris Drive In Cleaners
|
01/23/2017
|
01/23/2017
|
|
|
Amendment
|
$0.00
|
DC004E
|
Majik Touch Cleaners and Laundry
|
01/20/2017
|
01/20/2017
|
|
|
Amendment
|
$0.00
|
DC02CCO1
|
Gulf States Beauty Supply (Formerly)
|
01/17/2017
|
01/17/2017
|
|
|
Amendment
|
$0.00
|
HW01ECO1
|
Additional task time
|
12/22/2016
|
12/22/2016
|
|
|
Amendment
|
$0.00
|
DC05CCO3
|
Additional task time
|
12/22/2016
|
12/22/2016
|
|
|
Amendment
|
$0.00
|
DC09A
|
Multiple
|
12/19/2016
|
12/19/2016
|
|
|
Amendment
|
$0.00
|
DC01C
|
Sight review meeting
|
12/16/2016
|
12/16/2016
|
|
|
Amendment
|
$0.00
|
DC01B
|
Site Review Meeting
|
12/15/2016
|
12/15/2016
|
|
|
Amendment
|
$0.00
|
BF06BCO1
|
126th Ave. Landfill
|
12/09/2016
|
12/09/2016
|
|
|
Amendment
|
$0.00
|
HW02CCO1
|
Olive Street East (South Central Avenue)
|
12/01/2016
|
12/01/2016
|
|
|
Amendment
|
$0.00
|
HW01H
|
Former Lakeland Tannery
|
11/28/2016
|
11/28/2016
|
|
|
Amendment
|
$0.00
|
DC04D
|
Majik Touch Cleaners and Laundry
|
11/28/2016
|
11/28/2016
|
|
|
Amendment
|
$0.00
|
HW01GCO1
|
Former Lakeland Tannery
|
11/23/2016
|
11/23/2016
|
|
|
Amendment
|
$0.00
|
DC02C
|
Gulf States Beauty Supply (Formerly)
|
11/21/2016
|
11/21/2016
|
|
|
Amendment
|
$0.00
|
DC07BCO4
|
Nelson's Cleaners
|
11/04/2016
|
11/04/2016
|
|
|
Amendment
|
$0.00
|
DC03CCO2
|
Correction of Invoice/Deliverable Schedule
|
10/27/2016
|
10/27/2016
|
|
|
Amendment
|
$0.00
|
HW01G
|
Annual groundwater monitoring
|
10/20/2016
|
10/20/2016
|
|
|
Amendment
|
$0.00
|
BF04DCO1
|
3D Oil Site, South Daytona Beach
|
09/30/2016
|
09/30/2016
|
|
|
Amendment
|
$0.00
|
DC03D
|
Carriage Trade Dry Cleaners
|
09/29/2016
|
09/29/2016
|
|
|
Amendment
|
$0.00
|
DC03CCO1
|
Carriage trade Dry Cleaners - Increase task amount
|
09/19/2016
|
09/19/2016
|
|
|
Amendment
|
$0.00
|
DC05CCO2
|
Phenix Supply Company - Increase task amount
|
09/12/2016
|
09/12/2016
|
|
|
Amendment
|
$0.00
|
BF04D
|
Former 3-D Oil Distribution Facility
|
09/08/2016
|
09/08/2016
|
|
|
Amendment
|
$0.00
|
BF06B
|
126th Ave. Landfill
|
08/29/2016
|
08/29/2016
|
|
|
Amendment
|
$0.00
|
BF006B
|
126th Ave. Landfill
|
08/29/2016
|
08/29/2016
|
|
|
Amendment
|
$1,228,000.00
|
FIL8
|
Funding Increment Increase
|
07/25/2016
|
07/25/2016
|
|
|
Amendment
|
$0.00
|
DC07BCO3
|
Additional Task Time
|
07/22/2016
|
07/22/2016
|
|
|
Amendment
|
$0.00
|
HW01DCO2
|
Former Lakeland Tannery
|
07/12/2016
|
07/12/2016
|
|
|
Amendment
|
$0.00
|
HW002C
|
Olive Street East
|
06/28/2016
|
06/28/2016
|
|
|
Amendment
|
$0.00
|
DC05CCO1
|
Phenix Supply Company
|
06/24/2016
|
06/24/2016
|
|
|
Amendment
|
$0.00
|
HW001F
|
Former Lakeland Tannery
|
06/24/2016
|
06/24/2016
|
|
|
Amendment
|
$0.00
|
BF06ACO2
|
Extend final deliverable date
|
06/24/2016
|
06/24/2016
|
07/29/2016
|
|
Amendment
|
$0.00
|
BF04CCO2
|
Extend deliverable due date
|
06/22/2016
|
06/22/2016
|
07/29/2016
|
|
Amendment
|
$0.00
|
BF04CCO1
|
ADDITIONAL TIME
|
06/09/2016
|
06/09/2016
|
06/24/2016
|
|
Amendment
|
$0.00
|
BF06ACO1
|
126TH AVE LANDFILL
|
05/20/2016
|
05/20/2016
|
|
|
Amendment
|
$0.00
|
HW02B
|
Olive Street East (South Central Avenue
|
05/12/2016
|
05/12/2016
|
|
|
Amendment
|
$0.00
|
DC07BCO2
|
Nelson's Cleaners
|
05/12/2016
|
05/12/2016
|
|
|
Amendment
|
$0.00
|
HW01E
|
Former Lakeland Tannery
|
05/12/2016
|
05/12/2016
|
|
|
Amendment
|
$0.00
|
DC005C
|
Phenix Supply Company
|
04/14/2016
|
04/14/2016
|
|
|
Amendment
|
$0.00
|
HW002A
|
Olive Street East
|
04/04/2016
|
04/04/2016
|
|
|
Amendment
|
$0.00
|
DC008A
|
Classic Cleaners
|
04/04/2016
|
04/04/2016
|
|
|
Amendment
|
$0.00
|
BF006A
|
126th Ave. Landfill
|
03/30/2016
|
03/30/2016
|
|
|
Amendment
|
$0.00
|
HW01DCO1
|
Additional Fill Western Parcel Restoration
|
03/24/2016
|
03/24/2016
|
|
|
Amendment
|
$0.00
|
BF004C
|
Former 3-D Oil Distribution Facility
|
03/23/2016
|
03/23/2016
|
|
|
Amendment
|
$0.00
|
DC07BCO1
|
Decrease Task Funding
|
03/21/2016
|
03/21/2016
|
|
|
Amendment
|
$365,000.00
|
FIL7
|
Funding Increment
|
03/07/2016
|
03/07/2016
|
|
|
Amendment
|
$0.00
|
HW01CCO1
|
Former Lakeland Tannery
|
03/04/2016
|
03/04/2016
|
|
|
Amendment
|
$0.00
|
DC06B
|
Harris Drive In Cleaners
|
02/24/2016
|
02/24/2016
|
10/31/2016
|
|
Amendment
|
$0.00
|
HW01D
|
Former Lakeland Tannery
|
02/22/2016
|
02/22/2016
|
06/30/2016
|
|
Amendment
|
$0.00
|
DC03C
|
Carriage Trade Dry Cleaners
|
01/04/2016
|
01/04/2016
|
|
|
Amendment
|
$0.00
|
DC07B
|
Nelson's Cleaners
|
01/04/2016
|
01/04/2016
|
|
|
Amendment
|
$0.00
|
DC05BCO1
|
Phenix Supply Company
|
12/07/2015
|
12/07/2015
|
|
|
Amendment
|
$0.00
|
HW01C
|
Former Laakeland Tannery
|
11/16/2015
|
11/16/2015
|
|
|
Amendment
|
$0.00
|
HW01B
|
Former Lakeland Tannery
|
10/16/2015
|
10/16/2015
|
|
|
Amendment
|
$0.00
|
DC07A
|
Nelsons Cleaners
|
10/06/2015
|
10/06/2015
|
01/29/2016
|
|
Amendment
|
$310,000.00
|
FIL6
|
Funding Increase
|
10/05/2015
|
10/05/2015
|
|
|
Amendment
|
$0.00
|
DC05ACO1
|
Phenix Supply Company
|
09/29/2015
|
09/29/2015
|
03/30/2015
|
|
Amendment
|
$0.00
|
DC05B
|
Phenix Supply Company
|
09/29/2015
|
09/29/2015
|
01/29/2016
|
|
Amendment
|
$0.00
|
DC06A
|
Harris Drive In Cleaners
|
09/22/2015
|
09/22/2015
|
12/31/2015
|
|
Amendment
|
$0.00
|
DC05A
|
Phenix Supply Company
|
09/13/2015
|
09/13/2015
|
|
|
Amendment
|
$0.00
|
DC04C
|
Majik Touch Cleaners and Laundry
|
09/10/2015
|
09/10/2015
|
|
|
Amendment
|
$0.00
|
DC02BCO2
|
Gulf States Beauty Supply (Formerly)
|
08/26/2015
|
08/26/2015
|
|
|
Amendment
|
$0.00
|
HW01A
|
Former Lakeland Tannery
|
08/11/2015
|
08/11/2015
|
12/31/2015
|
|
Amendment
|
$0.00
|
DC03BCO2
|
Carriage Trade Dry Cleaners
|
08/05/2015
|
08/05/2015
|
|
|
Amendment
|
$290,000.00
|
FIL5
|
Funding Increase
|
08/05/2015
|
08/05/2015
|
|
|
Amendment
|
$0.00
|
BF05BCO3
|
TMH Foundation/Childs Property
|
07/16/2015
|
07/16/2015
|
|
|
Amendment
|
$0.00
|
BF05BCO2
|
TMH Foundation/Childs Property, Tallahassee, FL
|
06/30/2015
|
06/30/2015
|
|
|
Amendment
|
$0.00
|
DC03BCO1
|
Carriage Trade Dry Cleaners
|
06/24/2015
|
06/24/2015
|
|
|
Amendment
|
$0.00
|
DC02BCO1
|
Gulf States Beauty Supply (Formerly)
|
06/16/2015
|
06/16/2015
|
10/13/2015
|
|
Amendment
|
$0.00
|
BF05BCO1
|
TMH Foundation/Childs Property
|
06/05/2015
|
06/05/2015
|
|
|
Amendment
|
$0.00
|
A7
|
Paragraph 24 replaced. Attachment E-1 replaced with E-2.
|
05/28/2015
|
05/28/2015
|
|
|
Amendment
|
$0.00
|
BF05B
|
TMH foundation / Childs Property
|
04/14/2015
|
04/14/2015
|
|
|
Amendment
|
$0.00
|
DC04B
|
Majik Touch Cleaners and Laundry
|
04/08/2015
|
04/08/2015
|
|
|
Amendment
|
$0.00
|
DC03B
|
Carriage Trade Dry Cleaners
|
03/18/2015
|
03/18/2015
|
|
|
Amendment
|
$0.00
|
BF05ACO2
|
TMH Foundation/Childs Property, Tallahassee, FL
|
03/17/2015
|
03/17/2015
|
|
|
Amendment
|
$0.00
|
DC02B
|
Gulf States Beauty Supply (Formerly)
|
03/05/2015
|
03/05/2015
|
|
|
Amendment
|
$30,000.00
|
FIL4
|
Funding Increase
|
02/16/2015
|
02/16/2015
|
|
|
Amendment
|
$0.00
|
DC03ACO1
|
Carriage Trade Dry Cleaners
|
12/19/2014
|
12/19/2014
|
|
|
Amendment
|
$0.00
|
BF04BCO3
|
3-D Oil Site, South Daytona Beach
|
12/15/2014
|
12/15/2014
|
|
|
Amendment
|
$0.00
|
DC04A
|
Former Majik Touch Cleaners and Laundry
|
12/11/2014
|
12/11/2014
|
|
|
Amendment
|
$0.00
|
BF05A
|
TMH Foundation/Childs Property
|
12/01/2014
|
12/01/2014
|
|
|
Amendment
|
$30,000.00
|
A6
|
Corrected funding amt in A5, fund. increase
|
11/25/2014
|
11/25/2014
|
|
|
Amendment
|
$0.00
|
DC02ACO1
|
Gulf States Beauty Supply
|
11/18/2014
|
11/18/2014
|
|
|
Amendment
|
$0.00
|
DC03A
|
Carriage Trade Dry Cleaners
|
11/17/2014
|
11/17/2014
|
|
|
Amendment
|
$0.00
|
BF04BCO2
|
3-D Oil Site, South Daytona Beach
|
10/29/2014
|
10/29/2014
|
|
|
Amendment
|
$0.00
|
DC02A
|
Gulf States Beauty Supply
|
10/13/2014
|
10/13/2014
|
|
|
Amendment
|
$0.00
|
DC01A
|
Multiple locations
|
10/13/2014
|
10/13/2014
|
|
|
Amendment
|
$0.00
|
BF04BCO1
|
3-D Oil Site
|
09/09/2014
|
09/09/2014
|
|
|
Amendment
|
$0.00
|
BF04B
|
3-D Oil Site
|
08/15/2014
|
08/15/2014
|
|
|
Amendment
|
$0.00
|
CO1
|
Paragraph 24 replaced and revised
|
07/11/2014
|
07/11/2014
|
|
|
Amendment
|
$15,000.00
|
FIL3
|
Funding increase
|
05/20/2014
|
05/20/2014
|
|
|
Renewal
|
($6,294.57)
|
A4
|
Renewal, funding and rate decrease
|
03/31/2014
|
03/31/2014
|
12/26/2020
|
|
Amendment
|
$0.00
|
BF01A
|
Former 3-D Oil Distribution Facility
|
12/09/2013
|
12/09/2013
|
|
|
Amendment
|
$75,000.00
|
A3
|
Funding increase
|
11/26/2013
|
11/26/2013
|
|
|
Amendment
|
$0.00
|
BF04ACO1
|
Task Fund Decrease
|
09/30/2013
|
09/30/2013
|
|
|
Amendment
|
$0.00
|
BF04A
|
Former 3-D Oil Distribution Facility
|
07/29/2013
|
07/29/2013
|
|
|
Amendment
|
$0.00
|
BF03CCO1
|
Task Funding Increase
|
05/06/2013
|
05/06/2013
|
|
|
Amendment
|
$0.00
|
BF03C
|
Former Bunnell Hospital
|
04/01/2013
|
04/01/2013
|
|
|
Amendment
|
$35,000.00
|
FIL2
|
Funding Increase
|
03/19/2013
|
03/19/2013
|
|
|
Amendment
|
$0.00
|
BF03B
|
Former Bunnell Hospital
|
01/30/2013
|
01/30/2013
|
|
|
Amendment
|
$0.00
|
BF03ACO1
|
Task BF03A Time Extension
|
11/29/2012
|
11/29/2012
|
|
|
Amendment
|
$0.00
|
BF03A
|
Flagler County Free Clinic
|
09/07/2012
|
09/07/2012
|
|
|
Amendment
|
$8,191.29
|
A2
|
Funding increase and language change
|
08/06/2012
|
08/06/2012
|
|
|
Amendment
|
$0.00
|
TBF002A
|
A to Z Recycling and Salvage Site
|
04/13/2012
|
04/13/2012
|
|
|
Amendment
|
$60,000.00
|
FIL1
|
Funding Increase
|
02/16/2012
|
02/16/2012
|
|
|
Amendment
|
$0.00
|
A1
|
Contractor Address Change; Add Language
|
10/06/2011
|
10/06/2011
|
|