Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
ENVIRONMENTAL ENGINEERS
|
Waste Cleanup Program Services. Deliverables will be established on a Task Assignment basis.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Waste Cleanup Program Services. Deliverables will be established on a Task Assignment basis. |
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task HW001C: Submittal and FDEP approval of Field notes, sampling logs, and lab report - Subtask 2 ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task HW001C: Submittal and FDEP approval of Field notes, sampling logs, and lab report - Subtask 2 $2,690.97; Submittal and FDEP approval of Semi-Annual GW Sampling Report - subtask 3 $4,651.77; Submittal and FDEP approval of Field notes, sampling logs, and lab report - subtask 3 $2,690.97; Submittal and FDEP approval of Semi-Annual GW Sampling Report - subtasks 1 & 4 $5,865.18 |
| Deliverable Price: $15,898.89 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
TASK DC007I: Submittal and FDEP approval of the Annual Groundwater Monitoring Report, GIS tables, an...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TASK DC007I: Submittal and FDEP approval of the Annual Groundwater Monitoring Report, GIS tables, and EDD logs and EDD error logs Subtasks 1 &2: $4,058.79.
|
| Deliverable Price: $4,058.79 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: page 1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
DC019D, Del. 1: Subtask 2: FDEP approval of Electronic notification of Quarter 5 O&M Completion: $3...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: DC019D, Del. 1: Subtask 2: FDEP approval of Electronic notification of Quarter 5 O&M Completion: $3,456.23; Subtask 3: FDEP approval of Quarters 5&6 Semi-Annual O&M Report with ADaPT deliverables: $7,621.33; Subtask 6: FDEP approval of utilitiy invoices for 6 months of O&M= not to exceed $6,900.00, Utilities Handling Fee= $240; Subtask 4: FDEP Approval of Electronic Notification of Quarter 7 O&M Completion: $6,529.11; Subtask 1 & 5: FDEP approval of Quarters 7 & 8 Semi-Annual O&M Report with ADaPT deliverables: $8,034.84; Subtask 6: FDEP approval of utility invoices for 6 months of O&M= not to exceed $6,900, Utilities Handling Fee = $240. FEDEP approval of email documentation of troubleshoot results and system re-start - subtask 8: $382.42; FDEP approval of utility invoices for 4 months of O&M not to exceed $4600, Utilities Handling Fee $160. Total Task cost not to exceed $45,063.93
CO1: replacement of well pad and oversight for asphalt repaving; CO2: Increase in funding CO3: Increase in funding |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: DC019DCO3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
DC001H: Submittal and DEP approval of site status meeting presentation and notes - Subtask 1 & 2
|
Fixed Price - Lump Sum
|
| Major Deliverable: DC001H: Submittal and DEP approval of site status meeting presentation and notes - Subtask 1 & 2 |
| Deliverable Price: $4,316.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC020E: FDEP approval of Electronic Notification of Quarter 9 O&M completion: $6913.32;
FDEP ap...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task DC020E: FDEP approval of Electronic Notification of Quarter 9 O&M completion: $6913.32;
FDEP approval of Quarter 9 & 10 Semi-Annual RASS Report with ADaPT deliverables: $6904.68;
FDEP approval of 6 months paid utility invoices. Utilities (Cost Plus Fixed Fee) = not to exceed $6000. Utilities Handling Fee = $120: $6120.00;
FDEP approval of Electronic notification of quarter 11 O&M completion: $3540.96;
FDEP approval of quarters 11 & 12 Semi-annual RASS report with ADaPT deliverables: $8940.38;
FDEP approval of 6 months paid utility invoices. Utilities (Cost Plus Fixed Fee) = not to exceed $6000. Utilities Handling Fee = $120: $6120.00. CO1- decrease in funding
|
| Deliverable Price: $38,539.34 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: DC020ECO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC019F: FDEP Submittal and approval of Quarter 13 O&M and groundwater sampling activities deliv...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task DC019F: FDEP Submittal and approval of Quarter 13 O&M and groundwater sampling activities deliverables-subtask 2 $6,420.60; FDEP Submittal and approval of Quarter 14 O& M and RASS report- subtask 3 $7,446.33; FDEP submittal and approval of 6 months paid utilities not to exceed $6900 with utilities handling fee not to exceed $240 total not to exceed for subtask 6 $7,140.00; FDEP Submittal and approval of Quarter 15 O&M activities deliverables- subtask 4 $4,076.99; Submittal and approval of Quarter 16 O& M and RASS report- subtask 5 and subtask 1 $9,666.23; FDEP submittal and approval of 6 months paid utilities not to exceed $6900 with utilities handling fee not to exceed $240 total not to exceed for subtask 6 $7,140.00. Total not to exceed $41,890.15 |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC011H Del: FDEP approval of Equipment Inventory Report (Subtasks 1-2) = $13,791.53.
CO1: Decre...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task DC011H Del: FDEP approval of Equipment Inventory Report (Subtasks 1-2) = $13,791.53.
CO1: Decrease in funding.
|
| Deliverable Price: $13,791.53 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC024: FDEP submittal and approval of Annual Monitoring of Natural
Attenuation Report - Subtask...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task DC024: FDEP submittal and approval of Annual Monitoring of Natural
Attenuation Report - Subtask 1 & 2 = $4,563.29
|
| Deliverable Price: $4,563.29 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC013F: "Submittal and FDEP approval of field notes, well construction logs : $8,332.52;
Submi...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task DC013F: "Submittal and FDEP approval of field notes, well construction logs : $8,332.52;
Submittal and FDEP approval of Annual MNA Report : $6,337.69;
Submittal and FDEP approval of Annual UIC Report : $4,463.44;
Submittal and FDEP approval of SVE piping documentation deliverable: $7,004.68"
|
| Deliverable Price: $26,138.33 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: DC013F & CO3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC019C :Subtask 2-FDEP Approval of Electronic Notification of Year 1, Quarter 1 O&M Completion...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task DC019C :Subtask 2-FDEP Approval of Electronic Notification of Year 1, Quarter 1 O&M Completion $2380.10. Subtasks 3 & 7-FDEP Approval Year 1, Quarters 1 & 2 Semi Annual O&M Report with ADaPT deliverables $7834.73. Part of Subtask 6-FDEP approval of utility invoices for 5 months of O&M: (Utilities Cost Plus Fixed Fee not to exceed $5,750.00 & Utilities Handling Fee $200) $5950.00. Part of Subtask 6-FDEP approval of utility Invoices for 6 months of O&M: (Utilities Cost Plus Fixed Fee not to exceed $6,900.00 & Utilities Handling Fee $240.00) $7140.00. Subtask 4-FDEP Approval of Electronic Notification of Year 1, Quarter 3 O&M Completion $3156.93. Subtasks 1 & 5-FDEP Approval of Year 1, Quarters 3 & 4 Semi Annual O&M Report with ADaPT deliverables $7210.52. The Department shall pay the Contractor on a cost plus basis, not to exceed $33,672.28; CO1- funding increase. CO2 - Additional task time CO3- decrease task amount |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: DC019CCO2 & CO3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC024C: "Submittal and FDEP approval of field notes, lab data, sampling logs, figures, and COC...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task DC024C: "Submittal and FDEP approval of field notes, lab data, sampling logs, figures, and COCs: $3,492.18;
Submittal and FDEP approval of field notes, lab data, sampling logs, figures, and COCs : $2,423.20;
Submittal and FDEP approval of Groundwater Sampling Report, GIS tables, and EDD error logs : $5,729.28"
|
| Deliverable Price: $11,644.66 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: DC24C |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
TASK DC013G: Submittal and FDEP Approval of SVE Pilot Test: $2,797.99; Submittal and FDEP approval o...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TASK DC013G: Submittal and FDEP Approval of SVE Pilot Test: $2,797.99; Submittal and FDEP approval of Remedial Alternatives Evaluation: $2,620.25.CO1- increase in funding.
|
| Deliverable Price: $5,418.24 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: DC13GC01 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC012I: FDEP approval of Photo documentation log, confirmatory email message and completed emai...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task DC012I: FDEP approval of Photo documentation log, confirmatory email message and completed email message and completed equipment chain of custody upon completion of all activities: $3672.90
|
| Deliverable Price: $3,672.90 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: DC012I |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC003J: Submittal and FDEP approval of Annual Monitoring of Natural Attenuation Report, GIS tab...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task DC003J: Submittal and FDEP approval of Annual Monitoring of Natural Attenuation Report, GIS tables, and ADaPT deliverables (Subtasks 1 & 3) =$4525.09.
CO1: Cost reduction for well installation.
|
| Deliverable Price: $4,525.09 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: DC03JCO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC019E: Subtask 2: Submittal and FDEP approval of electronic notification of quarter 9 O&M comp...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task DC019E: Subtask 2: Submittal and FDEP approval of electronic notification of quarter 9 O&M completion = $7516.10; Subtask 3: FDEP approval of Quarters 9 & 10 Semi-annual O&M report with ADaPT deliverables= $7273.16; Subtask 6: FDEP approval of 6 months paid utility invoices. Utilities (Cost Plus Fixed Fee)= not to exceed $6900. Utilities Handling Fee = $240; Total =$3,671.08; Subtask 4: FDEP approval of electronic notification of quarter 11 O&M completion $2,903.22;
Subtasks 1 & 5: FDEP approval of Quarters 11 & 12 Semi-annual O&M report with ADaPT deliverables = $12,691.05;
Subtask 6: FDEP approval of 6 months pair utility invoices. Utilities (Cost Plus Fixed Fee)= not to exceed $6900. Utilities handling fee= $240. Total = $7140.00
CO1: Increase in cost; CO2: Decrease in cost; CO3: Task Time Change - sample & abandon 4 offsite monitoring wells. Utilities cost; CO4: Cost Reduction for unused labor hours. Total cost not to exceed $41,194.61 |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: DC19ECO4 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC015E: Subtasks 1 & 2 - FDEP approval of annual Monitoring of Natural Attenuation Report.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task DC015E: Subtasks 1 & 2 - FDEP approval of annual Monitoring of Natural Attenuation Report.
|
| Deliverable Price: $4,202.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
TASK DC013K, Subtasks 2-4: FDEP approval of all Remediation System Installation activities, startup...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: TASK DC013K, Subtasks 2-4: FDEP approval of all Remediation System Installation activities, startup activities and SVE system startup report, and first month of system operation activities (previously invoiced) $51,140.21; Subtasks 5 & 6 - FDEP approval of all baseline groundwater sampling activities and injection well installation activities (previously invoiced) $17,755.17; Subtask 7 - FDEP approval of Injection and Groundwater Status deliverable $27,639.55; Subtask 8 - FDEP approval of paid Utilities receipts for first moth of O&M (cost plus fixed fee) not to exceed $750.00, Handling Fees $20.00 (previously invoiced) $205.54; Subtasks 1 & 9 - FDEP approval of Groundwater Monitoring Report, GIS/ADaPT, project Management $9,926.95. Task Total = $106,667.42.
CO1: Time extension. CO2: Increase in task amount. CO3: Time Extension. CO4: reconcile costs WCD #3 and revise Scope of Work; CO5: Cost decrease, Additional task & Time Extension. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: CO5 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC007H, Del 1: Submittal and FDEP approval of Annual Groundwater Monitoring Report, GIS tables,...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task DC007H, Del 1: Submittal and FDEP approval of Annual Groundwater Monitoring Report, GIS tables, and EDD logs and EDD error logs: $3,848.55.
|
| Deliverable Price: $3,848.55 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: page 1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC024B: FDEP approval of MAGS notes, logs, tables, & figures - Subtask 2: $9,046.19; FDEP appro...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task DC024B: FDEP approval of MAGS notes, logs, tables, & figures - Subtask 2: $9,046.19; FDEP approval of Site Assessment notes, logs, tables, & figures - Subtask 3: $43,932.38; FDEP approval of SAR including final IDW manifests (if applicable) & FDEP EDDs - Subtask 4: $9,781.49; CO1 - Decrease task amount
|
| Deliverable Price: $62,760.06 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: 1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Electronic Notification of Year 1, Quarter 1 O&M Completion- $2,3800.10
Year 1, Quarters 1 & 2 Semi...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Electronic Notification of Year 1, Quarter 1 O&M Completion- $2,3800.10
Year 1, Quarters 1 & 2 Semi Annual O&M Report with ADaPT deliverables- $5,711.28
utility invoices for 5 months of O&M: Utilities (Cost Plus Fixed Fee) = not to exceed $5,750.00
Utilities Handling Fee = $200
Electronic Notification of Year 1, Quarter 3 O&M Completion- $3,156.93
Year 1, Quarters 3 & 4 Semi Annual O&M Report with ADaPT deliverables- $7,128.05
utility invoices for 6 months of O&M: Utilities (Cost Plus Fixed Fee) = not to exceed $6,900.00
Utilities Handling Fee = $240.00 |
| Deliverable Price: $31,466.36 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: FACTS Workbook |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC009I: Submittal Submittal and FDEP approval of Well Installation Logs and Field notes: $3,527...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task DC009I: Submittal Submittal and FDEP approval of Well Installation Logs and Field notes: $3,527.93; Submittal and FDEP approval of baseline groundwater monitoring email summary to include sampling logs and field notes: $1,870.30; Submittal and FDEP approval of Groundwater Remedial Action Implementation Report: $16,392.14; Submittal and FDEP approval of Semi-Annual Performance Groundwater Monitoring Report: $4,566.94; Submittal and FDEP approval of Annual Performance Groundwater Monitoring Report: $7,537.94. CO1- Funding decrease. CO2-funding decrease. |
| Deliverable Price: $34,225.25 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: DC009ICO2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC015A: DEP approval of Remedial Action Plan. Completion of Milestone 1 (System Design): $9,500...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task DC015A: DEP approval of Remedial Action Plan. Completion of Milestone 1 (System Design): $9,500; DEP Approval of Remedial Action Statrtup Report. Completion of Milestone 2-(System Install and Startup): $19,000; DEP approval of all Episodic Event field notes and lab reports, and all Remedial Action System Startup Reports. Completion of Milestone 3-Source Removal: $38,000; DEP approval of Site Closure Report. Completion of Milestone 4-System Removal: $28,500. CO1 - task time extension. CO2 - task time extension. CO3 - task time extension. CO4 - task time extension. CO5-task time extension. |
| Deliverable Price: $95,000.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: DC015ACO5 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC010G: Submittal and FDEP Approval of Annual Groundwater Monitoring Report, GIS tables, and ED...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task DC010G: Submittal and FDEP Approval of Annual Groundwater Monitoring Report, GIS tables, and EDD logs and EDD error logs: $3,611.78
|
| Deliverable Price: $3,611.78 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: DC010G |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC004I: Submittal and FDEP Approval of Annual Groundwater Monitoring Report, GIS tables, and ED...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task DC004I: Submittal and FDEP Approval of Annual Groundwater Monitoring Report, GIS tables, and EDD logs and EDD error logs: $3,845.21
|
| Deliverable Price: $3,845.21 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: DC004I |