Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
Professional engineering services
|
Task DC002A: Subtasks 1 and 2: Upon submittal and FDEP approval of the Groundwater Monitoring Report...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task DC002A: Subtasks 1 and 2: Upon submittal and FDEP approval of the Groundwater Monitoring Report + Project Management: $6,816.06. |
| Deliverable Price: $6,816.06 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: DC002A |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC006A - Subtasks 1 and 2: Upon submittal and FDEP approval of the Groundwater Monitoring Repor...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task DC006A - Subtasks 1 and 2: Upon submittal and FDEP approval of the Groundwater Monitoring Report + Project Management: $6,598.50. |
| Deliverable Price: $6,598.50 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: DC006A |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC015A - Subtasks 1 and 2: Upon submittal and FDEP approval of the Groundwater Monitoring Repor...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task DC015A - Subtasks 1 and 2: Upon submittal and FDEP approval of the Groundwater Monitoring Report + Project Management: $5,256.30.
|
| Deliverable Price: $5,256.30 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: DC015A |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC001C: Upon FDEP approval of completed attendance and signature by 2 staff members on workshop...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task DC001C: Upon FDEP approval of completed attendance and signature by 2 staff members on workshop sign in and sign out sheets - $4,500.00. |
| Deliverable Price: $4,500.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: DC001C |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task HW009A: Subtasks 1 & 2: Upon completion of PFAS assessment activities and FDEP approval of the ...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task HW009A: Subtasks 1 & 2: Upon completion of PFAS assessment activities and FDEP approval of the PFAS Summary Email + Project Management - $2,732.45.
|
| Deliverable Price: $2,732.45 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: HW009A |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task HW001G: Subtask 2: Upon receipt and FDEP approval of the Soil Sampling Summary - $8,774.01.
Sub...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task HW001G: Subtask 2: Upon receipt and FDEP approval of the Soil Sampling Summary - $8,774.01.
Subtasks 1 & 3: Upon receipt and FDEP approval of the Supplemental Soil Sampling Summary + Project Management - $17,534.21.
Total task amount not to exceed $26,308.22.
CO1: Cost increase
|
| Deliverable Price: $26,308.22 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC007A - Subtasks 1 and 2: Upon submittal and FDEP approval of the Groundwater Monitoring Repor...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task DC007A - Subtasks 1 and 2: Upon submittal and FDEP approval of the Groundwater Monitoring Report + Project Management: $12,670.51.
Subtask 3: Upon submittal and FDEP approval of the Off-site Noticing Package: $1,366.00.
CO1: Cost increase |
| Deliverable Price: $14,036.51 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC030A: Subtasks 1 & 2: Upon submittal and FDEP approval of the MAGS Field Notes + Project Mana...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task DC030A: Subtasks 1 & 2: Upon submittal and FDEP approval of the MAGS Field Notes + Project Management - $1,042.04.
|
| Deliverable Price: $1,042.04 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: DC030A |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task HW005A: Subtasks 1 & 2: Upon completion of PFAS assessment activities and FDEP approval of the ...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task HW005A: Subtasks 1 & 2: Upon completion of PFAS assessment activities and FDEP approval of the PFAS Summary Email + Project Management - $1,123.30.
|
| Deliverable Price: $1,123.30 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: HW005A |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC008D: Subtasks 1 & 2: Upon submittal and FDEP approval of the Supplemental Site Assessment Re...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task DC008D: Subtasks 1 & 2: Upon submittal and FDEP approval of the Supplemental Site Assessment Report + Project Management - $14,815.03.
|
| Deliverable Price: $14,815.03 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: DC008D |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC004D: Subtask 3: Upon submittal and FDEP approval of the Electronic Health and Safety Summary...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task DC004D: Subtask 3: Upon submittal and FDEP approval of the Electronic Health and Safety Summary (includes documentation of health and safety measures and dust monitoring) - $6,658.22.
Subtask 2: Upon submittal and FDEP approval of the Electronic Daily Reports (includes daily field updates of disposal, backfill, and sod activities) - $57,921.06.
Subtasks 1, 4,5, & 6: Upon submittal and FDEP approval of the Interim Source Removal Report; PM - $17,125.51.
CO1: Cost reduction.
|
| Deliverable Price: $81,704.79 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC026B: Subtask 2: Upon submittal and FDEP approval of the Soil and Groundwater Sampling Summar...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task DC026B: Subtask 2: Upon submittal and FDEP approval of the Soil and Groundwater Sampling Summary - $34,596.39.
Subtask 3: Upon submittal and FDEP approval of the IDW Manifests and Subcontractor Receipts - $7,157.28.
Subtasks 1, 4, & 5: Upon submittal and FDEP approval of the Site Assessment Report + Project Management - $27,454.25.
CO1: Cost increase.
CO2: Cost decrease.
|
| Deliverable Price: $69,207.92 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: CO2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC028A: Subtasks 1, 2, 4, 5, & 6: Upon completion of 6 months of O&M activities and FDEP approv...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task DC028A: Subtasks 1, 2, 4, 5, & 6: Upon completion of 6 months of O&M activities and FDEP approval of Remedial Action Status Report + Project Management - $25,748.56. Subtask 3 & 8: Upon FDEP approval of Paid Utility Invoices: Utilities (Cost Reimbursement) not to exceed $8,550.00; Utilities Handling Fee: $360.00; total - $8,910.00. Subtask 7: Upon completion of 3 months of O&M activities and FDEP approval of the Additional O&M Field Notes - $5,270.25.
CO1: Cost increase.
CO2: Cost decrease.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: CO2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC013A - Subtasks 2 & 4: Upon completion of 6 months O&M activities and FDEP approval of Remedi...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task DC013A - Subtasks 2 & 4: Upon completion of 6 months O&M activities and FDEP approval of Remedial Action Status Report = $14,017.52.
Subtasks 3 & 5: Upon submittal of Paid Utility Invoices = Utilities (Cost Plus Fixed Fee) not to exceed $4,000; Utilities Handling Fee: $120.
Subtasks 1 & 6: Upon completion of 6 months O&M activities and FDEP approval of Remedial Action Status Report + Project Management = $14,546.49.
Subtasks 7 & 8: Upon submittal of Paid Utility Invoices = Utilities (Cost Plus Fixed Fee) not to exceed $6,000; Utilities Handling Fee: $140.
Total cost = $38,201.53.
CO1: Cost increase.
CO2: Cost increase. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: CO2 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task HW001D: Subtask 2: Upon submittal and FDEP approval of the Electronic Data Summary. - $16,281.2...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task HW001D: Subtask 2: Upon submittal and FDEP approval of the Electronic Data Summary. - $16,281.25.
Subtasks 3 & 4: Upon submittal and FDEP approval of the Electronic Daily Reports with photo documentation of health and safety measures, dust monitoring, excavation, disposal, backfill, site restoration activities, and paid subcontractor receipts. - $210,278.77.
Subtasks 1, 5, 6, 7, & 8: Upon submittal and FDEP approval of the Interim Source Removal Report including IDW manifests, conclusions, and recommendations. - $32,937.96.
CO1: Cost increase.
CO2: Cost decrease.
CO3: Cost increase. |
| Deliverable Price: $259,497.98 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: CO3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task HW001B - Subtasks 2: Upon receipt and FDEP approval of the Soil Sampling Summary - $8,006.37.
S...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task HW001B - Subtasks 2: Upon receipt and FDEP approval of the Soil Sampling Summary - $8,006.37.
Subtasks 3: Upon receipt and FDEP approval of the Supplemental Soil Sampling Summary - $7,143.23.
Subtasks 1 & 4: Upon receipt and FDEP approval of the Additional Soil Sampling Summary + Project Management - $9,725.70.
CO1: Cost increase.
CO2: Time extension.
CO3: Cost increase.
|
| Deliverable Price: $24,875.30 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: CO3 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC043B:
FDEP approval of field notes, soil and groundwater data, MAGS data, and subcontractor ...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task DC043B:
FDEP approval of field notes, soil and groundwater data, MAGS data, and subcontractor receipts - Subtasks 2 & 6 = $45,711.52;
FDEP approval of IDW manifests and subcontractor receipts - Subtasks 3 & 5 = $6,748.10;
FDEP approval of Site Assessment Report and SVE layout - Subtasks 4 & 7 = $12,942.48;
FDEP approval of PFAS Testing Summary & PM - Subtasks 8 & 1 = $6,532.45.
Total cost = $71934.55
CO1: Cost reduction. |
| Deliverable Price: $71,934.55 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Deliverables are assigned by Task Assignments
under the Master Agreement
|
No Cost
|
| Major Deliverable: Deliverables are assigned by Task Assignments
under the Master Agreement
|
| Deliverable Price: $0.00 |
| Non Price Justification: Agreement without a financial exchange or impact |
| Performance Metrics: All work must be in accordance with the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC011A
Subtasks 1 and 2: Upon submittal and FDEP approval of the Groundwater Monitoring Report ...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task DC011A
Subtasks 1 and 2: Upon submittal and FDEP approval of the Groundwater Monitoring Report + Project Management: $4,859.67
|
| Deliverable Price: $4,859.67 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: DC011A |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC009A
Subtasks 1 & 2: Upon completion of groundwater sampling activities and FDEP approval of ...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task DC009A
Subtasks 1 & 2: Upon completion of groundwater sampling activities and FDEP approval of the Groundwater Monitoring Report + Project Management: $13,131.10
|
| Deliverable Price: $13,131.10 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: DC009A |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC014A: Subtask 1 + 2: Upon submittal and FDEP approval of the Soil and Groundwater Sampling Su...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task DC014A: Subtask 1 + 2: Upon submittal and FDEP approval of the Soil and Groundwater Sampling Summary + Project Management $23,613.77. |
| Deliverable Price: $23,613.77 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: DC014A |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC008A: Subtask 2: Upon submittal and FDEP approval of the Field Notes and Analytical Data: $1,...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task DC008A: Subtask 2: Upon submittal and FDEP approval of the Field Notes and Analytical Data: $1,076.81
Subtasks 1 & 3: Upon submittal and FDEP approval of the Groundwater Monitoring Summary Letter + Project Management: $1,808.66 |
| Deliverable Price: $2,885.47 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: DC008A |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC010A: Subtasks 1 and 2: Upon submittal and FDEP approval of the Groundwater Monitoring Report...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task DC010A: Subtasks 1 and 2: Upon submittal and FDEP approval of the Groundwater Monitoring Report + Project Management $6,285.91.
|
| Deliverable Price: $6,285.91 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: DC010A |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC016A: Subtasks 1 and 2: Upon submittal and FDEP approval of the Groundwater Monitoring Report...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task DC016A: Subtasks 1 and 2: Upon submittal and FDEP approval of the Groundwater Monitoring Report + Project Management: $4,613.58 |
| Deliverable Price: $4,613.58 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: DC016A |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Task DC017A: Subtasks 1 and 2: Upon submittal and FDEP approval of the Groundwater Monitoring Report...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task DC017A: Subtasks 1 and 2: Upon submittal and FDEP approval of the Groundwater Monitoring Report + Project Management: $4,560.31
|
| Deliverable Price: $4,560.31 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, the Standard Operating Procedures and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professional consultants under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: DC017A |
| Deliverable Number: |
|