Contract Information

 

Summary

Agency Name: DEPARTMENT OF ENVIRONMENTAL PROTECTION

Agency Contract ID: HW686

Long Title: Bureau of Waste Cleanup Program Services

Vendor Name: PROFESSIONAL SERVICE INDUSTRIES

Total Contract Amount: $4,475,000.00

Total Budgetary Amount: $4,365,290.87

Total Payment To Date: $3,115,854.99

Date of Execution: 12/21/2021

General Description: Bureau of Waste Cleanup Program Services.

Main Information

Agency Contract ID: HW686

FLAIR Contract ID: HW686

Short Title: Haz Waste

Long Title: Bureau of Waste Cleanup Program Services

Contract Type: Master Agreement

Contract Status: Active

Date of Execution: 12/21/2021

Date of Beginning: 12/21/2021

Original End Date: 12/20/2026

New Ending Date:

Agency Service Area: DWM

Statutory Authority: 403, F.S.

Contract Involves State or Federal Financial Assistance: No

Recipient Type: FOR PROFIT ORGANIZATION INCLUDES SOLE PROPRIETOR

Provide for Administrative Cost: No

Provide for Periodic Increase: No

Procurement Information

Authorized Advanced Payment: No

Method of Procurement: Consultant's Competitive Negotiation Act [s. 287.055, F.S.]

State Term Contract ID:

Contract’s Exemption Justification:

Agency Reference Number: 2021010

Business Case Study Done: No

Legal Challenges to Procurement: No

Outsourcing / Capital Improvements

Was the Contracted Function Previously Performed by the State: No

Was the Contracted Function Considered for Insourcing back to the State: No

Did the Vendor Make Capital Improvements on State Property: No

Budget Information

Original Contract Amount: $50,000.00

Total Contract Amount: $4,475,000.00

Total Recurring Budgetary Amount: $215,192.78

Total Non-Recurring Budgetary Amount: $4,150,098.09

Total Budgetary Amount: $4,365,290.87

Total Unfunded Amount: $109,709.13

As of Date: 5/16/2025

Recurring Budgetary Amount Account Code Fiscal Year Effective Date FY Cost Accumulator Agency Amendment Reference
$70,000.00 37-20-2-780001-37450300-00-101492-00 07/01/2023 2023-2024 FIL6
$100,000.00 37-20-2-212001-37450300-00-104132-00 07/01/2022 2022-2023 FIL3
$45,192.78 37-20-2-780001-37450300-00-101492-00 07/01/2022 2022-2023 FIL3
$0.00 37-20-2-212001-37450300-00-104132-00 07/01/2021 2021-2022
$0.00 37-20-2-780001-37450300-00-101492-00 07/01/2021 2021-2022


Non-Recurring Budgetary Amount Account Code Fiscal Year Effective Date FY Cost Accumulator Agency Amendment Reference
$75,000.00 37-20-2-780001-37450300-00-080524-25 07/01/2024 2024-2025 D000 FIL13
$400,000.00 37-20-2-780001-37450300-00-080524-24 07/01/2023 2023-2024 D000 FIL12
$325,000.00 37-20-2-780001-37450300-00-080524-24 07/01/2023 2023-2024 D000 FIL11
$140,290.87 37-20-2-780001-37450300-00-080524-24 07/01/2023 2023-2024 FIL10
$140,290.87 37-20-2-780001-37450300-00-080524-24 07/01/2023 2023-2024 FIL10
$100,000.00 37-20-2-780001-37450300-00-080524-24 07/01/2023 2023-2024 FIL9
$0.00 37-20-2-780001-37450300-00-088502-24 07/01/2023 2023-2024
$250,000.00 37-10-1-000286-37450300-00-088502-23 07/01/2022 2022-2023 FIL8
$297,840.10 37-20-2-780001-37450300-00-080524-23 07/01/2022 2022-2023 FIL8
$93,733.25 37-10-1-000286-37450300-00-080524-23 07/01/2022 2022-2023 FIL7
$137,943.00 37-10-1-000286-37450300-00-088502-23 07/01/2022 2022-2023 FIL5
$1,000,000.00 37-20-2-780001-37450300-00-080524-23 07/01/2022 2022-2023 D000 FIL3
$100,000.00 37-20-2-780001-37450300-00-088502-22 07/01/2021 2021-2022 H000 FIL4
$0.00 37-10-1-000286-37450300-00-080524-23 07/01/2021 2021-2022
$100,000.00 37-20-2-780001-37450300-00-088502-22 07/01/2021 2021-2022 HOOO FIL2
$350,000.00 37-20-2-780001-37450300-00-080524-22 07/01/2021 2021-2022 DOOO FIL2
$300,000.00 37-20-2-780001-37450300-00-080524-22 07/01/2021 2021-2022 D000 FIL1
$40,000.00 37-20-2-780001-37450300-00-080524-22 07/01/2021 2021-2022 D000
$10,000.00 37-20-2-780001-37450300-00-088502-22 07/01/2021 2021-2022 H000
$0.00 37-20-2-780001-37450300-00-088502-21 07/01/2020 2020-2021
$240,000.00 37-20-2-780001-37450300-00-082474-21 07/01/2020 2020-2021 FIL2
$50,000.00 37-20-2-780001-37450300-00-080524-21 07/01/2020 2020-2021 DOOO FIL2

Contract Change

Change Type Amendment Amount Agency Amendment Reference Change Description Amendment Effective Date Amendment Execution Date New Ending Date
Amendment $0.00 DC020D VOH and PFAS 10/07/2026 10/07/2026
Amendment $0.00 DC03GCO3 Increase in cost, increase in time 09/23/2026 09/23/2026
Amendment $0.00 DC04FCO2 Increase in time 09/21/2026 09/21/2026
Amendment $0.00 DC04ECO4 Decrease in cost 09/21/2026 09/21/2026
Amendment $0.00 DC021C Monitoring 08/19/2026 08/19/2026
Amendment $0.00 DC30ACO1 Increase in time 07/22/2026 07/22/2026
Amendment $0.00 DC29ACO2 Decrease in cost 07/21/2026 07/21/2026
Amendment $0.00 DC04FCO1 Increase in time 07/21/2026 07/21/2026
Amendment $0.00 DC29ACO1 Decrease in cost 07/20/2026 07/20/2026
Amendment $0.00 DC18CCO2 Decrease in cost 07/20/2026 07/20/2026
Amendment $0.00 DC03GCO2 Increase in time 07/08/2026 07/08/2026
Amendment $0.00 DC003H O&M 06/22/2026 06/22/2026
Amendment $0.00 DC04ECO3 Increase in cost, increase in time 06/22/2026 06/22/2026
Amendment $0.00 DC031A Site Assessment activities 05/22/2026 05/22/2026
Amendment $0.00 DC10ECO1 Decrease in cost 05/15/2026 05/15/2026
Amendment $0.00 DC18CCO1 Decrease in cost 04/22/2026 04/22/2026
Amendment $0.00 DC03GCO1 Increase in time 04/15/2026 04/15/2026
Amendment $0.00 DC04ECO2 Increase in cost 04/13/2026 04/13/2026
Amendment $0.00 DC02HCO1 Decrease in cost 04/02/2026 04/02/2026
Amendment $0.00 DC030A Site Assessment 03/31/2026 03/31/2026
Amendment $0.00 DC004F Work Plan 02/20/2026 02/20/2026
Amendment $0.00 DC13CCO2 Increase in time 02/20/2026 02/20/2026
Amendment $0.00 DC14DCO2 Increase in time 02/20/2026 02/20/2026
Amendment $0.00 DC15DCO1 Increase in time 01/27/2026 01/27/2026
Amendment $0.00 DC029A Site assessment, sampling, well installation 01/23/2026 01/23/2026
Amendment $0.00 DC13CCO1 Increase in time 01/23/2026 01/23/2026
Amendment $0.00 DC14DCO1 Increase in time 01/15/2026 01/15/2026
Amendment $0.00 DC003G SOW: ISRP Modification 12/09/2025 12/09/2025
Amendment $0.00 DC002H SOW: Inventory 12/09/2025 12/09/2025
Amendment $0.00 DC27BCO1 Time Extension Only 10/29/2025 10/29/2025
Amendment $0.00 DC19BCO2 Time Extension Only 10/28/2025 10/28/2025
Amendment $0.00 DC010E GW Mon Report and SVE Decommission and Scrapping 10/17/2025 10/17/2025
Amendment $0.00 DC014E INOC for non source property. 10/15/2025 10/15/2025
Amendment $0.00 DC09DCO3 Reduction of 1 IDW drum 10/02/2025 10/02/2025
Amendment $0.00 DC013C SVE Interim Source Removal Plan 09/19/2025 09/19/2025
Amendment $0.00 DC013D Annual Groundwater Monitoring: VOH Sampling of 16 wells and 09/19/2025 09/19/2025
Amendment $0.00 DC014D SVE Interim Source Removal Plan 09/19/2025 09/19/2025
Amendment $0.00 DC015D SVE Interim Source Removal Plan 09/11/2025 09/11/2025
Amendment $0.00 DC09ECO1 Addition of 5 MW abandonments and IDW analytical/disposal. 09/09/2025 09/09/2025
Amendment $0.00 DC19BCO1 Cost reduction - removal of some SPLP samples 09/09/2025 09/09/2025
Amendment $0.00 DC014C Annual VOH Groundwater Monitoring with Report. 08/29/2025 08/29/2025
Amendment $0.00 DC018C Annual Groundwater and PFAS Monitoring with GWMR or SRCR. 08/27/2025 08/27/2025
Amendment $0.00 DC022C Annual GW Monitoring for VOHs. 7 shallow wells, 1 intermedia 08/22/2025 08/22/2025
Amendment $0.00 DC009E SVE System Demolition, Disposal, Monitoring Well Abandon 08/19/2025 08/19/2025
Amendment $0.00 DC09DCO2 Utilities and completion date extension 08/06/2025 08/06/2025
Amendment $0.00 DC04ECO1 Drums & GAC filter 07/31/2025 07/31/2025
Amendment $0.00 DC10DCO1 SVE Transport removal 07/21/2025 07/21/2025
Amendment $0.00 DC05CCO3 Reduction of one GW sample 07/07/2025 07/07/2025
Amendment $0.00 DC07ECO1 Task time extension 11/28/2025 and cost increase 07/07/2025 07/07/2025
Amendment $0.00 DC06CC03 WCD Reconciliation - Shutdown evaluation 06/30/2025 06/30/2025
Amendment $0.00 DC09DCO1 WCD reconciliation 06/25/2025 06/25/2025
Amendment $0.00 DC017C Annual groundwater monitoring and subsequent report 06/24/2025 06/24/2025
Amendment $0.00 DC06DCO2 Entered in error 06/24/2025 06/24/2025
Amendment $0.00 DC06DCO1 Addition of soil analytical costs 06/24/2025 06/24/2025
Amendment $0.00 DC24BCO1 Increased costs for IDW sampling. 06/11/2025 06/11/2025
Amendment $0.00 DC05CCO2 GW well abandonment (15) 06/10/2025 06/10/2025
Amendment $0.00 DC003EC1 ST 7:ROI tables. ST 6 ROI test 05/19/2025 05/19/2025
Amendment $75,000.00 FIL13 Funding Increment Increase 05/14/2025 05/14/2025
Amendment $0.00 DC024B GW Mon for VOH and PFAS 05/05/2025 05/05/2025
Amendment $0.00 DCO24B GW Mon for VOH and PFAS 05/05/2025 05/05/2025
Amendment $0.00 DC026B GW mon for VOH and PFAS 05/02/2025 05/02/2025
Amendment $0.00 DC015C VOH groundwater monitoring and subsequent reporting. 05/01/2025 05/01/2025
Amendment $0.00 DC007E GW Monitoring for VOHs 04/25/2025 04/25/2025
Amendment $0.00 DC003F 12 Months of O&M, Annual RASS Report, Groundwater Monitoring 04/24/2025 04/24/2025
Amendment $0.00 DC027B System Disposal, Soil & GW Sampling, PARM, Reports 04/21/2025 04/21/2025
Amendment $0.00 DC004E 12 months of O&M, one semi annual RASS report, one annual RA 04/17/2025 04/17/2025
Amendment $0.00 DC008C Annual Groundwater VOH sampling and subsequent reporting. 04/17/2025 04/17/2025
Amendment $0.00 DC006D Soil and Groundwater Confirmatory Sampling with VOH and PFAS 04/16/2025 04/16/2025
Amendment $0.00 DC21BCO3 Reconciliation for WCD-1. Shutdown evaluation following the 04/08/2025 04/08/2025
Amendment $0.00 DC04DCO1 Cost Reduction: Removal of Effluent Summa Canister sampling 03/28/2025 03/28/2025
Amendment $0.00 DC001E Preparation and meeting with FDEP for Annual Site Review. 03/25/2025 03/25/2025
Amendment $0.00 DC02ECO2 SVE scrapping for storage yard 03/21/2025 03/21/2025
Amendment $0.00 DC02ECO1 TACO- Addition of evaluation and transferal of equipment 03/10/2025 03/10/2025
Amendment $0.00 DC06CCO2 Time extension 10/31/2025 01/15/2025 01/15/2025
Amendment $0.00 DC21BCO2 Time extension for four additional months of utilities. 01/15/2025 01/15/2025
Amendment $0.00 DC019B Soil assessment and groundwater sampling and analysis. 01/14/2025 01/14/2025
Amendment $0.00 DC010D Remediation system decommission - Removal of SVE system. 01/13/2025 01/13/2025
Amendment $0.00 DC002G TA- Equipment Inventory 12/17/2024 12/17/2024
Amendment $400,000.00 FIL12 Funding Increment increase 12/11/2024 12/11/2024
Amendment $0.00 DC01ACO6 Decrease in cost 12/10/2024 12/10/2024
Amendment $0.00 DC002F TA Authorizing management of FDEP Lakeland Storage Yard 12/10/2024 12/10/2024
Amendment $0.00 DC05CCO1 Monitoring for PFAS and reduction of 1 VOH sample for Subtas 12/02/2024 12/02/2024
Amendment $0.00 DC01ACO5 Task Cost Increase 11/19/2024 11/19/2024
Amendment $0.00 DC03DCO2 Task time extension 3/28/2025 11/13/2024 11/13/2024
Amendment $0.00 DC028B TA authorizing GW Mon 11/07/2024 11/07/2024
Amendment $325,000.00 FIL11 Funding Increment increase 10/28/2024 10/28/2024
Amendment $0.00 DC028A TA authorizing property visist. 10/21/2024 10/21/2024
Amendment $140,290.87 FIL10 Funding Increment increase 10/10/2024 10/10/2024
Amendment $0.00 DC007D Task Assignmnt - Creation of ISRP 10/03/2024 10/03/2024
Amendment $0.00 DC6CCO1 Entered in Error 09/25/2024 09/25/2024
Amendment $0.00 DC06CCO1 TACO- Reduction of Sample 09/25/2024 09/25/2024
Amendment $100,000.00 FIL9 Funding Increment increase 09/23/2024 09/23/2024
Amendment $0.00 DC21BCO1 Cost Increase 09/17/2024 09/17/2024
Amendment $0.00 DC020C GWM 09/04/2024 09/04/2024
Amendment $0.00 DC005C GWM 08/29/2024 08/29/2024
Amendment $0.00 DC03DCO1 Task time extension 08/16/2024 08/16/2024
Amendment $0.00 DC22ACO1 Reduction in Scope 07/26/2024 07/26/2024
Amendment $0.00 DC23ACO1 Cost adjustment 07/26/2024 07/26/2024
Amendment $0.00 DC010C Monitoring 06/26/2024 06/26/2024
Amendment $0.00 DC026A monitoring 06/26/2024 06/26/2024
Amendment $0.00 DC012C Groundwater monitoring 06/26/2024 06/26/2024
Amendment $0.00 DC011C Remedial system decomissioning 06/25/2024 06/25/2024
Amendment $0.00 DC020B Work Plan 06/24/2024 06/24/2024
Amendment $0.00 DC027A Monitoring 06/20/2024 06/20/2024
Amendment $0.00 DC022B Authorizes PSI to conduct GW monitoring 06/14/2024 06/14/2024
Amendment $0.00 DC017B Authorizes PSI to conduct Supplemental Site Assessment 06/10/2024 06/10/2024
Amendment $0.00 DC14BCO3 Increase in Time 04/15/2024 04/15/2024
Amendment $0.00 DC025A Assessment 04/05/2024 04/05/2024
Amendment $0.00 DC003E O&M 04/04/2024 04/04/2024
Amendment $0.00 DC009D O&M 03/25/2024 03/25/2024
Amendment $0.00 SA302 GMR; PM - Shamron Beach Condominium; ERIC_18494 03/21/2024 03/21/2024
Amendment $0.00 DC004D O&M 03/21/2024 03/21/2024
Amendment $0.00 DC007C Monitoring 02/27/2024 02/27/2024
Amendment $0.00 DC003D ISRP 02/22/2024 02/22/2024
Amendment $0.00 DC21ACO2 Decrease in cost 02/14/2024 02/14/2024
Amendment $0.00 DC002E Equipment storage and maintenance 02/12/2024 02/12/2024
Amendment $0.00 DC11BCO1 Incease in cost and task time extension 02/12/2024 02/12/2024
Amendment $0.00 DC018B Monitoring 02/12/2024 02/12/2024
Amendment $0.00 DC024A Authorizes PSI to conduct Annual Groundwater Monitoring 02/02/2024 02/02/2024
Amendment $0.00 DC023A Groundwater Monitoring 12/19/2023 12/19/2023
Amendment $0.00 DC14BCO2 Time extension 12/19/2023 12/19/2023
Amendment $0.00 DC022A SSAR 12/18/2023 12/18/2023
Amendment $0.00 DC021B O&M 12/05/2023 12/05/2023
Amendment $0.00 DC006C O&M 11/30/2023 11/30/2023
Amendment $797,840.10 FIL8 Funding Increment increase 11/20/2023 11/20/2023
Amendment $0.00 DC15BCO1 Cost Reduction-SA. 11/17/2023 11/17/2023
Amendment $0.00 DC003C Soil Assessment 11/14/2023 11/14/2023
Amendment $0.00 DC11ACO1 O&M 10/30/2023 10/30/2023
Amendment $0.00 SA253CO1 Collier-Hogan Study - FracTank Rental - One Qtr 10/27/2023 10/27/2023
Amendment $0.00 DC21ACO1 SVE start up. 10/19/2023 10/19/2023
Amendment $0.00 DC002D Annual Equipment Inventory 10/18/2023 10/18/2023
Amendment $0.00 DC01ACO4 Hurricane Response. 10/18/2023 10/18/2023
Amendment $93,733.25 FIL7 Funding Increment increase 10/10/2023 10/10/2023
Amendment $0.00 HW014A Critical Response. 10/04/2023 10/04/2023
Amendment $0.00 DC13BCO1 CO1: Cost reduction 10/02/2023 10/02/2023
Amendment $0.00 DC012B Groundwater Monitoring 09/29/2023 09/29/2023
Amendment $0.00 HW13ACO1 Task time extension 08/29/2023 08/29/2023
Amendment $0.00 DC011B Groundwater Monitoring 08/29/2023 08/29/2023
Amendment $0.00 DC07BCO3 CO3: Cost reduction 08/01/2023 08/01/2023
Amendment $0.00 DC14BCO1 Task time Extension 07/28/2023 07/28/2023
Amendment $70,000.00 FIL6 Funding Increment increase 07/17/2023 07/17/2023
Amendment $0.00 DC10BCO1 Decrease in cost 07/11/2023 07/11/2023
Amendment $0.00 DC009C SAR 06/29/2023 06/29/2023
Amendment $0.00 SA253 FracTank Rental - One Qtr 06/27/2023 06/27/2023
Amendment $0.00 HW013A PFAS sampling 06/23/2023 06/23/2023
Amendment $0.00 DC009B 12 Months of operation and maintenance 06/14/2023 06/14/2023
Amendment $0.00 DC16BCO1 Site Rehabilitation Completion Report 06/12/2023 06/12/2023
Amendment $0.00 SA187CO1 Cost reduction 06/09/2023 06/09/2023
Amendment $0.00 DC06BCO1 Increase in task time and cost 05/31/2023 05/31/2023
Amendment $0.00 HW011A PFAS Screening at 9 sites 05/26/2023 05/26/2023
Amendment $137,943.00 FIL5 Funding Increment Increase 05/17/2023 05/17/2023
Amendment $0.00 DC001D PRAC MEETING 05/12/2023 05/12/2023
Amendment $0.00 HW005B PFAS sampling and GWM 04/14/2023 04/14/2023
Amendment $0.00 HW012A groundwater monitoring and PFAS sampling 04/03/2023 04/03/2023
Amendment $0.00 DC04ACO1 reduction in cost and system repair 04/03/2023 04/03/2023
Amendment $0.00 DC002C management of equipment storage 03/29/2023 03/29/2023
Amendment $0.00 DC003B 12 months of operation and maintenance 03/29/2023 03/29/2023
Amendment $0.00 DC004C 12 months of operation and maintenance 03/29/2023 03/29/2023
Amendment $0.00 DC021A Installation of a Soil Vapor Extraction 03/21/2023 03/21/2023
Amendment $0.00 DC014B Site Assessment activities 03/21/2023 03/21/2023
Amendment $0.00 DC004B RAE Plan 03/16/2023 03/16/2023
Amendment $0.00 HW010A roundwater monitoring and PFAS sampling 03/16/2023 03/16/2023
Amendment $0.00 DC03ACO1 Additional soil and air sampling 03/07/2023 03/07/2023
Amendment $0.00 DC07BCO2 Time Extension 02/14/2023 02/14/2023
Amendment $0.00 HW03ACO1 Time Extension 02/14/2023 02/14/2023
Amendment $0.00 HW07ACO1 Time Extension 02/14/2023 02/14/2023
Amendment $0.00 SA234 Field Documentation and SSAR - ERIC_6426 02/14/2023 02/14/2023
Amendment $0.00 DC016B Site Rehabilitation Completion Report 01/25/2023 01/25/2023
Amendment $0.00 HW009A PFAS sampling 01/25/2023 01/25/2023
Amendment $0.00 DC020A ISR Work Plan 01/25/2023 01/25/2023
Amendment $0.00 DC01ACO3 Critical response WCD reconiliation 01/17/2023 01/17/2023
Amendment $0.00 DC013B Site Assessment 01/04/2023 01/04/2023
Amendment $100,000.00 FIL4 Funding Increment Increase 12/20/2022 12/20/2022
Amendment $0.00 DC015B Site Assessment work 12/15/2022 12/15/2022
Amendment $0.00 HW008A PFAS sampling 12/15/2022 12/15/2022
Amendment $0.00 DC02ACO1 change the names of the quarterly deliverables 11/16/2022 11/16/2022
Amendment $0.00 DC01ACO2 Critical response WCD reconiliation 10/27/2022 10/27/2022
Amendment $0.00 DC002B Annual property inventory 10/26/2022 10/26/2022
Amendment $0.00 DC07BCO1 time extension of 2 months 10/20/2022 10/20/2022
Amendment $0.00 DC019A Annual Groundwater Monitoring 10/20/2022 10/20/2022
Amendment $0.00 HW007A GWM and PFAS sampling 10/20/2022 10/20/2022
Amendment $0.00 HW006A Groundwater Monitoring & PFAS sampling 10/10/2022 10/10/2022
Amendment $0.00 HW003A Groundwater Monitoring AND PFAS sampling 10/10/2022 10/10/2022
Amendment $0.00 HW004A Groundwater Monitoring AND PFAS sampling 10/10/2022 10/10/2022
Amendment $0.00 HW005A PFAS sampling 10/07/2022 10/07/2022
Amendment $0.00 SA204 Field Documentation and SSAR - ERIC_6426 10/07/2022 10/07/2022
Amendment $0.00 HW002A Groundwater Monitoring & PFAS sampling 10/04/2022 10/04/2022
Amendment $0.00 HW001A PFAS GW sampling 09/26/2022 09/26/2022
Amendment $0.00 DC018A Groundwater Monitoring Activities 09/26/2022 09/26/2022
Amendment $0.00 DC007B Deep MAGs testing 09/23/2022 09/23/2022
Amendment $0.00 DC017A Natural Attenuation Monitoring Activities 08/23/2022 08/23/2022
Amendment $0.00 DC016A Ground Water Monitoring Activities 08/23/2022 08/23/2022
Amendment $0.00 SA191 Field Documentation and SSAR - ERIC_6384 08/04/2022 08/04/2022
Amendment $0.00 DC10ACO1 WCD reconciliation 08/01/2022 08/01/2022
Amendment $0.00 SA190 Field Documentation and SSAR - ERIC_6426 08/01/2022 08/01/2022
Amendment $0.00 DC01ACO1 Increase in cost 07/29/2022 07/29/2022
Amendment $0.00 DC005B Groundwater sampling and SRCR 07/27/2022 07/27/2022
Amendment $1,145,192.78 FIL3 Funding Increment Increase 07/14/2022 07/14/2022
Amendment $0.00 DC006B 6 months of operation and maintenance 07/14/2022 07/14/2022
Amendment $0.00 DC012A Ground water monitoring activities 07/14/2022 07/14/2022
Amendment $0.00 DC014A Initial site action work plan 07/07/2022 07/07/2022
Amendment $0.00 DC013A Initial site action work plan 07/07/2022 07/07/2022
Amendment $0.00 DC015A Initial site action work plan 07/07/2022 07/07/2022
Amendment $0.00 DC05ACO1 Subcontractor price decrease 07/05/2022 07/05/2022
Amendment $0.00 SA187 Collier-Hogan Study-FracTankPurge Water-ERIC_6426 06/30/2022 06/30/2022
Amendment $0.00 SA167CO1 ERIC_6426 Collier-Hogan Equipment Support 06/23/2022 06/23/2022
Amendment $0.00 DC011A 12 months of operation and maintenance 06/21/2022 06/21/2022
Amendment $0.00 SA184CO1 Atl Ave ERIC_6096 - IDW 06/21/2022 06/21/2022
Amendment $0.00 DC008B Good morning! Below is my pending workload: 06/14/2022 06/14/2022
Amendment $0.00 DC010B 12 months of operation and maintenance 06/13/2022 06/13/2022
Amendment $0.00 SA184 SSIR Field Notes Pkg - ERIC_6096 05/23/2022 05/23/2022
Amendment $0.00 DC001C Contractor workshop 05/12/2022 05/12/2022
Amendment $0.00 DC010A construction observations 05/06/2022 05/06/2022
Amendment $0.00 DC009A 12 Months of operation and maintenance 05/03/2022 05/03/2022
Amendment $740,000.00 FIL2 Funding Increment Increase 05/02/2022 05/02/2022
Amendment $0.00 SA181 May 2022 Soil and GW Assessment - ERIC_6482 04/29/2022 04/29/2022
Amendment $0.00 SA180 ERIC_6426-Collier-Hogan Study-May 2022 GW Sampling Event 04/22/2022 04/22/2022
Amendment $0.00 DC001B file review for 28 sites and a site review meeting 04/18/2022 04/18/2022
Amendment $0.00 DC008A groundwater monitoring and soil sampling activities 04/07/2022 04/07/2022
Amendment $0.00 SA167 ERIC_6426 Collier-Hogan Equipment Support 03/30/2022 03/30/2022
Amendment $0.00 DC007A conduct groundwater monitoring activities 03/30/2022 03/30/2022
Amendment $0.00 DC006A 6 months of operations and maintenance 03/15/2022 03/15/2022
Amendment $0.00 DC005A Well abandonment 03/14/2022 03/14/2022
Amendment $0.00 DC004A 12 months of Operation and Maintenance 03/03/2022 03/03/2022
Amendment $0.00 DC003A Operation and maintenance 02/14/2022 02/14/2022
Amendment $0.00 DC002A Oversee storage facility 02/14/2022 02/14/2022
Amendment $300,000.00 FIL1 Funding Increment Increase 01/24/2022 01/24/2022
Amendment $0.00 DC01A Staff created in error 01/03/2022 01/03/2022
Amendment $0.00 DC001A Critical Response 01/03/2022 01/03/2022

Vendor

Name Line 1Name Line 2City State ZipMinority Vendor Designation
PROFESSIONAL SERVICE INDUSTRIES TAMPA FL 336340000 Non-Minority

CFDA

No CFDA Codes found for the contract.

CSFA

No CSFA Codes found for the contract.
More Deliverable Number      Commodity/Service Type Major Deliverable Method of Payment
     
Professional engineering services Task DC007A: (Subtask 2): Submittal and FDEP approval of the groundwater monitoring field documentat... Fixed Fee / Unit Rate
     
Professional engineering services Task DC008A: Submittal and FDEP approval of the Groundwater monitoring/ soil sampling field document... Fixed Fee / Unit Rate
     
Professional engineering services Deliverables are assigned by Task Assignments under the Master Agreement. No Cost
     
Professional engineering services Task SA181: FDEP Approval of Field Notes Package ($9,654.23) - Subtasks 2-4; FDEP Approval of Projec... Fixed Fee / Unit Rate
     
Professional engineering services Task DC008B: Submittal of documentation Pre-Construction Activities including daily logs, excavation... Fixed Fee / Unit Rate
     
Professional engineering services Task DC014A: Subtasks 1 & 2: Upon submittal and FDEP approval of the Site Assessment Work Plan + Pro... Fixed Fee / Unit Rate
     
Professional engineering services Task DC013A: Subtasks 1 & 2: Upon submittal and FDEP approval of the Site Assessment Work Plan + Pro... Fixed Fee / Unit Rate
     
Professional engineering services Task DC005B: Submittal and FDEP approval of the SRC Report including; GW sampling field documentatio... Fixed Fee / Unit Rate
     
Professional engineering services Task DC010A: Task DC010A: Subtask 2: Submittal and FDEP approval of the Construction plan review/ si... Fixed Fee / Unit Rate
     
Professional engineering services Task SA190: Subtask 1 - Project Management ($1,451.44); Subtask 2 - Field Documentation ($16,144.88)... Fixed Fee / Unit Rate
     
Professional engineering services Task SA191: Subtask 1 - Project Management ($1,203.59); Subtasks 2 through 5 - Field Documentation a... Fixed Fee / Unit Rate
     
Professional engineering services Task HW002A: Subtasks 1 & 2 Submittal and FDEP approval of the Groundwater Monitoring Report and PFA... Fixed Fee / Unit Rate
     
Professional engineering services Task SA204: Subtask 1 - Project Management ($1,488.74); Subtask 2 - Field Documentation ($16,431.83)... Fixed Fee / Unit Rate
     
Professional engineering services Task DC004B: Subtasks 1,2&3: Submittal and FDEP approval of the Updated groundwater analytical tabl... Fixed Fee / Unit Rate
     
Professional engineering services Task HW013A: Subtasks 1 & 2 Submittal and FDEP approval of the PFAS email deliverable & Project Mana... Fixed Fee / Unit Rate
     
Professional engineering services Task SA187: Subcontractor invoices and weight tickets for purge water disposal - Subtask 1-Project ... Fixed Fee / Unit Rate
     
Professional engineering services Task DC009C: FDEP Approval of Supplemental Site Assessment – Groundwater Monitoring Well Installatio... Fixed Fee / Unit Rate
     
Professional engineering services Task DC002A: FDEP approval of Quarter 1 Equipment Storage Status Report - Subtasks 2 and 3 - $13,634... Fixed Fee / Unit Rate
     
Professional engineering services Task DC006A: FDEP approval of Operation and maintenance (O&M) email submittal including field docume... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task DC009A: Q1 and Q2 - Quarterly O&M email submittals including field documentation, laboratory re... Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
     
Professional engineering services Task DC001C: The signature of the 2 staff members in attendance on workshop sign in and sign out she... Fixed Fee / Unit Rate
     
Professional engineering services Task DC001B: Submittal and FDEP approval of the meeting minutes and project management $10,622.28 Fixed Fee / Unit Rate
     
Professional engineering services Task SA180: Completion of field activities-Field notes, GW sampling logs, COCs, photos (Subtask 1-Pr... Fixed Price - Lump Sum
     
Professional engineering services Task DC015A: Subtasks 1 & 2: Upon submittal and FDEP approval of the Site Assessment Work Plan + Pro... Fixed Fee / Unit Rate
     
Professional engineering services Task DC012A: Subtasks 1 & 2: Submittal and FDEP approval of the Annual Groundwater Monitoring Report... Fixed Fee / Unit Rate
 Displaying 1 to 25 of 133     1 2 3 4 5 6 Next  Last


Payments are also referred to as expenditures (creating or incurring a legal obligation to disburse money) or disbursements (the payment of expenditures). Payments include disbursements and accounting adjustments made on a contract. Payments are always positive amounts while accounting adjustments may be positive or negative depending on the type of adjustment.

Payment Details

"Date" in the listing below indicates the date the payment voucher was recorded in the system, not the date the payment was issued.
More Fiscal Year Total Amount
     
2026-2027 $177,939.28
     
2025-2026 $537,136.60
     
2024-2025 $905,518.18
     
2023-2024 $849,898.88
     
2022-2023 $605,955.83
     
2021-2022 $39,406.22

If a payment or adjustment to a contract was made before July 1, 2012, the information may not be posted in this system.

Contract Documents


Click on the pdf icon or Agency Document Link to view the document
Document Type Document Reference # Executed Date Document Add Date Agency Document Link View
Original Contract Original Contract - HW686 12/21/2021 12/27/2021 8:48:29 AM
Procurement Original Contract - HW686 4/5/2022 9:37:26 AM
Amendment DC001A 01/03/2022 7/26/2022 10:15:27 AM
Amendment DC001B 04/18/2022 4/19/2022 9:05:36 AM
Amendment DC001C 05/12/2022 5/19/2022 1:10:53 PM
Amendment DC001D 05/12/2023 5/30/2023 3:44:29 PM
Amendment DC001E 03/25/2025 4/22/2025 3:09:44 PM
Amendment DC002A 02/14/2022 4/8/2022 1:57:49 PM
Amendment DC002B 10/26/2022 10/27/2022 9:25:45 AM
Amendment DC002C 03/29/2023 4/7/2023 3:43:22 PM
Amendment DC002D 10/18/2023 10/19/2023 8:21:54 AM
Amendment DC002E 02/12/2024 2/12/2024 4:37:11 PM
Amendment DC002F 12/10/2024 12/11/2024 8:16:48 AM
Amendment DC002G 12/17/2024 12/30/2024 9:03:22 AM
Amendment DC002H 12/09/2025 12/18/2025 1:28:02 PM
Amendment DC003A 02/14/2022 3/2/2022 1:13:26 PM
Amendment DC003B 03/29/2023 4/7/2023 1:44:54 PM
Amendment DC003C 11/14/2023 11/14/2023 3:59:34 PM
Amendment DC003D 02/22/2024 2/28/2024 3:03:47 PM
Amendment DC003E 04/04/2024 4/11/2024 4:24:47 PM
Amendment DC003EC1 05/19/2025 6/11/2025 3:12:16 PM
Amendment DC003F 04/24/2025 7/7/2026 9:34:18 AM
Amendment DC003G 12/09/2025 12/18/2025 1:17:58 PM
Amendment DC003H 06/22/2026 6/26/2026 8:47:26 AM
Amendment DC004A 03/03/2022 3/28/2022 12:29:24 PM
Amendment DC004B 03/16/2023 3/20/2023 8:51:47 AM
Amendment DC004C 03/29/2023 4/7/2023 1:55:43 PM
Amendment DC004D 03/21/2024 4/10/2024 11:07:14 AM
Amendment DC004E 04/17/2025 4/22/2025 3:58:50 PM
Amendment DC004F 02/20/2026 2/27/2026 1:15:53 PM
Amendment DC005A 03/14/2022 3/28/2022 4:16:47 PM
Amendment DC005B 07/27/2022 7/27/2022 2:53:27 PM
Amendment DC005C 08/29/2024 8/30/2024 9:00:49 AM
Amendment DC006A 03/15/2022 3/28/2022 4:21:54 PM
Amendment DC006B 07/14/2022 7/18/2022 2:14:04 PM
Amendment DC006C 11/30/2023 11/30/2023 1:25:13 PM
Amendment DC006D 04/16/2025 4/23/2025 9:16:39 AM
Amendment DC007A 03/30/2022 4/4/2022 10:21:00 AM
Amendment DC007B 09/23/2022 10/3/2022 10:31:16 AM
Amendment DC007C 02/27/2024 2/28/2024 2:20:24 PM
Amendment DC007D 10/03/2024 10/3/2024 3:27:42 PM
Amendment DC007E 04/25/2025 5/5/2025 1:18:45 PM
Amendment DC008A 04/07/2022 4/11/2022 10:33:30 AM
Amendment DC008B 06/14/2022 6/20/2022 9:21:52 AM
Amendment DC008C 04/17/2025 4/22/2025 4:07:52 PM
Amendment DC009A 05/03/2022 5/5/2022 12:32:26 PM
Amendment DC009B 06/14/2023 6/15/2023 2:20:07 PM
Amendment DC009C 06/29/2023 6/30/2023 3:16:57 PM
Amendment DC009D 03/25/2024 4/4/2024 1:17:26 PM
Amendment DC009E 08/19/2025 8/19/2025 1:55:31 PM
Amendment DC010A 05/06/2022 5/12/2022 3:31:24 PM
Amendment DC010B 06/13/2022 6/14/2022 10:29:22 AM
Amendment DC010C 06/26/2024 6/28/2024 11:41:18 AM
Amendment DC010D 01/13/2025 1/13/2025 2:54:30 PM
Amendment DC010E 10/17/2025 10/17/2025 10:42:53 AM
Amendment DC011A 06/21/2022 6/21/2022 4:30:48 PM
Amendment DC011B 08/29/2023 9/1/2023 9:58:17 AM
Amendment DC011C 06/25/2024 7/23/2024 4:37:59 PM
Amendment DC012A 07/14/2022 7/18/2022 2:32:09 PM
Amendment DC012B 09/29/2023 9/29/2023 10:01:23 AM
Amendment DC012C 06/26/2024 1/7/2025 11:48:26 AM
Amendment DC013A 07/07/2022 7/8/2022 11:49:31 AM
Amendment DC013B 01/04/2023 1/5/2023 3:14:23 PM
Amendment DC013C 09/19/2025 1/20/2026 8:31:07 AM
Amendment DC013D 09/19/2025 10/6/2025 10:45:56 AM
Amendment DC014A 07/07/2022 7/8/2022 11:43:20 AM
Amendment DC014B 03/21/2023 4/7/2023 1:26:00 PM
Amendment DC014C 08/29/2025 3/18/2026 8:23:47 AM
Amendment DC014D 09/19/2025 9/19/2025 4:17:14 PM
Amendment DC014E 10/15/2025 10/16/2025 2:07:21 PM
Amendment DC015A 07/07/2022 7/8/2022 3:16:14 PM
Amendment DC015B 12/15/2022 12/16/2022 9:44:24 AM
Amendment DC015C 05/01/2025 6/11/2025 2:18:18 PM
Amendment DC015D 09/11/2025 9/19/2025 9:39:01 AM
Amendment DC016A 08/23/2022 8/24/2022 3:41:01 PM
Amendment DC016B 01/25/2023 1/26/2023 4:34:17 PM
Amendment DC017A 08/23/2022 8/24/2022 3:24:44 PM
Amendment DC017B 06/10/2024 7/11/2024 9:41:22 AM
Amendment DC017C 06/24/2025 7/7/2025 1:42:16 PM
Amendment DC018A 09/26/2022 9/29/2022 11:47:33 AM
Amendment DC018B 02/12/2024 2/28/2024 2:40:51 PM
Amendment DC018C 08/27/2025 8/28/2025 3:27:59 PM
Amendment DC019A 10/20/2022 10/20/2022 1:00:02 PM
Amendment DC019B 01/14/2025 1/14/2025 9:24:19 AM
Amendment DC01ACO1 07/29/2022 8/1/2022 3:39:25 PM
Amendment DC01ACO2 10/27/2022 10/19/2023 9:01:49 AM
Amendment DC01ACO3 01/17/2023 1/19/2023 1:32:51 PM
Amendment DC01ACO4 10/18/2023 10/19/2023 9:08:09 AM
Amendment DC01ACO5 11/19/2024 11/20/2024 3:31:15 PM
Amendment DC01ACO6 12/10/2024 12/13/2024 1:46:03 PM
Amendment DC020A 01/25/2023 1/30/2023 11:31:02 AM
Amendment DC020B 06/24/2024 7/15/2024 9:14:46 AM
Amendment DC020C 09/04/2024 9/4/2024 10:02:56 AM
Amendment DC020D 10/07/2026 10/14/2026 2:34:07 PM
Amendment DC021A 03/21/2023 4/7/2023 1:06:25 PM
Amendment DC021B 12/05/2023 12/6/2023 9:35:23 AM
Amendment DC021C 08/19/2026 8/24/2026 8:36:33 AM
Amendment DC022A 12/18/2023 12/18/2023 4:35:02 PM
Amendment DC022B 06/14/2024 6/17/2024 4:55:25 PM
Amendment DC022C 08/22/2025 8/25/2025 11:17:29 AM
Amendment DC023A 12/19/2023 12/19/2023 4:28:13 PM
Amendment DC024A 02/02/2024 2/5/2024 11:56:55 AM
Amendment DC024B 05/05/2025 6/11/2025 2:56:20 PM
Amendment DC025A 04/05/2024 4/5/2024 12:24:29 PM
Amendment DC026A 06/26/2024 6/28/2024 11:08:34 AM
Amendment DC026B 05/02/2025 5/5/2025 4:59:12 PM
Amendment DC027A 06/20/2024 7/15/2024 8:40:02 AM
Amendment DC027B 04/21/2025 4/22/2025 3:02:24 PM
Amendment DC028A 10/21/2024 10/21/2024 3:44:56 PM
Amendment DC028B 11/07/2024 11/7/2024 2:09:47 PM
Amendment DC029A 01/23/2026 1/29/2026 2:11:00 PM
Amendment DC02ACO1 11/16/2022 11/18/2022 11:22:42 AM
Amendment DC02ECO1 03/10/2025 3/10/2025 3:07:42 PM
Amendment DC02ECO2 03/21/2025 7/1/2025 11:40:58 AM
Amendment DC02HCO1 04/02/2026 4/2/2026 1:33:43 PM
Amendment DC030A 03/31/2026 4/14/2026 11:17:19 AM
Amendment DC031A 05/22/2026 6/1/2026 1:05:19 PM
Amendment DC03ACO1 03/07/2023 3/17/2023 4:53:00 PM
Amendment DC03DCO1 08/16/2024 8/16/2024 2:13:37 PM
Amendment DC03DCO2 11/13/2024 11/14/2024 11:21:16 AM
Amendment DC03GCO1 04/15/2026 4/24/2026 11:14:39 AM
Amendment DC03GCO2 07/08/2026 7/23/2026 10:06:06 AM
Amendment DC03GCO3 09/23/2026 9/25/2026 11:36:59 AM
Amendment DC04ACO1 04/03/2023 5/3/2023 9:31:02 AM
Amendment DC04DCO1 03/28/2025 4/22/2025 2:52:25 PM
Amendment DC04ECO1 07/31/2025 8/13/2025 2:33:40 PM
Amendment DC04ECO2 04/13/2026 4/20/2026 12:07:19 PM
Amendment DC04ECO3 06/22/2026 6/26/2026 9:21:55 AM
Amendment DC04ECO4 09/21/2026 9/25/2026 11:31:40 AM
Amendment DC04FCO1 07/21/2026 7/29/2026 9:00:55 AM
Amendment DC04FCO2 09/21/2026 9/25/2026 10:29:53 AM
Amendment DC05ACO1 07/05/2022 7/6/2022 9:49:57 AM
Amendment DC05CCO1 12/02/2024 12/2/2024 3:20:02 PM
Amendment DC05CCO2 06/10/2025 6/11/2025 4:46:59 PM
Amendment DC05CCO3 07/07/2025 7/7/2025 1:13:27 PM
Amendment DC06BCO1 05/31/2023 10/13/2023 9:58:13 AM
Amendment DC06CC03 06/30/2025 6/30/2025 3:09:09 PM
Amendment DC06CCO1 09/25/2024 1/28/2025 2:21:59 PM
Amendment DC06CCO2 01/15/2025 1/28/2025 2:32:27 PM
Amendment DC06DCO1 06/24/2025 8/6/2025 3:13:33 PM
Amendment DC07BCO1 10/20/2022 10/20/2022 11:35:45 AM
Amendment DC07BCO2 02/14/2023 2/16/2023 1:49:07 PM
Amendment DC07BCO3 08/01/2023 8/1/2023 10:39:09 AM
Amendment DC07ECO1 07/07/2025 7/7/2025 1:32:43 PM
Amendment DC09DCO1 06/25/2025 7/2/2025 12:54:48 PM
Amendment DC09DCO2 08/06/2025 8/7/2025 2:34:02 PM
Amendment DC09DCO3 10/02/2025 10/3/2025 7:57:44 AM
Amendment DC09ECO1 09/09/2025 9/11/2025 11:52:35 AM
Amendment DC10ACO1 08/01/2022 8/1/2022 1:19:18 PM
Amendment DC10BCO1 07/11/2023 7/17/2023 9:05:25 AM
Amendment DC10DCO1 07/21/2025 7/21/2025 1:36:13 PM
Amendment DC10ECO1 05/15/2026 5/18/2026 2:46:39 PM
Amendment DC11ACO1 10/30/2023 10/30/2023 1:13:01 PM
Amendment DC11BCO1 02/12/2024 2/29/2024 8:42:54 AM
Amendment DC13BCO1 10/02/2023 10/2/2023 8:56:17 AM
Amendment DC13CCO1 01/23/2026 1/26/2026 4:28:10 PM
Amendment DC13CCO2 02/20/2026 2/27/2026 1:50:19 PM
Amendment DC14BCO1 07/28/2023 8/2/2023 11:50:06 AM
Amendment DC14BCO2 12/19/2023 12/20/2023 8:51:46 AM
Amendment DC14BCO3 04/15/2024 4/17/2024 9:20:52 AM
Amendment DC14DCO1 01/15/2026 1/20/2026 2:16:46 PM
Amendment DC14DCO2 02/20/2026 3/2/2026 1:08:02 PM
Amendment DC15BCO1 11/17/2023 11/27/2023 11:16:16 AM
Amendment DC15DCO1 01/27/2026 1/29/2026 1:52:22 PM
Amendment DC16BCO1 06/12/2023 6/13/2023 10:16:11 AM
Amendment DC18CCO1 04/22/2026 4/30/2026 1:46:54 PM
Amendment DC18CCO2 07/20/2026 7/29/2026 8:44:52 AM
Amendment DC19BCO1 09/09/2025 9/17/2025 3:00:19 PM
Amendment DC19BCO2 10/28/2025 10/29/2025 3:54:12 PM
Amendment DC21ACO1 10/19/2023 10/19/2023 9:27:01 AM
Amendment DC21ACO2 02/14/2024 2/29/2024 8:55:08 AM
Amendment DC21BCO1 09/17/2024 9/17/2024 3:38:28 PM
Amendment DC21BCO2 01/15/2025 1/28/2025 10:38:39 AM
Amendment DC21BCO3 04/08/2025 4/22/2025 4:16:26 PM
Amendment DC22ACO1 07/26/2024 7/26/2024 4:59:10 PM
Amendment DC23ACO1 07/26/2024 8/2/2024 11:06:52 AM
Amendment DC24BCO1 06/11/2025 8/6/2025 9:01:16 AM
Amendment DC27BCO1 10/29/2025 10/29/2025 4:00:59 PM
Amendment DC29ACO1 07/20/2026 7/27/2026 2:02:50 PM
Amendment DC29ACO2 07/21/2026 8/4/2026 10:04:03 AM
Amendment DC30ACO1 07/22/2026 8/4/2026 11:03:42 AM
Amendment DCO24B 05/05/2025 5/5/2025 4:46:49 PM
Amendment FIL1 01/24/2022 1/25/2022 10:54:14 AM
Amendment FIL10 10/10/2024 10/10/2024 3:08:06 PM
Amendment FIL11 10/28/2024 10/30/2024 1:31:54 PM
Amendment FIL12 12/11/2024 12/12/2024 2:13:51 PM
Amendment FIL13 05/14/2025 5/16/2025 3:25:18 PM
Amendment FIL2 05/02/2022 5/2/2022 5:25:02 PM
Amendment FIL3 07/14/2022 7/15/2022 12:29:58 PM
Amendment FIL4 12/20/2022 12/20/2022 4:41:14 PM
Amendment FIL5 05/17/2023 5/17/2023 1:13:44 PM
Amendment FIL6 07/17/2023 7/20/2023 9:42:43 AM
Amendment FIL7 10/10/2023 10/11/2023 3:11:41 PM
Amendment FIL8 11/20/2023 11/21/2023 9:22:24 AM
Amendment FIL9 09/23/2024 9/24/2024 9:38:23 AM
Amendment HW001A 09/26/2022 9/29/2022 11:32:11 AM
Amendment HW002A 10/04/2022 10/5/2022 9:14:08 AM
Amendment HW003A 10/10/2022 10/10/2022 3:37:32 PM
Amendment HW004A 10/10/2022 10/10/2022 3:40:59 PM
Amendment HW005A 10/07/2022 10/10/2022 3:45:09 PM
Amendment HW005B 04/14/2023 5/3/2023 9:39:20 AM
Amendment HW006A 10/10/2022 10/10/2022 3:48:30 PM
Amendment HW007A 10/20/2022 10/20/2022 1:09:08 PM
Amendment HW008A 12/15/2022 12/16/2022 2:21:10 PM
Amendment HW010A 03/16/2023 4/7/2023 12:53:05 PM
Amendment HW011A 05/26/2023 5/30/2023 3:36:02 PM
Amendment HW012A 04/03/2023 4/7/2023 3:23:12 PM
Amendment HW013A 06/23/2023 6/27/2023 12:07:21 PM
Amendment HW014A 10/04/2023 10/4/2023 8:21:22 AM
Amendment HW07ACO1 02/14/2023 2/16/2023 2:23:30 PM
Amendment HW13ACO1 08/29/2023 9/1/2023 9:53:06 AM
Amendment SA167 03/30/2022 4/18/2022 12:22:36 PM
Amendment SA167CO1 06/23/2022 6/24/2022 1:57:21 PM
Amendment SA180 04/22/2022 5/4/2022 7:39:24 AM
Amendment SA181 04/29/2022 6/1/2022 3:59:14 PM
Amendment SA184 05/23/2022 5/26/2022 3:50:01 PM
Amendment SA184CO1 06/21/2022 6/23/2022 3:10:02 PM
Amendment SA187 06/30/2022 8/24/2022 4:12:50 PM
Amendment SA187CO1 06/09/2023 6/12/2023 8:58:32 AM
Amendment SA190 08/01/2022 8/10/2022 2:26:37 PM
Amendment SA191 08/04/2022 8/10/2022 2:39:38 PM
Amendment SA204 10/07/2022 10/7/2022 4:14:03 PM
Amendment SA234 02/14/2023 3/6/2023 3:05:47 PM
Amendment SA253 06/27/2023 8/11/2023 9:11:04 AM
Amendment SA253CO1 10/27/2023 11/9/2023 10:10:34 AM
Amendment SA302 03/21/2024 3/28/2024 3:21:15 PM


Audit results posted prior to June 30, 2012, appear in a summarized form. As of July 1, 2012, the audit reporting process was expanded to include additional questions and comments from the Bureau of Auditing. As audits are captured in electronic format, they will be posted to this system. If you are interested in seeing audit reports by Fiscal Year and Agency Action Plans, please click here to navigate to the Transparency Florida Contract Audit page.
Audit Type Review Date Fiscal Year View
Contract Review 03/13/2024 2023-2024 View
Expanded Audit of Payment 2023-2024 View
Contract Review 05/08/2023 2022-2023 View