Contract Information

 

Summary

Agency Name: DEPARTMENT OF ENVIRONMENTAL PROTECTION

Agency Contract ID: HW689

Long Title: Waste Cleanup Program Services

Vendor Name: APTIM ENVIRONMENTAL & INFRASTRU

Total Contract Amount: $7,655,611.60

Total Budgetary Amount: $7,655,611.60

Total Payment To Date: $4,796,212.86

Date of Execution: 12/21/2021

General Description: Waste Cleanup Program Services.

Main Information

Agency Contract ID: HW689

FLAIR Contract ID: HW689

Short Title: Haz Waste

Long Title: Waste Cleanup Program Services

Contract Type: Master Agreement

Contract Status: Active

Date of Execution: 12/21/2021

Date of Beginning: 12/21/2021

Original End Date: 12/20/2026

New Ending Date:

Agency Service Area: DWM

Statutory Authority: 403, F.S.

Contract Involves State or Federal Financial Assistance: No

Recipient Type: FOR PROFIT ORGANIZATION INCLUDES SOLE PROPRIETOR

Provide for Administrative Cost: No

Provide for Periodic Increase: No

Procurement Information

Authorized Advanced Payment: No

Method of Procurement: Consultant's Competitive Negotiation Act [s. 287.055, F.S.]

State Term Contract ID:

Contract’s Exemption Justification:

Agency Reference Number: 2021010

Business Case Study Done: No

Legal Challenges to Procurement: No

Outsourcing / Capital Improvements

Was the Contracted Function Previously Performed by the State: No

Was the Contracted Function Considered for Insourcing back to the State: No

Did the Vendor Make Capital Improvements on State Property: No

Budget Information

Original Contract Amount: $50,000.00

Total Contract Amount: $7,655,611.60

Total Recurring Budgetary Amount: $528,187.12

Total Non-Recurring Budgetary Amount: $7,127,424.48

Total Budgetary Amount: $7,655,611.60

Total Unfunded Amount: $0.00

As of Date: 3/25/2026

Recurring Budgetary Amount Account Code Fiscal Year Effective Date FY Cost Accumulator Agency Amendment Reference
$35,632.06 37-20-2-261019-37450300-00-101494-00 07/01/2025 2025-2026 FIL19
$117,000.00 37-20-2-780001-37450300-00-101492-00 07/01/2025 2025-2026 FIL18
$71,000.00 37-20-2-261019-37450300-00-101494-00 07/01/2024 2024-2025 FIL13
$105,000.00 37-20-2-261019-37450300-00-101494-00 10/11/2023 2023-2024 FIL9
$120,000.00 37-20-2-780001-37450300-00-101492-00 07/01/2022 2022-2023 FIL 3
$16,000.00 37-20-2-261019-37450300-00-101011-00 07/01/2021 2021-2022 FIL16
$8,555.06 37-20-2-261019-37450300-00-101494-00 07/01/2020 2020-2021 CER21 FIL5
$55,000.00 37-20-2-261019-37450300-00-101494-00 07/01/2020 2020-2021 FIL1


Non-Recurring Budgetary Amount Account Code Fiscal Year Effective Date FY Cost Accumulator Agency Amendment Reference
$195,000.00 37-20-2-780001-37450300-00-101492-00 07/01/2025 2025-2026 FIL20
$1,100,979.54 37-20-2-780001-37450300-00-080524-25 07/01/2024 2024-2025 D000 FIL17
$125,000.00 37-20-2-780001-37450300-00-080524-25 07/01/2024 2024-2025 D000 FIL15
$20,000.00 37-20-2-261019-37450300-00-101494-00 07/01/2024 2024-2025 FIL13
$50,000.00 37-20-2-780001-37450300-00-088502-24 07/01/2023 2023-2024 H000 FIL14
$800,000.00 37-20-2-780001-37450300-00-080524-24 07/01/2023 2023-2024 D000 FIL14
$25,000.00 37-20-2-780001-37450300-00-080524-24 07/01/2023 2023-2024 D000 FIL13
$109,563.30 37-20-2-780001-37450300-00-080524-24 07/01/2023 2023-2024 D000 FIL12
$175,000.00 37-20-2-780001-37450300-00-080524-24 07/01/2023 2023-2024 D000 FIL11
$250,000.00 37-20-2-780001-37450300-00-088502-24 07/01/2023 2023-2024 H000 FIL10
$46,405.35 37-20-2-780001-37450300-00-088502-23 07/01/2022 2022-2023 H000 FIL10
$250,000.00 37-10-1-000286-37450300-00-088502-23 07/01/2022 2022-2023 H000 FIL10
$100,000.00 37-20-2-780001-37450300-00-080524-23 07/01/2022 2022-2023 D000 FIL10
$0.00 37-20-2-780001-37450300-00-088502-23 07/01/2022 2022-2023
$691,093.00 37-10-1-000286-37450300-00-088502-23 07/01/2022 2022-2023 FIL8
$1,097,415.55 37-20-2-780001-37450300-00-080524-23 07/01/2022 2022-2023 FIL8
$174,386.92 37-10-1-000286-37450300-00-088502-23 07/01/2022 2022-2023 H000 FIL7
$131,224.49 37-10-1-000286-37450300-00-088502-23 07/01/2022 2022-2023 H000 FIL6
$186,660.26 37-10-1-000286-37450300-00-080524-23 07/01/2022 2022-2023 D000 FIL6
$0.00 37-20-2-261019-37450300-00-101011-00 02/24/2023 2022-2023
$0.00 37-10-1-000286-37450300-00-088502-23 07/01/2022 2022-2023
$1,000,000.00 37-20-2-780001-37450300-00-080524-23 07/01/2022 2022-2023 D000 FIL 3
$125,000.00 37-20-2-780001-37450300-00-088502-22 07/01/2021 2021-2022 HOOO FIL2
$100,000.00 37-20-2-780001-37450300-00-080524-22 07/01/2021 2021-2022 DOOO FIL2
$200,000.00 37-20-2-780001-37450300-00-080524-22 07/01/2021 2021-2022 D000 FIL1
$40,000.00 37-20-2-780001-37450300-00-080524-22 07/01/2021 2021-2022
$10,000.00 37-20-2-780001-37450300-00-088502-22 07/01/2021 2021-2022
$124,423.47 37-20-2-780001-37450300-00-088502-21 07/01/2020 2020-2021 H000 FIL4
$272.60 37-20-2-780001-37450300-00-088502-20 07/01/2019 2019-2020 H000 FIL4
$0.00 37-10-1-000286-37450300-00-080524-23 07/01/2019 2019-2020

Contract Change

Change Type Amendment Amount Agency Amendment Reference Change Description Amendment Effective Date Amendment Execution Date New Ending Date
Amendment $0.00 BIL1FCO2 Additional sampling 09/29/2026 09/29/2026
Amendment $0.00 DC16DC01 Entered in error 09/23/2026 09/23/2026
Amendment $0.00 DC16DCO1 Increase in cost, increase in time 09/23/2026 09/23/2026
Amendment $0.00 DC38ACO1 Increase in time 09/21/2026 09/21/2026
Amendment $0.00 DC15DCO6 Increase in cost; Increase in time 09/11/2026 09/11/2026
Amendment $0.00 DC29BCO1 Increase in time 09/04/2026 09/04/2026
Amendment $0.00 DC04DCO1 Decrease in cost, increase in time 08/31/2026 08/31/2026
Amendment $0.00 DC21CCO1 Decrease in cost 08/26/2026 08/26/2026
Amendment $0.00 DC13BCO8 Decrease in cost 08/17/2026 08/17/2026
Amendment $0.00 DC15DCO5 Increase in cost, increase in time 08/07/2026 08/07/2026
Amendment $0.00 DC16CCO6 Increase in cost, increase in time 08/05/2026 08/05/2026
Amendment $0.00 PA374CO3 Decreases costs and extend task end date to 8/12/2026 07/08/2026 07/08/2026
Amendment $0.00 DC016D site assessment activities 06/29/2026 06/29/2026
Amendment $0.00 BIL1GCO1 Cost reductions on hotel, personnel, labs 06/23/2026 06/23/2026
Amendment $0.00 DC004D Well abandonment activities 06/23/2026 06/23/2026
Amendment $0.00 DC027B Supplemental site assessment activities 06/22/2026 06/22/2026
Amendment $0.00 DC039A Annual Groundwater Sampling for VOHs 06/19/2026 06/19/2026
Amendment $0.00 DC05DCO3 Decrease in cost, increase in time 06/15/2026 06/15/2026
Amendment $0.00 DC29ACO5 Increase in cost, increase in time 06/10/2026 06/10/2026
Amendment $0.00 DC029B Interim Source Removal Plan (ISRP) 06/08/2026 06/08/2026
Amendment $0.00 DC021C Well abandonment and project management 06/04/2026 06/04/2026
Amendment $0.00 BIL1FCO1 Task time extension 05/27/2026 05/27/2026
Amendment $0.00 DC18BCO5 Decrease in cost, increase in time 05/21/2026 05/21/2026
Amendment $0.00 DC038A Initial Site Assessment Work Plan 05/19/2026 05/19/2026
Amendment $0.00 DC003E O&M 05/15/2026 05/15/2026
Amendment $0.00 DC16CCO5 Cost Reimbursement adjustment 05/13/2026 05/13/2026
Amendment $0.00 DC35ACO1 Decrease in cost, increase in time 05/13/2026 05/13/2026
Amendment $0.00 DC037A Site Assessment Work Plan 05/11/2026 05/11/2026
Amendment $0.00 DC036A Site Assessment Work Plan 05/01/2026 05/01/2026
Amendment $0.00 DC15DCO4 Decrease in cost 04/29/2026 04/29/2026
Amendment $0.00 PA374CO2 Increases and reconciles costs and extend end date 04/09/2026 04/09/2026
Amendment $0.00 PA329CO6 Pasco County Fire (ERIC_7395) Cost Decrease 6/30/2026 04/07/2026 04/07/2026
Amendment $195,000.00 FIL20 Funding Increment increase 03/25/2026 03/25/2026
Amendment $0.00 BIL1ECO1 Cost reduction due to moving IDW costs to subsequent TA 03/23/2026 03/23/2026
Amendment $0.00 DC024D Well abandonment and reporting 03/19/2026 03/19/2026
Amendment $35,632.06 FIL19 Funding Increment increase 03/17/2026 03/17/2026
Amendment $0.00 DC026B Groundwater Sampling VOH & PFAS 03/16/2026 03/16/2026
Amendment $0.00 DC29ACO4 Increase in cost, increase in time 03/13/2026 03/13/2026
Amendment $0.00 DC32ACO3 Decrease in cost, increase in time 03/12/2026 03/12/2026
Amendment $0.00 DC31ACO3 Decrease in cost, increase in time 03/12/2026 03/12/2026
Amendment $0.00 DC30ACO3 Decrease in cost, increase in time 03/05/2026 03/05/2026
Amendment $0.00 BIL01G SSA Report 03/02/2026 03/02/2026
Amendment $0.00 BIL01F Remedial Action Plan 02/22/2026 02/22/2026
Amendment $0.00 PA329CO5 Pasco County Fire (ERIC_7395) Cost Decrease 6/30/2026 02/19/2026 02/19/2026
Amendment $117,000.00 FIL18 Funding Increment increase 02/09/2026 02/09/2026
Amendment $0.00 DC15DCO3 Increase in cost 02/09/2026 02/09/2026
Amendment $0.00 DC09CCO2 Decrease in cost 02/09/2026 02/09/2026
Amendment $0.00 DC16CCO4 Increase in cost, Increase in time 02/09/2026 02/09/2026
Amendment $0.00 DC05DCO2 Incease in cost, increase in time 02/03/2026 02/03/2026
Amendment $0.00 PA329CO4 Pasco County Fire (ERIC_7395) Cost Decrease 05/29/2026 01/12/2026 01/12/2026
Amendment $1,100,979.54 FIL17 Funding Increment increase 01/06/2026 01/06/2026
Amendment $0.00 DC035A Monitoring 12/23/2025 12/23/2025
Amendment $0.00 DC007B Monitoring 12/23/2025 12/23/2025
Amendment $0.00 DC31ACO2 decrease in cost, increase in time 12/23/2025 12/23/2025
Amendment $0.00 DC20CCO1 Decrease in cost 12/19/2025 12/19/2025
Amendment $0.00 DC32ACO2 Decease in cost, increase in time 12/16/2025 12/16/2025
Amendment $0.00 BIL01E SSA Report 12/15/2025 12/15/2025
Amendment $0.00 DC29ACO3 Decrease in cost 12/12/2025 12/12/2025
Amendment $16,000.00 FIL16 Funding Increment increase 12/11/2025 12/11/2025
Amendment $0.00 PA374CO1 Decreases and reconciles costs 12/04/2025 12/04/2025
Amendment $0.00 DC30ACO2 decrease in cost, increase in time 12/03/2025 12/03/2025
Amendment $0.00 DC08CCO4 Increase in time 12/02/2025 12/02/2025
Amendment $0.00 DC034A Assessment 12/02/2025 12/02/2025
Amendment $0.00 CO4 entered in error 12/01/2025 12/01/2025
Amendment $0.00 DC18BCO4 increase in cost, increase in time 12/01/2025 12/01/2025
Amendment $0.00 DC13BCO7 Increase in cost; increase in time 11/18/2025 11/18/2025
Amendment $0.00 DC29ACO2 Decrease in cost, Increase in time 11/10/2025 11/10/2025
Amendment $0.00 DC11DCO1 increase in cost 11/03/2025 11/03/2025
Amendment $0.00 BIL1DCO1 Cost reduction due to fewer samples taken 10/29/2025 10/29/2025
Amendment $0.00 PA329CO3 Reoncile WCD costs. 3/31/2026 10/27/2025 10/27/2025
Amendment $0.00 DC15DCO2 Increase in cost, increase in time 10/27/2025 10/27/2025
Amendment $0.00 DC15DCO1 Time extension 09/19/2025 09/19/2025
Amendment $0.00 DC020C Well Abandonment 09/18/2025 09/18/2025
Amendment $0.00 DC09CCO1 Cost reduction 09/11/2025 09/11/2025
Amendment $0.00 DC28ACO1 Cost reduction 09/08/2025 09/08/2025
Amendment $0.00 DC08CCO3 Cost increase 08/28/2025 08/28/2025
Amendment $0.00 DC32ACO1 Cost increase 08/27/2025 08/27/2025
Amendment $0.00 HW689 Cost Reduction 08/26/2025 08/26/2025
Amendment $0.00 DC31AC01 Cost Reduction 08/26/2025 08/26/2025
Amendment $0.00 DC06BCO1 Cost decrease 08/20/2025 08/20/2025
Amendment $0.00 DC30ACO1 Cost increase 08/19/2025 08/19/2025
Amendment $0.00 DC03DCO1 Cost increase 08/19/2025 08/19/2025
Amendment $0.00 DC08CCO2 Cost increase and time extension 08/18/2025 08/18/2025
Amendment $0.00 PA329CO2 Adjust actual costs. 1/30/2026 08/13/2025 08/13/2025
Amendment $0.00 DC29ACO1 Cost increase 08/04/2025 08/04/2025
Amendment $0.00 DC27ACO1 WCD reconcile 07/29/2025 07/29/2025
Amendment $0.00 DC033A SAWP 07/22/2025 07/22/2025
Amendment $0.00 DC04CCO1 Cost decrease 07/16/2025 07/16/2025
Amendment $0.00 DC11CCO6 Cost increase and time extension 07/16/2025 07/16/2025
Amendment $0.00 DC14BCO2 Cost increase and time extension 07/09/2025 07/09/2025
Amendment $0.00 BIL01D SSA Report 07/08/2025 07/08/2025
Amendment $0.00 PA380 Initial Notice of Contamination 9/25/2025 06/27/2025 06/27/2025
Amendment $0.00 DC13BCO6 Cost increase and time extension 06/24/2025 06/24/2025
Amendment $0.00 DC003CO1 entered in error 06/18/2025 06/18/2025
Amendment $0.00 DC03CC01 WCD Reconcile 06/18/2025 06/18/2025
Amendment $0.00 DC05DCO1 WCD reconcile 06/17/2025 06/17/2025
Amendment $0.00 DC16CCO3 WCD reconcile 06/16/2025 06/16/2025
Amendment $0.00 DC24CCO2 Cost reduction 06/13/2025 06/13/2025
Amendment $0.00 DC003D O&M 05/29/2025 05/29/2025
Amendment $0.00 DC15ECO1 Offsite noticing 05/28/2025 05/28/2025
Amendment $0.00 DC18BCO3 Additional Assessment 05/20/2025 05/20/2025
Amendment $0.00 DC009C Monitoring and SRCR 05/20/2025 05/20/2025
Amendment $125,000.00 FIL15 Funding Increment increase 05/14/2025 05/14/2025
Amendment $0.00 DC08CCO1 WCD Reconcile 05/12/2025 05/12/2025
Amendment $0.00 BIL01CC1 Cost reduction to reflect actual field work costs. 05/05/2025 05/05/2025
Amendment $0.00 DC022B GWM 05/01/2025 05/01/2025
Amendment $0.00 DC028A GWM 05/01/2025 05/01/2025
Amendment $0.00 HW016A GWM 04/30/2025 04/30/2025
Amendment $0.00 DC032A Site Assessment 04/30/2025 04/30/2025
Amendment $0.00 DC23BCO1 Cost reduction 04/25/2025 04/25/2025
Amendment $0.00 PA374 Supplemental Site Assessment. 02/27/2026 04/25/2025 04/25/2025
Amendment $0.00 DC030A Initial Assessment 04/23/2025 04/23/2025
Amendment $0.00 DC031A Site Assessment 04/23/2025 04/23/2025
Amendment $0.00 DC015E GWM 04/23/2025 04/23/2025
Amendment $0.00 DC006B GWM 04/18/2025 04/18/2025
Amendment $0.00 DC029A Initial Assessment 03/26/2025 03/26/2025
Amendment $0.00 DC14BCO1 Cost increase and time extension 03/21/2025 03/21/2025
Amendment $0.00 DC17BCO4 Cost reduction 03/17/2025 03/17/2025
Amendment $0.00 DC24CCO1 Cost increase and time extension 03/14/2025 03/14/2025
Amendment $0.00 DC027A Initial Assessment 03/14/2025 03/14/2025
Amendment $0.00 PA329CO1 Additonal Wells and IDW. 9/30/25 03/13/2025 03/13/2025
Amendment $0.00 DC001E Site Review Meeting 02/27/2025 02/27/2025
Amendment $0.00 DC15CCO2 Cost decrease 02/18/2025 02/18/2025
Amendment $0.00 DC11CCO5 WCD reconcile 02/18/2025 02/18/2025
Amendment $0.00 DC21BCO2 WCD reconcile 02/17/2025 02/17/2025
Amendment $0.00 DC16CCO2 Cost increase 01/27/2025 01/27/2025
Amendment $0.00 BIL01C New Task 01/27/2025 01/27/2025
Amendment $0.00 DC011D O&M 12/19/2024 12/19/2024
Amendment $850,000.00 FIL14 Funding Increment increase 12/11/2024 12/11/2024
Amendment $0.00 DC016CC1 Entered in error 12/10/2024 12/10/2024
Amendment $0.00 DC05CCO3 Cost Reduction 12/10/2024 12/10/2024
Amendment $0.00 DC16CCO1 WCD reconcilliation 12/10/2024 12/10/2024
Amendment $0.00 DC014B GWM 12/05/2024 12/05/2024
Amendment $0.00 DC004C PARM 12/03/2024 12/03/2024
Amendment $0.00 DC13BCO5 Increases costs to allow for DPT groundwater sampling 11/22/2024 11/22/2024
Amendment $0.00 DC015D O&M 11/21/2024 11/21/2024
Amendment $0.00 DC023B Annual Soil and GW Sampling 11/19/2024 11/19/2024
Amendment $116,000.00 FIL13 Funding Increment increase 10/28/2024 10/28/2024
Amendment $0.00 DC21BCO1 Task cost reduction 10/17/2024 10/17/2024
Amendment $0.00 DC20BCO1 Task cost reduction 10/17/2024 10/17/2024
Amendment $109,563.30 FIL12 Funding Increment increase 10/10/2024 10/10/2024
Amendment $0.00 PA254CO3 Reconcile WCD #6, 7, and 8. 11/29/2024 10/07/2024 10/07/2024
Amendment $175,000.00 FIL11 Funding Increment increase 09/23/2024 09/23/2024
Amendment $0.00 DC026A GWMR 09/18/2024 09/18/2024
Amendment $0.00 DC05CO2 Derrick A./ Entered this in Error 09/17/2024 09/17/2024
Amendment $0.00 DC05CCO2 Time extension 09/17/2024 09/17/2024
Amendment $0.00 DC005D Four quarters of O&M 09/11/2024 09/11/2024
Amendment $0.00 DC18BCO2 MOT and Utility Locate 09/04/2024 09/04/2024
Amendment $0.00 DC008C O&M 09/03/2024 09/03/2024
Amendment $0.00 DC08BCO1 Three months O&M 08/30/2024 08/30/2024
Amendment $0.00 PA329 Supplemental Site Assessment 7/31/2025 08/22/2024 08/22/2024
Amendment $0.00 DC04BCO1 Cost increase and time extension 08/21/2024 08/21/2024
Amendment $0.00 DC11CCO4 Cost increase and time extension 07/24/2024 07/24/2024
Amendment $0.00 DC03BCO2 Time extension 07/23/2024 07/23/2024
Amendment $0.00 DC13BCO4 Cost increase and time extension 07/23/2024 07/23/2024
Amendment $0.00 BIL1BCO3 Removal of lodging costs 06/21/2024 06/21/2024 07/27/2024
Amendment $0.00 BF1ECO1 Cost reduction of drilling and IDW 06/21/2024 06/21/2024
Amendment $0.00 DC024C Site Assessment 06/20/2024 06/20/2024
Amendment $0.00 PA254CO2 Cost Increase: SSAR & T&D of IDW - CCFTC; ERIC_7394 06/05/2024 06/05/2024
Amendment $0.00 DC13BCO3 Time extension 05/28/2024 05/28/2024
Amendment $0.00 DC11CCO3 Time extension 05/28/2024 05/28/2024
Amendment $0.00 DC17BCO3 Cost increase and time extension 05/28/2024 05/28/2024
Amendment $0.00 BIL1BCO2 Time extension 05/17/2024 05/17/2024
Amendment $0.00 HW12ACO2 Time Extension 05/16/2024 05/16/2024
Amendment $0.00 DC015C SVE Installation 05/15/2024 05/15/2024
Amendment $0.00 HW10ACO2 Task time extension 05/14/2024 05/14/2024
Amendment $0.00 DC003C 12 Months of O&M 04/26/2024 04/26/2024
Amendment $0.00 HW14ACO1 Cost reduction and time extension 04/22/2024 04/22/2024
Amendment $0.00 DC03BCO1 WCD Reconcile 04/22/2024 04/22/2024
Amendment $0.00 PA254CO1 Cost Increase: SSAR & T&D of IDW - CCFTC; ERIC_7394 04/19/2024 04/19/2024
Amendment $0.00 DC008B SVE Installation 04/01/2024 04/01/2024
Amendment $0.00 DC025A Multiple SAWPs 03/28/2024 03/28/2024
Amendment $0.00 DC05CCO1 Additional monitoring 03/18/2024 03/18/2024
Amendment $0.00 DC24BCO1 Cost decrease 03/18/2024 03/18/2024
Amendment $0.00 DC19BCO1 Cost Increase (WCD #1-3) 03/05/2024 03/05/2024
Amendment $0.00 DC12BCO4 Cost Decrease 02/27/2024 02/27/2024
Amendment $0.00 HW01BCO3 Cost Increase 02/26/2024 02/26/2024
Amendment $0.00 DC11CCO2 Task Time Extension 02/26/2024 02/26/2024
Amendment $0.00 BIL1BCO1 Costs to replace damanged samples and perform IDW sampling 02/21/2024 02/21/2024
Amendment $0.00 DC020B Authorizes APTIM to conduct Site Assessment Activities 02/14/2024 02/14/2024
Amendment $0.00 BF01E SSA Report 02/13/2024 02/13/2024
Amendment $0.00 DC17BCO2 Cost Increase 02/12/2024 02/12/2024
Amendment $0.00 HW07ACO2 Cost Decrease 02/09/2024 02/09/2024
Amendment $0.00 DC005C Authorizes APTIM to install SVE system + 1 month of O&M 02/09/2024 02/09/2024
Amendment $0.00 DC021B Authorizes APTIM to conduct Site Assessment Activities 02/09/2024 02/09/2024
Amendment $0.00 DC009B Authorizes APTIM to conduct Annual Groundwater Monitoring 02/09/2024 02/09/2024
Amendment $0.00 DC18BCO1 Cost Increase & Time Extension 02/09/2024 02/09/2024
Amendment $0.00 DC013C Authorizes APTIM to compile an ISRP 02/08/2024 02/08/2024
Amendment $0.00 DC016C Authorizes APTIM to implement SVE system 02/08/2024 02/08/2024
Amendment $0.00 DC024B Authorizes APTIM to conduct a Historical Records Review 02/06/2024 02/06/2024
Amendment $0.00 DC24ACO1 Task time extension 01/30/2024 01/30/2024
Amendment $0.00 DC15CCO1 Cost increase and time extension 01/30/2024 01/30/2024
Amendment $0.00 HW10ACO1 Time Extension 12/22/2023 12/22/2023
Amendment $0.00 HW12ACO1 Time Extension 12/22/2023 12/22/2023
Amendment $0.00 DC12BCO3 Time Extension 12/22/2023 12/22/2023
Amendment $0.00 HW07ACO1 Time Extension 12/22/2023 12/22/2023
Amendment $0.00 HW10CO1 Made in Error 12/22/2023 12/22/2023
Amendment $646,405.35 FIL10 Funding Increment increase 11/20/2023 11/20/2023
Amendment $0.00 HW01BCO2 Cost increase and task time extension 11/17/2023 11/17/2023
Amendment $0.00 DC23ACO1 Task time extension 11/16/2023 11/16/2023
Amendment $0.00 BF01D SSA Report 11/07/2023 11/07/2023
Amendment $0.00 BIL01B SSA Report 10/31/2023 10/31/2023
Amendment $0.00 DC17BCO1 Cost Increase 10/30/2023 10/30/2023
Amendment $0.00 DC024A Site Assessment Work Plan for Southgate Cleaners 10/24/2023 10/24/2023
Amendment $0.00 DC11CCO1 Task time extension 10/20/2023 10/20/2023
Amendment $105,000.00 FIL9 Funding Increment increase 10/10/2023 10/10/2023
Amendment $0.00 HW015A Authorizes APTIM to adress ciritical issues at WSCS sites 10/02/2023 10/02/2023
Amendment $0.00 DC12BCO2 Task time extension 09/28/2023 09/28/2023
Amendment $0.00 DC11BCO2 Cost Decrease + Time Extension 09/28/2023 09/28/2023
Amendment $0.00 DC13BCO2 Cost decrease and Task time extension 09/26/2023 09/26/2023
Amendment $1,788,508.55 FIL8 Funding Increment increase 08/29/2023 08/29/2023
Amendment $174,386.92 FIL7 Funding Increment increase 08/16/2023 08/16/2023
Amendment $0.00 PA254 SSAR & T&D of IDW - CCFTC; ERIC_7394 08/09/2023 08/09/2023
Amendment $0.00 SA216CO3 MADEINERROR 08/07/2023 08/07/2023
Amendment $0.00 BF01C SSA and Well location 08/01/2023 08/01/2023
Amendment $0.00 HW08ACO1 Increase in Cost 07/27/2023 07/27/2023
Amendment $0.00 HW09ACO1 Increase in cost 07/26/2023 07/26/2023
Amendment $0.00 HW13ACO1 Time extension 07/20/2023 07/20/2023
Amendment $317,884.75 FIL6 Funding Increment increase 07/17/2023 07/17/2023
Amendment $0.00 HW01BCO1 CO1: Time Extension 07/10/2023 07/10/2023
Amendment $0.00 DC019B SAR 06/29/2023 06/29/2023
Amendment $0.00 DC017B SAR 06/29/2023 06/29/2023
Amendment $0.00 DC018B SAR 06/29/2023 06/29/2023
Amendment $0.00 DC011C Create SVE ISRP 06/28/2023 06/28/2023
Amendment $0.00 HW03ACO2 ERIC_5246 Clothes Doctor: Time extension and cost increase 06/27/2023 06/27/2023
Amendment $0.00 HW014A ERIC_5574: Soil and DPT GW Sampling 06/26/2023 06/26/2023
Amendment $0.00 HW11CO1 ERIC_4123 One Stop Cleaners: Time Extension 06/22/2023 06/22/2023
Amendment $0.00 DC03ACO2 Task time extension 06/22/2023 06/22/2023
Amendment $0.00 DC022A SVE system removal 06/22/2023 06/22/2023
Amendment $0.00 DC023A GW sampling, remedial system design, and bid specifications 06/22/2023 06/22/2023
Amendment $0.00 HW11ACO1 Task time extension 06/22/2023 06/22/2023
Amendment $0.00 DC010B System Decommission 06/15/2023 06/15/2023
Amendment $0.00 DC003B One Stop Cleaners 12 Month O&M TA 06/13/2023 06/13/2023
Amendment $0.00 HW001B Well abandonment. 06/09/2023 06/09/2023
Amendment $0.00 DC004B O&M 06/09/2023 06/09/2023
Amendment $0.00 DC021A Assessment 05/31/2023 05/31/2023
Amendment $0.00 DC020A SAWP 05/26/2023 05/26/2023
Amendment $0.00 DC001D PRAC Meeting 05/12/2023 05/12/2023
Amendment $0.00 HW013A PFAS Screening 05/11/2023 05/11/2023
Amendment $0.00 CSS2AC02 Revised due to non-DEP lab use 05/08/2023 05/08/2023
Amendment $0.00 HW02ACO1 increase in GWM cost 04/27/2023 04/27/2023
Amendment $0.00 HW05ACO1 Reduction in IDW 04/27/2023 04/27/2023
Amendment $0.00 DC10ACO1 Reduction in IDW 04/27/2023 04/27/2023
Amendment $8,555.06 FIL5 Funding Increment Increase 04/20/2023 04/20/2023
Amendment $0.00 DC04ACO3 Time extension 04/18/2023 04/18/2023
Amendment $0.00 HW012A PFAS screening at 12 sites 04/18/2023 04/18/2023
Amendment $0.00 DC13BCO1 Reconcile WCD 1-4 04/17/2023 04/17/2023
Amendment $0.00 DC002B SVE abandonment and Well abandonment 04/07/2023 04/07/2023
Amendment $0.00 DC11BCO1 WCD reconiliation #1-3 Time extension 04/06/2023 04/06/2023
Amendment $0.00 DC12BCO1 lab cost reduction. Time extension 04/05/2023 04/05/2023
Amendment $0.00 HW03ACO1 locate 10 on-site monitor wells 03/26/2023 03/26/2023
Amendment $0.00 DC008A SVE construction 1mo O&M 03/21/2023 03/21/2023
Amendment $0.00 DC005B ISRP 03/07/2023 03/07/2023
Amendment $0.00 DC015B Additional MAGS 03/07/2023 03/07/2023
Amendment $0.00 PA241 Pasco County FRTC Site Reconnaissance and GW Sampling 03/06/2023 03/06/2023
Amendment $0.00 DC016B Bid Package 02/27/2023 02/27/2023
Amendment $0.00 HW011A PFAS sampling 02/24/2023 02/24/2023
Amendment $0.00 HW010A GWM & PFAS sampling 02/20/2023 02/20/2023
Amendment $0.00 HW007A GWM & PFAS sampling 02/16/2023 02/16/2023
Amendment $0.00 HW009A GWM & PFAS sampling 02/16/2023 02/16/2023
Amendment $0.00 HW008A GWM & PFAS sampling 02/16/2023 02/16/2023
Amendment $0.00 BIL01A SSA Report 02/15/2023 02/15/2023
Amendment $0.00 BF1BCO1 Labor and lab cost reduction and extension of due date 02/14/2023 02/14/2023
Amendment $0.00 CSS02A Site Inspection Report 02/14/2023 02/14/2023
Amendment $0.00 DC03ACO1 increase in GWM costs 02/07/2023 02/07/2023
Amendment $0.00 DC017A Site Assessment Work Plan 01/19/2023 01/19/2023
Amendment $0.00 DC018A Site Assessment Work Plan 01/19/2023 01/19/2023
Amendment $0.00 DC019A Site Assessment Work Plan 01/19/2023 01/19/2023
Amendment $0.00 DC04ACO2 TACO-ERIC_4028 Palm Bay Laundry Due Date Extension. 12/09/2022 12/09/2022
Amendment $0.00 HW003A Annual Sampling and PFAS Screening. 11/14/2022 11/14/2022
Amendment $0.00 HW004A Annual Sampling and PFAS Screening. 11/14/2022 11/14/2022
Amendment $0.00 HW005A Annual Sampling and PFAS Screening. 11/14/2022 11/14/2022
Amendment $0.00 HW006A Title Search 11/14/2022 11/14/2022
Amendment $0.00 DC012B Initial site assessment. 11/10/2022 11/10/2022
Amendment $0.00 HW002A Annual Sampling and PFAS Screening. 11/07/2022 11/07/2022
Amendment $0.00 DC011B Initial site assessment. 11/07/2022 11/07/2022
Amendment $0.00 DC0013B Initial site assessment. 11/07/2022 11/07/2022
Amendment $0.00 DC013B Initial site assessment. 11/04/2022 11/04/2022
Amendment $124,696.07 FIL4 Funding Increment Increase 11/01/2022 11/01/2022
Amendment $0.00 BF01B Supplemental Site Assessment Report 10/25/2022 10/25/2022
Amendment $0.00 DC14ACO1 INOC and Site Access 10/24/2022 10/24/2022
Amendment $0.00 DC016A Equipment Evaluation Cost Estimate 09/30/2022 09/30/2022
Amendment $0.00 DC15ACO1 TACO: ERIC_4885 Cost increase and Time Extension. 09/30/2022 09/30/2022 12/30/2022
Amendment $0.00 DC04ACO1 TACO-ERIC_4028 Palm Bay Laundry Due Date Extension 09/28/2022 09/28/2022 02/28/2023
Amendment $0.00 DC014A PARM Sampling 08/03/2022 08/03/2022
Amendment $0.00 DC015A ISR 08/02/2022 08/02/2022
Amendment $1,120,000.00 FIL 3 Funding Increment Increase 07/14/2022 07/14/2022
Amendment $0.00 DC02ACO1 Monitoring 07/14/2022 07/14/2022
Amendment $0.00 DC013A Monitoring 07/08/2022 07/08/2022
Amendment $0.00 DC012A Monitoring 07/08/2022 07/08/2022
Amendment $0.00 DC011A Monitoring 07/07/2022 07/07/2022
Amendment $0.00 CSS1ACO1 Additional sampling costs 06/21/2022 06/21/2022
Amendment $0.00 DC009A Monitoring 06/10/2022 06/10/2022
Amendment $0.00 BF1ACO1 Reduction of field work costs 06/10/2022 06/10/2022
Amendment $0.00 DC010A Monitoring 06/08/2022 06/08/2022
Amendment $0.00 DC007A Monitoring 05/26/2022 05/26/2022
Amendment $0.00 DC006A Monitoring 05/17/2022 05/17/2022
Amendment $0.00 DC001C Contractor Workshop 05/11/2022 05/11/2022
Amendment $0.00 DC004A O&M 05/06/2022 05/06/2022
Amendment $0.00 DC005A Monitoring 05/05/2022 05/05/2022
Amendment $225,000.00 FIL2 Funding Increment Increase 05/02/2022 05/02/2022
Amendment $0.00 CSS01A Site Investigation Report 04/08/2022 04/08/2022
Amendment $0.00 DC03A O&M 04/06/2022 04/06/2022
Amendment $0.00 DC001B Site Review Meeting 03/28/2022 03/28/2022
Amendment $0.00 DC002A Monitoring 03/03/2022 03/03/2022
Amendment $0.00 HW001A Monitoring 02/01/2022 02/01/2022
Amendment $0.00 BF01A Supplemental Site Assessment Activities 02/01/2022 02/01/2022
Amendment $255,000.00 FIL1 Funding Increment Increase 01/24/2022 01/24/2022
Amendment $0.00 DC001A Critical Waste Site Clean Up 01/10/2022 01/10/2022

Vendor

Name Line 1Name Line 2City State ZipMinority Vendor Designation
APTIM ENVIRONMENTAL & INFRASTRU WINTER GARDEN FL 347870000 Non-Minority

CFDA

No CFDA Codes found for the contract.

CSFA

No CSFA Codes found for the contract.
More Deliverable Number      Commodity/Service Type Major Deliverable Method of Payment
     
Professional engineering services Task DC001C: Upon FDEP approval of completed attendance and signature by 2 staff members on workshop... Fixed Price - Lump Sum
     
Professional engineering services Task DC013A: Subtasks 1 & 2: Upon submittal and FDEP approval of the Site Assessment Work Plan + Pro... Fixed Fee / Unit Rate
     
Professional engineering services Task DC012A: Subtasks 1 & 2: Upon submittal and FDEP approval of the Site Assessment Work Plan + Pro... Fixed Fee / Unit Rate
     
Professional engineering services Task DC011A: Subtasks 1 & 2: Upon submittal and FDEP approval of the Site Assessment Work Plan + Pro... Fixed Fee / Unit Rate
     
Professional engineering services Task PA241: FDEP approval of Site Reconnaissance Report - Subtask 2 = $3,280.80. FDEP approval of Gr... Fixed Fee / Unit Rate
     
Professional engineering services Task HW008A: Submittal and FDEP approval of the Email PFAS results, lab results and summary (Subtask... Fixed Fee / Unit Rate
     
Professional engineering services Task HW009A: Submittal and FDEP approval of the Email PFAS results, lab results and summary (Subtask... Fixed Fee / Unit Rate
     
Professional engineering services Task DC003A: Upon completion of all semi-annual O&M activities and FDEP approval of Semi-Annual O&M ... Fixed Fee / Unit Rate
     
Professional engineering services Task DC022A: FDEP Approval of Remediation System Decommissioning Letter Report & PM - Subtasks 1-3 =... Fixed Price - Lump Sum
     
Professional engineering services Task DC005A: DEP approval of submittal of Noticing Documentation Subtask 2: 985.53 Submittal Annual ... Fixed Price - Lump Sum
     
Professional engineering services Task DC001A: Documentation of completed site activities:2500 Fixed Price - Lump Sum
     
Professional engineering services Task DC001B: Subtasks 1 & 2: Submittal and FDEP approval of Site Review Meeting Notes and Project Ma... Fixed Price - Lump Sum
     
Professional engineering services Task DC007A: Upon Submittal and approval of Annual Groundwater and PDB Installation Documentation; G... Fixed Price - Lump Sum
     
Professional engineering services Task DC009A: Upon Submittal and approval of Annual Groundwater Monitoring Field Documentation and L... Fixed Price - Lump Sum
     
Professional engineering services Task BF01A: SSA Workplan, QAPP, and Health and Safety Plan, $3,469.72; Field notes, MW installation ... Fixed Price - Lump Sum
     
Professional engineering services Task CSS01A: FDEP approval of SI Workplan, QAPP, and Health and Safety Plan (Subtask 2) $3,018.46. F... Fixed Fee / Unit Rate
     
Professional engineering services Task DC006A: Subtask 2&1: Upon completion and FDEP approval of : Ground Water Sampling Report, GIS/D... Fixed Price - Lump Sum
     
Professional engineering services Task DC002A: DEP approval of Vapor shutdown Sampling field documentation, laboratory analytical repo... Fixed Price - Lump Sum
     
Professional engineering services Deliverables are assigned by Task Assignments under the Master Agreement. No Cost
     
Professional engineering services Task HW001A: FDEP Approval of Submittal of Chain of Title and Survey: Subtask 2: 8194.71 FDEP appro... Fixed Price - Lump Sum
     
Professional engineering services Task DC016A: FDEP approval of Equipment Evaluation Cost Estimate and Project Management: Subtask 1 &... Fixed Price - Lump Sum
     
Professional engineering services Task DC015A: Upon Submittal and approval of ISR Work plan and project management. Subtask 2& 1: 14,1... Fixed Fee / Unit Rate
     
Professional engineering services Task DC016B: Subtasks 1 & 2: PM & Bid specification package for Remedial system$4,445.46 Fixed Price - Lump Sum
     
Professional engineering services Task HW004A: FDEP approval of Email PFAS Results and Lab Report (Subtask 2, 3)- $2,930.27 ... Fixed Fee / Unit Rate
     
Professional engineering services Task HW006A: Approval of Title Search and PM (Subtask 1, 2)- $769.14 ... Fixed Price - Lump Sum
 Displaying 1 to 25 of 130     1 2 3 4 5 6 Next  Last


Payments are also referred to as expenditures (creating or incurring a legal obligation to disburse money) or disbursements (the payment of expenditures). Payments include disbursements and accounting adjustments made on a contract. Payments are always positive amounts while accounting adjustments may be positive or negative depending on the type of adjustment.

Payment Details

"Date" in the listing below indicates the date the payment voucher was recorded in the system, not the date the payment was issued.
More Fiscal Year Total Amount
     
2026-2027 $462,028.34
     
2025-2026 $1,345,608.47
     
2024-2025 $1,413,098.88
     
2023-2024 $980,773.67
     
2022-2023 $554,089.01
     
2021-2022 $40,614.49

If a payment or adjustment to a contract was made before July 1, 2012, the information may not be posted in this system.

Contract Documents


Click on the pdf icon or Agency Document Link to view the document
Document Type Document Reference # Executed Date Document Add Date Agency Document Link View
Original Contract Original Contract - HW689 12/21/2021 8/31/2026 8:54:27 AM
Procurement Original Contract - HW689 1/4/2022 3:25:01 PM
Amendment BF01A 02/01/2022 2/2/2022 11:34:04 AM
Amendment BF01B 10/25/2022 10/26/2022 10:37:09 AM
Amendment BF01C 08/01/2023 8/3/2023 9:37:28 AM
Amendment BF01D 11/07/2023 11/7/2023 2:08:19 PM
Amendment BF01E 02/13/2024 8/23/2024 1:35:28 PM
Amendment BF1ACO1 06/10/2022 6/14/2022 9:37:18 AM
Amendment BF1BCO1 02/14/2023 2/16/2023 11:23:09 AM
Amendment BF1ECO1 06/21/2024 8/23/2024 2:01:24 PM
Amendment BIL01A 02/15/2023 4/3/2023 3:43:12 PM
Amendment BIL01B 10/31/2023 11/1/2023 2:00:52 PM
Amendment BIL01C 01/27/2025 5/12/2025 4:21:55 PM
Amendment BIL01CC1 05/05/2025 5/12/2025 4:38:35 PM
Amendment BIL01D 07/08/2025 10/30/2025 3:36:57 PM
Amendment BIL01E 12/15/2025 3/3/2026 11:21:33 AM
Amendment BIL01F 02/22/2026 3/3/2026 11:10:26 AM
Amendment BIL01G 03/02/2026 3/3/2026 11:17:58 AM
Amendment BIL1BCO1 02/21/2024 2/22/2024 1:47:54 PM
Amendment BIL1BCO2 05/17/2024 5/30/2024 11:22:21 AM
Amendment BIL1BCO3 06/21/2024 7/29/2024 8:53:55 AM
Amendment BIL1DCO1 10/29/2025 10/30/2025 3:59:43 PM
Amendment BIL1ECO1 03/23/2026 3/23/2026 2:35:13 PM
Amendment BIL1FCO1 05/27/2026 5/27/2026 2:46:49 PM
Amendment BIL1FCO2 09/29/2026 10/1/2026 9:17:05 AM
Amendment BIL1GCO1 06/23/2026 6/24/2026 4:02:52 PM
Amendment CSS01A 04/08/2022 4/11/2022 11:20:17 AM
Amendment CSS1ACO1 06/21/2022 6/22/2022 12:06:39 PM
Amendment CSS2AC02 05/08/2023 5/16/2023 2:20:27 PM
Amendment DC0013B 11/07/2022 11/7/2022 11:39:23 AM
Amendment DC001A 01/10/2022 9/29/2022 3:54:00 PM
Amendment DC001B 03/28/2022 4/8/2022 8:45:34 AM
Amendment DC001C 05/11/2022 5/20/2022 8:59:33 AM
Amendment DC001D 05/12/2023 5/30/2023 4:04:47 PM
Amendment DC001E 02/27/2025 2/28/2025 9:38:02 AM
Amendment DC002A 03/03/2022 3/28/2022 12:05:16 PM
Amendment DC002B 04/07/2023 2/7/2024 11:29:02 AM
Amendment DC003B 06/13/2023 6/14/2023 2:34:32 PM
Amendment DC003C 04/26/2024 5/1/2024 4:08:45 PM
Amendment DC003D 05/29/2025 5/29/2025 2:10:10 PM
Amendment DC003E 05/15/2026 7/15/2026 10:02:06 AM
Amendment DC004A 05/06/2022 5/10/2022 12:17:10 PM
Amendment DC004B 06/09/2023 6/13/2023 9:14:10 AM
Amendment DC004C 12/03/2024 12/4/2024 11:37:51 AM
Amendment DC004D 06/23/2026 6/29/2026 8:00:56 AM
Amendment DC005A 05/05/2022 5/10/2022 12:25:32 PM
Amendment DC005B 03/07/2023 3/17/2023 4:42:25 PM
Amendment DC005C 02/09/2024 2/14/2024 10:46:47 AM
Amendment DC005D 09/11/2024 9/11/2024 11:55:17 AM
Amendment DC006A 05/17/2022 6/28/2022 9:46:25 AM
Amendment DC006B 04/18/2025 4/21/2025 9:20:31 AM
Amendment DC007A 05/26/2022 6/13/2022 1:34:36 PM
Amendment DC007B 12/23/2025 12/29/2025 3:50:36 PM
Amendment DC008A 03/21/2023 4/7/2023 11:02:48 AM
Amendment DC008B 04/01/2024 4/2/2024 2:54:25 PM
Amendment DC008C 09/03/2024 9/4/2024 8:52:37 AM
Amendment DC009A 06/10/2022 6/13/2022 1:50:33 PM
Amendment DC009B 02/09/2024 2/14/2024 11:09:38 AM
Amendment DC009C 05/20/2025 5/21/2025 9:19:59 AM
Amendment DC010A 06/08/2022 6/13/2022 1:58:42 PM
Amendment DC010B 06/15/2023 6/15/2023 2:36:46 PM
Amendment DC011A 07/07/2022 7/8/2022 4:45:36 PM
Amendment DC011B 11/07/2022 4/7/2023 11:35:27 AM
Amendment DC011C 06/28/2023 6/28/2023 3:49:09 PM
Amendment DC011D 12/19/2024 12/20/2024 3:04:20 PM
Amendment DC012A 07/08/2022 7/8/2022 4:38:13 PM
Amendment DC012B 11/10/2022 11/14/2022 4:05:30 PM
Amendment DC013A 07/08/2022 7/8/2022 4:33:02 PM
Amendment DC013B 11/04/2022 11/4/2022 12:53:57 PM
Amendment DC013C 02/08/2024 2/9/2024 2:15:40 PM
Amendment DC014A 08/03/2022 8/3/2022 2:32:47 PM
Amendment DC014B 12/05/2024 12/6/2024 9:23:38 AM
Amendment DC015A 08/02/2022 8/5/2022 10:23:38 AM
Amendment DC015B 03/07/2023 3/17/2023 4:47:46 PM
Amendment DC015C 05/15/2024 5/21/2024 11:05:14 AM
Amendment DC015D 11/21/2024 11/22/2024 1:45:38 PM
Amendment DC015E 04/23/2025 5/27/2025 10:43:45 AM
Amendment DC016A 09/30/2022 10/3/2022 10:45:01 AM
Amendment DC016B 02/27/2023 3/6/2023 1:18:18 PM
Amendment DC016C 02/08/2024 2/9/2024 2:32:36 PM
Amendment DC016D 06/29/2026 7/15/2026 11:10:36 AM
Amendment DC017A 01/19/2023 1/19/2023 2:29:26 PM
Amendment DC017B 06/29/2023 6/30/2023 10:29:40 AM
Amendment DC018A 01/19/2023 1/19/2023 3:58:04 PM
Amendment DC018B 06/29/2023 6/30/2023 10:41:35 AM
Amendment DC019A 01/19/2023 1/19/2023 4:00:36 PM
Amendment DC019B 06/29/2023 6/30/2023 10:19:54 AM
Amendment DC020A 05/26/2023 5/30/2023 3:54:58 PM
Amendment DC020B 02/14/2024 2/15/2024 10:55:43 AM
Amendment DC020C 09/18/2025 9/22/2025 10:55:56 AM
Amendment DC021A 05/31/2023 10/13/2023 1:27:39 PM
Amendment DC021B 02/09/2024 2/14/2024 10:59:35 AM
Amendment DC021C 06/04/2026 6/18/2026 9:21:04 AM
Amendment DC022A 06/22/2023 6/23/2023 9:55:31 AM
Amendment DC022B 05/01/2025 5/1/2025 2:17:16 PM
Amendment DC023A 06/22/2023 6/23/2023 1:17:30 PM
Amendment DC023B 11/19/2024 11/20/2024 9:31:02 AM
Amendment DC024A 10/24/2023 2/2/2024 10:00:28 AM
Amendment DC024B 02/06/2024 2/6/2024 3:05:27 PM
Amendment DC024C 06/20/2024 7/1/2024 11:17:42 AM
Amendment DC024D 03/19/2026 4/2/2026 8:59:26 AM
Amendment DC025A 03/28/2024 3/29/2024 12:30:49 PM
Amendment DC026A 09/18/2024 9/19/2024 9:55:03 AM
Amendment DC026B 03/16/2026 3/19/2026 12:18:49 PM
Amendment DC027A 03/14/2025 3/17/2025 8:37:27 AM
Amendment DC027B 06/22/2026 6/26/2026 1:22:19 PM
Amendment DC028A 05/01/2025 5/5/2025 8:40:12 AM
Amendment DC029A 03/26/2025 3/27/2025 2:47:56 PM
Amendment DC029B 06/08/2026 7/15/2026 9:52:19 AM
Amendment DC02ACO1 07/14/2022 7/25/2022 10:53:19 AM
Amendment DC030A 04/23/2025 4/23/2025 9:38:12 AM
Amendment DC031A 04/23/2025 4/24/2025 9:33:06 AM
Amendment DC032A 04/30/2025 4/30/2025 2:51:10 PM
Amendment DC033A 07/22/2025 7/22/2025 2:14:14 PM
Amendment DC034A 12/02/2025 12/10/2025 9:48:35 AM
Amendment DC035A 12/23/2025 12/29/2025 2:11:55 PM
Amendment DC036A 05/01/2026 5/7/2026 11:44:18 AM
Amendment DC037A 05/11/2026 5/15/2026 8:48:07 AM
Amendment DC038A 05/19/2026 5/26/2026 8:39:59 AM
Amendment DC039A 06/19/2026 6/23/2026 2:50:03 PM
Amendment DC03A 04/06/2022 4/7/2022 1:20:02 PM
Amendment DC03ACO1 02/07/2023 2/9/2023 1:35:10 PM
Amendment DC03ACO2 06/22/2023 6/22/2023 4:41:31 PM
Amendment DC03BCO1 04/22/2024 4/23/2024 1:15:01 PM
Amendment DC03BCO2 07/23/2024 7/23/2024 10:38:53 AM
Amendment DC03CC01 06/18/2025 6/19/2025 8:56:02 AM
Amendment DC03DCO1 08/19/2025 8/20/2026 9:21:52 AM
Amendment DC04ACO1 09/28/2022 9/30/2022 8:48:17 AM
Amendment DC04BCO1 08/21/2024 8/21/2024 2:46:21 PM
Amendment DC04CCO1 07/16/2025 7/16/2025 1:47:32 PM
Amendment DC04DCO1 08/31/2026 9/10/2026 9:43:14 AM
Amendment DC05CCO1 03/18/2024 3/19/2024 12:03:11 PM
Amendment DC05CCO2 09/17/2024 12/10/2024 1:15:09 PM
Amendment DC05CCO3 12/10/2024 12/10/2024 11:42:07 AM
Amendment DC05DCO1 06/17/2025 6/17/2025 11:51:59 AM
Amendment DC05DCO2 02/03/2026 2/5/2026 4:15:45 PM
Amendment DC05DCO3 06/15/2026 6/23/2026 8:12:05 AM
Amendment DC06BCO1 08/20/2025 8/20/2025 11:12:38 AM
Amendment DC08BCO1 08/30/2024 8/30/2024 2:37:03 PM
Amendment DC08CCO1 05/12/2025 5/12/2025 1:15:52 PM
Amendment DC08CCO2 08/18/2025 8/18/2025 1:57:43 PM
Amendment DC08CCO3 08/28/2025 8/29/2025 11:45:58 AM
Amendment DC08CCO4 12/02/2025 12/8/2025 8:15:31 AM
Amendment DC09CCO1 09/11/2025 9/11/2025 11:10:14 AM
Amendment DC09CCO2 02/09/2026 3/2/2026 1:34:23 PM
Amendment DC10ACO1 04/27/2023 5/3/2023 10:38:05 AM
Amendment DC11BCO1 04/06/2023 4/7/2023 11:36:34 AM
Amendment DC11BCO2 09/28/2023 2/1/2024 2:05:58 PM
Amendment DC11CCO1 10/20/2023 2/16/2024 2:42:00 PM
Amendment DC11CCO2 02/26/2024 2/27/2024 9:11:54 AM
Amendment DC11CCO3 05/28/2024 6/13/2024 8:14:36 AM
Amendment DC11CCO4 07/24/2024 7/24/2024 10:00:13 AM
Amendment DC11CCO5 02/18/2025 2/18/2025 3:23:52 PM
Amendment DC11CCO6 07/16/2025 7/17/2025 8:37:23 AM
Amendment DC11DCO1 11/03/2025 6/2/2026 2:13:04 PM
Amendment DC12BCO1 04/05/2023 2/21/2024 4:56:39 PM
Amendment DC12BCO2 09/28/2023 2/21/2024 4:36:36 PM
Amendment DC12BCO3 12/22/2023 2/21/2024 4:54:53 PM
Amendment DC12BCO4 02/27/2024 2/27/2024 4:16:15 PM
Amendment DC13BCO1 04/17/2023 5/3/2023 9:55:23 AM
Amendment DC13BCO2 09/26/2023 2/22/2024 10:58:46 AM
Amendment DC13BCO3 05/28/2024 7/16/2024 10:03:51 AM
Amendment DC13BCO4 07/23/2024 7/23/2024 2:07:04 PM
Amendment DC13BCO5 11/22/2024 11/22/2024 1:40:47 PM
Amendment DC13BCO6 06/24/2025 7/1/2025 11:19:40 AM
Amendment DC13BCO7 11/18/2025 12/1/2025 3:57:13 PM
Amendment DC13BCO8 08/17/2026 8/31/2026 8:32:47 AM
Amendment DC14ACO1 10/24/2022 10/25/2022 10:14:22 AM
Amendment DC14BCO1 03/21/2025 3/21/2025 9:42:15 AM
Amendment DC14BCO2 07/09/2025 7/10/2025 9:01:42 AM
Amendment DC15ACO1 09/30/2022 10/3/2022 10:49:55 AM
Amendment DC15CCO1 01/30/2024 1/30/2025 1:19:32 PM
Amendment DC15CCO2 02/18/2025 2/18/2025 9:47:13 AM
Amendment DC15DCO1 09/19/2025 9/19/2025 1:25:01 PM
Amendment DC15DCO2 10/27/2025 12/12/2025 1:38:42 PM
Amendment DC15DCO3 02/09/2026 3/2/2026 11:45:17 AM
Amendment DC15DCO4 04/29/2026 5/7/2026 11:32:34 AM
Amendment DC15DCO5 08/07/2026 8/19/2026 10:20:16 AM
Amendment DC15DCO6 09/11/2026 9/15/2026 1:11:00 PM
Amendment DC15ECO1 05/28/2025 5/29/2025 8:16:59 AM
Amendment DC16CCO1 12/10/2024 1/27/2025 10:52:41 AM
Amendment DC16CCO2 01/27/2025 1/27/2025 11:04:00 AM
Amendment DC16CCO3 06/16/2025 6/17/2025 8:42:06 AM
Amendment DC16CCO4 02/09/2026 3/2/2026 2:09:14 PM
Amendment DC16CCO5 05/13/2026 6/1/2026 2:10:29 PM
Amendment DC16CCO6 08/05/2026 8/31/2026 10:50:18 AM
Amendment DC16DCO1 09/23/2026 9/29/2026 10:42:22 AM
Amendment DC17BCO1 10/30/2023 2/1/2024 10:20:54 AM
Amendment DC17BCO2 02/12/2024 2/14/2024 8:50:10 AM
Amendment DC17BCO3 05/28/2024 5/29/2024 9:19:49 AM
Amendment DC17BCO4 03/17/2025 3/17/2025 10:40:48 AM
Amendment DC18BCO1 02/09/2024 2/14/2024 3:28:40 PM
Amendment DC18BCO2 09/04/2024 9/4/2024 2:04:44 PM
Amendment DC18BCO3 05/20/2025 5/21/2025 9:59:49 AM
Amendment DC18BCO4 12/01/2025 12/4/2025 1:53:55 PM
Amendment DC18BCO5 05/21/2026 6/1/2026 8:55:00 AM
Amendment DC19BCO1 03/05/2024 3/6/2024 2:50:05 PM
Amendment DC20BCO1 10/17/2024 10/17/2024 2:22:53 PM
Amendment DC20CCO1 12/19/2025 12/29/2025 10:31:27 AM
Amendment DC21BCO1 10/17/2024 10/17/2024 1:55:07 PM
Amendment DC21BCO2 02/17/2025 2/18/2025 9:29:30 AM
Amendment DC23ACO1 11/16/2023 2/22/2024 11:09:29 AM
Amendment DC23BCO1 04/25/2025 4/25/2025 1:42:00 PM
Amendment DC24ACO1 01/30/2024 2/2/2024 10:10:41 AM
Amendment DC24BCO1 03/18/2024 3/19/2024 12:48:35 PM
Amendment DC24CCO1 03/14/2025 3/24/2025 8:31:43 AM
Amendment DC24CCO2 06/13/2025 6/13/2025 2:05:48 PM
Amendment DC27ACO1 07/29/2025 7/30/2025 8:32:50 AM
Amendment DC28ACO1 09/08/2025 9/10/2025 8:13:17 AM
Amendment DC29ACO1 08/04/2025 8/4/2025 1:19:38 PM
Amendment DC29ACO2 11/10/2025 12/11/2025 11:45:45 AM
Amendment DC29ACO3 12/12/2025 12/29/2025 11:30:32 AM
Amendment DC29ACO4 03/13/2026 3/19/2026 11:48:50 AM
Amendment DC29ACO5 06/10/2026 6/18/2026 1:07:41 PM
Amendment DC29BCO1 09/04/2026 9/15/2026 1:03:10 PM
Amendment DC30ACO1 08/19/2025 8/19/2025 1:16:01 PM
Amendment DC30ACO2 12/03/2025 12/10/2025 2:11:38 PM
Amendment DC30ACO3 03/05/2026 3/13/2026 8:54:16 AM
Amendment DC31AC01 08/26/2025 8/26/2025 4:13:22 PM
Amendment DC31ACO2 12/23/2025 12/29/2025 3:59:59 PM
Amendment DC31ACO3 03/12/2026 3/23/2026 3:46:33 PM
Amendment DC32ACO1 08/27/2025 8/28/2025 3:28:30 PM
Amendment DC32ACO2 12/16/2025 12/23/2025 8:43:27 AM
Amendment DC32ACO3 03/12/2026 3/23/2026 3:07:17 PM
Amendment DC35ACO1 05/13/2026 5/18/2026 10:51:30 AM
Amendment DC38ACO1 09/21/2026 9/29/2026 9:50:41 AM
Amendment FIL 3 07/14/2022 7/18/2022 9:52:15 AM
Amendment FIL1 01/24/2022 1/26/2022 9:04:38 AM
Amendment FIL10 11/20/2023 11/20/2023 4:53:07 PM
Amendment FIL11 09/23/2024 9/24/2024 10:05:23 AM
Amendment FIL12 10/10/2024 10/10/2024 2:23:25 PM
Amendment FIL13 10/28/2024 10/30/2024 11:22:07 AM
Amendment FIL14 12/11/2024 12/12/2024 1:55:43 PM
Amendment FIL15 05/14/2025 5/16/2025 4:26:48 PM
Amendment FIL16 12/11/2025 12/18/2025 11:35:30 AM
Amendment FIL17 01/06/2026 1/6/2026 3:28:50 PM
Amendment FIL18 02/09/2026 2/10/2026 10:20:42 AM
Amendment FIL19 03/17/2026 3/17/2026 10:44:29 AM
Amendment FIL2 05/02/2022 5/2/2022 5:09:36 PM
Amendment FIL20 03/25/2026 3/25/2026 1:19:47 PM
Amendment FIL4 11/01/2022 11/9/2022 2:12:15 PM
Amendment FIL5 04/20/2023 4/25/2023 2:35:17 PM
Amendment FIL6 07/17/2023 7/20/2023 9:36:25 AM
Amendment FIL7 08/16/2023 8/17/2023 4:19:43 PM
Amendment FIL8 08/29/2023 9/1/2023 1:12:21 PM
Amendment FIL9 10/10/2023 10/11/2023 11:45:09 AM
Amendment HW001A 02/01/2022 2/2/2022 10:58:36 AM
Amendment HW001B 06/09/2023 6/12/2023 4:15:45 PM
Amendment HW002A 11/07/2022 1/9/2023 1:04:12 PM
Amendment HW003A 11/14/2022 11/15/2022 1:17:25 PM
Amendment HW004A 11/14/2022 11/15/2022 1:22:06 PM
Amendment HW005A 11/14/2022 11/15/2022 1:25:19 PM
Amendment HW006A 11/14/2022 11/15/2022 1:32:28 PM
Amendment HW007A 02/16/2023 2/21/2023 8:54:09 AM
Amendment HW008A 02/16/2023 2/21/2023 9:37:49 AM
Amendment HW009A 02/16/2023 2/21/2023 9:16:23 AM
Amendment HW010A 02/20/2023 2/20/2023 4:24:37 PM
Amendment HW011A 02/24/2023 3/6/2023 2:34:51 PM
Amendment HW012A 04/18/2023 5/3/2023 10:10:59 AM
Amendment HW013A 05/11/2023 5/30/2023 3:50:35 PM
Amendment HW014A 06/26/2023 6/27/2023 10:05:04 AM
Amendment HW015A 10/02/2023 2/22/2024 10:46:05 AM
Amendment HW016A 04/30/2025 4/30/2025 1:45:36 PM
Amendment HW01BCO1 07/10/2023 7/17/2023 8:22:48 AM
Amendment HW01BCO2 11/17/2023 2/20/2024 3:57:26 PM
Amendment HW01BCO3 02/26/2024 2/29/2024 10:21:34 AM
Amendment HW02ACO1 04/27/2023 6/5/2023 10:02:39 AM
Amendment HW03ACO1 03/26/2023 4/7/2023 11:15:19 AM
Amendment HW03ACO2 06/27/2023 6/28/2023 8:54:16 AM
Amendment HW05ACO1 04/27/2023 5/3/2023 10:30:04 AM
Amendment HW07ACO1 12/22/2023 12/27/2023 11:35:26 AM
Amendment HW07ACO2 02/09/2024 2/14/2024 10:19:51 AM
Amendment HW08ACO1 07/27/2023 7/28/2023 11:36:10 AM
Amendment HW09ACO1 07/26/2023 7/28/2023 2:52:48 PM
Amendment HW10ACO1 12/22/2023 5/21/2024 8:56:29 AM
Amendment HW10ACO2 05/14/2024 5/21/2024 9:03:19 AM
Amendment HW10CO1 12/22/2023 1/10/2024 8:46:24 AM
Amendment HW11ACO1 06/22/2023 2/16/2024 3:31:55 PM
Amendment HW11CO1 06/22/2023 6/22/2023 3:56:59 PM
Amendment HW12ACO1 12/22/2023 12/27/2023 11:22:42 AM
Amendment HW12ACO2 05/16/2024 5/21/2024 10:31:25 AM
Amendment HW13ACO1 07/20/2023 7/21/2023 9:20:21 AM
Amendment HW14ACO1 04/22/2024 4/22/2024 2:21:04 PM
Amendment PA241 03/06/2023 3/6/2023 3:39:48 PM
Amendment PA254 08/09/2023 8/11/2023 1:28:17 PM
Amendment PA254CO1 04/19/2024 4/22/2024 10:17:47 AM
Amendment PA254CO2 06/05/2024 6/6/2024 11:44:33 AM
Amendment PA254CO3 10/07/2024 10/7/2024 2:15:17 PM
Amendment PA329 08/22/2024 8/23/2024 2:42:39 PM
Amendment PA329CO1 03/13/2025 3/14/2025 9:02:48 AM
Amendment PA329CO2 08/13/2025 8/14/2025 9:46:35 AM
Amendment PA329CO3 10/27/2025 11/5/2025 1:35:23 PM
Amendment PA329CO4 01/12/2026 1/20/2026 1:08:56 PM
Amendment PA329CO5 02/19/2026 3/18/2026 9:12:29 AM
Amendment PA329CO6 04/07/2026 4/16/2026 2:57:29 PM
Amendment PA374 04/25/2025 5/5/2025 8:50:41 AM
Amendment PA374CO1 12/04/2025 12/15/2025 2:16:31 PM
Amendment PA374CO2 04/09/2026 4/13/2026 8:36:00 AM
Amendment PA374CO3 07/08/2026 7/9/2026 8:20:55 AM
Amendment PA380 06/27/2025 7/2/2025 9:23:27 AM


Audit results posted prior to June 30, 2012, appear in a summarized form. As of July 1, 2012, the audit reporting process was expanded to include additional questions and comments from the Bureau of Auditing. As audits are captured in electronic format, they will be posted to this system. If you are interested in seeing audit reports by Fiscal Year and Agency Action Plans, please click here to navigate to the Transparency Florida Contract Audit page.
Audit Type Review Date Fiscal Year View
Expanded Audit of Payment 03/11/2024 2023-2024 View
Contract Review 02/07/2024 2023-2024 View