ENVIRONMENTAL CLEANUP AND RESTORATION
|
WA 4I-47448: Meet OER at site, collect preburn sample, arrange DOT permit, and excavate 100 gallon d...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: WA 4I-47448: Meet OER at site, collect preburn sample, arrange DOT permit, and excavate 100 gallon diesel fuel spill from crash not to exceed $10,057. |
| Deliverable Price: $10,057.00 |
| Non Price Justification: |
| Performance Metrics: Supply material and provide shipping manifest and disposal documentation. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL CLEANUP AND RESTORATION
|
General emergency response including regulated materials, short-term mitigation efforts, responding ...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: General emergency response including regulated materials, short-term mitigation efforts, responding to abandoned drum containers or uncontrolled hazardous material release, pollutant discharges in the coastal zone, or responding to any situation determined by DEP to represent a threat to the public or environment of Florida. Deliverable(s) established on a Work Authorization basis. |
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverables reviewed to ensure specifications in Work Authorization have been met. |
| Financial Consequences: No payment for unsatisfactory deliverable or services. In addition, contract can be terminated for failure to perform.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL CLEANUP AND RESTORATION
|
WA 3I-46188: Response in Collier County. Deliverables included test results, profiles, manifests, ...
|
Cost Reimbursement
|
| Major Deliverable: WA 3I-46188: Response in Collier County. Deliverables included test results, profiles, manifests, and certificates of disposal. Deliverable price is maximum cost. Supplemental WA added work and funding. |
| Deliverable Price: $2,002.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with Work Authorization, DEP QA requirements, U.S. DOT waste transportation regulations and contract scope of services. |
| Financial Consequences: No payment for unsatisfactory deliverables of services. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: WA 3I-46188 & S1 |
| Deliverable Number: |
|
|
|
|
ENVIRONMENTAL CLEANUP AND RESTORATION
|
WA 2I-47655- Abandoned Drums in Palm Beach County. Deliverables: test results, profiles, manifests, ...
|
Cost Reimbursement
|
| Major Deliverable: WA 2I-47655- Abandoned Drums in Palm Beach County. Deliverables: test results, profiles, manifests, and certificates of disposal. Deliverable price is maximum cost. |
| Deliverable Price: $2,086.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with Work Authorization, DEP QA requirements, U.S. DOT waste transportation regulations and contract scope of services. |
| Financial Consequences: No payment for unsatisfactory deliverables or services. Contract can be terminated for failure to perform.
|
| Source Documentation Page Reference: WA 2I-47655 |
| Deliverable Number: |
|
|
|
|
Hazardous waste disposal
|
WA 7I-51021: Spill response of 300 gallons of diesel, pumpoff saddletanks, clean road and soil clea...
|
Cost Reimbursement
|
| Major Deliverable: WA 7I-51021: Spill response of 300 gallons of diesel, pumpoff saddletanks, clean road and soil cleanup not to exceed $10,000. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure specifications in Work Authorization have been met. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: 7I-51021 |
| Deliverable Number: |
|
|
|
|
Hazardous waste disposal
|
WA 7I-53293: spill response for 100 g waste oil/water to storm drain, orange county
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: WA 7I-53293: spill response for 100 g waste oil/water to storm drain, orange county
|
| Deliverable Price: $8,000.00 |
| Non Price Justification: |
| Performance Metrics: Deliverable will be reviewed and evaluated by the DEP Contract Manager to ensure appropriate documentation reviewed and/or provided and that the documentation submitted is complete, accurate, and submitted timely
|
| Financial Consequences: No payment will be made for deliverable deemed unsatisfactory by the Department. In the event that a deliverable is deemed unsatisfactory by the department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within 20 days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Agreement for failure to perform.
|
| Source Documentation Page Reference: 7I-53293 |
| Deliverable Number: |
|
|
|
|
Hazardous waste disposal
|
WA 4I-58009: Soild contaminated with oil waste. Not to exceede $20000.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: WA 4I-58009: Soild contaminated with oil waste. Not to exceede $20000.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverable will be reviewed and evaluated by the DEP Contract Manager to ensure appropriate documentation reviewed and/or provided and that the documentation submitted is complete, accurate, and submitted timely
|
| Financial Consequences: No payment will be made for deliverable deemed unsatisfactory by the Department. In the event that a deliverable is deemed unsatisfactory by the department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within 20 days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Agreement for failure to perform.
|
| Source Documentation Page Reference: 2017-4I-58009 |
| Deliverable Number: |
|
|
|
|
Hazardous waste disposal
|
4i-59422 - DR Transport diesel spill - 25-50 gallons of Diesel fuel . Not to exceed $25,000.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: 4i-59422 - DR Transport diesel spill - 25-50 gallons of Diesel fuel . Not to exceed $25,000.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverable will be reviewed and evaluated by the DEP Contract Manager to ensure appropriate documentation reviewed and/or provided and that the documentation submitted is complete, accurate, and submitted timely
|
| Financial Consequences: No payment will be made for deliverable deemed unsatisfactory by the Department. In the event that a deliverable is deemed unsatisfactory by the department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within 20 days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Agreement for failure to perform.
|
| Source Documentation Page Reference: 2017-4i-59422 |
| Deliverable Number: |
|
|
|
|
Hazardous waste disposal
|
Task 7I-59786: Lead contaminated glass, leaves, branches, soil, PPE
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 7I-59786: Lead contaminated glass, leaves, branches, soil, PPE
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverable will be reviewed and evaluated by the DEP Contract Manager to ensure appropriate documentation reviewed and/or provided and that the documentation submitted is complete, accurate, and submitted timely
|
| Financial Consequences: No payment will be made for deliverable deemed unsatisfactory by the Department. In the event that a deliverable is deemed unsatisfactory by the department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within 20 days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Agreement for failure to perform.
|
| Source Documentation Page Reference: 2018-7I-59786 |
| Deliverable Number: |
|
|
|
|
Hazardous waste disposal
|
T1-6: Supply emergency response services (all tasks completed prior to FACTS). Deliverables include...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: T1-6: Supply emergency response services (all tasks completed prior to FACTS). Deliverables included test results, profiles, manifests, and certificates of disposal. |
| Deliverable Price: $711,502.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure specifications in Work Authorization have been met. |
| Financial Consequences: No payment for unsatisfactory deliverable or services. In addition, contract can be terminated for failure to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Hazardous waste disposal
|
Task 7I-60647
DEP Incident #: 2018-7I-60647C
Deliverable1: Various non-hazourdous on site
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 7I-60647
DEP Incident #: 2018-7I-60647C
Deliverable1: Various non-hazourdous on site
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverable will be reviewed and evaluated by the DEP Contract Manager to ensure appropriate documentation reviewed and/or provided and that the documentation submitted is complete, accurate, and submitted timely
|
| Financial Consequences: No payment will be made for deliverable deemed unsatisfactory by the Department. In the event that a deliverable is deemed unsatisfactory by the department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within 20 days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Agreement for failure to perform.
|
| Source Documentation Page Reference: 2018-7I-60647C |
| Deliverable Number: |
|
|
|
|
Hazardous waste disposal
|
WA 8I-61488 - Incident # 2018-8I-61488 - 100 gallons of fuel. Not to exceed $45,000.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: WA 8I-61488 - Incident # 2018-8I-61488 - 100 gallons of fuel. Not to exceed $45,000.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverable will be reviewed and evaluated by the DEP Contract Manager to ensure appropriate documentation reviewed and/or provided and that the documentation submitted is complete, accurate, and submitted timely
|
| Financial Consequences: No payment will be made for deliverable deemed unsatisfactory by the Department. In the event that a deliverable is deemed unsatisfactory by the department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within 20 days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Agreement for failure to perform.
|
| Source Documentation Page Reference: 2018-8I-61488 |
| Deliverable Number: |
|
|
|
|
Hazardous waste disposal
|
Task 4I-62614 Supplemental: 30g of Diesel
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 4I-62614 Supplemental: 30g of Diesel
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverable will be reviewed and evaluated by the DEP Contract Manager to ensure appropriate documentation reviewed and/or provided and that the documentation submitted is complete, accurate, and submitted timely
|
| Financial Consequences: No payment will be made for deliverable deemed unsatisfactory by the Department. In the event that a deliverable is deemed unsatisfactory by the department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within 20 days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Agreement for failure to perform.
|
| Source Documentation Page Reference: 2019-4I-62614 |
| Deliverable Number: |
|
|
|
|
Hazardous waste disposal
|
Task 4I-62836: Clean up of 5g of gasoline.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 4I-62836: Clean up of 5g of gasoline.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverable will be reviewed and evaluated by the DEP Contract Manager to ensure appropriate documentation reviewed and/or provided and that the documentation submitted is complete, accurate, and submitted timely
|
| Financial Consequences: No payment will be made for deliverable deemed unsatisfactory by the Department. In the event that a deliverable is deemed unsatisfactory by the department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within 20 days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Agreement for failure to perform.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Hazardous waste disposal
|
4I-63017C: 25 gallons +/- of gasoline was dumped on soil on County right-of-way.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: 4I-63017C: 25 gallons +/- of gasoline was dumped on soil on County right-of-way. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverable will be reviewed and evaluated by the DEP Contract Manager to ensure appropriate documentation reviewed and/or provided and that the documentation submitted is complete, accurate, and submitted timely
|
| Financial Consequences: No payment will be made for deliverable deemed unsatisfactory by the Department. In the event that a deliverable is deemed unsatisfactory by the department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within 20 days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Agreement for failure to perform.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Hazardous waste disposal
|
Task 7I-63081: 60 gallons of diesel spilled on soil.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 7I-63081: 60 gallons of diesel spilled on soil. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverable will be reviewed and evaluated by the DEP Contract Manager to ensure appropriate documentation reviewed and/or provided and that the documentation submitted is complete, accurate, and submitted timely
|
| Financial Consequences: No payment will be made for deliverable deemed unsatisfactory by the Department. In the event that a deliverable is deemed unsatisfactory by the department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within 20 days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Agreement for failure to perform.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Hazardous waste disposal
|
Task 4I-61763: 20g +/- of Gasoline spilled in a ditch and onto soil. Cost not to exceed $6,000.00.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 4I-61763: 20g +/- of Gasoline spilled in a ditch and onto soil. Cost not to exceed $6,000.00.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverable will be reviewed and evaluated by the DEP Contract Manager to ensure appropriate documentation reviewed and/or provided and that the documentation submitted is complete, accurate, and submitted timely
|
| Financial Consequences: No payment will be made for deliverable deemed unsatisfactory by the Department. In the event that a deliverable is deemed unsatisfactory by the department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within 20 days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Agreement for failure to perform.
|
| Source Documentation Page Reference: 2018-4I-61763 |
| Deliverable Number: |
|
|
|
|
Hazardous waste disposal
|
WA 3C-62710 Del 1: Hurricane displaced AST
Cost not to exceed $65,000.00.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: WA 3C-62710 Del 1: Hurricane displaced AST
Cost not to exceed $65,000.00. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverable will be reviewed and evaluated by the DEP Contract Manager to ensure appropriate documentation reviewed and/or provided and that the documentation submitted is complete, accurate, and submitted timely
|
| Financial Consequences: No payment will be made for deliverable deemed unsatisfactory by the Department. In the event that a deliverable is deemed unsatisfactory by the department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within 20 days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Agreement for failure to perform.
|
| Source Documentation Page Reference: 2019-3C-62710 |
| Deliverable Number: |
|
|
|
|
Hazardous waste disposal
|
Task 4I-62581: 100 gallons of fuel.
Supplemental Task 62581-1: 100 gallons of fuel, supplemental ta...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 4I-62581: 100 gallons of fuel.
Supplemental Task 62581-1: 100 gallons of fuel, supplemental task not to exceed $29,000.00. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverable will be reviewed and evaluated by the DEP Contract Manager to ensure appropriate documentation reviewed and/or provided and that the documentation submitted is complete, accurate, and submitted timely
|
| Financial Consequences: No payment will be made for deliverable deemed unsatisfactory by the Department. In the event that a deliverable is deemed unsatisfactory by the department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within 20 days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Agreement for failure to perform.
|
| Source Documentation Page Reference: 2019-4I-62581 |
| Deliverable Number: |
|
|
|
|
Hazardous waste disposal
|
Task 4I-63983
DEP Incident #: 2019-4I-63983
Approximately 30 gallons of gasoline spilled from a pass...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 4I-63983
DEP Incident #: 2019-4I-63983
Approximately 30 gallons of gasoline spilled from a passanger pickup truck that caught fire. Impacted soil will need to be removed and disposed of.
Task not to exceed $14,000.00. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverable will be reviewed and evaluated by the DEP Contract Manager to ensure appropriate documentation reviewed and/or provided and that the documentation submitted is complete, accurate, and submitted timely
|
| Financial Consequences: No payment will be made for deliverable deemed unsatisfactory by the Department. In the event that a deliverable is deemed unsatisfactory by the department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within 20 days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Agreement for failure to perform.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Hazardous waste disposal
|
Task 4I-64283: Approximately 100 gallons of used oil abandoned on County right-of-way inside a 500-g...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 4I-64283: Approximately 100 gallons of used oil abandoned on County right-of-way inside a 500-gallon AST. Impacted soil will need to be removed and disposed of. Not to exceed $7,000.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverable will be reviewed and evaluated by the DEP Contract Manager to ensure appropriate documentation reviewed and/or provided and that the documentation submitted is complete, accurate, and submitted timely
|
| Financial Consequences: No payment will be made for deliverable deemed unsatisfactory by the Department. In the event that a deliverable is deemed unsatisfactory by the department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within 20 days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Agreement for failure to perform.
|
| Source Documentation Page Reference: 2019-4I-64283 |
| Deliverable Number: |
|
|
|
|
Hazardous waste disposal
|
WA 71-57581C -Estimated 50-tons of oil contaminated soil. Not to exceed $10000.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: WA 71-57581C -Estimated 50-tons of oil contaminated soil. Not to exceed $10000.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverable will be reviewed and evaluated by the DEP Contract Manager to ensure appropriate documentation reviewed and/or provided and that the documentation submitted is complete, accurate, and submitted timely
|
| Financial Consequences: No payment will be made for deliverable deemed unsatisfactory by the Department. In the event that a deliverable is deemed unsatisfactory by the department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within 20 days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Agreement for failure to perform.
|
| Source Documentation Page Reference: 2017-7I-57581C |
| Deliverable Number: |
|
|
|
|
Hazardous waste disposal
|
Task 7I58468C-Estimaated 25 gallons dumped to soil. Not to exceede $7000.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 7I58468C-Estimaated 25 gallons dumped to soil. Not to exceede $7000.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverable will be reviewed and evaluated by the DEP Contract Manager to ensure appropriate documentation reviewed and/or provided and that the documentation submitted is complete, accurate, and submitted timely
|
| Financial Consequences: No payment will be made for deliverable deemed unsatisfactory by the Department. In the event that a deliverable is deemed unsatisfactory by the department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within 20 days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Agreement for failure to perform.
|
| Source Documentation Page Reference: 2017-7I-58468C |
| Deliverable Number: |
|
|
|
|
Hazardous waste disposal
|
WA 4I-58009 -Supplemental WAF. Solid contaminated with oil waste. Not to exceed $8000. Excavation is...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: WA 4I-58009 -Supplemental WAF. Solid contaminated with oil waste. Not to exceed $8000. Excavation is done. Need to add sod, and remove some clean fill (that rain pushed into culvert)
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverable will be reviewed and evaluated by the DEP Contract Manager to ensure appropriate documentation reviewed and/or provided and that the documentation submitted is complete, accurate, and submitted timely
|
| Financial Consequences: No payment will be made for deliverable deemed unsatisfactory by the Department. In the event that a deliverable is deemed unsatisfactory by the department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within 20 days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Agreement for failure to perform.
|
| Source Documentation Page Reference: 2017-4I-58009 |
| Deliverable Number: |
|
|
|
|
Hazardous waste disposal
|
Task 7C-64527: 2-55g drums located on a beach in Melborne, FL with no access nearby. Drums suspected...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 7C-64527: 2-55g drums located on a beach in Melborne, FL with no access nearby. Drums suspected to have diesel in them. Will need a skidloader to travel along the beach from nearest access and pick up drums for disposal. Not to exceed $5,500.00.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverable will be reviewed and evaluated by the DEP Contract Manager to ensure appropriate documentation reviewed and/or provided and that the documentation submitted is complete, accurate, and submitted timely
|
| Financial Consequences: No payment will be made for deliverable deemed unsatisfactory by the Department. In the event that a deliverable is deemed unsatisfactory by the department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within 20 days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, terminate the Agreement for failure to perform.
|
| Source Documentation Page Reference: 2019-7C-64527 |
| Deliverable Number: |
|