| More |
Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
ENVIRONMENTAL STUDIES SERVICES &
|
Combination Baseline Documentation / Environmental Site Assessment Reports or Baseline Documentation...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Combination Baseline Documentation / Environmental Site Assessment Reports or Baseline Documentation Reports - Deliverables established on a task assignment basis. |
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverables reviewed to ensure compliance with the Division of State Lands standards in the Scope of Services and the American Society of Testing and Materials requirements. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to DEP. All CAPs must be able to be implemented and performed in no more than sixty (60) days.
i. A CAP shall be submitted within ten (10) business days of the date of the letter request from DEP. The CAP shall be sent to the DEP Contract Manager for review and approval. Within ten (10) business days of receipt of a CAP, the DEP shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) business days from receipt of the DEP letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain DEP approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract. |
| Source Documentation Page Reference: Attachment C |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 1-Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR)...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1-Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM. Authorized deviations from DSL Scope of Services: 1) DSL waives the requirement to conduct a 50-year chain-of-title search; however, the Contractor will be responsible for conducting a proper Environmental Lien and AUL Search. Contractor shall report on the findings of this search and provide an assessment as to whether any findings constitute a significant concern. 2) DSL waives the requirement to submit five (5) certified hard copies of the Phase I ESA report and three (3) certified hard copies of the BDR to DSL. Only a digital copy (compact disc) will be required to be submitted to DSL for each report. Contractor shall remain responsible for providing one (1) certified hard copy of each report to the landowner. CO1: Increase in time (14 days). Fee Schedule $14,873.95 (6,071 acres X $2.45/acre); reimbursables not to exceed $1,574.75. The Department shall pay the Contractor on a cost reimbursement plus fee schedule basis not to exceed $16,448.70. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure compliance with the Division of State Lands standards in the scope of services and the American Society of Testing and Materials (ASTM) requirements.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: page 1 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 5: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 5: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM. Authorized deviations from DSL Scope of Services: 1) DSL waives the requirement to conduct a 50-year chain-of-title search; however, the Contractor will be responsible for conducting a proper Environmental Lien and AUL Search. Contractor shall report on the findings of this search and provide an assessment as to whether any findings constitute a significant concern. 2) DSL waives the requirement to submit five (5) certified hard copies of the Phase I ESA report and three (3) certified hard copies of the BDR to DSL. Two digital copy (compact disc) will be required to be submitted to DSL for each report. Contractor shall remain responsible for providing one (1) certified hard copy of each report to the landowner. Total not to exceed $12,171.47 |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure compliance with the Division of State Lands standards in the scope of services and the American Society of Testing and Materials (ASTM) requirements.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 2: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 2: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
Authorized deviations from DSL Scope of Services: 1) DSL waives the requirement to conduct a 50-year chain-of-title search; however, the Contractor will be responsible for conducting a proper Environmental Lien and AUL Search. Contractor shall report on the findings of this search and provide an assessment as to whether any findings constitute a significant concern. 2) DSL waives the requirement to submit five (5) certified hard copies of the Phase I ESA report and three (3) certified hard copies of the BDR to DSL. Two digital copy (compact disc) will be required to be submitted to DSL for each report. Contractor shall remain responsible for providing one (1) certified hard copy of each report to the landowner. Fee schedule $1.16/acre; Reimbursable not to exceed $2,013.90.
CO1: Additional Acreage Costs
|
| Deliverable Price: $24,345.06 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with the Division of State Lands standards in the scope of services and the American Society of Testing and Materials (ASTM) requirements.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 4: "Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BD...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 4: "Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
Authorized deviations from DSL Scope of Services: 1) DSL waives the requirement to conduct a 50-year chain-of-title search; however, the Contractor will be responsible for conducting a proper Environmental Lien and AUL Search. Contractor shall report on the findings of this search and provide an assessment as to whether any findings constitute a significant concern. 2) DSL waives the requirement to submit five (5) certified hard copies of the Phase I ESA report and three (3) certified hard copies of the BDR to DSL. Two digital copy (compact disc) will be required to be submitted to DSL for each report. Contractor shall remain responsible for providing one (1) certified hard copy of each report to the landowner. The Department shall pay the Contractor on a cost reimbursement plus fee schedule basis not to exceed $5,007.62. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure compliance with the Division of State Lands standards in the scope of services and the American Society of Testing and Materials (ASTM) requirements.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: TA 4 page 1 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 6: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 6: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and in accordance with the cost estimate provided in Exhibit “C.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
Authorized deviations from DSL Scope of Services: 1) DSL waives the requirement to conduct a 50-year chain-of-title search; however, the Contractor will be responsible for conducting a proper Environmental Lien and AUL Search. Contractor shall report on the findings of this search and provide an assessment as to whether any findings constitute a significant concern. 2) DSL waives the requirement to submit five (5) certified hard copies of the Phase I ESA report and three (3) certified hard copies of the BDR to DSL. Two digital copy (compact disc) will be required to be submitted to DSL for each report. Contractor shall remain responsible for providing one (1) certified hard copy of each report to the landowner.
The Department will pay the Contractor on a cost-reimbursement basis not exceed the amount for this task is $12,294.75.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure compliance with the Division of State Lands standards in the scope of services and the American Society of Testing and Materials (ASTM) requirements.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: T6 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 7: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 7: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and in accordance with the cost estimate provided in Exhibit “C.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
Authorized deviations from DSL Scope of Services: 1) DSL waives the requirement to conduct a 50-year chain-of-title search; however, the Contractor will be responsible for conducting a proper Environmental Lien and AUL Search. Contractor shall report on the findings of this search and provide an assessment as to whether any findings constitute a significant concern. 2) DSL waives the requirement to submit five (5) certified hard copies of the Phase I ESA report and three (3) certified hard copies of the BDR to DSL. Two digital copy (compact disc) will be required to be submitted to DSL for each report. Contractor shall remain responsible for providing one (1) certified hard copy of each report to the landowner. The Department will pay the Contractor on a cost-reimbursement basis not exceed the amount for this task is $7,346.38.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure compliance with the Division of State Lands standards in the scope of services and the American Society of Testing and Materials (ASTM) requirements.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: T7 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 3:
Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 3:
Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
Authorized deviations from DSL Scope of Services: 1) DSL waives the requirement to conduct a 50-year chain-of-title search; however, the Contractor will be responsible for conducting a proper Environmental Lien and AUL Search. Contractor shall report on the findings of this search and provide an assessment as to whether any findings constitute a significant concern. 2) DSL waives the requirement to submit five (5) certified hard copies of the Phase I ESA report and three (3) certified hard copies of the BDR to DSL. Two digital copy (compact disc) will be required to be submitted to DSL for each report. Contractor shall remain responsible for providing one (1) certified hard copy of each report to the landowner.
|
| Deliverable Price: $15,362.58 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with the Division of State Lands standards in the scope of services and the American Society of Testing and Materials (ASTM) requirements.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: Task 3 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 8:"Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 8:"Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and in accordance with the cost estimate provided in Exhibit “C.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
Authorized deviations from DSL Scope of Services: 1) DSL waives the requirement to conduct a 50-year chain-of-title search; however, the Contractor will be responsible for conducting a proper Environmental Lien and AUL Search. Contractor shall report on the findings of this search and provide an assessment as to whether any findings constitute a significant concern. 2) DSL waives the requirement to submit five (5) certified hard copies of the Phase I ESA report and three (3) certified hard copies of the BDR to DSL. Two digital copy (compact disc) will be required to be submitted to DSL for each report. Contractor shall remain responsible for providing one (1) certified hard copy of each report to the landowner.
Not to exceed amounts:Fee Schedule:8,722.80 Cost Reimbursement 481.80. Total task not to exceed $9,204.60."
|
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverables reviewed to ensure compliance with the Division of State Lands standards in the scope of services and the American Society of Testing and Materials (ASTM) requirements.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 9: Provide a Baseline Documentation Report (BDR) for the above referenced parcel(s) as describ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 9: Provide a Baseline Documentation Report (BDR) for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B”. The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
Authorized deviations from DSL Scope of Services: 1) DSL waives the requirement to submit three (3) certified hard copies of the BDR to DSL. Two digital copy (compact disc) will be required to be submitted to DSL. Contractor shall remain responsible for providing one (1) certified hard copy of each report to the landowner.
|
| Deliverable Price: $8,741.60 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with the Division of State Lands standards in the scope of services and the American Society of Testing and Materials (ASTM) requirements. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract. |
| Source Documentation Page Reference: page 1 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 10: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BD...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 10: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and in accordance with the cost estimate provided in Exhibit “C.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
Authorized deviations from DSL Scope of Services: 1) DSL waives the requirement to conduct a 50-year chain-of-title search; however, the Contractor will be responsible for conducting a proper Environmental Lien and AUL Search. Contractor shall report on the findings of this search and provide an assessment as to whether any findings constitute a significant concern. 2) DSL waives the requirement to submit five (5) certified hard copies of the Phase I ESA report and three (3) certified hard copies of the BDR to DSL. Two digital copy (compact disc) will be required to be submitted to DSL for each report. Contractor shall remain responsible for providing one (1) certified hard copy of each report to the landowner.
|
| Deliverable Price: $17,669.69 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with the Division of State Lands standards in the scope of services and the American Society of Testing and Materials (ASTM) requirements.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: Page 1 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 11: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BD...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 11: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B”. In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
Authorized deviations from DSL Scope of Services: 1) DSL waives the requirement to conduct a 50-year chain-of-title search; however, the Contractor will be responsible for conducting a proper Environmental Lien and AUL Search. Contractor shall report on the findings of this search and provide an assessment as to whether any findings constitute a significant concern. 2) DSL waives the requirement to submit five (5) certified hard copies of the Phase I ESA report and three (3) certified hard copies of the BDR to DSL. Two digital copy (compact disc) will be required to be submitted to DSL for each report. Contractor shall remain responsible for providing one (1) certified hard copy of each report to the landowner.
|
| Deliverable Price: $1,113.60 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with the Division of State Lands standards in the scope of services and the American Society of Testing and Materials (ASTM) requirements.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: Page 1 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 13: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BD...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 13: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and in accordance with the cost estimate provided in Exhibit “C.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
Authorized deviations from DSL Scope of Services: 1) DSL waives the requirement to conduct a 50-year chain-of-title search; however, the Contractor will be responsible for conducting a proper Environmental Lien and AUL Search. Contractor shall report on the findings of this search and provide an assessment as to whether any findings constitute a significant concern. 2) DSL waives the requirement to submit five (5) certified hard copies of the Phase I ESA report and three (3) certified hard copies of the BDR to DSL. Two digital copy (compact disc) will be required to be submitted to DSL for each report. Contractor shall remain responsible for providing one (1) certified hard copy of each report to the landowner.
|
| Deliverable Price: $20,717.05 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with the Division of State Lands standards in the scope of services and the American Society of Testing and Materials (ASTM) requirements.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: Page 1 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 14: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BD...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 14: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and in accordance with the cost estimate provided in Exhibit “C.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
Authorized deviations from DSL Scope of Services: 1) DSL waives the requirement to conduct a 50-year chain-of-title search; however, the Contractor will be responsible for conducting a proper Environmental Lien and AUL Search. Contractor shall report on the findings of this search and provide an assessment as to whether any findings constitute a significant concern. 2) DSL waives the requirement to submit five (5) certified hard copies of the Phase I ESA report and three (3) certified hard copies of the BDR to DSL. Two digital copy (compact disc) will be required to be submitted to DSL for each report. Contractor shall remain responsible for providing one (1) certified hard copy of each report to the landowner.
|
| Deliverable Price: $4,107.90 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with the Division of State Lands standards in the scope of services and the American Society of Testing and Materials (ASTM) requirements.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: Page 1 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 15: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BD...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 15: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and in accordance with the cost estimate provided in Exhibit “C.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
Authorized deviations from DSL Scope of Services: 1) DSL waives the requirement to conduct a 50-year chain-of-title search; however, the Contractor will be responsible for conducting a proper Environmental Lien and AUL Search. Contractor shall report on the findings of this search and provide an assessment as to whether any findings constitute a significant concern. 2) DSL waives the requirement to submit five (5) certified hard copies of the Phase I ESA report and three (3) certified hard copies of the BDR to DSL. Two digital copy (compact disc) will be required to be submitted to DSL for each report. Contractor shall remain responsible for providing one (1) certified hard copy of each report to the landowner.
|
| Deliverable Price: $2,383.80 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with the Division of State Lands standards in the scope of services and the American Society of Testing and Materials (ASTM) requirements.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: Page 1 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 16: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BD...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 16: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and in accordance with the cost estimate provided in Exhibit “C.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
Authorized deviations from DSL Scope of Services: 1) DSL waives the requirement to conduct a 50-year chain-of-title search; however, the Contractor will be responsible for conducting a proper Environmental Lien and AUL Search. Contractor shall report on the findings of this search and provide an assessment as to whether any findings constitute a significant concern. 2) DSL waives the requirement to submit five (5) certified hard copies of the Phase I ESA report and three (3) certified hard copies of the BDR to DSL. Two digital copy (compact disc) will be required to be submitted to DSL for each report. Contractor shall remain responsible for providing one (1) certified hard copy of each report to the landowner.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure compliance with the Division of State Lands standards in the scope of services and the American Society of Testing and Materials (ASTM) requirements.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: T16 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 19: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BD...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 19: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and in accordance with the cost estimate provided in Exhibit “C.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
Authorized deviations from DSL Scope of Services: 1) DSL waives the requirement to conduct a 50-year chain-of-title search; however, the Contractor will be responsible for conducting a proper Environmental Lien and AUL Search. Contractor shall report on the findings of this search and provide an assessment as to whether any findings constitute a significant concern. 2) DSL waives the requirement to submit five (5) certified hard copies of the Phase I ESA report and three (3) certified hard copies of the BDR to DSL. Two digital copy (compact disc) will be required to be submitted to DSL for each report. Contractor shall remain responsible for providing one (1) certified hard copy of each report to the landowner.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure compliance with the Division of State Lands standards in the scope of services and the American Society of Testing and Materials (ASTM) requirements.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: T19 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 17: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BD...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 17: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and in accordance with the cost estimate provided in Exhibit “C.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM. Authorized deviations from DSL Scope of Services: 1) DSL waives the requirement to conduct a 50-year chain-of-title search; however, the Contractor will be responsible for conducting a proper Environmental Lien and AUL Search. Contractor shall report on the findings of this search and provide an assessment as to whether any findings constitute a significant concern. 2) DSL waives the requirement to submit five (5) certified hard copies of the Phase I ESA report and three (3) certified hard copies of the BDR to DSL. Two digital copy (compact disc) will be required to be submitted to DSL for each report. Contractor shall remain responsible for providing one (1) certified hard copy of each report to the landowner.
CO1: Task Extension |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure compliance with the Division of State Lands standards in the scope of services and the American Society of Testing and Materials (ASTM) requirements.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: T17CO1 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 18: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BD...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 18: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and in accordance with the cost estimate provided in Exhibit “C.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
Authorized deviations from DSL Scope of Services: 1) DSL waives the requirement to conduct a 50-year chain-of-title search; however, the Contractor will be responsible for conducting a proper Environmental Lien and AUL Search. Contractor shall report on the findings of this search and provide an assessment as to whether any findings constitute a significant concern. 2) DSL waives the requirement to submit five (5) certified hard copies of the Phase I ESA report and three (3) certified hard copies of the BDR to DSL. Two digital copy (compact disc) will be required to be submitted to DSL for each report. Contractor shall remain responsible for providing one (1) certified hard copy of each report to the landowner. Total not to exceed $13,242.85.
CO1; Task extension
|
| Deliverable Price: $0.00 |
| Non Price Justification: Agreement without a financial exchange or impact |
| Performance Metrics: Deliverables reviewed to ensure compliance with the Division of State Lands standards in the scope of services and the American Society of Testing and Materials (ASTM) requirements.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: T18CO1 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 20: "Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (B...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 20: "Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and in accordance with the cost estimate provided in Exhibit “C.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
Authorized deviations from DSL Scope of Services: 1) DSL waives the requirement to conduct a 50-year chain-of-title search; however, the Contractor will be responsible for conducting a proper Environmental Lien and AUL Search. Contractor shall report on the findings of this search and provide an assessment as to whether any findings constitute a significant concern. 2) DSL waives the requirement to submit five (5) certified hard copies of the Phase I ESA report and three (3) certified hard copies of the BDR to DSL. Two digital copy (compact disc) will be required to be submitted to DSL for each report. Contractor shall remain responsible for providing one (1) certified hard copy of each report to the landowner. |
| Deliverable Price: $18,882.75 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with the Division of State Lands standards in the scope of services and the American Society of Testing and Materials (ASTM) requirements.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: T20 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 22:Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 22:Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and in accordance with the cost estimate provided in Exhibit “C.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
Authorized deviations from DSL Scope of Services: 1) DSL waives the requirement to conduct a 50-year chain-of-title search; however, the Contractor will be responsible for conducting a proper Environmental Lien and AUL Search. Contractor shall report on the findings of this search and provide an assessment as to whether any findings constitute a significant concern. 2) DSL waives the requirement to submit five (5) certified hard copies of the Phase I ESA report and three (3) certified hard copies of the BDR to DSL. Two digital copy (compact disc) will be required to be submitted to DSL for each report. Contractor shall remain responsible for providing one (1) certified hard copy of each report to the landowner. |
| Deliverable Price: $30,945.23 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with the Division of State Lands standards in the scope of services and the American Society of Testing and Materials (ASTM) requirements.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 21: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BD...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 21: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and in accordance with the cost estimate provided in Exhibit “C.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
Authorized deviations from DSL Scope of Services: 1) DSL waives the requirement to conduct a 50-year chain-of-title search; however, the Contractor will be responsible for conducting a proper Environmental Lien and AUL Search. Contractor shall report on the findings of this search and provide an assessment as to whether any findings constitute a significant concern. 2) DSL waives the requirement to submit five (5) certified hard copies of the Phase I ESA report and three (3) certified hard copies of the BDR to DSL. Two digital copy (compact disc) will be required to be submitted to DSL for each report. Contractor shall remain responsible for providing one (1) certified hard copy of each report to the landowner. |
| Deliverable Price: $6,573.50 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with the Division of State Lands standards in the scope of services and the American Society of Testing and Materials (ASTM) requirements.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: T21 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 23: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BD...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 23: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and in accordance with the cost estimate provided in Exhibit “C.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
Authorized deviations from DSL Scope of Services: 1) DSL waives the requirement to conduct a 50-year chain-of-title search; however, the Contractor will be responsible for conducting a proper Environmental Lien and AUL Search. Contractor shall report on the findings of this search and provide an assessment as to whether any findings constitute a significant concern. 2) DSL waives the requirement to submit five (5) certified hard copies of the Phase I ESA report and three (3) certified hard copies of the BDR to DSL. Two digital copy (compact disc) will be required to be submitted to DSL for each report. Contractor shall remain responsible for providing one (1) certified hard copy of each report to the landowner. |
| Deliverable Price: $15,251.27 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with the Division of State Lands standards in the scope of services and the American Society of Testing and Materials (ASTM) requirements.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 24: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BD...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 24: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B”. In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
Authorized deviations from DSL Scope of Services: 1) DSL waives the requirement to conduct a 50-year chain-of-title search; however, the Contractor will be responsible for conducting a proper Environmental Lien and AUL Search. Contractor shall report on the findings of this search and provide an assessment as to whether any findings constitute a significant concern. 2) DSL waives the requirement to submit five (5) certified hard copies of the Phase I ESA report and three (3) certified hard copies of the BDR to DSL. Two digital copy (compact disc) will be required to be submitted to DSL for each report. Contractor shall remain responsible for providing one (1) certified hard copy of each report to the landowner. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure compliance with the Division of State Lands standards in the scope of services and the American Society of Testing and Materials (ASTM) requirements.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: T24 |
| Deliverable Number: |
|
|
|
page 1
|
Environmental Services
|
Task 25: Provide an Updated Phase I Environmental Site Assessment (ESA) and Baseline Documentation R...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 25: Provide an Updated Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate submitted on September 15, 2023 attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
Authorized deviations from DSL Scope of Services: 1) DSL waives the requirement to conduct a 50-year chain-of-title search; however, the Contractor will be responsible for conducting a proper Environmental Lien and AUL Search. Contractor shall report on the findings of this search and provide an assessment as to whether any findings constitute a significant concern. 2) DSL waives the requirement to submit five (5) certified hard copies of the Phase I ESA report and three (3) certified hard copies of the BDR to DSL. Two digital copy (compact disc) will be required to be submitted to DSL for each report. Contractor shall remain responsible for providing one (1) certified hard copy of each report to the landowner. |
| Deliverable Price: $27,510.38 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with the Division of State Lands standards in the scope of services and the American Society of Testing and Materials (ASTM) requirements.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: |
| Deliverable Number: page 1 |
|