Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
Environmental Services
|
Task 3: Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as descri...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as described in Exhibit “A” in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) E1527 standard. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM. Please be aware that DSL requires the contractor to conduct an AUL/lien search on its behalf, as outlined in the DSL Scope of Services. The following deviations from DSL standards will be authorized: Submittal of DRAFT and FINAL products may be done electronically; paper copies will not be required. Two (2) compact discs containing the FINAL report will be required upon approval of the DRAFT product. No other deviations from the above-mentioned standards are allowed, unless in writing from the Division of State Lands.
|
| Deliverable Price: $1,900.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with requirements set forth in Chapter 62-160, F.A.C. and the Quality Assurance Requirements for Department contracts.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: TA3 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 1: "1) Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as de...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: "1) Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as described in Exhibit “A” in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 1527 standard. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
2) Provide an Asbestos Containing Material (ACM) survey and Lead-Based Paint (LBP) survey in accordance with all applicable State of Florida and/or EPA requirements, as outlined in the cost estimate submitted to DSL on July 24, 2015 and attached hereto as Exhibit “C”
"
|
| Deliverable Price: $3,490.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with requirements set forth in Chapter 62-160, F.A.C. and the Quality Assurance Requirements for Department contracts.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: TA1 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 2: (1) Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as de...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 2: (1) Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as described in Exhibit “A” in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 1527 standard. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM. Authorized deviations from DSL Scope of Services / ASTM Practice E1527-13: DSL will not require Contractor to perform inspection of interior spaces of any buildings located on the Subject Property. Sufficient photo documentation of building exteriors is required. |
| Deliverable Price: $2,200.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with requirements set forth in Chapter 62-160, F.A.C. and the Quality Assurance Requirements for Department contracts.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: TA2 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Environmental Site Assessments. Deliverables established on a task assignment basis.
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Environmental Site Assessments. Deliverables established on a task assignment basis. |
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverables reviewed to ensure compliance with requirements set forth in Chapter 62-160, F.A.C. and the Quality Assurance Requirements for Department contracts.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days.
A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: Attachment C, Pages 1-12 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 4: Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as descri...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 4: Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as described in Exhibit “A” in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) E1527 standard. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM. Please be aware that DSL requires the contractor to conduct an AUL/lien search on its behalf, as outlined in the DSL Scope of Services. The following deviations from DSL standards will be authorized: Submittal of DRAFT and FINAL products may be done electronically; paper copies will not be required. Two (2) compact discs containing the FINAL report will be required upon approval of the DRAFT product. No other deviations from the above-mentioned standards are allowed, unless in writing from the Division of State Lands.
|
| Deliverable Price: $2,200.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with requirements set forth in Chapter 62-160, F.A.C. and the Quality Assurance Requirements for Department contracts.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: page 1 |
| Deliverable Number: |
|
|
|
|
Farming and Fishing and Forestry and Wildlife Contracting Services
|
Task 5:Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as describ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 5:Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as described in Exhibit “A” in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate dated April 18, 2018 attached as Exhibit "C". In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) E1527 standard. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM. Please be aware that DSL requires the contractor to conduct an AUL/lien search on its behalf, as outlined in the DSL Scope of Services. The following deviations from DSL standards will be authorized: Submittal of DRAFT and FINAL products may be done electronically; paper copies will not be required. Two (2) compact discs containing the FINAL report will be required upon approval of the DRAFT product. No other deviations from the above-mentioned standards are allowed, unless in writing from the Division of State Lands.
|
| Deliverable Price: $2,360.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with requirements set forth in Chapter 62-160, F.A.C. and the Quality Assurance Requirements for Department contracts.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: Page 1 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 6: Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as descri...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 6: Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as described in Exhibit “A” in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate dated April 18, 2018 attached as Exhibit "C". In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) E1527 standard. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM. Please be aware that DSL requires the contractor to conduct an AUL/lien search on its behalf, as outlined in the DSL Scope of Services. The following deviations from DSL standards will be authorized: Submittal of DRAFT and FINAL products may be done electronically; paper copies will not be required. Two (2) compact discs containing the FINAL report will be required upon approval of the DRAFT product. No other deviations from the above-mentioned standards are allowed, unless in writing from the Division of State Lands.
|
| Deliverable Price: $13,740.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with requirements set forth in Chapter 62-160, F.A.C. and the Quality Assurance Requirements for Department contracts.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: Page 1 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 7: Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as descri...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 7: Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as described in Exhibit “A” in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) E1527 standard. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM. Please be aware that DSL requires the contractor to conduct an AUL/lien search on its behalf, as outlined in the DSL Scope of Services. The following deviations from DSL standards will be authorized: Submittal of DRAFT and FINAL products may be done electronically; paper copies will not be required. Two (2) compact discs containing the FINAL report will be required upon approval of the DRAFT product. No other deviations from the above-mentioned standards are allowed, unless in writing from the Division of State Lands.
|
| Deliverable Price: $1,900.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with requirements set forth in Chapter 62-160, F.A.C. and the Quality Assurance Requirements for Department contracts.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: page 1 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 8: Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as descri...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 8: Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as described in Exhibit “A” in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) E1527 standard. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM. Please be aware that DSL requires the contractor to conduct an AUL/lien search on its behalf, as outlined in the DSL Scope of Services. The following deviations from DSL standards will be authorized: Submittal of DRAFT and FINAL products may be done electronically; paper copies will not be required. Two (2) compact discs containing the FINAL report will be required upon approval of the DRAFT product. No other deviations from the above-mentioned standards are allowed, unless in writing from the Division of State Lands.
|
| Deliverable Price: $2,200.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with requirements set forth in Chapter 62-160, F.A.C. and the Quality Assurance Requirements for Department contracts.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: page 1 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 9: Provide an Asbestos Containing Material (ACM) survey, Lead-Based Paint (LBP) survey, and mol...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 9: Provide an Asbestos Containing Material (ACM) survey, Lead-Based Paint (LBP) survey, and mold survey in accordance with all applicable State of Florida and/or EPA requirements, as outlined in the cost estimate submitted to DSL on March 7, 2019 and attached hereto as Exhibit “A”. The following deviations from DSL standards will be authorized: Submittal of DRAFT and FINAL products may be done electronically; paper copies will not be required. Two (2) compact discs containing the FINAL report will be required upon approval of the DRAFT product. No other deviations from the above-mentioned standards are allowed, unless in writing from the Division of State Lands.
|
| Deliverable Price: $3,095.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with requirements set forth in Chapter 62-160, F.A.C. and the Quality Assurance Requirements for Department contracts.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 10:
1) Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as d...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 10:
1) Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as described in Exhibit “A” in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
2) Provide an Asbestos Containing Material (ACM) survey, Lead-Based Paint (LBP), and mold surveys in accordance with all applicable State of Florida and/or EPA requirements, as outlined in the cost estimate submitted to DSL on March 25, 2019 and attached hereto as Exhibit “C”
|
| Deliverable Price: $5,500.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with requirements set forth in Chapter 62-160, F.A.C. and the Quality Assurance Requirements for Department contracts.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 11: Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as descr...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 11: Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as described in Exhibit “A” in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) E1527 standard. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM. Please be aware that DSL requires the contractor to conduct an AUL/lien search on its behalf, as outlined in the DSL Scope of Services. The following deviations from DSL standards will be authorized: Submittal of DRAFT and FINAL products may be done electronically; paper copies will not be required. Two (2) compact discs containing the FINAL report will be required upon approval of the DRAFT product. No other deviations from the above-mentioned standards are allowed, unless in writing from the Division of State Lands.
|
| Deliverable Price: $2,770.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with requirements set forth in Chapter 62-160, F.A.C. and the Quality Assurance Requirements for Department contracts.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 12: Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as descr...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 12: Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as described in Exhibit “A” in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) E1527 standard. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM. Please be aware that DSL requires the contractor to conduct an AUL/lien search on its behalf, as outlined in the DSL Scope of Services. The following deviations from DSL standards will be authorized: Submittal of DRAFT and FINAL products may be done electronically; paper copies will not be required. Two (2) compact discs containing the FINAL report will be required upon approval of the DRAFT product. No other deviations from the above-mentioned standards are allowed, unless in writing from the Division of State Lands.
|
| Deliverable Price: $2,200.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with requirements set forth in Chapter 62-160, F.A.C. and the Quality Assurance Requirements for Department contracts.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 13: "1) Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as d...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 13: "1) Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as described in Exhibit “A” in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
2) Provide an Asbestos Containing Material (ACM) survey, Lead-Based Paint (LBP), and mold surveys in accordance with all applicable State of Florida and/or EPA requirements, as outlined in the cost estimate submitted to DSL on March 27, 2020 and attached hereto as Exhibit “C”
"
|
| Deliverable Price: $5,370.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with requirements set forth in Chapter 62-160, F.A.C. and the Quality Assurance Requirements for Department contracts.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: page 1 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 14:"1) Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as de...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 14:"1) Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as described in Exhibit “A” in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
2) Provide a mold survey in accordance with all applicable State of Florida and/or EPA requirements, as outlined in the cost estimate submitted to DSL on July 25, 2020 and attached hereto as Exhibit “C”
"
|
| Deliverable Price: $3,510.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with requirements set forth in Chapter 62-160, F.A.C. and the Quality Assurance Requirements for Department contracts.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 15: Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as descr...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 15: Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as described in Exhibit “A” in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B.” In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
2) Provide an Asbestos Containing Material (ACM) survey, Lead-Based Paint (LBP), Radon, and mold surveys in accordance with all applicable State of Florida and/or EPA requirements, as outlined in the cost estimate submitted to DSL on October 6, 2021 and attached hereto as Exhibit “C”
|
| Deliverable Price: $7,120.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with requirements set forth in Chapter 62-160, F.A.C. and the Quality Assurance Requirements for Department contracts. |
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract. |
| Source Documentation Page Reference: Page 1 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 16: 1) Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as de...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 16: 1) Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as described in Exhibit “A” in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and in accordance with the cost estimate provided in Exhibit ""C"". In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM. The following deviations from DSL standards will be authorized: Submittal of DRAFT and FINAL products may be done electronically; paper copies will not be required. Two (2) compact discs containing the FINAL report will be required upon approval of the DRAFT product. No other deviations from the above-mentioned standards are allowed, unless in writing from the Division of State Lands. |
| Deliverable Price: $2,680.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with requirements set forth in Chapter 62-160, F.A.C. and the Quality Assurance Requirements for Department contracts.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: T16 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 17: 1) Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as de...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 17: 1) Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as described in Exhibit “A” in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and in accordance with the cost estimate provided in Exhibit ""C"". In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM. The following deviations from DSL standards will be authorized: Submittal of DRAFT and FINAL products may be done electronically; paper copies will not be required. Two (2) compact discs containing the FINAL report will be required upon approval of the DRAFT product. No other deviations from the above-mentioned standards are allowed, unless in writing from the Division of State Lands.
|
| Deliverable Price: $2,680.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with requirements set forth in Chapter 62-160, F.A.C. and the Quality Assurance Requirements for Department contracts.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: PL270.017 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 18: 1) Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as de...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 18: 1) Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as described in Exhibit “A” in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and in accordance with the cost estimate provided in Exhibit ""C"". In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM. The following deviations from DSL standards will be authorized: Submittal of DRAFT and FINAL products may be done electronically; paper copies will not be required. Two (2) compact discs containing the FINAL report will be required upon approval of the DRAFT product. No other deviations from the above-mentioned standards are allowed, unless in writing from the Division of State Lands. |
| Deliverable Price: $5,720.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with requirements set forth in Chapter 62-160, F.A.C. and the Quality Assurance Requirements for Department contracts.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: T18 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 19: 1) Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as de...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 19: 1) Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as described in Exhibit “A” in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and in accordance with the cost estimate provided in Exhibit ""C"". In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM. The following deviations from DSL standards will be authorized: Submittal of DRAFT and FINAL products may be done electronically; paper copies will not be required. Two (2) compact discs containing the FINAL report will be required upon approval of the DRAFT product. No other deviations from the above-mentioned standards are allowed, unless in writing from the Division of State Lands. |
| Deliverable Price: $2,680.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with requirements set forth in Chapter 62-160, F.A.C. and the Quality Assurance Requirements for Department contracts.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
page 1
|
Environmental Services
|
Task 20: Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as descr...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 20: Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as described in Exhibit “A” in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and in accordance with the cost estimate provided in Exhibit ""C"". In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM. The following deviations from DSL standards will be authorized: Submittal of DRAFT and FINAL products may be done electronically; paper copies will not be required. Two (2) compact discs containing the FINAL report will be required upon approval of the DRAFT product. No other deviations from the above-mentioned standards are allowed, unless in writing from the Division of State Lands.
|
| Deliverable Price: $10,600.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with requirements set forth in Chapter 62-160, F.A.C. and the Quality Assurance Requirements for Department contracts.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: |
| Deliverable Number: page 1 |
|