Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
Environmental Services
|
The Contractor shall provide Environmental Site Assessment Services (ESA), on a Task Assignment (TA)...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: The Contractor shall provide Environmental Site Assessment Services (ESA), on a Task Assignment (TA) basis. These services may include, but not be limited to, the performance of all levels of ESA’s (i.e., Phase I, Phase II and updates) in compliance with the Division of State Lands’ (DSL) requirements (see Exhibits G, I, J, and K); summarizing recommendations and conclusions; preparing recommendations and conclusions; remediation coordination; remediation activities; clerical staff assistance for ESA and related document processing, project assessment and remediation consultation. (Service).
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 1: Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as descri...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 1: Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as described in Exhibit “A” in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and in accordance with the cost estimate attached as Exhibit "C". In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) E2247 standard. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM. Please be aware that DSL requires the contractor to conduct an AUL/lien search on its behalf, as outlined in the DSL Scope of Services.
|
| Deliverable Price: $4,400.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with requirements set forth in Chapter 62-160, F.A.C. and the Quality Assurance Requirements for Department contracts.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: T1 |
| Deliverable Number: |
|
|
|
T2
|
Environmental Services
|
Task 2: Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as descri...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 2: Provide a Phase I Environmental Site Assessment for the above referenced parcel(s) as described in Exhibit “A” in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and in accordance with the cost estimate attached as Exhibit "C". In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) E2247 standard. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM. Please be aware that DSL requires the contractor to conduct an AUL/lien search on its behalf, as outlined in the DSL Scope of Services.
|
| Deliverable Price: $3,460.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with requirements set forth in Chapter 62-160, F.A.C. and the Quality Assurance Requirements for Department contracts.
|
| Financial Consequences: No payment will be made for unsatisfactory deliverables. In the event that a deliverable is deemed unsatisfactory by the Department, Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable. If a satisfactory deliverable is not submitted within the specified timeframe, the Department may, in its sole discretion, either: 1) terminate the Contract for failure to perform, or 2) DEP Contract Manager may, by letter specifying the failure of performance under the Contract, request that a proposed Corrective Action Plan (CAP) be submitted by Contractor to the Department. All CAPs must be able to be implemented and performed in no more than sixty (60) days. A. A CAP shall be submitted within ten (10) calendar days of the date of the letter request from the Department. The CAP shall be sent to the Department Contract Manager for review and approval. Within ten (10) calendar days of receipt of a CAP, the Department shall notify the Contractor in writing whether the CAP proposed has been accepted. If the CAP is not accepted, Contractor shall have ten (10) calendar days from receipt of the Department letter rejecting the proposal to submit a revised proposed CAP. Failure to obtain Department approval of a CAP as specified above shall result in the Department’s termination of the Contract for cause as authorized in the Contract.
|
| Source Documentation Page Reference: |
| Deliverable Number: T2 |
|