| More |
Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
Environmental Services
|
The Contractor(s) shall, for less-than-fee land acquisitions mad eon behalf of the Board of Trustees...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: The Contractor(s) shall, for less-than-fee land acquisitions mad eon behalf of the Board of Trustees of the Internal Improvement Trust Fund ("Board"), perform a Combination Baseline Documentation-Environmental Site Assessment (ESA) Reports or Baseline Documentation (BD) Reports and related services. The results should be provided by two (2) separate reports by the Contractor (s). The first report must satisfy the requirements of the Department, Division of State Lands (DSL), and those of the Comprehensive Environmental Response Compenstaion and Liability Act as set forth in 42 U.S.C, Section 9601 (CERCLA) regarding environmental assessments (ESA Report) The second report is to satisfy the Department DSL requirements regarding documentation of conditions, at the time of acquisition, of properties over which a conservation easement or other less-than-fee-simple real estate interest is acquired (BD Report). All sampling and analysis performed under the Contract resulting from this solitication must conform to the requirements set forth in Chapter 62-160, Florid Administrative Code (F.A.C.) and the Quality Assurance Requirements for Department Contracts (see Exhibit D).
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 1: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $5,808.25 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T1 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 2: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 2: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $8,044.80 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T2 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 3: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 3: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $7,659.25 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T3 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 4: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 4: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $3,623.30 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T4 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 5: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 5: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $8,507.88 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T5 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 6: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 6: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $27,300.00 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T6 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Tsk 7: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR)...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Tsk 7: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $10,647.40 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T7 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 8: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 8: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $1,942.52 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP. |
| Source Documentation Page Reference: T8 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 9: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 9: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $5,776.75 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T9 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 10: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BD...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 10: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $5,747.22 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T10 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 11: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BD...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 11: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $6,945.30 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T11 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 12: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BD...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 12: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $15,195.85 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T12 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 13: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BD...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 13: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $2,571.18 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T13 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 14: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BD...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 14: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $5,347.95 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T14 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 15: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BD...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 15: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $38,170.00 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T15 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 16: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BD...
|
Cost Reimbursement Plus Award Fee
|
| Major Deliverable: Task 16: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $20,414.90 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T16 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 17: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BD...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 17: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $9,661.77 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T17 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 18: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BD...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 18: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $10,976.52 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T18 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 19: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BD...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 19: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $21,823.96 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T19 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 20: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BD...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 20: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $20,423.78 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T20 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 21: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BD...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 21: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $14,680.30 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T21 |
| Deliverable Number: |
|