The Contractor(s) shall, for less-than-fee land acquisitions mad eon behalf of the Board of Trustees...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: The Contractor(s) shall, for less-than-fee land acquisitions mad eon behalf of the Board of Trustees of the Internal Improvement Trust Fund ("Board"), perform a Combination Baseline Documentation-Environmental Site Assessment (ESA) Reports or Baseline Documentation (BD) Reports and related services. The results should be provided by two (2) separate reports by the Contractor (s). The first report must satisfy the requirements of the Department, Division of State Lands (DSL), and those of the Comprehensive Environmental Response Compenstaion and Liability Act as set forth in 42 U.S.C, Section 9601 (CERCLA) regarding environmental assessments (ESA Report) The second report is to satisfy the Department DSL requirements regarding documentation of conditions, at the time of acquisition, of properties over which a conservation easement or other less-than-fee-simple real estate interest is acquired (BD Report). All sampling and analysis performed under the Contract resulting from this solitication must conform to the requirements set forth in Chapter 62-160, Florid Administrative Code (F.A.C.) and the Quality Assurance Requirements for Department Contracts (see Exhibit D).
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 2: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 2: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM. |
| Deliverable Price: $5,115.00 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 1: Provide an Updated Phase I Environmental Site Assessment (ESA) and Baseline Documentation Re...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1: Provide an Updated Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate submitted on September 15, 2023 attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
Authorized deviations from DSL Scope of Services: 1) DSL waives the requirement to conduct a 50-year chain-of-title search; however, the Contractor will be responsible for conducting a proper Environmental Lien and AUL Search. Contractor shall report on the findings of this search and provide an assessment as to whether any findings constitute a significant concern. 2) DSL waives the requirement to submit five (5) certified hard copies of the Phase I ESA report and three (3) certified hard copies of the BDR to DSL. Two digital copy (compact disc) will be required to be submitted to DSL for each report. Contractor shall remain responsible for providing one (1) certified hard copy of each report to the landowner. |
| Deliverable Price: $6,803.50 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 7:Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR)...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 7:Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM. |
| Deliverable Price: $7,649.45 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 8:Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR)...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 8:Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM. |
| Deliverable Price: $14,903.10 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 6: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 6: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $5,186.80 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T6 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 10: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BD...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 10: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $1,743.00 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T10 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 11: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BD...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 11: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $7,196.36 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T11 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 17: Provide an Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (B...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 17: Provide an Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $5,562.62 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T17 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 18: Provide an Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (B...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 18: Provide an Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $15,253.31 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T18 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 19: Provide an Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (B...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 19: Provide an Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $15,736.24 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T19 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task Three: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task Three: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM. |
| Deliverable Price: $2,834.20 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: PL522.003 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 4: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 4: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM. |
| Deliverable Price: $4,305.50 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T4 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 5: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 5: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM. |
| Deliverable Price: $8,626.00 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met. |
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP. |
| Source Documentation Page Reference: PL522.005 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 9: Provide an Updated Phase I Environmental Site Assessment (ESA) and Baseline Documentation Re...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 9: Provide an Updated Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM. |
| Deliverable Price: $6,500.00 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T9 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 12: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (B...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 12: Provide a Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $20,054.80 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T12 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 13: Provide an Updated Phase I Environmental Site Assessment (ESA) and Baseline Documentation R...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 13: Provide an Updated Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $10,500.00 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T13 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 14: Provide an Updated Phase I Environmental Site Assessment (ESA) and Baseline Documentation R...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 14: Provide an Updated Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $5,144.30 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T14 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 15: Provide an Updated Phase I Environmental Site Assessment (ESA) and Baseline Documentation R...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 15: Provide an Updated Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $1,223.60 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T15 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 16: Provide an Updated Phase I Environmental Site Assessment (ESA) and Baseline Documentation R...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 16: Provide an Updated Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $19,800.00 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T16 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 20: Provide an Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (B...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 20: Provide an Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
CO1: Funding correction.
|
| Deliverable Price: $16,000.00 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T20 CO1 |
| Deliverable Number: |
|
|
|
|
Environmental Services
|
Task 21: Provide an Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (B...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 21: Provide an Phase I Environmental Site Assessment (ESA) and Baseline Documentation Report (BDR), as separate reports, for the above referenced parcel(s) as described in Exhibit “A”; in accordance with Division of State Lands (DSL) standards which are attached as Exhibit “B” and the cost estimate attached as Exhibit ""C"" In addition, the Contractor must comply with the most current American Society of Testing and Materials (ASTM) 2247 standard for conducting Phase I ESAs on forestland or rural property. If the DSL standards and ASTM requirements for Phase I ESAs conflict, then the Contractor must perform to the more stringent of the requirements (ASTM scope and limitations will be provided to the Contractor upon request). The signatory on the report must be an “environmental professional”, as that term is defined by ASTM.
|
| Deliverable Price: $19,054.39 |
| Non Price Justification: |
| Performance Metrics: Establish on a work assignment basis. DEP Contract Manager will review deliverable to ensure specifications were met.
|
| Financial Consequences: DEP will not pay for unsatisfactory deliverables. Contractor shall be given the right to remedy at no cost to DEP.
|
| Source Documentation Page Reference: T21 |
| Deliverable Number: |
|