| More |
Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
CONSTRUCTION MANAGEMENT SERVICES
|
Engineering design, permit preparation and limited construction administration services. Deliverabl...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Engineering design, permit preparation and limited construction administration services. Deliverables established on a task assignment basis. |
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverables reviewed to ensure professional, complete and in accordance with task assignment specifications. |
| Financial Consequences: No payment for unsatisfactory deliverables. In the event that the deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable at no cost to the Department.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Building construction management
|
Task 1: Subtask 1: Comments and notes from the meetings $2,284.94; Subtask 2: A listing of the dat...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 1: Subtask 1: Comments and notes from the meetings $2,284.94; Subtask 2: A listing of the data and reports obtained and a brief review with DEPs project manager on the content and relevance of the material obtained from the Districts research within 30 days of NTP $2,886.24; Subtask 3: Notes Sketches, photos and maps from field reconnaissance performed by District staff $14,866.24; Subtask 4: Mapping of the jurisdictional wetlands and notes from meetings $2,879.24; Subtask 5: Copy of the Hydrologic Model in either SWMM or ICPR format $17,317.44; Subtask 6: Copies of the preliminary design alternatives and notes from the review meeting $17,317.44; Subtask 7: Copies of notes from the three meetings with the City; and DEP and USACE if required $3,448.30; Subtask 8: Final Design and Specifications $17,317.44; Subtask 9: Permitting $2,886.24; Subtask 10: Attendance at Pre-construction conference $3,427.44. CO#1, #2 & #3 added time. |
| Deliverable Price: $84,650.93 |
| Non Price Justification: Rate Agreement |
| Performance Metrics:
Deliverables reviewed to ensure compliance with specifications in task assignment and applications complete. |
| Financial Consequences:
No payment will be made for unsatisfactory deliverables. In the event that deliverable is deemed unsatisfactory, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department. Contract can be terminated for failure to perform.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Building construction management
|
Task 3: Subtask 1: Comments and notes from the meetings $577; Subtask 2: A listing of the data and r...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: Subtask 1: Comments and notes from the meetings $577; Subtask 2: A listing of the data and reports obtained and a brief review with DEPs project manager on the content and relevance of the material obtained from the Districts research within 60 days of NTP $2,310; Subtask 3: Notes Sketches, photos and maps from field reconnaissance performed by District staff $6,165; Subtask 4: Mapping of the jurisdictional wetlands and notes from meetings $2,165; Subtask 5: Hydrologic Model in either SWMM or ICPR format $5,774; Subtask 6: Preliminary design alternatives $8,662; Subtask 7: Copies of notes from coordination meeting $577; Subtask 8: Final Design and Specifications $8,662; Subtask 9: Permitting $1,732; Subtask 10: Attendance at Pre-construction conference $3,465. CO1 - updated deliverable comments. |
| Deliverable Price: $40,089.00 |
| Non Price Justification: |
| Performance Metrics: Deliverable reviewed to ensure reports complete, all information requests have been addressed, all shop drawings and product submittals have been approved and site observations were timely completed. |
| Financial Consequences: Consultant will not be paid for services not performed satisfactorily. Task Assignment will be terminated if the consultant fails to perform. |
| Source Documentation Page Reference: TA3CO1 |
| Deliverable Number: |
|
|
|
|
Building construction management
|
Task 2: Subtask 1-Comments and notes from the meetings $577; Subtask 2-A listing of the data and rep...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 2: Subtask 1-Comments and notes from the meetings $577; Subtask 2-A listing of the data and reports obtained and a brief review with DEPs project manager on the content and relevance of the material obtained from the Districts research within 60 days of NTP $2,310; Subtask 3-Notes Sketches, photos and maps from field reconnaissance performed by District staff $3,744; Subtask 4-Mapping of the jurisdictional wetlands and notes from meetings $1,732; Subtask 5-Hydrologic Model in either SWMM or ICPR format $2,887; Subtask 6-Preliminary design alternatives $5,774; Subtask 7-Copies of notes from coordination meeting $577; Subtask 8-Final Design and Specifications $6,496; Subtask 9-Permitting $1,732; Subtask 10-Attendance at Pre-construction conference $3,465. |
| Deliverable Price: $29,294.00 |
| Non Price Justification: |
| Performance Metrics: Deliverable reviewed to ensure reports complete, all information requests have been addressed, all shop drawings and product submittals have been approved and site observations were timely completed. |
| Financial Consequences: Consultant will not be paid for services not performed satisfactorily. Task Assignment will be terminated if the consultant fails to perform. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|