Amendment
|
$325.00
|
T193
|
To provide a Title Commitment on the parcels
|
10/05/2026
|
10/05/2026
|
|
|
Amendment
|
$325.00
|
T194
|
To provide a Title Commitment on the parcels
|
10/05/2026
|
10/05/2026
|
|
|
Amendment
|
$325.00
|
T195
|
To provide a Title Commitment on the parcels
|
10/01/2026
|
10/01/2026
|
|
|
Amendment
|
$325.00
|
PT37
|
Task assignment for PRP Title Searches
|
09/30/2026
|
09/30/2026
|
|
|
Amendment
|
$325.00
|
PT36
|
Task assignment for PRP Title Searches
|
09/23/2026
|
09/23/2026
|
|
|
Amendment
|
$325.00
|
PT35
|
Task assignment for PRP Title Searches
|
09/14/2026
|
09/14/2026
|
|
|
Amendment
|
$325.00
|
T192
|
To provide a Title Commitment on the parcels
|
09/02/2026
|
09/02/2026
|
|
|
Amendment
|
$325.00
|
T191
|
To provide a Title Commitment on the parcels
|
09/01/2026
|
09/01/2026
|
|
|
Amendment
|
$325.00
|
PT34
|
Task assignment for PRP Title Searches
|
08/28/2026
|
08/28/2026
|
|
|
Amendment
|
$0.00
|
CMC4
|
Contract Manager Change
|
08/17/2026
|
08/17/2026
|
|
|
Amendment
|
$325.00
|
T190
|
To provide a Title Commitment on the parcels
|
08/11/2026
|
08/11/2026
|
|
|
Amendment
|
$125.00
|
T161-2
|
To provide an updated Title Commitment on the parcels
|
08/04/2026
|
08/04/2026
|
|
|
Amendment
|
$325.00
|
PT33
|
Task assignment for PRP Title Searches
|
07/23/2026
|
07/23/2026
|
|
|
Amendment
|
$5,500.00
|
T189
|
To record Deeds and/or documents
|
06/15/2026
|
06/15/2026
|
|
|
Amendment
|
$25.00
|
T188
|
To provide an updated Title Commitment on the parcels
|
06/09/2026
|
06/09/2026
|
|
|
Amendment
|
$325.00
|
T187
|
To provide a Title Commitment on the parcels
|
06/05/2026
|
06/05/2026
|
|
|
Amendment
|
$325.00
|
PT31
|
Task assignment for PRP Title Searches
|
05/28/2026
|
05/28/2026
|
|
|
Amendment
|
$325.00
|
PT32
|
Task assignment for PRP Title Searches
|
05/28/2026
|
05/28/2026
|
|
|
Amendment
|
$325.00
|
PT30
|
Task assignment for PRP Title Searches
|
04/20/2026
|
04/20/2026
|
04/20/2027
|
|
Amendment
|
$2,600.00
|
T186
|
To provide a Title Commitment on the parcels
|
03/17/2026
|
03/17/2026
|
|
|
Amendment
|
$0.00
|
T185CO1
|
No cost time extension
|
03/06/2026
|
03/06/2026
|
|
|
Amendment
|
$5,200.00
|
T185
|
To provide a Title Commitment on the parcels
|
02/18/2026
|
02/18/2026
|
|
|
Amendment
|
$2,600.00
|
T183
|
To provide a Title Commitment on the parcels
|
02/17/2026
|
02/17/2026
|
|
|
Amendment
|
$650.00
|
T184
|
To provide a Title Commitment on the parcels
|
02/17/2026
|
02/17/2026
|
|
|
Amendment
|
$0.00
|
T181CO1
|
No cost time extension
|
02/13/2026
|
02/13/2026
|
|
|
Amendment
|
$1,625.00
|
T182
|
To provide a Title Commitment on the parcels
|
02/06/2026
|
02/06/2026
|
|
|
Amendment
|
$325.00
|
PT29
|
Task assignment for PRP Title Searches
|
01/27/2026
|
01/27/2026
|
|
|
Amendment
|
$325.00
|
PT28
|
Task assignment for PRP Title Searches.
|
01/27/2026
|
01/27/2026
|
|
|
Amendment
|
$3,250.00
|
T181
|
To provide a Title Commitment on the parcels
|
01/26/2026
|
01/26/2026
|
|
|
Amendment
|
$0.00
|
T179CO1
|
No cost time extension
|
01/12/2026
|
01/12/2026
|
|
|
Amendment
|
$325.00
|
T180
|
To provide a Title Commitment on the parcels
|
12/23/2025
|
12/23/2025
|
|
|
Amendment
|
$975.00
|
T178
|
To provide a Title Commitment on the parcels
|
12/22/2025
|
12/22/2025
|
|
|
Amendment
|
$650.00
|
T179
|
To provide a Title Commitment on the parcels
|
12/22/2025
|
12/22/2025
|
|
|
Amendment
|
$325.00
|
T177
|
To provide a Title Commitment on the parcels
|
12/12/2025
|
12/12/2025
|
|
|
Amendment
|
$4,550.00
|
T176
|
To provide a Title Commitment on the parcels
|
12/11/2025
|
12/11/2025
|
|
|
Amendment
|
$325.00
|
T175
|
To provide a Title Commitment on the parcels
|
12/10/2025
|
12/10/2025
|
|
|
Amendment
|
$10,400.00
|
T174
|
To provide a Title Commitment on the parcels
|
10/29/2025
|
10/29/2025
|
|
|
Amendment
|
$2,925.00
|
T172
|
To provide a Title Commitment on the parcels
|
10/17/2025
|
10/17/2025
|
|
|
Amendment
|
$650.00
|
T173
|
To provide a Title Commitment on the parcels
|
10/17/2025
|
10/17/2025
|
|
|
Amendment
|
$325.00
|
T171
|
To provide a Title Commitment on the parcels
|
09/04/2025
|
09/04/2025
|
|
|
Amendment
|
$1,300.00
|
T170
|
To provide a Title Commitment on the parcels
|
09/03/2025
|
09/03/2025
|
|
|
Amendment
|
$0.00
|
T167CO2
|
No cost time extension
|
09/02/2025
|
09/02/2025
|
|
|
Amendment
|
$0.00
|
T168CO2
|
No cost time extension
|
09/02/2025
|
09/02/2025
|
|
|
Amendment
|
$325.00
|
T169
|
To provide a Title Commitment on the parcels
|
08/25/2025
|
08/25/2025
|
|
|
Amendment
|
$0.00
|
T167CO1
|
No cost time extension
|
07/31/2025
|
07/31/2025
|
|
|
Amendment
|
$0.00
|
T168CO1
|
No cost time extension
|
07/31/2025
|
07/31/2025
|
|
|
Amendment
|
$0.00
|
PT226
|
Entered in error
|
07/28/2025
|
07/28/2025
|
|
|
Amendment
|
$325.00
|
PT26
|
Task assignment for PRP Title Searches
|
07/25/2025
|
07/25/2025
|
|
|
Amendment
|
$0.00
|
T94CO3
|
Entered in Error
|
07/15/2025
|
07/15/2025
|
|
|
Amendment
|
$325.00
|
T94-3
|
To provide an updated Title Commitment on the parcels
|
07/15/2025
|
07/15/2025
|
|
|
Amendment
|
$325.00
|
T149-2
|
To provide an updated Title Commitment on the parcels
|
07/15/2025
|
07/15/2025
|
|
|
Amendment
|
$2,275.00
|
T167
|
To provide a Title Commitment on the parcels
|
07/15/2025
|
07/15/2025
|
|
|
Amendment
|
$3,900.00
|
T168
|
To provide a Title Commitment on the parcels
|
07/15/2025
|
07/15/2025
|
|
|
Amendment
|
$2,275.00
|
T165
|
To provide a Title Commitment on the parcels
|
06/24/2025
|
06/24/2025
|
|
|
Amendment
|
$5,500.00
|
T166
|
To record Deeds and/or documents
|
06/24/2025
|
06/24/2025
|
|
|
Amendment
|
$325.00
|
T164
|
To provide a Title Commitment on the parcels
|
06/16/2025
|
06/16/2025
|
|
|
Amendment
|
$650.00
|
T163
|
To provide a Title Commitment on the parcels
|
06/09/2025
|
06/09/2025
|
|
|
Amendment
|
$1,625.00
|
T161
|
To provide a Title Commitment on the parcels
|
06/04/2025
|
06/04/2025
|
|
|
Amendment
|
$975.00
|
T162
|
To provide a Title Commitment on the parcels
|
06/03/2025
|
06/03/2025
|
|
|
Amendment
|
$325.00
|
PT25
|
Task assignment for PRP Title Searches
|
05/27/2025
|
05/27/2025
|
|
|
Amendment
|
$325.00
|
PT24
|
Task assignment for PRP Title Searches
|
05/23/2025
|
05/23/2025
|
|
|
Amendment
|
$650.00
|
T159-2
|
To provide an updated Title Commitment on the parcels
|
05/22/2025
|
05/22/2025
|
|
|
Amendment
|
$325.00
|
T160
|
To provide a Title Commitment on the parcels
|
05/18/2025
|
05/18/2025
|
|
|
Amendment
|
$0.00
|
T157CO2
|
No cost time extension
|
05/06/2025
|
05/06/2025
|
|
|
Amendment
|
$2,925.00
|
T159
|
To provide a Title Commitment on the parcels
|
04/24/2025
|
04/24/2025
|
|
|
Amendment
|
$325.00
|
PT23
|
Task assignment for PRP Title Searches
|
04/23/2025
|
04/23/2025
|
|
|
Amendment
|
$0.00
|
T152CO2
|
No cost time extension
|
04/21/2025
|
04/21/2025
|
|
|
Amendment
|
$325.00
|
PT22
|
Task assignment for PRP Title Searches
|
04/18/2025
|
04/18/2025
|
|
|
Amendment
|
$325.00
|
PT21
|
Task assignment for PRP Title Searches
|
04/16/2025
|
04/16/2025
|
|
|
Amendment
|
$0.00
|
T156CO1
|
No cost time extension
|
04/09/2025
|
04/09/2025
|
|
|
Amendment
|
$0.00
|
T157CO1
|
No cost time extension
|
04/09/2025
|
04/09/2025
|
|
|
Amendment
|
$0.00
|
T152CO1
|
No cost time extension
|
04/08/2025
|
04/08/2025
|
|
|
Amendment
|
$0.00
|
T153CO1
|
No cost time extension
|
04/08/2025
|
04/08/2025
|
|
|
Amendment
|
$20,000.00
|
T158
|
To provide Title Search Report/Commitment on the parcels
|
04/04/2025
|
04/04/2025
|
|
|
Amendment
|
$3,575.00
|
T157
|
To provide a Title Commitment on the parcels
|
03/27/2025
|
03/27/2025
|
|
|
Amendment
|
$4,550.00
|
T156
|
To provide a Title Commitment on the parcels
|
03/25/2025
|
03/25/2025
|
|
|
Amendment
|
$325.00
|
T147-2
|
To provide an udpated Title Commitment on the parcels
|
03/24/2025
|
03/24/2025
|
|
|
Amendment
|
$325.00
|
T154
|
To provide a Title Commitment on the parcels
|
03/24/2025
|
03/24/2025
|
|
|
Amendment
|
$325.00
|
T155
|
To provide a Title Commitment on the parcels
|
03/24/2025
|
03/24/2025
|
|
|
Amendment
|
$325.00
|
PT20
|
Task assignment for PRP Title Searches
|
03/21/2025
|
03/21/2025
|
|
|
Amendment
|
$3,250.00
|
T152
|
To provide a Title Commitment on the parcels
|
03/20/2025
|
03/20/2025
|
|
|
Amendment
|
$4,550.00
|
T153
|
To provide a Title Commitment on the parcels
|
03/20/2025
|
03/20/2025
|
|
|
Amendment
|
$0.00
|
T144CO3
|
No cost time extension
|
03/18/2025
|
03/18/2025
|
|
|
Amendment
|
$3,575.00
|
T150
|
To provide a Title Commitment on the parcels
|
03/13/2025
|
03/13/2025
|
|
|
Amendment
|
$1,300.00
|
T151
|
To provide a Title Commitment on the parcels
|
03/13/2025
|
03/13/2025
|
|
|
Amendment
|
$2,275.00
|
T149
|
To provide a Title Commitment on the parcels
|
03/11/2025
|
03/11/2025
|
|
|
Amendment
|
$325.00
|
PT18
|
Task assignment for PRP Title Searches
|
03/11/2025
|
03/11/2025
|
|
|
Amendment
|
$325.00
|
PT19
|
Task assignment for PRP Title Searches
|
03/10/2025
|
03/10/2025
|
|
|
Amendment
|
$25.00
|
T14-2
|
To provide an updated Title Commitment on the parcels
|
03/10/2025
|
03/10/2025
|
|
|
Amendment
|
$0.00
|
T143CO2
|
No cost time extension
|
03/04/2025
|
03/04/2025
|
|
|
Amendment
|
$0.00
|
T144CO2
|
No cost time extension
|
03/04/2025
|
03/04/2025
|
|
|
Amendment
|
$0.00
|
T146CO1
|
No cost time extension
|
02/27/2025
|
02/27/2025
|
|
|
Amendment
|
$0.00
|
T145CO1
|
No cost time extension
|
02/26/2025
|
02/26/2025
|
|
|
Amendment
|
$1,300.00
|
T147
|
To provide a Title Commitment on the parcels
|
02/23/2025
|
02/23/2025
|
|
|
Amendment
|
$325.00
|
T148
|
To provide a Title Commitment on the parcels
|
02/21/2025
|
02/21/2025
|
|
|
Amendment
|
$0.00
|
T144CO1
|
No cost time extension
|
02/21/2025
|
02/21/2025
|
|
|
Amendment
|
$0.00
|
T143CO1
|
No cost time extension
|
02/21/2025
|
02/21/2025
|
|
|
Amendment
|
$0.00
|
TL144CO1
|
Entered in Error
|
02/21/2025
|
02/21/2025
|
|
|
Amendment
|
$8,450.00
|
T145
|
To provide a Title Commitment on the parcels
|
02/13/2025
|
02/13/2025
|
|
|
Amendment
|
$7,800.00
|
T146
|
To provide a Title Commitment on the parcels
|
02/13/2025
|
02/13/2025
|
|
|
Amendment
|
$0.00
|
T142CO1
|
No cost time extension
|
02/12/2025
|
02/12/2025
|
|
|
Amendment
|
$18,525.00
|
T143
|
To provide a Title Commitment on the parcels
|
02/07/2025
|
02/07/2025
|
|
|
Amendment
|
$21,125.00
|
T144
|
To provide a Title Commitment on the parcels
|
02/07/2025
|
02/07/2025
|
|
|
Amendment
|
$325.00
|
T141
|
To provide a Title Commitment on the parcels
|
01/30/2025
|
01/30/2025
|
|
|
Amendment
|
$51,350.00
|
T142
|
To provide a Title Commitment on the parcels
|
01/30/2025
|
01/30/2025
|
|
|
Amendment
|
$0.00
|
T140CO1
|
No cost time extension
|
01/14/2025
|
01/14/2025
|
|
|
Amendment
|
$325.00
|
PT17
|
Task assignment for PRP Title Searches
|
12/27/2024
|
12/27/2024
|
|
|
Amendment
|
$325.00
|
PT27
|
Task assignment for PRP Title Searches. 3.21.2025
|
03/21/2025
|
12/27/2024
|
|
|
Amendment
|
$325.00
|
T136
|
To provide a Title Commitment on the parcels
|
12/20/2024
|
12/20/2024
|
|
|
Amendment
|
$325.00
|
T137
|
To provide a Title Commitment on the parcels
|
12/20/2024
|
12/20/2024
|
|
|
Amendment
|
$325.00
|
T138
|
To provide a Title Commitment on the parcels
|
12/20/2024
|
12/20/2024
|
|
|
Amendment
|
$325.00
|
T139
|
To provide a Title Commitment on the parcels
|
12/20/2024
|
12/20/2024
|
|
|
Amendment
|
$4,225.00
|
T140
|
To provide a Title Commitment on the parcels
|
12/20/2024
|
12/20/2024
|
|
|
Amendment
|
$0.00
|
T132CO1
|
No cost time extension
|
12/09/2024
|
12/09/2024
|
|
|
Amendment
|
$325.00
|
T135
|
To provide a Title Commitment on the parcels
|
11/25/2024
|
11/25/2024
|
|
|
Amendment
|
$0.00
|
T130CO1
|
No cost time extension
|
11/25/2024
|
11/25/2024
|
|
|
Amendment
|
$325.00
|
T132
|
To provide a Title Commitment on the parcels
|
11/13/2024
|
11/13/2024
|
|
|
Amendment
|
$325.00
|
T133
|
To provide a Title Commitment on the parcels
|
11/13/2024
|
11/13/2024
|
|
|
Amendment
|
$650.00
|
T134
|
To provide a Title Commitment on the parcels
|
11/13/2024
|
11/13/2024
|
|
|
Amendment
|
$325.00
|
T131
|
To provide a Title Commitment on the parcels
|
11/11/2024
|
11/11/2024
|
|
|
Amendment
|
$16,575.00
|
T130
|
To provide a Title Commitment on the parcels
|
11/05/2024
|
11/05/2024
|
|
|
Amendment
|
$325.00
|
PT16
|
Task assignment for PRP Title Searches
|
10/28/2024
|
10/28/2024
|
|
|
Amendment
|
$650.00
|
T129
|
To provide a title search report on the parcels
|
10/17/2024
|
10/17/2024
|
|
|
Amendment
|
$0.00
|
T122CO2
|
No cost time extension
|
10/17/2024
|
10/17/2024
|
|
|
Amendment
|
$325.00
|
T128
|
To provide a Title Commitment on the parcels
|
10/15/2024
|
10/15/2024
|
|
|
Amendment
|
$0.00
|
CMC3
|
Contract Manger Change
|
10/10/2024
|
10/10/2024
|
|
|
Amendment
|
$325.00
|
T117-2
|
To provide a Title Commitment on the parcels
|
10/04/2024
|
10/04/2024
|
|
|
Amendment
|
$0.00
|
T125CO1
|
No cost time extension
|
10/04/2024
|
10/04/2024
|
|
|
Amendment
|
$7,475.00
|
T127
|
To provide a Title Commitment on the parcels
|
10/02/2024
|
10/02/2024
|
|
|
Amendment
|
$325.00
|
T126
|
To provide a Title Commitment on the parcels
|
09/30/2024
|
09/30/2024
|
|
|
Amendment
|
$0.00
|
T122CO1
|
No cost time extension
|
09/30/2024
|
09/30/2024
|
|
|
Amendment
|
$3,575.00
|
T125
|
To provide a Title Commitment on the parcels
|
09/24/2024
|
09/24/2024
|
|
|
Amendment
|
$0.00
|
CMC2
|
Contract Manger Change
|
09/17/2024
|
09/17/2024
|
|
|
Amendment
|
$8,775.00
|
T124
|
To provide a Title Commitment on the parcels
|
09/17/2024
|
09/17/2024
|
|
|
Amendment
|
$1,625.00
|
T122
|
To provide a Title Commitment on the parcels
|
09/16/2024
|
09/16/2024
|
|
|
Amendment
|
$975.00
|
T123
|
To provide a Title Commitment on the parcels
|
09/16/2024
|
09/16/2024
|
|
|
Amendment
|
$325.00
|
T121
|
To provide a Title Commitment on the parcels
|
09/11/2024
|
09/11/2024
|
|
|
Amendment
|
$0.00
|
T119CO1
|
No cost time extension
|
08/21/2024
|
08/21/2024
|
|
|
Amendment
|
$2,600.00
|
T120
|
To provide a Title Commitment on the parcels
|
08/20/2024
|
08/20/2024
|
|
|
Amendment
|
$0.00
|
T115CO1
|
No cost time extension
|
08/13/2024
|
08/13/2024
|
|
|
Amendment
|
$0.00
|
T116CO1
|
No cost time extension
|
08/13/2024
|
08/13/2024
|
|
|
Amendment
|
$0.00
|
T117CO1
|
No cost time extension
|
08/13/2024
|
08/13/2024
|
|
|
Amendment
|
$3,250.00
|
T119
|
To provide a Title Commitment on the parcels
|
08/03/2024
|
08/03/2024
|
|
|
Amendment
|
$325.00
|
T118
|
To provide a Title Commitment on the parcels
|
07/31/2024
|
07/31/2024
|
|
|
Amendment
|
$1,950.00
|
T114
|
To provide a Title Commitment on the parcels
|
07/24/2024
|
07/24/2024
|
|
|
Amendment
|
$650.00
|
T115
|
To provide a Title Commitment on the parcels
|
07/24/2024
|
07/24/2024
|
|
|
Amendment
|
$975.00
|
T116
|
To provide a Title Commitment on the parcels
|
07/24/2024
|
07/24/2024
|
|
|
Amendment
|
$325.00
|
T117
|
To provide a Title Commitment on the parcels
|
07/24/2024
|
07/24/2024
|
|
|
Amendment
|
$325.00
|
T96-2
|
To provide an updated Title Commitment on the parcels
|
07/23/2024
|
07/23/2024
|
|
|
Amendment
|
$0.00
|
T111CO1
|
Correcting funding on task
|
07/17/2024
|
07/17/2024
|
|
|
Amendment
|
$0.00
|
T108CO1
|
No cost time extesion
|
07/16/2024
|
07/16/2024
|
|
|
Amendment
|
$1,300.00
|
T112
|
To provide a Title Commitment on the parcels
|
07/16/2024
|
07/16/2024
|
|
|
Amendment
|
$975.00
|
T113
|
To provide a Title Commitment on the parcels
|
07/16/2024
|
07/16/2024
|
|
|
Amendment
|
$650.00
|
T110
|
To provide a Title Commitment on the parcels
|
07/12/2024
|
07/12/2024
|
|
|
Amendment
|
$650.00
|
T111
|
To provide a Title Commitment on the parcels
|
07/12/2024
|
07/12/2024
|
|
|
Amendment
|
$325.00
|
T109
|
To provide a Title Commitment on the parcels
|
07/11/2024
|
07/11/2024
|
|
|
Amendment
|
$0.00
|
T102CO1
|
No cost time extension.
|
07/01/2024
|
07/01/2024
|
|
|
Amendment
|
$325.00
|
T106
|
To provide a Title Commitment on the parcels
|
07/01/2024
|
07/01/2024
|
|
|
Amendment
|
$325.00
|
T107
|
To provide a Title Commitment on the parcels
|
07/01/2024
|
07/01/2024
|
|
|
Amendment
|
$975.00
|
T108
|
To provide a Title Commitment on the parcels
|
07/01/2024
|
07/01/2024
|
|
|
Amendment
|
$325.00
|
T94-2
|
To provide an updated Title Commitment on the parcels
|
06/28/2024
|
06/28/2024
|
|
|
Amendment
|
$1,300.00
|
T104
|
To provide a Title Commitment on the parcels
|
06/27/2024
|
06/27/2024
|
|
|
Amendment
|
$3,250.00
|
T105
|
To provide a Title Commitment on the parcels
|
06/27/2024
|
06/27/2024
|
|
|
Amendment
|
$5,500.00
|
T103
|
To record Deeds and/or documents
|
07/01/2024
|
06/24/2024
|
|
|
Amendment
|
$1,300.00
|
T101
|
To provide a Title Commitment on the parcels
|
06/10/2024
|
06/10/2024
|
|
|
Amendment
|
$16,575.00
|
T102
|
To provide a Title Commitment on the parcels
|
06/07/2024
|
06/07/2024
|
|
|
Amendment
|
$1,300.00
|
T100
|
To provide a Title Commitment on the parcels
|
06/07/2024
|
06/07/2024
|
|
|
Amendment
|
$325.00
|
T99
|
To provide a Title Commitment on the parcels
|
06/05/2024
|
06/05/2024
|
|
|
Amendment
|
$325.00
|
T97
|
To provide a Title Commitment on the parcels
|
06/05/2024
|
06/05/2024
|
|
|
Amendment
|
$325.00
|
T98
|
To provide a Title Commitment on the parcels
|
06/04/2024
|
06/04/2024
|
|
|
Amendment
|
$1,300.00
|
T96
|
To provide a Title Commitment on the parcels
|
05/31/2024
|
05/31/2024
|
|
|
Amendment
|
$325.00
|
PT15
|
Task assignment for PRP Title Searches
|
05/29/2024
|
05/29/2024
|
|
|
Amendment
|
$650.00
|
T95
|
To provide a Title Commitment on the parcels
|
05/28/2024
|
05/28/2024
|
|
|
Amendment
|
$75.00
|
T36-2
|
To provide an updated Title Commitment on the parcels
|
05/15/2024
|
05/15/2024
|
|
|
Amendment
|
$0.00
|
T91CO1
|
Correcting funding on task
|
04/26/2024
|
04/26/2024
|
|
|
Amendment
|
$0.00
|
T92CO1
|
Correcting funding on task
|
04/26/2024
|
04/26/2024
|
|
|
Amendment
|
$0.00
|
T93CO1
|
Correcting funding on task
|
04/26/2024
|
04/26/2024
|
|
|
Amendment
|
$975.00
|
T92
|
To provide a Title Commitment on the parcels
|
04/15/2024
|
04/15/2024
|
|
|
Amendment
|
$2,925.00
|
T93
|
To provide a Title Commitment on the parcels
|
04/15/2024
|
04/15/2024
|
|
|
Amendment
|
$3,900.00
|
T94
|
To provide a Title Commitment on the parcels
|
04/14/2024
|
04/15/2024
|
|
|
Amendment
|
$0.00
|
SL010
|
Made in Error
|
04/09/2024
|
04/09/2024
|
|
|
Amendment
|
$7,475.00
|
T91
|
To provide a Title Commitment on the parcels
|
04/09/2024
|
04/09/2024
|
|
|
Amendment
|
$325.00
|
T90
|
To provide a Title Commitment on the parcels
|
04/04/2024
|
04/04/2024
|
|
|
Amendment
|
$325.00
|
PT14
|
Task assignment for PRP Title Searches
|
04/04/2024
|
04/04/2024
|
|
|
Amendment
|
$0.00
|
T89
|
To bill DEP for Title Insurance Policy and Closing Fee.
|
04/02/2024
|
04/02/2024
|
|
|
Amendment
|
$650.00
|
T88
|
To provide a Title Commitment on the parcels
|
03/31/2024
|
03/31/2024
|
|
|
Amendment
|
$650.00
|
T86
|
To provide a Title Commitment on the parcels
|
03/25/2024
|
03/25/2024
|
|
|
Amendment
|
$325.00
|
T79
|
To provide a Title Commitment on the parcels
|
03/19/2024
|
03/19/2024
|
|
|
Amendment
|
$650.00
|
T80
|
To provide a Title Commitment on the parcels
|
03/19/2024
|
03/19/2024
|
|
|
Amendment
|
$325.00
|
T81
|
To provide a Title Commitment on the parcels
|
03/19/2024
|
03/19/2024
|
|
|
Amendment
|
$325.00
|
T82
|
To provide a Title Commitment on the parcels
|
03/19/2024
|
03/19/2024
|
|
|
Amendment
|
$325.00
|
T83
|
To provide a Title Commitment on the parcels
|
03/19/2024
|
03/19/2024
|
|
|
Amendment
|
$325.00
|
T84
|
To provide a Title Commitment on the parcels
|
03/19/2024
|
03/19/2024
|
|
|
Amendment
|
$325.00
|
T85
|
To provide a Title Commitment on the parcels
|
03/19/2024
|
03/19/2024
|
|
|
Amendment
|
$325.00
|
T76
|
To provide a Title Commitment on the parcels
|
03/18/2024
|
03/18/2024
|
|
|
Amendment
|
$325.00
|
T77
|
To provide a Title Commitment on the parcels
|
03/18/2024
|
03/18/2024
|
|
|
Amendment
|
$325.00
|
T78
|
To provide a Title Commitment on the parcels
|
03/18/2024
|
03/18/2024
|
|
|
Amendment
|
$0.00
|
T72CO1
|
No cost time extension
|
03/10/2024
|
03/10/2024
|
|
|
Amendment
|
$325.00
|
T75
|
To provide a Title Commitment on the parcels
|
03/07/2024
|
03/07/2024
|
|
|
Amendment
|
$3,900.00
|
T74
|
To provide a Title Commitment on the parcels
|
02/26/2024
|
02/26/2024
|
|
|
Amendment
|
$0.00
|
T67CO1
|
No cost time extension
|
02/23/2024
|
02/23/2024
|
|
|
Amendment
|
$0.00
|
T68CO1
|
No cost time extension
|
02/23/2024
|
02/23/2024
|
|
|
Amendment
|
$975.00
|
T73
|
To provide a Title Commitment on the parcels
|
02/20/2024
|
02/20/2024
|
|
|
Amendment
|
$325.00
|
T70
|
To provide a Title Commitment on the parcels
|
02/19/2024
|
02/19/2024
|
|
|
Amendment
|
$325.00
|
T71
|
To provide a Title Commitment on the parcels
|
02/19/2024
|
02/19/2024
|
|
|
Amendment
|
$975.00
|
T72
|
To provide a Title Commitment on the parcels
|
02/19/2024
|
02/19/2024
|
|
|
Amendment
|
$0.00
|
T63CO2
|
No cost time extension
|
02/16/2024
|
02/16/2024
|
|
|
Amendment
|
$25.00
|
PT13
|
Task assignment for PRP Title Searches
|
02/12/2024
|
02/12/2024
|
|
|
Amendment
|
$1,300.00
|
T67
|
To provide a Title Commitment on the parcels
|
02/02/2024
|
02/02/2024
|
|
|
Amendment
|
$325.00
|
T68
|
To provide a Title Commitment on the parcels
|
02/02/2024
|
02/02/2024
|
|
|
Amendment
|
$325.00
|
T69
|
To provide a Title Commitment on the parcels
|
02/02/2024
|
02/02/2024
|
|
|
Amendment
|
$325.00
|
T66
|
To provide a Title Commitment on the parcels
|
01/25/2024
|
01/25/2024
|
|
|
Amendment
|
$325.00
|
T64
|
To provide a Title Commitment on the parcels
|
01/19/2024
|
01/19/2024
|
|
|
Amendment
|
$325.00
|
T65
|
To provide a Title Commitment on the parcels
|
01/19/2024
|
01/19/2024
|
|
|
Amendment
|
$0.00
|
T63CO1
|
No cost time extension
|
01/16/2024
|
01/16/2024
|
|
|
Amendment
|
$0.00
|
T34CO1
|
Language change on task assignment.
|
01/05/2024
|
01/05/2024
|
|
|
Amendment
|
$650.00
|
T62
|
To provide a Title Commitment on the parcels
|
12/27/2023
|
12/27/2023
|
|
|
Amendment
|
$325.00
|
T63
|
To provide a Title Commitment on the parcels
|
12/27/2023
|
12/27/2023
|
|
|
Amendment
|
$0.00
|
T59CO1
|
No cost time extension
|
12/20/2023
|
12/20/2023
|
|
|
Amendment
|
$0.00
|
T60CO1
|
No cost time extension.
|
12/20/2023
|
12/20/2023
|
|
|
Amendment
|
$325.00
|
T61
|
To provide a Title Commitment on the parcels
|
12/09/2023
|
12/09/2023
|
|
|
Amendment
|
$6,500.00
|
T59
|
To provide a Title Commitment on the parcels
|
12/01/2023
|
12/01/2023
|
|
|
Amendment
|
$2,275.00
|
T60
|
To provide a Title Commitment on the parcels
|
12/01/2023
|
12/01/2023
|
|
|
Amendment
|
$325.00
|
T58
|
To provide a Title Commitment on the parcels
|
11/16/2023
|
11/16/2023
|
|
|
Amendment
|
$0.00
|
T57CO1
|
No cost time extension.
|
11/08/2023
|
11/08/2023
|
|
|
Amendment
|
$0.00
|
T51CO1
|
No cost time extension.
|
10/24/2023
|
10/24/2023
|
|
|
Amendment
|
$0.00
|
T54CO1
|
No cost time extension.
|
10/24/2023
|
10/24/2023
|
|
|
Amendment
|
$650.00
|
T37-2
|
To provide an updated Title Commitment on the parcels
|
10/23/2023
|
10/23/2023
|
|
|
Amendment
|
$650.00
|
T55
|
To provide a Title Commitment on the parcels
|
10/18/2023
|
10/18/2023
|
|
|
Amendment
|
$975.00
|
T56
|
To provide a Title Commitment on the parcels
|
10/18/2023
|
10/18/2023
|
|
|
Amendment
|
$975.00
|
T57
|
To provide a Title Commitment on the parcels
|
10/18/2023
|
10/18/2023
|
|
|
Amendment
|
$650.00
|
T49CO1
|
Price increase and time extension.
|
10/10/2023
|
10/10/2023
|
|
|
Amendment
|
$2,600.00
|
T53
|
To provide a Title Commitment on the parcels
|
10/06/2023
|
10/06/2023
|
|
|
Amendment
|
$3,250.00
|
T54
|
To provide a Title Commitment on the parcels
|
10/06/2023
|
10/06/2023
|
|
|
Amendment
|
$325.00
|
T52
|
To provide a Title Commitment on the parcels
|
10/03/2023
|
10/03/2023
|
|
|
Amendment
|
$39,650.00
|
T51
|
To provide a Title Commitment on the parcels
|
09/22/2023
|
09/22/2023
|
|
|
Amendment
|
$0.00
|
T46CO1
|
No cost time extension.
|
09/22/2023
|
09/22/2023
|
|
|
Amendment
|
$9,100.00
|
T49
|
To provide a Title Commitment on the parcels
|
09/22/2023
|
09/22/2023
|
|
|
Amendment
|
$650.00
|
T50
|
To provide a Title Commitment on the parcels
|
09/21/2023
|
09/21/2023
|
|
|
Amendment
|
$650.00
|
T48
|
To provide a Title Commitment on the parcels
|
09/18/2023
|
09/18/2023
|
|
|
Amendment
|
$325.00
|
PT12
|
Task assignment for PRP Title Searches
|
09/13/2023
|
09/13/2023
|
|
|
Amendment
|
$975.00
|
T47
|
To provide a Title Commitment on the parcels
|
09/12/2023
|
09/12/2023
|
|
|
Amendment
|
$0.00
|
T44CO1
|
No cost time extension.
|
09/07/2023
|
09/07/2023
|
|
|
Amendment
|
$20,800.00
|
T46
|
To provide a Title Commitment on the parcels
|
09/01/2023
|
09/01/2023
|
|
|
Amendment
|
$325.00
|
T43
|
To provide a Title Commitment on the parcels
|
08/18/2023
|
08/18/2023
|
|
|
Amendment
|
$650.00
|
T44
|
To provide a Title Commitment on the parcels
|
08/18/2023
|
08/18/2023
|
|
|
Amendment
|
$325.00
|
T45
|
To provide a Title Commitment on the parcels
|
08/18/2023
|
08/18/2023
|
|
|
Amendment
|
$166,014.87
|
T41
|
To provide acquisition services
|
08/15/2023
|
08/15/2023
|
|
|
Amendment
|
$325.00
|
PT11
|
Task assignment for PRP Title Searches
|
08/14/2023
|
08/14/2023
|
|
|
Amendment
|
$325.00
|
PT10
|
Task assignment for PRP Title Searches
|
08/10/2023
|
08/10/2023
|
|
|
Amendment
|
$0.00
|
T37CO1
|
Task time extension
|
08/04/2023
|
08/04/2023
|
|
|
Amendment
|
$325.00
|
T42
|
To provide a Title Commitment on the parcels
|
08/03/2023
|
08/03/2023
|
|
|
Amendment
|
$325.00
|
T39
|
To provide a Title Commitment on the parcels
|
07/20/2023
|
07/20/2023
|
|
|
Amendment
|
$650.00
|
T40
|
To provide a Title Commitment on the parcels
|
07/20/2023
|
07/20/2023
|
|
|
Amendment
|
$325.00
|
T38
|
To provide a Title Search Report on the parcels
|
07/19/2023
|
07/19/2023
|
|
|
Amendment
|
$2,275.00
|
T36
|
To provide a Title Commitment on the parcels
|
07/18/2023
|
07/18/2023
|
|
|
Amendment
|
$8,450.00
|
T37
|
To provide a Title Commitment on the parcels
|
07/18/2023
|
07/18/2023
|
|
|
Amendment
|
$325.00
|
T35
|
To provide a Title Commitment on the parcels
|
07/10/2023
|
07/10/2023
|
|
|
Amendment
|
$25.00
|
PT08
|
Task assignment for PRP Title Searches
|
07/05/2023
|
07/05/2023
|
|
|
Amendment
|
$325.00
|
PT09
|
Task assignment for PRP Title Searches
|
07/05/2023
|
07/05/2023
|
|
|
Amendment
|
$5,500.00
|
T34
|
To record Deeds and/or documents
|
06/13/2023
|
06/13/2023
|
|
|
Amendment
|
$650.00
|
T33
|
To provide a Title Commitment on the parcels
|
06/08/2023
|
06/08/2023
|
|
|
Amendment
|
$650.00
|
T32
|
To provide a Title Commitment on the parcels
|
05/30/2023
|
05/30/2023
|
|
|
Amendment
|
$0.00
|
T18CO2
|
Time extension
|
05/15/2023
|
05/15/2023
|
|
|
Amendment
|
$325.00
|
PT07
|
Task assignment for PRP Title Searches
|
05/12/2023
|
05/12/2023
|
|
|
Amendment
|
$8,450.00
|
T21-2
|
To provide a Title Commitment on the parcels
|
05/02/2023
|
05/02/2023
|
|
|
Amendment
|
$1,925.00
|
T1CO2
|
Adding additional funding
|
04/27/2023
|
04/27/2023
|
|
|
Amendment
|
$325.00
|
T31
|
To provide a Title Commitment on the parcels
|
04/26/2023
|
04/26/2023
|
|
|
Amendment
|
$0.00
|
T23CO1
|
Time extension
|
04/21/2023
|
04/21/2023
|
|
|
Amendment
|
$0.00
|
T28CO1
|
Time extension
|
04/21/2023
|
04/21/2023
|
|
|
Amendment
|
$0.00
|
T29CO1
|
Time extension
|
04/21/2023
|
04/21/2023
|
|
|
Amendment
|
$1,300.00
|
T29
|
To provide a Title Commitment on the parcels
|
04/14/2023
|
04/14/2023
|
|
|
Amendment
|
$325.00
|
T30
|
To provide a Title Commitment on the parcels
|
04/14/2023
|
04/14/2023
|
|
|
Amendment
|
$2,925.00
|
T27
|
To provide a Title Commitment on the parcels
|
04/11/2023
|
04/11/2023
|
|
|
Amendment
|
$1,625.00
|
T28
|
To provide a Title Commitment on the parcels
|
04/11/2023
|
04/11/2023
|
|
|
Amendment
|
$325.00
|
T25
|
To provide a Title Commitment on the parcels
|
04/07/2023
|
04/07/2023
|
|
|
Amendment
|
$6,175.00
|
T26
|
To provide a Title Commitment on the parcels
|
04/07/2023
|
04/07/2023
|
|
|
Amendment
|
$325.00
|
PT04
|
Task assignment for PRP Title Searches
|
04/05/2023
|
04/05/2023
|
|
|
Amendment
|
$325.00
|
PT05
|
Task assignment for PRP Title Searches
|
04/05/2023
|
04/05/2023
|
|
|
Amendment
|
$325.00
|
PT06
|
Task assignment for PRP Title Searches
|
04/05/2023
|
04/05/2023
|
|
|
Amendment
|
$325.00
|
T23
|
To provide a Title Commitment on the parcels
|
04/03/2023
|
04/03/2023
|
|
|
Amendment
|
$650.00
|
T24
|
To provide a Title Commitment on the parcels
|
04/03/2023
|
04/03/2023
|
|
|
Amendment
|
$1,625.00
|
T20
|
To provide a Title Commitment on the parcels
|
03/31/2023
|
03/31/2023
|
|
|
Amendment
|
$6,000.00
|
T1CO1
|
Adding additional funding and removing language
|
03/31/2023
|
03/31/2023
|
|
|
Amendment
|
$6,500.00
|
T21
|
To provide a Title Commitment on the parcels
|
03/31/2023
|
03/31/2023
|
|
|
Amendment
|
$325.00
|
T22
|
To provide a Title Commitment on the parcels
|
03/31/2023
|
03/31/2023
|
|
|
Amendment
|
$0.00
|
T18CO1
|
Time Extension
|
03/28/2023
|
03/28/2023
|
|
|
Amendment
|
$975.00
|
T19
|
To provide a Title Commitment on the parcels
|
03/23/2023
|
03/23/2023
|
|
|
Amendment
|
$2,600.00
|
T18
|
To provide a Title Commitment on the parcels
|
03/16/2023
|
03/16/2023
|
|
|
Amendment
|
$2,275.00
|
T17
|
To provide a Title Commitment on the parcels
|
03/09/2023
|
03/09/2023
|
|
|
Amendment
|
$225.00
|
T16
|
To provide an updated Title Commitment on the parcels
|
03/08/2023
|
03/08/2023
|
|
|
Amendment
|
$0.00
|
T15CO1
|
Time Extension
|
02/27/2023
|
02/27/2023
|
|
|
Amendment
|
$325.00
|
T15
|
To provide a Title Commitment on the parcels
|
02/03/2023
|
02/03/2023
|
|
|
Amendment
|
$325.00
|
T14
|
To provide a Title Commitment on the parcels
|
01/25/2023
|
01/25/2023
|
|
|
Amendment
|
$25.00
|
T11
|
To provide an updated Title Commitment on the parcels
|
01/05/2023
|
01/05/2023
|
|
|
Amendment
|
$325.00
|
T12
|
To provide a Title Commitment on the parcels
|
01/05/2023
|
01/05/2023
|
|
|
Amendment
|
$325.00
|
T13
|
To provide a Title Commitment on the parcels
|
01/04/2023
|
01/04/2023
|
|
|
Amendment
|
$5,525.00
|
T10
|
To provide a Title Commitment on the parcels
|
12/21/2022
|
12/21/2022
|
|
|
Amendment
|
$225.00
|
T8
|
To provide an updated Title Commitment on the parcels
|
12/19/2022
|
12/19/2022
|
|
|
Amendment
|
$325.00
|
T9
|
To provide a Title Commitment on the parcels
|
12/19/2022
|
12/19/2022
|
|
|
Amendment
|
$0.00
|
T6CO1
|
Time Extension
|
12/15/2022
|
12/15/2022
|
|
|
Amendment
|
$325.00
|
T7
|
To provide an updated Title Commitment on the parcels
|
12/01/2022
|
12/01/2022
|
|
|
Amendment
|
$325.00
|
PT02
|
Task assignment for PRP Title Searches
|
12/01/2022
|
12/01/2022
|
|
|
Amendment
|
$325.00
|
PT03
|
Task assignment for PRP Title Searches
|
12/01/2022
|
12/01/2022
|
|
|
Amendment
|
$1,625.00
|
T6
|
To provide a Title Commitment on the parcels
|
11/28/2022
|
11/28/2022
|
|
|
Amendment
|
$0.00
|
T3CO1
|
Time Extension
|
11/22/2022
|
11/22/2022
|
|
|
Amendment
|
$325.00
|
PT01
|
Task assignment for PRP Title Searches
|
11/17/2022
|
11/17/2022
|
|
|
Amendment
|
$25.00
|
T4
|
To provide an updated Title Commitment on the parcels
|
11/14/2022
|
11/14/2022
|
|
|
Amendment
|
$3,250.00
|
T5
|
To provide a Title Commitment on the parcels
|
11/10/2022
|
11/10/2022
|
|
|
Amendment
|
$25.00
|
T3
|
To provide an updated Title Commitment on the parcels
|
11/02/2022
|
11/02/2022
|
|
|
Amendment
|
$5,500.00
|
T1
|
To record Deeds and/or documents
|
11/01/2022
|
11/01/2022
|
|
|
Amendment
|
$325.00
|
T2
|
To provide a Title Commitment on the parcels
|
10/31/2022
|
10/31/2022
|
|
|
Amendment
|
$0.00
|
CMC1
|
Contract Manager Change
|
10/12/2022
|
10/12/2022
|
|