Recycling services
|
Task 12-1: Osborne Reef Tire Abatement (July 6, 2016 through October 30,2016). Deliverables: 1) Rec...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 12-1: Osborne Reef Tire Abatement (July 6, 2016 through October 30,2016). Deliverables: 1) Recovery of 3,000 tires from the osborne reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and description of reef protection & restoration achieved. |
| Deliverable Price: $47,040.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: T12 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 12-2: Osborne Reef Tire Abatement (July 6, 2016 through October 30,2016). Deliverables: 1) Re...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 12-2: Osborne Reef Tire Abatement (July 6, 2016 through October 30,2016). Deliverables: 1) Recovery of 3,000 tires from the osborne reef project site accompanied by weekly project evaluation report includeing daily diver productivity, recovery & transport tire quantities, tire recovery methods, and discription of reef protection & restoration achieved. |
| Deliverable Price: $47,040.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: T12 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 14, Del. 1: Task 14 - Osborne Reef Tire Abatement (September 27, 2016 through January 31, 2017...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 14, Del. 1: Task 14 - Osborne Reef Tire Abatement (September 27, 2016 through January 31, 2017). Deliverables: 1) Recovery of 3,000 tires ($15.68/tire) from the Osborne reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and description of reef protection & restoration achieved.
|
| Deliverable Price: $47,040.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: 1 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 14, Del. 2: Task 14 - Osborne Reef Tire Abatement (September 27, 2016 through January 31, 2017...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 14, Del. 2: Task 14 - Osborne Reef Tire Abatement (September 27, 2016 through January 31, 2017). Deliverables: 1) Recovery of 3,000 tires ($15.68/tire) from the Osborne reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and description of reef protection & restoration achieved.
|
| Deliverable Price: $47,040.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: 1 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 13, Del. 1: Osborne Reef Tire Abatement (August 1, 2016 through December 31,2016). Deliverable...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 13, Del. 1: Osborne Reef Tire Abatement (August 1, 2016 through December 31,2016). Deliverables: 1) Recovery of 3,000 tires from the Osborne reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and description of reef protection & restoration achieved. |
| Deliverable Price: $47,040.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: task 13 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 13, Del. 2: Osborne Reef Tire Abatement (August 1, 2016 through December 31,2016). Deliverabl...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 13, Del. 2: Osborne Reef Tire Abatement (August 1, 2016 through December 31,2016). Deliverables: 1) Recovery of 3,000 tires from the Osborne reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and description of reef protection & restoration achieved. |
| Deliverable Price: $47,040.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: task 13 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 11-1: Osborne Reef Tire Abatement (June 6, 2016 through September 30,2016). Deliverables: 1)...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 11-1: Osborne Reef Tire Abatement (June 6, 2016 through September 30,2016). Deliverables: 1) Recovery of 3,000 tires from the osborne reef project site accompanied by weekly project evaluation report includeing daily diver productivity, recovery & transport tire quantities, tire recovery methods, and discription of reef protection & restoration achieved. |
| Deliverable Price: $47,040.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: Task 11 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 8, DEL 1: Osborne Reef Tire Abatement (February 16, 2016 through March 31, 2016). Deliverables...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 8, DEL 1: Osborne Reef Tire Abatement (February 16, 2016 through March 31, 2016). Deliverables: 1) Recovery of 3,000 tires from the Osborne reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and description of reef protection & restoration achieved. |
| Deliverable Price: $47,040.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: T8 - 1 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 8, DEL 2: Osborne Reef Tire Abatement (February 16, 2016 through March 31, 2016). Deliverables...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 8, DEL 2: Osborne Reef Tire Abatement (February 16, 2016 through March 31, 2016). Deliverables: 1) Recovery of 3,000 tires from the Osborne reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and description of reef protection & restoration achieved. |
| Deliverable Price: $47,040.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: T8, DEL 2 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 3: Task 3 - Osborne Reef Tire Abatement (June 27, 2015 through September 30, 2015). Deliverabl...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: Task 3 - Osborne Reef Tire Abatement (June 27, 2015 through September 30, 2015). Deliverables: 1) Recovery of 1,000 tires from the osborne reef project site accompanied by weekly project evaluation report includeing daily diver productivity, recovery & transport tire quantities, tire recovery methods, and discription of reef protection & restoration achieved $15,680.00
|
| Deliverable Price: $15,680.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: TA3 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 3: Task 3 - Osborne Reef Tire Abatement (June 27, 2015 through September 30, 2015). Deliverabl...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: Task 3 - Osborne Reef Tire Abatement (June 27, 2015 through September 30, 2015). Deliverables: 1) Recovery of 1,000 tires from the osborne reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and description of reef protection & restoration achieved $15,680.00
|
| Deliverable Price: $15,680.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: TA3 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 3: Task 3 - Osborne Reef Tire Abatement (June 27, 2015 through September 30, 2015). Deliverabl...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: Task 3 - Osborne Reef Tire Abatement (June 27, 2015 through September 30, 2015). Deliverables: 1) Recovery of 1,000 tires from the osborne reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and description of reef protection & restoration achieved $15,680.00
|
| Deliverable Price: $15,680.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: TA3 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 3: Task 3 - Osborne Reef Tire Abatement (June 27, 2015 through September 30, 2015). Deliverabl...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: Task 3 - Osborne Reef Tire Abatement (June 27, 2015 through September 30, 2015). Deliverables: 1) Recovery of 1,000 tires from the osborne reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and description of reef protection & restoration achieved $15,680.00
|
| Deliverable Price: $15,680.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: TA3 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 3: Task 3 - Osborne Reef Tire Abatement (June 27, 2015 through September 30, 2015). Deliverabl...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 3: Task 3 - Osborne Reef Tire Abatement (June 27, 2015 through September 30, 2015). Deliverables: 1) Recovery of 1,000 tires from the osborne reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and description of reef protection & restoration achieved $15,680.00
|
| Deliverable Price: $15,680.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: TA3 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 5: Task 5 - Osborne Reef Tire Abatement (August 10, 2015 through October 31, 2015). Deliverabl...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 5: Task 5 - Osborne Reef Tire Abatement (August 10, 2015 through October 31, 2015). Deliverables: 1) Recovery of 3,000 tires from the Osborne reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and description of reef protection & restoration achieved.
|
| Deliverable Price: $47,040.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: T5 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 5: Task 5 - Osborne Reef Tire Abatement (August 10, 2015 through October 31, 2015). Deliverabl...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 5: Task 5 - Osborne Reef Tire Abatement (August 10, 2015 through October 31, 2015). Deliverables: 1) Recovery of 3,000 tires from the Osborne reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and description of reef protection & restoration achieved.
|
| Deliverable Price: $47,040.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: T5 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 1 - Osborne Reef Pilot Abatement (May 1, 2015 through December 31, 2015). Deliverables: 1) Perm...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 1 - Osborne Reef Pilot Abatement (May 1, 2015 through December 31, 2015). Deliverables: 1) Permits and licenses needed for the project.
2) Recovered tires from Osborne Reef project site evidenced by the project evaluation report evaluating diver productivity, recovery & transport techniques, tire recovery, transport and processing costs, and level of reef protection & restoration achieved. |
| Deliverable Price: $111,680.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: Task Assignment 1 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 2 - Osborne Reef Tire Abatement (May 18, 2015 through July 31, 2015). Deliverables: 1) Recovery...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 2 - Osborne Reef Tire Abatement (May 18, 2015 through July 31, 2015). Deliverables: 1) Recovery of 1,000 tires from the osborne reef project site accompanied by weekly project evaluation report includeing daily diver productivity, recovery & transport tire quantities, tire recovery methods, and discription of reef protection & restoration achieved.
|
| Deliverable Price: $15,680.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: Task Assignment 2 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 2 - Osborne Reef Tire Abatement (May 18, 2015 through July 31, 2015). Deliverables: 1) Recovery...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 2 - Osborne Reef Tire Abatement (May 18, 2015 through July 31, 2015). Deliverables: 1) Recovery of 1,000 tires from the osborne reef project site accompanied by weekly project evaluation report includeing daily diver productivity, recovery & transport tire quantities, tire recovery methods, and discription of reef protection & restoration achieved.
|
| Deliverable Price: $15,680.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: Task Assignment 2 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 2 - Osborne Reef Tire Abatement (May 18, 2015 through July 31, 2015). Deliverables: 1) Recovery...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 2 - Osborne Reef Tire Abatement (May 18, 2015 through July 31, 2015). Deliverables: 1) Recovery of 1,000 tires from the osborne reef project site accompanied by weekly project evaluation report includeing daily diver productivity, recovery & transport tire quantities, tire recovery methods, and discription of reef protection & restoration achieved.
|
| Deliverable Price: $15,680.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: Task Assignment 2 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 2 - Osborne Reef Tire Abatement (May 18, 2015 through July 31, 2015). Deliverables: 1) Recovery...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 2 - Osborne Reef Tire Abatement (May 18, 2015 through July 31, 2015). Deliverables: 1) Recovery of 1,000 tires from the osborne reef project site accompanied by weekly project evaluation report includeing daily diver productivity, recovery & transport tire quantities, tire recovery methods, and discription of reef protection & restoration achieved.
|
| Deliverable Price: $15,680.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: Task Assignment 2 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 2 - Osborne Reef Tire Abatement (May 18, 2015 through July 31, 2015). Deliverables: 1) Recovery...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 2 - Osborne Reef Tire Abatement (May 18, 2015 through July 31, 2015). Deliverables: 1) Recovery of 1,000 tires from the osborne reef project site accompanied by weekly project evaluation report includeing daily diver productivity, recovery & transport tire quantities, tire recovery methods, and discription of reef protection & restoration achieved.
|
| Deliverable Price: $15,680.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: Task Assignment 2 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 2 - Osborne Reef Tire Abatement (May 18, 2015 through July 31, 2015). Deliverables: 1) Recovery...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 2 - Osborne Reef Tire Abatement (May 18, 2015 through July 31, 2015). Deliverables: 1) Recovery of 1,000 tires from the osborne reef project site accompanied by weekly project evaluation report includeing daily diver productivity, recovery & transport tire quantities, tire recovery methods, and discription of reef protection & restoration achieved.
|
| Deliverable Price: $15,680.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: Task Assignment 2 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 6: Task 6 - Osborne Reef Tire Abatement (September 1, 2015 through December 31, 2015). Deliver...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 6: Task 6 - Osborne Reef Tire Abatement (September 1, 2015 through December 31, 2015). Deliverables: 1) Recovery of 3,000 tires from the osborne reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and description of reef protection & restoration achieved. CO1 - Additional task time.
|
| Deliverable Price: $47,040.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: T6CO1 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 9: Osborne Reef Tire Abatement (March 15, 2016 through June30,2016). Deliverables: 1) Recover...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 9: Osborne Reef Tire Abatement (March 15, 2016 through June30,2016). Deliverables: 1) Recovery of 6,000 tires from the osborne reef project site accompanied by weekly project evaluation report includeing daily diver productivity, recovery & transport tire quantities, tire recovery methods, and discription of reef protection & restoration achieved. |
| Deliverable Price: $94,080.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: T9 |
| Deliverable Number: |
|