Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
Recycling services
|
Task 3 - Osborne Reef Tire Abatement (July 6, 2017 through December 31, 2017). Deliverables: 1) Rec...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 3 - Osborne Reef Tire Abatement (July 6, 2017 through December 31, 2017). Deliverables: 1) Recovery of 15,296 tires from the osborne reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and discription of reef protection & restoration achieved. The Department shall pay the Contractor for the number of tires up to 15,296 @ $17.80 per tire removed from the salvage area.
|
| Deliverable Price: $272,268.80 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: Task Assignment 3 SW238-3 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 1: Osborne Reef Tire Abatement (February 27, 2017 through May 31, 2017). Deliverables: 1) Mob...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 1: Osborne Reef Tire Abatement (February 27, 2017 through May 31, 2017). Deliverables: 1) Mobilization activites and recovery of 10,000 tires from the osborne reef project site accompanied by weekly project evaluation report includeing daily diver productivity, recovery & transport tire quantities, tire recovery methods, and discription of reef protection & restoration achieved.
|
| Deliverable Price: $218,000.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: Task Assignment 1 SW238-1 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Contractor shall provide the services specified in the Scope (“Work”). Department shall authorize al...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Contractor shall provide the services specified in the Scope (“Work”). Department shall authorize all work assignments by Task Assignment As consideration for the services rendered by Contractor under the terms of this Contract, the Department shall pay the Contractor on a combination fee schedule/fixed price basis up to a maximum of $814,000 for the completion of The Contractor shall provide all materials, labor, and equipment necessary to perform submerged waste tire retrieval and disposal services in support of the Department’s Osborne Reef Restoration Project (“Project”). The Contractor shall remove, transport and load the tires on trucks at Port Everglades(Port), as specified in the contract. The Scope of Work provides the minimum services the Department is seeking. The specific Tasks, Deliverables, Performance Measures, Budget and Deliverable due dates will be included in each issued Task Assignment.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: Original Contract |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 2: Task 2 - Osborne Reef Tire Abatement (March 23, 2017 through July 31, 2017). Deliverables: ...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 2: Task 2 - Osborne Reef Tire Abatement (March 23, 2017 through July 31, 2017). Deliverables: 1) Recovery of 15,000 tires from the osborne reef project site accompanied by weekly project evaluation report includeing daily diver productivity, recovery & transport tire quantities, tire recovery methods, and discription of reef protection & restoration achieved.
|
| Deliverable Price: $267,000.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: Task Assignment 2 SW238-2 (Attached) |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 4------------------Task 4 - Osborne Reef Tire Abatement (August 28, 2017 through March 31, 201...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 4------------------Task 4 - Osborne Reef Tire Abatement (August 28, 2017 through March 31, 2018). Deliverables: 1) Recovery of 15,000 tires from the osborne reef project site accompanied by weekly project evaluation report includeing daily diver productivity, recovery & transport tire quantities, tire recovery methods, and discription of reef protection & restoration achieved.
|
| Deliverable Price: $267,000.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: Task Assignment 4 SW238-4 (Attached) |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 8 - Osborne Reef Tire Abatement (August 6, 2018 through November 30, 2018). Deliverables: 1) R...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 8 - Osborne Reef Tire Abatement (August 6, 2018 through November 30, 2018). Deliverables: 1) Recovery of 15,000 tires from the Osborne Reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and discription of reef protection & restoration achieved. $17.80 per tire not to exceed $267,000.00. Deliverable 2) Mobilization of equipment to site, lump sum not to exceed $10,000.
|
| Deliverable Price: $277,000.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: Task Assignment 8 SW238-8 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 5 - Osborne Reef Tire Abatement (November 16, 2017 through March 31, 2018). Deliverables: 1) R...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 5 - Osborne Reef Tire Abatement (November 16, 2017 through March 31, 2018). Deliverables: 1) Recovery of 15,000 tires from the osborne reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and description of reef protection & restoration achieved. $17.80 per tire not to exceed $267,000.00.
|
| Deliverable Price: $267,000.00 |
| Non Price Justification: |
| Performance Metrics: A review of all supporting documentation and deliverables will be conducted to assure that 15,000 tires are recovered and deposited into transport containers for transport.
|
| Financial Consequences: No payment will be made for deliverables deemed unsatisfactory by Department. In the event that a deliverable is deemed unsatisfactory by the department, the Contractor shall re-perform the services needed for submittal of a satisfactory deliverable, at no additional cost to the Department, within thirty (30) days of being notified of the unsatisfactory deliverable.
|
| Source Documentation Page Reference: Task Assignment 5 SW238-5 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 6 - Osborne Reef Tire Abatement (March 6, 2018 through July 31, 2018). Deliverables: 1) Recove...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 6 - Osborne Reef Tire Abatement (March 6, 2018 through July 31, 2018). Deliverables: 1) Recovery of 14,813 tires from the Osborne Reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and description of reef protection & restoration achieved. $18.02 per tire not to exceed $266,930.26.
|
| Deliverable Price: $266,930.26 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: Task Assignment 6 SW238-6 (Attached) |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 7: Task 7 - Osborne Reef Tire Abatement (May 23, 2018 through September 30, 2018). Deliverabl...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 7: Task 7 - Osborne Reef Tire Abatement (May 23, 2018 through September 30, 2018). Deliverables: 1) Recovery of 15,000 tires from the Osborne Reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and discription of reef protection & restoration achieved. $18.02 per tire not to exceed $270,300.00.
|
| Deliverable Price: $270,300.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: Task Assignment 7 SW238-7 (Attached) |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 9: Osborne Reef Tire Abatement (September 4, 2018 through December 31, 2018). Deliverables: 1) ...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 9: Osborne Reef Tire Abatement (September 4, 2018 through December 31, 2018). Deliverables: 1) Recovery of 15,000 tires from the Osborne Reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and discription of reef protection & restoration achieved. $17.80 per tire not to exceed $267,000.00.
|
| Deliverable Price: $267,000.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 10: Task 10 - Osborne Reef Tire Abatement (November 15, 2018 through April 30, 2019). Deliverab...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 10: Task 10 - Osborne Reef Tire Abatement (November 15, 2018 through April 30, 2019). Deliverables: 1) Recovery of 15,000 tires from the Osborne Reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and discription of reef protection & restoration achieved. $17.80 per tire not to exceed $267,000.00.
|
| Deliverable Price: $267,000.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: Task Assignment 10 SW238-10 (Attached) |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 11: - Osborne Reef Tire Abatement (Janary 17, 2019 through June 30, 2019). Deliverables: 1) Rec...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 11: - Osborne Reef Tire Abatement (Janary 17, 2019 through June 30, 2019). Deliverables: 1) Recovery of 10,621 tires from the Osborne Reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and discription of reef protection & restoration achieved. $17.80 per tire not to exceed $189,053.80.
|
| Deliverable Price: $189,053.80 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 12: Task 12 - Osborne Reef Tire Abatement (September 3, 2019 through December 31, 2019). Delive...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 12: Task 12 - Osborne Reef Tire Abatement (September 3, 2019 through December 31, 2019). Deliverables: 1) Recovery of 15,000 tires from the Osborne Reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and description of reef protection & restoration achieved. Task 12 is for the retrieval of 15,000 tires at $17.80 per tire not to exceed $267,000.00 and one mobilization @ $10,000 for estimated total cost not to exceed $277,000.00. |
| Deliverable Price: $277,000.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: Task Assignment 12 SW238-12 (Attached) |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 13 - Osborne Reef Tire Abatement (November 19, 2019 through January 31, 2020). Deliverables: 1)...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 13 - Osborne Reef Tire Abatement (November 19, 2019 through January 31, 2020). Deliverables: 1) Recovery of 15,000 tires from the Osborne Reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and description of reef protection & restoration achieved. $17.80 per tire not to exceed $267,000.00
|
| Deliverable Price: $267,000.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: Task Assignment 113SW238-13 (Attached) |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 14: Osborne Reef Tire Abatement (January 28, 2020 through May 31, 2020). Deliverables: 1) Recov...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Task 14: Osborne Reef Tire Abatement (January 28, 2020 through May 31, 2020). Deliverables: 1) Recovery of 15,000 tires from the Osborne Reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and description of reef protection & restoration achieved. $17.80 per tire not to exceed $267,000.00.
|
| Deliverable Price: $267,000.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: T14 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 15 - Osborne Reef Tire Abatement (March 30, 2020 through July 31, 2020). Deliverables: 1) Recov...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 15 - Osborne Reef Tire Abatement (March 30, 2020 through July 31, 2020). Deliverables: 1) Recovery of 15,000 tires from the Osborne Reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and description of reef protection & restoration achieved. $18.02 per tire not to exceed $270,300.00
|
| Deliverable Price: $270,300.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: Task Assignment SW238-15 (Attached) |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 16 - Osborne Reef Tire Abatement (June 10, 2020 through October 31, 2020). Deliverables: 1) Rec...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 16 - Osborne Reef Tire Abatement (June 10, 2020 through October 31, 2020). Deliverables: 1) Recovery of 15,000 tires from the Osborne Reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and description of reef protection & restoration achieved. Retrieve 15,000.00 tires@ $18.02 per tire. |
| Deliverable Price: $270,300.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Recycling services
|
"Task 17 - Osborne Reef Tire Abatement (July 16, 2020 through November 30, 2020). Deliverables: 1) R...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: "Task 17 - Osborne Reef Tire Abatement (July 16, 2020 through November 30, 2020). Deliverables: 1) Recovery of 15,000 tires from the Osborne Reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and description of reef protection & restoration achieved. RETRIEVAL COST PER TIRE $18.02
RETRIEVAL 15,000 TIRES
@ $18.02 A TIRE $270,300.00.Task not to exceed $270,300.00"
|
| Deliverable Price: $270,300.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: Task Assignment SW238-17 (Attached) |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 18: Osborne Reef Tire Abatement (August 20, 2020 through December 31, 2020). Deliverables: 1) R...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 18: Osborne Reef Tire Abatement (August 20, 2020 through December 31, 2020). Deliverables: 1) Recovery of 15,000 tires from the Osborne Reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and description of reef protection & restoration achieved. $18.02 per tire. Cost not to exceed $270,300.00. |
| Deliverable Price: $270,300.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: T18 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 19 - Osborne Reef Tire Abatement (October 29, 2020 through March 31, 2021). Deliverables: 1) Re...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 19 - Osborne Reef Tire Abatement (October 29, 2020 through March 31, 2021). Deliverables: 1) Recovery of 15,000 tires from the Osborne Reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and description of reef protection & restoration achieved. $18.02 per tire not to exceed $270,300.00
Task 19 Change orderDeliverables: 1) Recovery an aditional 1,495 tires from the Osborne Reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and description of reef protection & restoration achieved. $18.02 per tire not to exceed $297,239.90 |
| Deliverable Price: $297,239.90 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: SW238-19 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 20 - Osborne Reef Tire Abatement (April 12, 2021 through July 31, 2021). Deliverables: 1) Recov...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 20 - Osborne Reef Tire Abatement (April 12, 2021 through July 31, 2021). Deliverables: 1) Recovery of 15,000 tires from the Osborne Reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and description of reef protection & restoration achieved. $18.38 per tire not to exceed $275,700.00. CO1: Time extension. |
| Deliverable Price: $275,700.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed. |
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract. |
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 21: Osborne Reef Tire Abatement (August 3, 2021 through March 31, 2022) - Recovery of 15,000 ti...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 21: Osborne Reef Tire Abatement (August 3, 2021 through March 31, 2022) - Recovery of 15,000 tires from the Osborne Reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and description of reef protection & restoration achieved. $18.38 per tire not to exceed $275,700.00.
|
| Deliverable Price: $275,700.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: T21 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 23 - Osborne Reef Tire Abatement (May 17, 2022 through October 31, 2022). Deliverables: 1) One ...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 23 - Osborne Reef Tire Abatement (May 17, 2022 through October 31, 2022). Deliverables: 1) One mobilization and the recovery of 15,000 tires from the Osborne Reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and description of reef protection & restoration achieved. $18.75 per tire not to exceed $291,250.00
|
| Deliverable Price: $291,250.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: T23 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 22 - Osborne Reef Tire Abatement (October 5, 2021 through September 29, 2022). Deliverables: 1)...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 22 - Osborne Reef Tire Abatement (October 5, 2021 through September 29, 2022). Deliverables: 1) Recovery of 15,000 tires from the Osborne Reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and description of reef protection & restoration achieved. $18.38 per tire not to exceed $275,700.00
CO1: Task time extension. |
| Deliverable Price: $275,700.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Recycling services
|
Task 24 - Osborne Reef Tire Abatement (September 6, 2022 through February 16, 2023). Deliverables: 1...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 24 - Osborne Reef Tire Abatement (September 6, 2022 through February 16, 2023). Deliverables: 1) The recovery of 15,000 tires from the Osborne Reef project site accompanied by weekly project evaluation report including daily diver productivity, recovery & transport tire quantities, tire recovery methods, and description of reef protection & restoration achieved. $18.75 per tire not to exceed $281,250.00.
|
| Deliverable Price: $281,250.00 |
| Non Price Justification: |
| Performance Metrics: All work must be in accordance to the Contract, and the terms and conditions referenced in the Task Assignment. The Contractor represents that its services shall be performed in a manner consistent under similar circumstances at the time the services are performed.
|
| Financial Consequences: Failure to implement any of the terms and conditions of this Task Assignment shall be considered a breach of contract and shall subject the Contractor to cancellation of this Task Assignment, loss of payment, or termination of the Contract.
|
| Source Documentation Page Reference: T24 |