| More |
Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
Environmental advisory services
|
Task 1: Draft summary reports; meeting documentation; final reports; calibrated model (HSPF, EFDC an...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 1: Draft summary reports; meeting documentation; final reports; calibrated model (HSPF, EFDC and WASP) applications; summary of model loading outputs; responses to stakeholder comments; meeting notes; public workshop notes and powerpoint presentations; on-site WASP model training; model input data and data used in model calibration and validation. Salaries: Senior Project Manager $160.14,Senior Program Manager $219.49, Program Manager $189.85, Project Manager $132.02, Senior Modeler $157.28, Junior Modeler $110.61, GIS Specialist $88.21, Administrative Assistant $59.52; Subcontractor handling fee=5%; Reimbursement for travel not to exceed $7,335. The Department shall pay the Contractor on a cost reimbursement plus fixed fee basis not to exceed $313,452.56.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in executed task assignments and contract scope of services. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: T1 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task 2: Draft summary reports; summary of site visit; functioning public domain versions of models; ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 2: Draft summary reports; summary of site visit; functioning public domain versions of models; calibrated model (PD EFDC, DS-EFDC, and HSPF) applications, summary of model loading outputs; materials referenced in summary reports; model input data and data used in model calibration and validation; HSPF and EFDC input files and model executable; meeting summaries; final report; fully functioning copies of the calibrated/validated (hydrology and water quality) HSPF and EFDC models. Hourly rates not to exceed: Senior Project Manager $160.14, Program Manager (1) $189.85, Senior Prog. Manager (2) $219.49, Proj. Manager (2) $132.02, Senior Modeler (2) $157.28, Junior Modeler (2)$110.61, GIS Specialist (2) $88.21, & Administrative Assistant $59.52 . Subcontractor handling fee=5%. Travel expenses not to exceed $16580. Total Task Assignment Value not to exceed $565,047.00; CO1: Time Extension
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in executed task assignments and contract scope of services.
|
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform.
|
| Source Documentation Page Reference: TA2 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task 11: Draft summary reports; meeting documentation; final reports; calibrated model (HSPF, EFDC a...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 11: Draft summary reports; meeting documentation; final reports; calibrated model (HSPF, EFDC and WASP) applications; summary of model loading outputs; responses to stakeholder comments; meeting notes; public workshop notes and powerpoint presentations; on-site WASP model training; model input data and data used in model calibration and validation. Salaries: Senior Project Manager $160.14, Senior Program Manager $219.49, Program Manager $189.85, Project Manager $132.02, Senior Modeler $157.28, Junior Modeler $110.61, GIS Specialist $88.21, Administrative Assistant $59.52; Reimbursement for travel not to exceed $7,335. A maximum subcontractor handling fee of five percent (5%) shall be allowed. The Department shall pay the Contractor on a cost reimbursement plus fixed fee basis not to exceed $94,005.37.Task11CO1:Revised rates in major deliverable description (rate table provided with Attachment D - Task Assignment Notification Form).
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in executed task assignments and contract scope of services. |
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform. |
| Source Documentation Page Reference: T11 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task 17------------------Priority scenario plots and statistics; model run scenario results; clippin...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 17------------------Priority scenario plots and statistics; model run scenario results; clipping and recalibrating results, recalibrated clipped model; revised plots and statistics; summary memos; final clipped model finals; finaly memos; written meeting summaries. Hourly rates- Senior Project Manager $160.14, Senior Program Manager $219.49, Associate Program Manager $175.22, Senior Modeler $157.28, Junior Modeler $110.61, Project Manager $189.85, Project Manager $132.02,Administrative Assistant $59.52. Subcontractor Handling Fee 5%. Total Task Assignment Value not to exceed $68,906.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in executed task assignments and contract scope of services.
|
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform.
|
| Source Documentation Page Reference: T17 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task 12: "Draft summary reports; meeting documentation; final reports; calibrated model (HSPF, EFDC ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 12: "Draft summary reports; meeting documentation; final reports; calibrated model (HSPF, EFDC and WASP) applications; summary of model loading outputs; responses to stakeholder comments; meeting notes; public workshop notes and powerpoint presentations; on-site WASP model training; model input data and data used in model calibration and validation. AMEC Salaries: Senior Project Manager $160.14, Senior Program Manager $219.49, Program Manager $195.72, Project Manager $134.98, Senior Modeler $157.28, Junior Modeler $110.61, GIS Specialist $88.21, Administrative Assistant $59.52; Reimbursement for travel not to exceed $7,335. The Department shall pay the Contractor on a cost reimbursement plus fixed fee basis not to exceed $25,769.81" Task12CO2:Revised rates in major deliverable description (rate table provided with Attachment D - Task Assignment Notification Form).
|
| Deliverable Price: $25,769.81 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in executed task assignments and contract scope of services.
|
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform.
|
| Source Documentation Page Reference: WQ019 Task 12CO2 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task 3: Draft Technical Reports; Draft Model Outputs and Analysis for TMDLS and/or SSACS; Draft Meet...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 3: Draft Technical Reports; Draft Model Outputs and Analysis for TMDLS and/or SSACS; Draft Meeting Presentations and Draft Issue Papers; Draft Meeting Notes; Drafts of Adoptable and Supporting Documents; Email Documentation for Teleconferences; Memos; Project Load Reduction Calculations. Personnel Titles (Amec Foster Wheeler) : Principal/Manager $245.06, Senior Program Manager, Program Manager $195.72, Associate Program Manager $175.22, Senior Project Manager $160.14, Project Manager $134.98, Administrative Assistant $59.52, Senior Engineer III $184.44, Senior Engineer II $147.27, Senior Engineer I $124.31, Engineer II $107.02, Engineer I $80.28, Senior Scientist III $148.81, Senior Scientist II $123.04, Senior Scientist I $104.22, Scientist II $99.48, Scientist I $81.11, Modeler II $171.71, Modeler I $111.90, GIS Specialist $84.46, Field Technician $54.67. Personnel Title (Tetra Tech): Principal/Manager $249.05, Senior Program Manager $221.95, Program Manager $189.85, Associate Program Manager $179.79, Senior Project Manager $152.94, Project Manager $132.02, Senior Engineer III $183.67, Senior Engineer II $147.46, Senior Engineer I $124.52, Engineer II $103.91, Engineer I $85.11, Senior Scientist III $145.38, Senior Scientist II $115.92, Senior Scientist I $100.45, Scientist II $90.83, Scientist I $71.22 Administrative Assistant $56.03, Senior Modeler $157.28, Junior Modeler $110.61, GIS Specialist $88.21. Personnel $179,038, Subcontractor Handling Fee $924, Reimbursable travel not to exceed $3,500, and other expenses not to exceed $3,500. Total Task Assignment Value not to exceed $186,962.00. CO1 Time Extension. CO2 Time Extension. CO3: Increase in task amount, total task assignment not to exceed $351,355.00.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in executed task assignments and contract scope of services.
|
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform.
|
| Source Documentation Page Reference: TA3, CO3 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task 4: Draft Technical Reports; Draft Model Outputs and Analysis for TMDLS and/or SSACS; Draft Meet...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 4: Draft Technical Reports; Draft Model Outputs and Analysis for TMDLS and/or SSACS; Draft Meeting Presentations and Draft Issue Papers; Draft Meeting Notes; Drafts of Adoptable and Supporting Documents; Email Documentation for Teleconferences; Memos; Project Load Reduction Calculations. Hourly rates - Principal/Manager $245.06, Senior Program Manager $219.49, Associate Program Manager $175.22, Senior Project Manager $160.14, Senior Engineer II $147.46, Project Manager $134.98, Senior Engineer I $124.31, Senior Scientist II $123.04, Senior Scientist I $104.22, Engineer I $80.28, GIS Specialist $84.46, Admin Assistant $59.52, Project Manager (Tetra Tech) $132.02. Subcontractor Handling Fee 5%. Total Task Assignment Value not to exceed $182,793.00; CO1 Time Extension; CO2 Time Extension.CO3: Time Extension.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in executed task assignments and contract scope of services.
|
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform.
|
| Source Documentation Page Reference: TA4 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task 5: Draft Technical Reports; Draft Model Outputs and Analysis for TMDLS and/or SSACS; Draft Meet...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 5: Draft Technical Reports; Draft Model Outputs and Analysis for TMDLS and/or SSACS; Draft Meeting Presentations and Draft Issue Papers; Draft Meeting Notes; Drafts of Adoptable and Supporting Documents; Email Documentation for Teleconferences; Memos; Project Load Reduction Calculations. Personnel Titles (Amec Foster Wheeler) : Principal/Manager $245.06, Senior Program Manager, Program Manager $219.49, Associate Program Manager $175.22, Senior Project Manager $160.14, Project Manager $134.98, Administrative Assistant $59.52, Senior Engineer I $124.31, Engineer I $80.28, Senior Scientist II $123.04, Senior Scientist I $104.22, GIS Specialist $84.46, Project Manager (Tetra Tech) $132.02; Subcontractor Handling Fee 5% - $2,112; Reimbursable: travel $8,500 and Other Expenses $8,500. Total Task Assignment Value not to exceed $422,837.00; CO1 Time Extension; CO2: Additional task time;CO3:Time Extension.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in executed task assignments and contract scope of services.
|
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform.
|
| Source Documentation Page Reference: TA5 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task 7: Draft Technical Reports; Draft Model Outputs and Analysis for TMDLS and/or SSACS; Draft Meet...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 7: Draft Technical Reports; Draft Model Outputs and Analysis for TMDLS and/or SSACS; Draft Meeting Presentations and Draft Issue Papers; Draft Meeting Notes; Drafts of Adoptable and Supporting Documents; Email Documentation for Teleconferences; Memos; Project Load Reduction Calculations. Hourly rates- Principal/Manager $245.06, Senior Program Manager $219.49, Associate Program Manager $175.22, Senior Project Manager $160.14, Senior Engineer II $147.46, Project Manager $134.98, Senior Engineer I $124.31, Senior Scientist II $123.04, Senior Scientist I $104.22, Engineer I $80.28, GIS Specialist $84.46, Admin Assistant $59.52. Personnel Title (Tetra Tech): Program Manager $132.02. Total Task Assignment Value not to exceed $127,933.00.CO1: Time Extension; CO2: Time Extension.CO3: Time Extension.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in executed task assignments and contract scope of services.
|
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform.
|
| Source Documentation Page Reference: TA7 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task 6: Draft Technical Reports; Draft Model Outputs and Analysis for TMDLS and/or SSACS; Draft Meet...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 6: Draft Technical Reports; Draft Model Outputs and Analysis for TMDLS and/or SSACS; Draft Meeting Presentations and Draft Issue Papers; Draft Meeting Notes; Drafts of Adoptable and Supporting Documents; Email Documentation for Teleconferences; Memos; Project Load Reduction Calculations. Hourly rates- Principal/Manager $245.06, Senior Program Manager $219.49, Associate Program Manager $175.22, Senior Project Manager $160.14, Senior Engineer II $147.46, Project Manager $134.98, Senior Engineer I $124.31, Senior Scientist II $123.04, Senior Scientist I $104.22, Engineer I $80.28, Engineer II $107.02, GIS Specialist $84.46, Admin Assistant $59.52, Project Manager (Tetra Tech) $132.02. Personnel $141,987, Subcontractor Handling Fee $792, Reimbursable travel not to exceed $3,000 and other expenses not to exceed $3,000. Total Task Assignment Value not to exceed $148,779.00; CO1 Time Extension.CO2: Time Extension. CO3: Time Extension.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in executed task assignments and contract scope of services.
|
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform.
|
| Source Documentation Page Reference: TA6 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task 8: Draft Technical Reports; Draft Model Outputs and Analysis for TMDLS and/or SSACS; Draft Meet...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 8: Draft Technical Reports; Draft Model Outputs and Analysis for TMDLS and/or SSACS; Draft Meeting Presentations and Draft Issue Papers; Draft Meeting Notes; Drafts of Adoptable and Supporting Documents; Email Documentation for Teleconferences; Memos; Project Load Reduction Calculations. Administrative Assistant $59.52.Total Task Assignment Value not to exceed $177,526.00; CO1 Time Extension.CO2: Time Extension. CO3: Time Extension.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in executed task assignments and contract scope of services.
|
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform.
|
| Source Documentation Page Reference: TA8 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task 9: Draft Technical Reports; Draft Model Outputs and Analysis for TMDLS and/or SSACS; Draft Meet...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 9: Draft Technical Reports; Draft Model Outputs and Analysis for TMDLS and/or SSACS; Draft Meeting Presentations and Draft Issue Papers; Draft Meeting Notes; Drafts of Adoptable and Supporting Documents; Email Documentation for Teleconferences; Memos; Project Load Reduction Calculations. Hourly rates- Principal/Manager $245.06, Senior Program Manager $219.49, Associate Program Manager $175.22, Senior Project Manager $160.14, Senior Engineer II $147.46, Project Manager $134.98, Senior Engineer I $124.31, Senior Scientist II $123.04, Senior Scientist I $104.22, Engineer I $80.28, GIS Specialist $84.46, Admin Assistant $59.52, Project Manager (Tetra Tech) $132.02. See Exhibit II for additional Personnel hourly rates. Total Task Assignment Value not to exceed $548,379.00; CO1 Time Extension.CO2: Time Extension.CO3: Time Extension.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in executed task assignments and contract scope of services.
|
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform.
|
| Source Documentation Page Reference: TA9 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task 10: Draft Technical Reports; Draft Model Outputs and Analysis for TMDLS and/or SSACS; Draft Mee...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 10: Draft Technical Reports; Draft Model Outputs and Analysis for TMDLS and/or SSACS; Draft Meeting Presentations and Draft Issue Papers; Draft Meeting Notes; Drafts of Adoptable and Supporting Documents; Email Documentation for Teleconferences; Memos; Project Load Reduction Calculations. Hourly rates- Principal/Manager $245.06, Senior Program Manager $219.49, Associate Program Manager $175.22, Senior Project Manager $160.14, Senior Engineer II $147.46, Project Manager $134.98, Senior Engineer I $124.31, Senior Scientist II $123.04, Senior Scientist I $104.22, Engineer I $80.28, GIS Specialist $84.46, Admin Assistant $59.52, Project Manager (Tetra Tech) $132.02. Subcontractor Handling Fee 5%. Total Task Assignment Value not to exceed $144,484.00; CO1 Time Extension; CO2(Time Extension). CO3: Time Extension.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in executed task assignments and contract scope of services.
|
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform.
|
| Source Documentation Page Reference: TA10 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task 13: Functioning and calibrated copies of model applications (EFDC and WASP); all model input da...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 13: Functioning and calibrated copies of model applications (EFDC and WASP); all model input data and data used in model calibration; summary reports; final modeling reports; natural background scenario application; responses to stakeholder comments; public workshop notes and powerpoint presentation. AMEC Salaries: Senior Project Manager $160.14, Senior Program Manager $219.49, Program Manager $189.85, Project Manager $134.98, Senior Modeler $157.28, Junior Modeler $110.61, Administrative Assistant $59.52. Reimbursement for travel not to exceed $1,730. Task13 CO2:The Department shall pay the Contractor on a cost reimbursement plus fixed fee basis not to exceed $111,877.91.Increase in task amount $23,183.83 to continue work on Task Assignment 13.
Task13 CO3:Revised rates in major deliverable description (rate table provided with Attachment D - Task Assignment Notification Form).
CO4: Time extension.
|
| Deliverable Price: $111,877.91 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in executed task assignments and contract scope of services.
|
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform.
|
| Source Documentation Page Reference: CO4 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task 14: Draft summary reports; summary of site visit; functioning public domain versions of models;...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 14: Draft summary reports; summary of site visit; functioning public domain versions of models; calibrated model (PD EFDC, DS-EFDC, and HSPF) applications, summary of model loading outputs; materials referenced in summary reports; model input data and data used in model calibration and validation; HSPF and EFDC input files and model executables; meeting summaries; final report; fully functioning copies of the calibrated/validated (hydrology and water quality) HSPF and EFDC models. Personnel Titles (Amec Foster Wheeler) : Senior Project Manager $160.14, Senior Program Manager $219.49, Senior Engineer $124.31, Admin Assistant $59.52, Program Manager $134.98, Project Manager $132.02, Senior Modeler $157.28, Junior Modeler $110.61, GIS Specialist $88.21, Senior Scientist I $104.22, GIS Specialist $84.46, Admin Assistant $56.03; Subcontractor Handling Fee 5% - not to exceed $25,699; Reimbursable: travel and Other Expenses $16,580.00.Total Task Assignment Value not to exceed $72,225.00. CO1 - time extension; CO2 - cost increase; CO3 - revised rates; CO4: Time extension.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in executed task assignments and contract scope of services.
|
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform.
|
| Source Documentation Page Reference: CO4 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task 15-----------------------Model run scenarios/results; presentations; meeting summaries. Adminis...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 15-----------------------Model run scenarios/results; presentations; meeting summaries. Administrative Assistant $59.52. Total Task Assignment Value not to exceed $34,005.96; CO1: Time extension.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in executed task assignments and contract scope of services.
|
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task 16---------------------Draft Technical Reports; Draft Model Outputs and Analysis for RA Plans a...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 16---------------------Draft Technical Reports; Draft Model Outputs and Analysis for RA Plans and/or SSACS; Draft Meeting Presentations and Draft Issue Papers; Draft Meeting Notes; Drafts of Adoptable and Supporting Documents; Email Documentation for Teleconferences; Memos; Project Load Reduction Calculations. Hourly rates- Principal/Manager $245.06, Senior Program Manager $219.49, Associate Program Manager $175.22, Senior Project Manager $160.14, Senior Engineer II $147.46, Project Manager $134.98, Senior Engineer I $124.31, Senior Scientist II $123.04, Senior Scientist I $104.22, Engineer I $80.28, GIS Specialist $84.46, Admin Assistant $59.52. Labor Cost not to exceed $134,482, Travel not to exceed $9,000, and other expenses not to exceed $1,000. Total Task Assignment Value not to exceed $144,482. CO1: Time extension.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in executed task assignments and contract scope of services.
|
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task 18 del: Draft Technical Reports; Draft Model Outputs and Analysis for TMDLS and/or SSACS; Draft...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 18 del: Draft Technical Reports; Draft Model Outputs and Analysis for TMDLS and/or SSACS; Draft Meeting Presentations and Draft Issue Papers; Draft Meeting Notes; Drafts of Adoptable and Supporting Documents; Email Documentation for Teleconferences; Memos; Project Load Reduction Calculations. Hourly rates- Principal/Manager $245.06, Senior Program Manager $219.49, Associate Program Manager $175.22, Senior Project Manager $160.14, Senior Engineer II $147.46, Project Manager $134.98, Senior Engineer I $124.31, Senior Scientist II $123.04, Senior Scientist I $104.22, Engineer I $80.28, GIS Specialist $84.46, Admin Assistant $59.52, Project Manager (Tetra Tech) $132.02. CO1: Time extension.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in executed task assignments and contract scope of services.
|
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task 19 del: Coordination meetings (DEP, water management district), stakeholder meetings, general t...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: Task 19 del: Coordination meetings (DEP, water management district), stakeholder meetings, general technical support (evaluate data, determine endpoints for TMDLs, identify model runs and modifications). Personnel Titles (Amec Foster Wheeler) : Principal/Manager $245.06, Senior Program Manager, Program Manager $195.72, Associate Program Manager $175.22, Senior Project Manager $160.14, Project Manager $134.98, Administrative Assistant $59.52, Senior Engineer III $184.44, Senior Engineer II $147.27, Senior Engineer I $124.31, Engineer II $107.02, Engineer I $80.28, Senior Scientist III $148.81, Senior Scientist II $123.04, Senior Scientist I $104.22, Scientist II $99.48, Scientist I $81.11, Modeler II $171.71, Modeler I $111.90, GIS Specialist $84.46, Field Technician $54.67. Personnel Title (Tetra Tech): Principal/Manager $249.05, Senior Program Manager $221.95, Program Manager $189.85, Associate Program Manager $179.79, Senior Project Manager $152.94, Project Manager $132.02, Senior Engineer III $183.67, Senior Engineer II $147.46, Senior Engineer I $124.52, Engineer II $103.91, Engineer I $85.11, Senior Scientist III $145.38, Senior Scientist II $115.92, Senior Scientist I $100.45, Scientist II $90.83, Scientist I $71.22 Administrative Assistant $56.03, Senior Modeler $157.28, Junior Modeler $110.61, GIS Specialist $88.21. CO1: Time extension.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in executed task assignments and contract scope of services.
|
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task 20 -Deliverable (Task 1): Summary memorandum; update of subwatershed delienation, flow routing,...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 20 -Deliverable (Task 1): Summary memorandum; update of subwatershed delienation, flow routing, land use classifications; corrections of QA/QC issues; all model executable files; model applications; model input files; related time series files and database; GIS shapefiles; model documentation related to existign HSPF; information on canal flows and pump locations; available data for the watershed.Rates:Program Manager: $195.72
Admin Assistant: $59.52
Senior Program Manager: $221.95
Program Manager: $189.85
Project Manager: $132.02; Senior Project Manager: $160.14/hr
Senior Modeler: $157.28
Junior Modeler:$110.61
GIS Specialist: $88.21
Admin Assistant: $56.03
Subcontractor Handling Fee $1,909.00 (5%);
CO1: Time extension.
|
| Deliverable Price: $40,789.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in executed task assignments and contract scope of services.
|
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|
|
|
|
Environmental advisory services
|
Task 21, Deliverable (Task 1): Provide DEP initial hydrology calibration results; after DEP review c...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Task 21, Deliverable (Task 1): Provide DEP initial hydrology calibration results; after DEP review contractor will provide final hydrology calibration results and a memorandum summarizing resuts of water quality calibration. DEP will provide comments and contractor will address memorandum comments.
Rates:Program Manager: $195.72
Admin Assistant: $59.52
Senior Program Manager: $221.95
Program Manager: $189.85
Project Manager: $132.02
Senior Modeler: $157.28
Junior Modeler:$110.61
GIS Specialist: $88.21
Admin Assistant: $56.03
Subcontractor Handling Fee $1,546.00 (5%);
CO1: Time extension.
|
| Deliverable Price: $32,981.00 |
| Non Price Justification: |
| Performance Metrics: Deliverables reviewed to ensure compliance with specifications in executed task assignments and contract scope of services.
|
| Financial Consequences: No payment for unsatisfactory deliverables. Contract can be terminated for failure to perform.
|
| Source Documentation Page Reference: CO1 |
| Deliverable Number: |
|