| More |
Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
Information technology consultation services
|
Deliverable 1 - Contractor shall host a Project kick-off meeting in accordance with section 2.1.1.
|
Cost Reimbursement
|
| Major Deliverable: Deliverable 1 - Contractor shall host a Project kick-off meeting in accordance with section 2.1.1. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: At a minimum, Contractor must conduct a kick-off meeting in accordance with section 2.1.1, and as evidence provide DEO with the agenda, presentation materials, and meeting minutes as approved by DEO within 10 calendar days of Contract execution.
Completion of this deliverable is based on review and approval by DEO. |
| Financial Consequences: Failure to conduct the kick-off meeting and provide the agenda, presentation materials, and meeting meetings as approved by DEO within 10 calendar days of Contract execution shall result in a penalty of $500 per day for every business day beyond the due date. Such reduction shall be made from the deliverable payment. |
| Source Documentation Page Reference: Pg 66 |
| Deliverable Number: |
|
|
|
|
Information technology consultation services
|
Deliverable 2 - Contractor shall draft and submit a Project Management Plan in accordance with secti...
|
Cost Reimbursement
|
| Major Deliverable: Deliverable 2 - Contractor shall draft and submit a Project Management Plan in accordance with section 2.1.2.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: At a minimum, Contractor must submit to DEO a Project Management Plan in accordance with section 2.1.2 within 15 calendar days following Contract execution. Completion of this deliverable is based on review and approval by DEO. |
| Financial Consequences: Failure to provide the Project Management Plan as specified in section 2.1.2 within 15 calendar days of Contract execution shall result in a penalty of $1,000 per day for every business day beyond the due date. Such reduction shall be made from the deliverable payment. |
| Source Documentation Page Reference: Pg 66 - 67 |
| Deliverable Number: |
|
|
|
|
Information technology consultation services
|
Deliverable 3 - Contractor shall draft and submit a staffing plan in accordance with section 2.1.3.
|
Cost Reimbursement
|
| Major Deliverable: Deliverable 3 - Contractor shall draft and submit a staffing plan in accordance with section 2.1.3. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: At a minimum, Contractor shall submit a Staffing Plan in accordance with section 2.1.3 to DEO within 15 calendar days following Contract execution. Completion of this deliverable is based on review and approval by DEO. |
| Financial Consequences: Failure to provide a Staffing Plan as specified in section 2.1.3 within 15 calendar days of Contract execution shall result in a penalty of $500 per day for every business day beyond the due date. Such reduction shall be made from the deliverable payment. |
| Source Documentation Page Reference: Pg 67 |
| Deliverable Number: |
|
|
|
|
Information technology consultation services
|
Deliverable 4 - Contractor shall create and document the To-Be Technical Requirements necessary for ...
|
Cost Reimbursement
|
| Major Deliverable: Deliverable 4 - Contractor shall create and document the To-Be Technical Requirements necessary for the modernization efforts of the System, including the As-Is and To-Be Technical Requirements for the Modernization Projects in accordance with section 2.2. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: At a minimum, Contractor shall document the To-Be Technical Requirements in accordance with section 2.2 and submit the To-Be Technical Requirements to DEO no later than August 24, 2022. Completion of this deliverable is based on review and approval by DEO. |
| Financial Consequences: Failure to submit the To-Be Technical Requirements as specified in section 2.2. no later than August 24, 2022, shall result in a penalty of $1,000 per day for every business day beyond the due date. Such reduction shall be made from the deliverable payment. |
| Source Documentation Page Reference: Pg 67 |
| Deliverable Number: |
|
|
|
|
Information technology consultation services
|
Deliverable 5 - Contractor shall conduct on-site working sessions with subject matter experts, as id...
|
Cost Reimbursement
|
| Major Deliverable: Deliverable 5 - Contractor shall conduct on-site working sessions with subject matter experts, as identified by DEO, to discuss and evaluate the To-Be Technical Requirements in accordance with section 2.2.2.c. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: At a minimum, Contractor shall conduct working sessions with DEO subject matter experts to discuss and evaluate To-Be Technical Requirements in accordance with section 2.2.2.c. The working sessions shall be conducted no later than August 31, 2022. Completion of this deliverable is based on review and approval by DEO. |
| Financial Consequences: Failure to conduct the To-Be working sessions in accordance with section 2.2.2.c no later than August 31, 2022, shall result in a penalty of $1,000 per day for every business day beyond the due date. Such reduction shall be made from the deliverable payment. |
| Source Documentation Page Reference: Pg 67 |
| Deliverable Number: |
|
|
|
|
Information technology consultation services
|
Deliverable 6 - Contractor shall develop and provide DEO with a Final To-Be Report Phase 1a, which d...
|
Cost Reimbursement
|
| Major Deliverable: Deliverable 6 - Contractor shall develop and provide DEO with a Final To-Be Report Phase 1a, which details the “As Is” functional and nonfunctional business requirements and the To-Be Technical Requirements in accordance with section 2.2.2.f. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: At a minimum, Contractor shall provide and submit a Final To-Be Report Phase 1a to DEO in accordance with section 2.2.2.f by the due date specified in the approved Project Plan.
Completion of this deliverable is based on review and approval by DEO. |
| Financial Consequences: Failure to submit the Final To-Be Report Phase 1a in accordance with section 2.2.2.f by the due date specified in the approved Project Plan shall result in a penalty of $1,000 per day for every business day beyond the due date. Such reduction shall be made from the deliverable payment. |
| Source Documentation Page Reference: Pg 68 |
| Deliverable Number: |
|
|
|
|
Information technology consultation services
|
Deliverable 7 - Contractor shall define and document the technical functional and non-functional des...
|
Cost Reimbursement
|
| Major Deliverable: Deliverable 7 - Contractor shall define and document the technical functional and non-functional design specifications to provide a holistic view of the As-Is and To-Be System in accordance with section 2.3. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: At a minimum, Contractor shall prepare and submit a System Design Document to DEO in accordance with section 2.3 no later than March 7, 2023. Completion of this deliverable is based on review and approval by DEO. |
| Financial Consequences: Failure to submit the System Design Document in accordance with section 2.3 no later than March 7, 2023, shall result in a penalty of $500 per day for every business day beyond the due date. Such reduction shall be made from the deliverable payment. |
| Source Documentation Page Reference: Pg 68 |
| Deliverable Number: |
|
|
|
|
Information technology consultation services
|
Deliverable 8 - Contractor shall develop infrastructure performance requirements to ensure the netwo...
|
Cost Reimbursement
|
| Major Deliverable: Deliverable 8 - Contractor shall develop infrastructure performance requirements to ensure the network and System infrastructure is reliable, secure, and scalable to meet or exceed DEO’s expected demands for the modernized System and provide an Infrastructure Assessment Report in accordance with section 2.4. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: At a minimum, Contractor shall draft and submit the infrastructure performance requirements to DEO in accordance with section 2.4 no later than February 13, 2023. Completion of this deliverable is based on review and approval by DEO. |
| Financial Consequences: Failure to submit the infrastructure performance requirements in accordance with section 2.4 no later than February 13, 2023, shall result in a penalty of $500 per day for every business day beyond the due date. Such reduction shall be made from the deliverable payment. |
| Source Documentation Page Reference: Pg 68 |
| Deliverable Number: |
|
|
|
|
Information technology consultation services
|
Deliverable 9 - Contractor shall develop and submit to DEO a Requirements Management Plan in accorda...
|
Cost Reimbursement
|
| Major Deliverable: Deliverable 9 - Contractor shall develop and submit to DEO a Requirements Management Plan in accordance with section 2.5. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: At a minimum, Contractor shall submit a Requirements Management Plan to DEO in accordance with section 2.5.3. and the due date specified in the approved Project Plan.
Completion of this deliverable is based on review and approval by DEO. |
| Financial Consequences: Failure to submit the Requirements Management Plan in accordance with section 2.5.3. by the due date specified in the approved Project Plan shall result in a penalty of $500 per day for every business day beyond the due date. Such reduction shall be made from the deliverable payment. |
| Source Documentation Page Reference: Pg 68 - 69 |
| Deliverable Number: |
|
|
|
|
Information technology consultation services
|
Deliverable 10 - Contractor shall identify, recommend, and document the methodology for the Architec...
|
Cost Reimbursement
|
| Major Deliverable: Deliverable 10 - Contractor shall identify, recommend, and document the methodology for the Architectural Standards as well as define, describe, and document the Architectural Standards in accordance with section 2.6.2. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: At a minimum, Contractor shall, no later than October 17, 2022, submit to DEO an Architectural Standards for Overall System Modernization in accordance with sections 2.6.2. The document shall include but is not limited to:
• Defined architecture and technical methodology
• Architecture Definition Document for each building block • Define the Enterprise Management
• Define the Enterprise Architecture
• Architecture standards
• Architecture diagram products (models, diagrams and artifacts) as needed for stakeholder requirements. Completion of this deliverable is based on review and approval by DEO. |
| Financial Consequences: Failure to submit the Architectural Standards for Overall System Modernization in accordance with section 2.6.2, as specified, no later than October 17, 2022, shall result in a penalty of $500 per day for every business day beyond the due date. Such reduction shall be made from the deliverable payment. |
| Source Documentation Page Reference: Pg 69 |
| Deliverable Number: |
|
|
|
|
Information technology consultation services
|
Deliverable 11 - Contractor shall define optimal performance benchmarks by which technology integrat...
|
Cost Reimbursement
|
| Major Deliverable: Deliverable 11 - Contractor shall define optimal performance benchmarks by which technology integration for the Modernization Projects will be measured and accepted in accordance with section 2.7.2. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: At a minimum, Contractor shall submit the optimal performance benchmarks for how the technology integration for the Modernization Projects will be measured and accepted and define and document phase gates in accordance with section 2.7.2. The optimal performance benchmarks and phase gates shall by submitted to DEO no later than February 20, 2023.
Completion of this deliverable is based on review and approval by DEO. |
| Financial Consequences: Failure to submit the optimal performance benchmarks, as specified, no later than February 20, 2023, shall result in a penalty of $500 per day for every business day beyond the due date. Such reduction shall be made from the deliverable payment. Failure to submit the phase gates, as specified, no later than February 20, 2023, shall result in a penalty of $500 per day for every business day beyond the due date. Such reduction shall be made from the deliverable payment. |
| Source Documentation Page Reference: Pg 69-70 |
| Deliverable Number: |
|
|
|
|
Information technology consultation services
|
Deliverable 12 - Contractor shall document and define the architecture change control and approval p...
|
Cost Reimbursement
|
| Major Deliverable: Deliverable 12 - Contractor shall document and define the architecture change control and approval processes in accordance with sections 2.6.1 and 2.7.4. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: At a minimum, Contractor shall document and submit to DEO the architecture change control and approval process in accordance with sections 2.6.1 and 2.7.4. The architecture change control and approval process must be submitted to DEO no later than December 7, 2022. Completion of this deliverable is based on review and approval by DEO. |
| Financial Consequences: Failure to submit the architecture change control and approval process, as specified, no later than December 7, 2022, shall result in a penalty of $500 per day for every business day beyond the due date. Such reduction shall be made from the deliverable payment. |
| Source Documentation Page Reference: Pg 70 |
| Deliverable Number: |
|
|
|
|
Information technology consultation services
|
Deliverable 13 - Contractor shall oversee and monitor the integration of the Modernization Projects ...
|
Cost Reimbursement
|
| Major Deliverable: Deliverable 13 - Contractor shall oversee and monitor the integration of the Modernization Projects in accordance with section 2.7.5 and 2.7.8.
Monthly invoicing not to exceed $119,009.64 for services rendered under this Deliverable between December 1, 2022, and May 31, 2023. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: At a minimum, Contractor shall conduct bi-weekly architectural reviews with Modernization Project vendors during the design and development of each Modernization Project. Contractor shall provide DEO with status reports that summarize the bi-weekly architectural reviews. The biweekly reports are due the 15th day of each month and the last day of each month during the Contract term.
In addition to the status reports, Contractor shall provide DEO with the meeting minutes for each architectural review meeting within 48 hours of when the meeting is held. Contractor shall submit the test results received in accordance with section 2.7.5.a.iii for each Modernization Project to DEO within 72 hours of test completion.
Contractor shall also submit any risks to the Risk Register with 24 hours of determination in accordance with section 2.7.8. Completion of this deliverable is based on review and approval by DEO.
Final payment of $238,019.28 shall be payable at the completion of this Deliverable based on review and approval by DEO. |
| Financial Consequences: Failure to provide bi-weekly status reports by the due dates specified shall result in a penalty of $500 per business day for every business day beyond the due date. Such reduction shall be made from the deliverable payment. Failure to provide the architectural review meetings minutes by the due date specified shall result in a penalty of $500 per business day for every business day beyond the due date. Such reduction shall be made from the deliverable payment. Failure to submit the tests results received in accordance with section 2.7.5.a.iii within 72 hours of test completion shall result in a penalty of $500 for every business day beyond the due date. Such reduction shall be made from the deliverable payment. Failure to update the Risk Register within 24 hours of determination shall result in a penalty of $500 for every business day beyond the due date. Such reduction shall be made from the deliverable payment. |
| Source Documentation Page Reference: Pg 70 - 71 |
| Deliverable Number: |
|
|
|
|
Information technology consultation services
|
Deliverable 14 - Contractor shall conduct integration testing for each Modernization Project in acco...
|
Cost Reimbursement
|
| Major Deliverable: Deliverable 14 - Contractor shall conduct integration testing for each Modernization Project in accordance with section 2.7.6. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: At a minimum, Contractor shall conduct integration testing for each Modernization Project to ensure each Modernization Project is integrated successfully with the System, applications, interfaces, and other systems that exchange information with the Reemployment Assistance Program in accordance with section 2.7.6. As evidence of completion, Contractor shall submit to DEO all test results for each Modernization Project in accordance with section 2.7.6.j within 48 hours of test completion, but no later than May 31, 2023. Completion of this deliverable is based on review and approval by DEO. |
| Financial Consequences: Failure to conduct integration testing in accordance with section 2.7.6 for any Modernization Project, and to submit to DEO all test results no later than May 31, 2023, shall result in non-payment for this deliverable, and Contractor shall be assessed a financial penalty of 10% of the entire Contract amount for each Modernization Project not tested. Failure to provide DEO with the test results for each Modernization Project within 48 hours of test completion shall result in a penalty of $500 per business day for every business day beyond the due date. |
| Source Documentation Page Reference: Pg 71 |
| Deliverable Number: |
|
|
|
|
Information technology consultation services
|
Deliverable 15 - Contractor shall ensure integration of all Modernization Projects in accordance wit...
|
Cost Reimbursement
|
| Major Deliverable: Deliverable 15 - Contractor shall ensure integration of all Modernization Projects in accordance with section 2.7.7. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: At a minimum, Contractor shall successfully integrate all applications, systems, interfaces, and Modernization Projects, as applicable, with the System in accordance with section 2.7.7 no later than June 7, 2023. As evidence of completion, Contractor shall submit to DEO Production Readiness test results for each Modernization Project in accordance with section 2.7.7.c within 48 hours of test completion. Completion of this deliverable is based on review and approval by DEO. |
| Financial Consequences: Failure to successfully integrate in accordance with section 2.7.7 no later than June 7, 2023, for any Modernization Project shall result in non-payment for this deliverable, and Contractor shall be assessed a financial penalty of 10% of the entire Contract amount for each Modernization Project not successfully integrated. Failure to provide DEO with the test results for each Modernization Project within 48 hours of test completion shall result in a penalty of $500 per business day for every business day beyond the due date. |
| Source Documentation Page Reference: Pg 71 - 72 |
| Deliverable Number: |
|
|
|
|
Information technology consultation services
|
Deliverable 16 - Contractor shall provide DEO with recommendations for the technology selection for ...
|
Cost Reimbursement
|
| Major Deliverable: Deliverable 16 - Contractor shall provide DEO with recommendations for the technology selection for CX/UX, SOA/API layer, rules engine, and master data management projects in accordance with the architectural standards identified in section 2.8.2. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: At a minimum, Contractor shall provide a minimum of three (3) technology recommendations for CX/UX, SOA/API layer, rules engine, and master data management in accordance with section 2.8.2. The recommendations shall be submitted no later than October 19, 2022. Completion of this deliverable is based on review and approval by DEO. |
| Financial Consequences: Failure to provide a minimum of three technology recommendations in accordance with section 2.8.2 no later than October 19, 2022, shall result in a penalty of $500 per business day for every business day beyond the due date. |
| Source Documentation Page Reference: Pg 72 |
| Deliverable Number: |
|
|
|
|
Information technology consultation services
|
Deliverable 17 - Contractor shall draft the scopes of work and deliverables for modernization procur...
|
Cost Reimbursement
|
| Major Deliverable: Deliverable 17 - Contractor shall draft the scopes of work and deliverables for modernization procurements and assist in evaluating procurement responses in accordance with sections 2.8.4 and 2.8.6. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: At a minimum, Contractor shall draft and submit to DEO the scopes of work and deliverables for the procurements for CX/UX, SOA/API layer, rules engine, and master data management projects in accordance with section 2.8.4, as specified, no later than January 31, 2023. Contractor shall also assist in evaluating procurement responses in accordance with section 2.8.6. Completion of this deliverable is based on review and approval by DEO. |
| Financial Consequences: Failure to submit the scopes of work and deliverables for the procurements for CX/UX, SOA/API layer, rules engine, and master data management projects in accordance with section 2.8.4 no later than January 31, 2023, shall result in a penalty of $1,000 per business day for every business day beyond the due date. Failure to assist in evaluating procurement responses in accordance with section 2.8.6 shall result in a financial penalty of 5% of the entire Contract amount. |
| Source Documentation Page Reference: Pg 72 |
| Deliverable Number: |
|
|
|
|
Information technology consultation services
|
Deliverable 18 - Contractor shall develop a Transition Plan in accordance with section 2.9.3.
|
Cost Reimbursement
|
| Major Deliverable: Deliverable 18 - Contractor shall develop a Transition Plan in accordance with section 2.9.3. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: At a minimum, Contractor shall draft and submit a Transition Plan in accordance with section 2.9.3 to DEO for review and approval no later than October 13, 2022. Completion of this deliverable is based on review and approval by DEO. |
| Financial Consequences: Failure to provide the Transition Plan no later than October 13, 2022, shall result in a penalty of $500 per business day for every business day beyond the due date. Such reduction shall be made from the deliverable payment. |
| Source Documentation Page Reference: Pg 72 - 73 |
| Deliverable Number: |
|
|
|
|
Information technology consultation services
|
Deliverable 19 - Contractor shall provide an Enterprise Architecture Tool in accordance with section...
|
Cost Reimbursement
|
| Major Deliverable: Deliverable 19 - Contractor shall provide an Enterprise Architecture Tool in accordance with section 2.6.3. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: At a minimum, Contractor shall provide an Enterprise Architecture Tool in accordance with section 2.6.3 by the due date specified in the approved Project Management Plan.
Completion of this deliverable is based on review and approval by DEO. |
| Financial Consequences: Failure to provide the Enterprise Architecture Tool in accordance with section 2.6.3 by the due date specified in the approved Project Management Plan shall result in a penalty of $500 per day for every business day beyond the due date. Such reduction shall be made from the deliverable payment. |
| Source Documentation Page Reference: A3 Pg 8 |
| Deliverable Number: |
|
|
|
20
|
Information technology consultation services
|
Contractor shall provide a Testing Manager and four (4) testing resources in accordance with section...
|
Cost Reimbursement
|
| Major Deliverable: Contractor shall provide a Testing Manager and four (4) testing resources in accordance with section 2.7.9. Invoicing shall be as follows for services rendered under this deliverable: Monthly invoicing not to exceed $510,814.50 between October 1, 2023, and November 30, 2023. Monthly invoicing not to exceed $145, 947.00 from December 1, 2023, through April 9, 2024. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: At a minimum, Contractor shall provide a Testing Manager and four (4) testing resources in accordance with section 2.7.9 by the due date specified in the approved Project Management Plan. Contractor shall submit to Commerce a monthly summary of testing activities along with monthly metrics and year-to-date totals in accordance with section 2.7.9.l. within 48 hours of month-end completion. Completion of this deliverable is based on review and approval by Commerce. |
| Financial Consequences: Failure to provide a Testing Manager and four (4) testing resources in accordance with section 2.7.9 by the due date specified in the approved Project Management Plan shall result in a deduction of $500 per day for every business day beyond the due date. Failure to provide monthly summaries of testing activities along with monthly metrics and year-to-date totals in accordance with section 2.7.9.l. by the due date specified in the approved Project Management Plan shall result in a deduction of $500 per business day for every business day beyond the due date. Such deductions shall be made from the deliverable payment.
Deliverable 20 Amount Not to Exceed: $1,751,364.00 |
| Source Documentation Page Reference: A4 Pg 2-3 |
| Deliverable Number: 20 |
|
|
|
21
|
Information technology consultation services
|
Deliverable 21 - Contractor shall provide support to Commerce by identifying and managing informatio...
|
Cost Reimbursement
|
| Major Deliverable: Deliverable 21 - Contractor shall provide support to Commerce by identifying and managing information security and regulatory compliance matters in accordance with section 2.7.10.
Invoicing shall be as follows for services rendered under this deliverable: Monthly invoices not to exceed $142,603.00 for August 2023. Monthly invoicing not to exceed $207,962.75 between October 1, 2023, and November 30, 2023. Monthly invoice not to exceed $59,417.90 from December 1, 2023, through April 9, 2024. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: At a minimum, Contractor shall provide support to Commerce by identifying and managing information security and regulatory compliance matters in accordance with section 2.7.10 by the due date specified in the approved Project Management Plan.
Contractor shall submit to Commerce a monthly summary of information security and compliance matters within 48 hours of month-end completion.
Completion of this deliverable is based on review and approval by Commerce. |
| Financial Consequences: Failure to provide support in identifying and managing information security and regulatory compliance matters in accordance with section 2.7.10 by the due date specified in the approved Project Management Plan and the monthly summaries by the due date specified herein shall result in a penalty of $500 per day for every business day beyond the due date. Such reduction shall be made from the deliverable payment.
Deliverable 21 Amount Not to Exceed: $855,618.00 |
| Source Documentation Page Reference: A4 Pg 3 |
| Deliverable Number: 21 |
|
|
|
22
|
Information technology consultation services
|
Deliverable 22 - Contractor shall provide business strategy development in accordance with section 2...
|
Cost Reimbursement
|
| Major Deliverable: Deliverable 22 - Contractor shall provide business strategy development in accordance with section 2.7.11.
Invoicing shall be as follows for services rendered under this deliverable: Monthly invoicing not to exceed $89,545.00 for July 2023. Monthly invoicing not to exceed $31,980.35 between October 1, 2023, and November 30, 2023. Monthly invoice not to exceed $76,752.86 from December 1, 2023, through April 9, 2024. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: At a minimum, Contractor shall provide business strategy development in accordance with section 2.7.11 by the due date specified in the approved Project Management Plan. Contractor shall submit to Commerce a monthly summary of business strategy development ideas within 48 hours of month-end completion. Completion of this deliverable is based on review and approval by Commerce |
| Financial Consequences: Failure to provide business strategy development in accordance with section 2.7.11 by the due date specified in the approved Project Management Plan and the monthly summaries by the due date specified herein shall result in a deduction of $500 per day for every business day beyond the due date. Such reduction shall be made from the deliverable payment.
Deliverable 22 Amount Not to Exceed: $537,270.00 |
| Source Documentation Page Reference: A4 Pg 3 - 4 |
| Deliverable Number: 22 |
|